The following information is for X Company for 2014: 1. What was the 2014 master (static) budget for total costs? 2. What was the 2014 flexible budget for total costs? Solution 1. A static budget is a budget that does not change as volume changes. Thus, $197,900 is the static budget. 2. A flexible budget is a budget that changes as volume changes. Thus, $110,000 is the flexible budget. .