Ahmed Elyamany, PhD
October 31/November 3, 2010
•   •
•   •
•   •
•   •
•   •
•   •
•
   Write a short report (not less than 800 words) in
    one of the following topics:
    ◦   Egyptian Contractors Union
    ◦   Contractor prequalification
    ◦   Qualifications of Project Manager
    ◦   Software used in Estimating
   The report should include:
    ◦ Cover Page- Introduction- Discussion- Conclusion-
      References
   The evaluation criteria are:
    ◦ Organization 25%
    ◦ Discussion 50%
    ◦ References 25%.
 By the end of this lecture, you will:
1. Define the meaning and steps of Estimating.
2. Differentiate between Estimation and
   Calculation.
3. Estimate the cost of different construction
   activities.
4. Define the Method Statement.
5. Prepare a Method Statement for different
   construction items.


                                                 4
Definition:
 To judge approximately the value or produce the
  approximately cost of project.

Process:
 Planning and scheduling the estimate
 Project study - Collection of cost information and
  rates
 Preparation of method statement
 Assessing output of selected resources
 Calculation of the direct cost of each item
 Calculation of the site overhead
 Estimator report
Planning and scheduling the estimate




Project study                    Collection of cost information    Calculation of rates
                         -                                        - all-in labor rate
                                                              -
                         -                                   -    - all-in plant rate
                         -                                        - material cost
                                                             -
                         -                                        - sub-contractor cost
                          -

                             Preparation of method statement


            Assessing output of selected resources and elapsed time of resources


                         Calculation of the direct cost of each item


                                Calculation of the site overhead


                                    Estimator report













   Drawings
   Specifications
   Contract conditions
   Meeting with the owner and architect
   Site visit
   General description.
   Soil.
   Topography.
   Transportations.
   Utilities.
   Labors.
   Safety arrangements.
   Temporary buildings.
   Neighbors.
   Collection of cost information:
    ◦ Daily cost of labor.
    ◦ Daily cost of equipment.
    ◦ Cost of materials.

   Calculation of rates:
    ◦   All-in labor rate
    ◦   All-in plant rate
    ◦   Material cost
    ◦   Sub-contractor
   All-in labor rate (LE/day) =


                                       




      +        )–                      
                    (         +    +
   All-in plant rate (LE/day) =



                                           


    +       +       )–                     
                                   (   +
   A statement of the construction methods and
    resources to be employed in executing
    construction work. This statement is normally
    closely linked to the tender program

   Major factors in planning a method statement :
    ◦   Cost
    ◦   Time
    ◦   Resource availability
    ◦   Quality
    ◦   Health, Safety, and Environment
Alternative methods of construction
                     Alternative Sequence of work
                   Alternative rates of construction
                         Alternative site layout


                   Preferred method of construction


                   Pre-tender construction program



 Sequence of        Duration of       Duration of       Labor & plant
main activities    main activities   overall project      required
   Qualitative sequential screening for Alternative
    methods
Alternative methods   Acceptable to   Feasible   Adequate   Safety
                       consultant?                quality
Plywood                 √               √          √         √
Rough-swan              √               √          √         √
Steel                   √
Brick                   √               √          √
Corrugated iron
Corrugated asbestos     √               √          √          √
Trench sides
   Cost and time comparison for 3 shuttering
    methods that pass the previous screening process
     Cost / unit of shutter     plywood     Swan board   Asbestos
Material cost (LE)                 20          4           3
Off-site making cost (LE)
                             +     19          --          --
                             -
Residual value (LE)                4           --          --
Number of uses
                             /     10          3           1

On-site making cost (LE/use) +     8           9.5         10
                              {(20+19-4)/10} (4/3)+9.5    3+10
Total cost / use (LE/use)
                                +8 =11.5      =10.83       =13

   Methods of Estimating
    ◦ Unit method
                             

    ◦ Space method
                             

    ◦ Element method
                             

    ◦ Spot method
                             

    ◦ Detailed cost method
                             
   Detailed cost method
      Unit rate method



      Operational method
   Quantity of Plain concrete = 1080 m3
   1 m3 of P.C. consists of (250 kg cement + 0.8 m3 gravel +
    0.4 m3 sand)
   Vendor price of 1 m3 of P.C. =250 LE / m3
   Estimate Item price for plain concrete
Equipment crew
No.   Equipment          Production rate     All - in rate
1     Pump               30 m3/hr            650 LE/day
3     Truck mixer        9 m3/hr/one         520 LE/day/one
2     Vibrator           -------             150 LE/day/one

    Labor crew
                        No.                  All – in rate
    Foreman             1                    90 LE/day
    Laborer             5                    55 LE/day/one
Material cost
Assume allowable for (Handling + wastage + price
 increase + discount) = 22 %
Cost of 1 m3 of PC = 250 x 1.22 = 305 LE/m3
Material cost = 1080 x 305 = 329,400 LE

Labor cost
Labor crew cost / day = 1 x 90 + 5 x 55 =365 LE/day
Production rate = 30 OR 3 x 9 = 27 Choose 27 m3/hr
Duration = 1080 27 = 40 hr
Assume: one day = 8 hr
Duration = 40      8 = 5 days
Labor cost = 5days x 365 LE/day = 1,825 LE
Equipment cost
Equipment crew cost = 650 +3 x 520 + 2 x 150
                      = 2,510 LE/day
Duration = 5 days
Equipment cost = 5days x 2,510 LE/day = 12,550 LE
Item cost
Total item cost =329,400 +1,825 +12,550 =343,775
Assume price factor = 1.25
Item price = 343,775 x 1.25 = 429,718.75 LE
Item unit price = 429,718.75 LE  1080 m3
                = 397.89 LE/m3
Definition :
 A sum of money to cover costs which are
  forecasted but are difficult or impossible to
  identify when proposing.
Example
 If you know that site overheads = 10% direct cost
                 and mark-up = 15% construction cost

Calculate :
1) Total direct cost, construction cost, tender price, and unit
  price of each item for the project assuming no contingency is
  added to the total cost estimate

2) The amount of contingency to be added to the total
  construction cost estimate using the expected net risk
  analysis method

3) The final cost estimate and final tender price assuming
  uniform distribution of contingency
Direct cost                Maximum       %
No.          Item     Unit Quantity
                                                                              cost    probability
                                      Material Equipment   labor    S/C

1     LEFT ABUTMENT   m3     120      9,000     3,000      4,000     -      19,000       14%

2     CENTER PIER     m3     100      7,000      200       1,000     -      10,000       12%

3     RIGHT ABUTMENT m3      120      9,000     4,000      2,000     -      19,000       19%

4     DECK            m3     140      12,000    3,500      1,500     -      20,000       13%

5     PRE-CAST SPAN   m3     job        -         -            -   10,000   12,000        6%

6     FINISHES        m3     job        -         -            -   50,000   60,000       12%
Solution:
Construction cost = direct cost * 1.10
Tender price       = construction cost * 1.15
                   = 1.10 * 1.15 * direct cost
1) tender price = 1.265 D.C.
                                                          X 1.1             X 1.15
   total direct cost       = 116,200
   construction cost       = 127,820                         case 1
   tender price            = 146,993               Direct    construction       item
                                          No.
                                                   cost            cost         price
                                           1      16,000          17,600       20,240
                                           2       8,200           9,020       10,373
                                           3      15,000          16,500       18,975
                                           4      17,000          18,700       21,505
                                           5      10,000          11,000       12,650
                                           6      50,000          55,000       63,250
                                         Totals   116,200         127,820      146,993
Contingency calculation

                    -
         construction
         construction
                          max
                          max
                                     x case 2
                                  max.
                                  max.
                                       case 2
                                            %
                                            %
                                                  net
                                                   net
                                                            expected     final item
No.
No.          cost         cost     risk   prob.   risk        Cost         price
             cost         cost     risk   prob.   risk
 1         17,600       19,000    1,400    14%    196      17,822.73    20,496.14
 1         17,600        19,000   1,400    14%    196
 2          9,020       10,000    980     12%     117.6     9,134.15    10,504.27

 3         16,500       19,000    2,500   19%      475     16,708.81    19,215.13

 4         18,700       20,000    1,300   13%      169     18,936.65    21,777.15
 5         11,000       12,000    1,000    6%      60      11,139.21    12,810.09
 6         55,000       60,000    5,000   12%      600     55,696.03    64,050.43
 Total    127,820                                 1617.6   129,437.56   148,853.20

From the table above
amount of contingency to be added = 1617.6
contingency as % of total construction cost = (1617.6/127,820)*100 = 1.265 %
Total cost with contingency = 127,820 * 1.012655      = 129,437.56
Tender price with contingency = 129,437.56 * 1.15 = 148,53.2
Q1-Select the best answer for each of the following sentences:

1. The invitation to bidding should include:
    A)Drawings. B)Specifications. C)Initial and final bond. D)Bill of Quantity

2. In a certain highway project, the contractor decided to add site
  overhead equal to 15% of direct cost, general overhead equal to
  5% of construction cost, and profit & risk equal to 5% of net cost.
  The price factor should equal:
    A)1.25      B) 1.0    C) 1.2678          D)25%

3.The Profit & Risk is added to the project cost by the:
    A)Estimator. B)Owner. C)Architect/Engineer. D)Senior manager.

4.The supplementary conditions may include:
    A)Project duration. B)Payment system. C)Claims and change orders
      system. D)All the above.

5. Contract documents do not include:
    A)Drawings. B)Priced Bill of Quantity. C)Letter of offer. D)Contract
      conditions.
Questions?



             28

Más contenido relacionado

Destacado

Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16
Luisa Klein
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
J.j. Hayashi
 
Construction activities and Process
Construction activities and ProcessConstruction activities and Process
Construction activities and Process
Ibrahim Adhnan
 
Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
rajensen00
 
Hotel Design
Hotel DesignHotel Design
Hotel Design
lbridge89
 

Destacado (19)

Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16Hotel Construction Report GLOBAL_February16
Hotel Construction Report GLOBAL_February16
 
Construction Activities and Process
Construction Activities and ProcessConstruction Activities and Process
Construction Activities and Process
 
1. productivity concept and calculation.
1. productivity concept and calculation.1. productivity concept and calculation.
1. productivity concept and calculation.
 
Construction activities and Process
Construction activities and ProcessConstruction activities and Process
Construction activities and Process
 
Critical Path Ppt
Critical Path PptCritical Path Ppt
Critical Path Ppt
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...
 
Hotel Development - From Concept To Construction
Hotel Development - From Concept To ConstructionHotel Development - From Concept To Construction
Hotel Development - From Concept To Construction
 
Portman Hotel Case Study Analysis
Portman Hotel Case Study AnalysisPortman Hotel Case Study Analysis
Portman Hotel Case Study Analysis
 
5 Star Hotel Project
5 Star Hotel Project5 Star Hotel Project
5 Star Hotel Project
 
Construction process
Construction processConstruction process
Construction process
 
Data collection of five star hotel
Data collection of five star hotelData collection of five star hotel
Data collection of five star hotel
 
HOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNEHOTEL CASESTUDY - HYATT REGENCY, PUNE
HOTEL CASESTUDY - HYATT REGENCY, PUNE
 
Case study - Hotel Silicrest
Case study - Hotel SilicrestCase study - Hotel Silicrest
Case study - Hotel Silicrest
 
Case Study -Hotel design
Case Study -Hotel designCase Study -Hotel design
Case Study -Hotel design
 
Hotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis BookHotel Design - Midpoint Thesis Book
Hotel Design - Midpoint Thesis Book
 
Project Construction of 5 star hotel
Project Construction of 5 star hotelProject Construction of 5 star hotel
Project Construction of 5 star hotel
 
Hotel Design
Hotel DesignHotel Design
Hotel Design
 
Project network scheduling and S-curve
Project network scheduling and S-curve Project network scheduling and S-curve
Project network scheduling and S-curve
 

Similar a 3.estimating

Analyis of Rate MODULE VI October 2022.pptx
Analyis of Rate  MODULE VI October 2022.pptxAnalyis of Rate  MODULE VI October 2022.pptx
Analyis of Rate MODULE VI October 2022.pptx
rekhat26
 
Lecture -Price Breakdown and cost Estimation (1).pdf
Lecture -Price Breakdown and cost Estimation (1).pdfLecture -Price Breakdown and cost Estimation (1).pdf
Lecture -Price Breakdown and cost Estimation (1).pdf
RHesham1
 

Similar a 3.estimating (20)

Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh
 
Rate analysis vansheika
Rate analysis   vansheikaRate analysis   vansheika
Rate analysis vansheika
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
Drilling Engineering - Drilling Economics
Drilling Engineering - Drilling EconomicsDrilling Engineering - Drilling Economics
Drilling Engineering - Drilling Economics
 
Analyis of Rate MODULE VI October 2022.pptx
Analyis of Rate  MODULE VI October 2022.pptxAnalyis of Rate  MODULE VI October 2022.pptx
Analyis of Rate MODULE VI October 2022.pptx
 
_VIP_Cost Management -20-10-2018.pdf
_VIP_Cost Management -20-10-2018.pdf_VIP_Cost Management -20-10-2018.pdf
_VIP_Cost Management -20-10-2018.pdf
 
COST ANALYSIS (Brief overview)
COST ANALYSIS (Brief overview)COST ANALYSIS (Brief overview)
COST ANALYSIS (Brief overview)
 
Chapter 7 capital cost estimation
Chapter 7 capital cost estimationChapter 7 capital cost estimation
Chapter 7 capital cost estimation
 
project costs
project costsproject costs
project costs
 
Presentation Bldg 7871 Project Final Version
Presentation Bldg 7871 Project  Final VersionPresentation Bldg 7871 Project  Final Version
Presentation Bldg 7871 Project Final Version
 
Chapter 5
Chapter 5Chapter 5
Chapter 5
 
Drilling economics drilling engineering
Drilling economics drilling engineeringDrilling economics drilling engineering
Drilling economics drilling engineering
 
Notes on Estimation.ppt
Notes on Estimation.pptNotes on Estimation.ppt
Notes on Estimation.ppt
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
U1 p2 breakeven analysis
U1 p2 breakeven analysisU1 p2 breakeven analysis
U1 p2 breakeven analysis
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATION
 
PPCE UNIT- 3.pptx
PPCE UNIT- 3.pptxPPCE UNIT- 3.pptx
PPCE UNIT- 3.pptx
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATION
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Lecture -Price Breakdown and cost Estimation (1).pdf
Lecture -Price Breakdown and cost Estimation (1).pdfLecture -Price Breakdown and cost Estimation (1).pdf
Lecture -Price Breakdown and cost Estimation (1).pdf
 

Más de Tu Nguyen, PMP®,PMI-RMP®

Más de Tu Nguyen, PMP®,PMI-RMP® (20)

4.contracting
4.contracting4.contracting
4.contracting
 
1.introduction
1.introduction1.introduction
1.introduction
 
Session 8 gdas pmp study group presentation
Session 8   gdas pmp study group presentationSession 8   gdas pmp study group presentation
Session 8 gdas pmp study group presentation
 
Session 7 gdas pmp study group presentation
Session 7   gdas pmp study group presentationSession 7   gdas pmp study group presentation
Session 7 gdas pmp study group presentation
 
Session 6 gdas pmp study group presentation
Session 6   gdas pmp study group presentationSession 6   gdas pmp study group presentation
Session 6 gdas pmp study group presentation
 
Session 5 gdas pmp study group presentation
Session 5   gdas pmp study group presentationSession 5   gdas pmp study group presentation
Session 5 gdas pmp study group presentation
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 
Session 10 gdas pmp study group presentation
Session 10   gdas pmp study group presentationSession 10   gdas pmp study group presentation
Session 10 gdas pmp study group presentation
 
Session 3 gdas pmp study group presentation
Session 3   gdas pmp study group presentationSession 3   gdas pmp study group presentation
Session 3 gdas pmp study group presentation
 
Session 2 gdas pmp study group presentation
Session 2   gdas pmp study group presentationSession 2   gdas pmp study group presentation
Session 2 gdas pmp study group presentation
 
Node
NodeNode
Node
 
Contract
ContractContract
Contract
 
Cash flow
Cash flowCash flow
Cash flow
 
Bar chart
Bar chartBar chart
Bar chart
 
Arrow computation
Arrow computationArrow computation
Arrow computation
 
Arrow
ArrowArrow
Arrow
 
Administration
AdministrationAdministration
Administration
 
Time cost-trade-off
Time cost-trade-offTime cost-trade-off
Time cost-trade-off
 
Time cost-control
Time cost-controlTime cost-control
Time cost-control
 
Resources
ResourcesResources
Resources
 

Último

Último (20)

Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 

3.estimating

  • 1. Ahmed Elyamany, PhD October 31/November 3, 2010
  • 2. • • • • • • • • • • • •
  • 3. Write a short report (not less than 800 words) in one of the following topics: ◦ Egyptian Contractors Union ◦ Contractor prequalification ◦ Qualifications of Project Manager ◦ Software used in Estimating  The report should include: ◦ Cover Page- Introduction- Discussion- Conclusion- References  The evaluation criteria are: ◦ Organization 25% ◦ Discussion 50% ◦ References 25%.
  • 4.  By the end of this lecture, you will: 1. Define the meaning and steps of Estimating. 2. Differentiate between Estimation and Calculation. 3. Estimate the cost of different construction activities. 4. Define the Method Statement. 5. Prepare a Method Statement for different construction items. 4
  • 5. Definition:  To judge approximately the value or produce the approximately cost of project. Process:  Planning and scheduling the estimate  Project study - Collection of cost information and rates  Preparation of method statement  Assessing output of selected resources  Calculation of the direct cost of each item  Calculation of the site overhead  Estimator report
  • 6. Planning and scheduling the estimate Project study Collection of cost information Calculation of rates - - all-in labor rate - - - - all-in plant rate - - material cost - - - sub-contractor cost - Preparation of method statement Assessing output of selected resources and elapsed time of resources Calculation of the direct cost of each item Calculation of the site overhead Estimator report
  • 8. Drawings  Specifications  Contract conditions  Meeting with the owner and architect  Site visit
  • 9. General description.  Soil.  Topography.  Transportations.  Utilities.  Labors.  Safety arrangements.  Temporary buildings.  Neighbors.
  • 10. Collection of cost information: ◦ Daily cost of labor. ◦ Daily cost of equipment. ◦ Cost of materials.  Calculation of rates: ◦ All-in labor rate ◦ All-in plant rate ◦ Material cost ◦ Sub-contractor
  • 11. All-in labor rate (LE/day) =  + )–  ( + +
  • 12. All-in plant rate (LE/day) =  + + )–  ( +
  • 13. A statement of the construction methods and resources to be employed in executing construction work. This statement is normally closely linked to the tender program  Major factors in planning a method statement : ◦ Cost ◦ Time ◦ Resource availability ◦ Quality ◦ Health, Safety, and Environment
  • 14. Alternative methods of construction Alternative Sequence of work Alternative rates of construction Alternative site layout Preferred method of construction Pre-tender construction program Sequence of Duration of Duration of Labor & plant main activities main activities overall project required
  • 15. Qualitative sequential screening for Alternative methods Alternative methods Acceptable to Feasible Adequate Safety consultant? quality Plywood √ √ √ √ Rough-swan √ √ √ √ Steel √ Brick √ √ √ Corrugated iron Corrugated asbestos √ √ √ √ Trench sides
  • 16. Cost and time comparison for 3 shuttering methods that pass the previous screening process Cost / unit of shutter plywood Swan board Asbestos Material cost (LE) 20 4 3 Off-site making cost (LE) + 19 -- -- - Residual value (LE) 4 -- -- Number of uses / 10 3 1 On-site making cost (LE/use) + 8 9.5 10 {(20+19-4)/10} (4/3)+9.5 3+10 Total cost / use (LE/use) +8 =11.5 =10.83 =13
  • 17.   Methods of Estimating ◦ Unit method  ◦ Space method  ◦ Element method  ◦ Spot method  ◦ Detailed cost method 
  • 18. Detailed cost method  Unit rate method  Operational method
  • 19. Quantity of Plain concrete = 1080 m3  1 m3 of P.C. consists of (250 kg cement + 0.8 m3 gravel + 0.4 m3 sand)  Vendor price of 1 m3 of P.C. =250 LE / m3  Estimate Item price for plain concrete Equipment crew No. Equipment Production rate All - in rate 1 Pump 30 m3/hr 650 LE/day 3 Truck mixer 9 m3/hr/one 520 LE/day/one 2 Vibrator ------- 150 LE/day/one Labor crew No. All – in rate Foreman 1 90 LE/day Laborer 5 55 LE/day/one
  • 20. Material cost Assume allowable for (Handling + wastage + price increase + discount) = 22 % Cost of 1 m3 of PC = 250 x 1.22 = 305 LE/m3 Material cost = 1080 x 305 = 329,400 LE Labor cost Labor crew cost / day = 1 x 90 + 5 x 55 =365 LE/day Production rate = 30 OR 3 x 9 = 27 Choose 27 m3/hr Duration = 1080 27 = 40 hr Assume: one day = 8 hr Duration = 40 8 = 5 days Labor cost = 5days x 365 LE/day = 1,825 LE
  • 21. Equipment cost Equipment crew cost = 650 +3 x 520 + 2 x 150 = 2,510 LE/day Duration = 5 days Equipment cost = 5days x 2,510 LE/day = 12,550 LE Item cost Total item cost =329,400 +1,825 +12,550 =343,775 Assume price factor = 1.25 Item price = 343,775 x 1.25 = 429,718.75 LE Item unit price = 429,718.75 LE 1080 m3 = 397.89 LE/m3
  • 22. Definition :  A sum of money to cover costs which are forecasted but are difficult or impossible to identify when proposing.
  • 23. Example  If you know that site overheads = 10% direct cost and mark-up = 15% construction cost Calculate : 1) Total direct cost, construction cost, tender price, and unit price of each item for the project assuming no contingency is added to the total cost estimate 2) The amount of contingency to be added to the total construction cost estimate using the expected net risk analysis method 3) The final cost estimate and final tender price assuming uniform distribution of contingency
  • 24. Direct cost Maximum % No. Item Unit Quantity cost probability Material Equipment labor S/C 1 LEFT ABUTMENT m3 120 9,000 3,000 4,000 - 19,000 14% 2 CENTER PIER m3 100 7,000 200 1,000 - 10,000 12% 3 RIGHT ABUTMENT m3 120 9,000 4,000 2,000 - 19,000 19% 4 DECK m3 140 12,000 3,500 1,500 - 20,000 13% 5 PRE-CAST SPAN m3 job - - - 10,000 12,000 6% 6 FINISHES m3 job - - - 50,000 60,000 12%
  • 25. Solution: Construction cost = direct cost * 1.10 Tender price = construction cost * 1.15 = 1.10 * 1.15 * direct cost 1) tender price = 1.265 D.C. X 1.1 X 1.15 total direct cost = 116,200 construction cost = 127,820 case 1 tender price = 146,993 Direct construction item No. cost cost price 1 16,000 17,600 20,240 2 8,200 9,020 10,373 3 15,000 16,500 18,975 4 17,000 18,700 21,505 5 10,000 11,000 12,650 6 50,000 55,000 63,250 Totals 116,200 127,820 146,993
  • 26. Contingency calculation - construction construction max max x case 2 max. max. case 2 % % net net expected final item No. No. cost cost risk prob. risk Cost price cost cost risk prob. risk 1 17,600 19,000 1,400 14% 196 17,822.73 20,496.14 1 17,600 19,000 1,400 14% 196 2 9,020 10,000 980 12% 117.6 9,134.15 10,504.27 3 16,500 19,000 2,500 19% 475 16,708.81 19,215.13 4 18,700 20,000 1,300 13% 169 18,936.65 21,777.15 5 11,000 12,000 1,000 6% 60 11,139.21 12,810.09 6 55,000 60,000 5,000 12% 600 55,696.03 64,050.43 Total 127,820 1617.6 129,437.56 148,853.20 From the table above amount of contingency to be added = 1617.6 contingency as % of total construction cost = (1617.6/127,820)*100 = 1.265 % Total cost with contingency = 127,820 * 1.012655 = 129,437.56 Tender price with contingency = 129,437.56 * 1.15 = 148,53.2
  • 27. Q1-Select the best answer for each of the following sentences: 1. The invitation to bidding should include: A)Drawings. B)Specifications. C)Initial and final bond. D)Bill of Quantity 2. In a certain highway project, the contractor decided to add site overhead equal to 15% of direct cost, general overhead equal to 5% of construction cost, and profit & risk equal to 5% of net cost. The price factor should equal: A)1.25 B) 1.0 C) 1.2678 D)25% 3.The Profit & Risk is added to the project cost by the: A)Estimator. B)Owner. C)Architect/Engineer. D)Senior manager. 4.The supplementary conditions may include: A)Project duration. B)Payment system. C)Claims and change orders system. D)All the above. 5. Contract documents do not include: A)Drawings. B)Priced Bill of Quantity. C)Letter of offer. D)Contract conditions.