Front End Engineering
Design Capabilities
CostProfit
Time
Reduced
Capital
Spend
Traditional Project Cost
Breakeven CurveFaster
Start-up
MAC/Digital Plant Project Cost
Breakeven Curve
Traditional
Start-up
Capital
Cost Savings
Faster
Profitability
Increased
Profit
Superior
manageability
Aligning your project
and business objectives
while creating a solid,
detailed project
foundation begins with
a Front End Engineering
Design (FEED) study
from Emerson Process
Management.
Emerson blends industry
expertise, process
engineering and project
management together
with the proven
PlantWeb®
digital plant
architecture to deliver
the ROI you expect from
your project.
2
The one-stop technology
Why
EMERSON?
Plan for success
Build your plan for success the
smart way by partnering with the
undisputed leader in process
automation, Emerson Process
Management.
Right from the start
Whether it’s a large, complex
greenfield project or just adding a
few upgrades, Emerson delivers a
multi-disciplinary approach with
industry-standard FEED work
processes, industry experts with
decades of combined experience,
and our deep commitment to
operational excellence.
An Emerson FEED study provides
the foundation for a controllable
and profitable project by helping
you:
•Ensure that the design meets your
project’s time, budget, ROI and
operating cost criteria
•Set scope boundaries by
quantifying and justifying the
investment required for a given
benefit
•Encounter fewer changes with
better change management
•Identify and plan for project risks
early so that actions can be taken to
minimize their impact
•Involve your key stakeholders to
make certain your design meets
your organization's overall needs
•Achieve faster implementation of
technology
Emerson total value
Emerson’s FEED capabilities are part
of a total value proposition by which
we combine applied expertise and
our digital plant technology to
create smart plant solutions with
great benefits:
• Lower capital expenditure to
reduce automation costs 20% - 30%
• Faster time to profitability
• Increased profitability
• Superior system manageability
Emerson’s Total Solution Value Proposition Benefits
Project management
•Project managers with the
training and experience to deliver
consistent results
•Global best practices with an
organized, structured approach
•Budgeting, schedule control and
project team communications
tools
Process automation engineering
•Main Automation Contractor
(MAC) experience on small to very
large projects
•DCS design, configuration,
migration and connectivity to
legacy systems
•Engineer control buildings,
modular process skids and analyzer
housings
•Design and implementation of
embedded advanced control
functionality
Instrumentation & electrical
•Smart field instrumentation
installation, commissioning and
start-up
•Supplemental electrical
engineering related to automation
projects
•Supplemental mechanical/
structural engineering related to
automation projects
•Supplemental design,
construction, and commissioning
of piping related to automation
projects
Safety system engineering
•Certified FEED work processes for
safety systems
•Process hazard analysis, risk &
non-instrumented layers of
protection (NLOP) assessments, SIL
evaluations
•Certified specification,
engineering, installation, and
commissioning of safety
instrumented systems
Power engineering
•Complete power system
engineering from the utility source
to the process equipment
•Design of emergency/backup
power systems for critical
equipment
•Arc flash hazard assessments to
complement your facility's safe
work practices
Process engineering
•Process knowledge and
experience to meet performance
and reliability objectives
•Process definition and analysis
•Process descriptions and flow
diagrams
•P&ID development
3
and services experts
“One of the major reasons for the success was due to the excellent front-
end engineering… The front-end package generated by Emerson and a
small team from Solutia allowed us to develop plans and stick to them.”
Greg Kanteres - Solutia Project Manager
Multi-disciplinary expertise
Emerson provides a wide range of expertise to meet the demands of your project, including the very best
engineers and designers in the process automation industry. Our smart field instrumentation technology
leadership means you get skilled and experienced engineers to help you design efficient new facilities as well as
analyze and improve your existing operations.
Emerson’s structured FEED
work process includes
training project team
members to ensure
consistency and efficiency
throughout the planning
process and on into
implementation.
Proven technology and
processes
Emerson’s proven FEED work
process is built upon the
recommended best practices of
authorities such as Construction
Industry Institute (CII), Project
Management Institute (PMI), and
Independent Project Analysis (IPA)
methodologies. Our project
management program is consistent
with these guidelines for project
implementation.
You get a single point of
accountability for the instrument
and automation system project,
and our PlantWeb expertise
ensures that your project is
technically sound, safe, timely, and
that it derives the most benefit
from today's digital technologies.
FEED planning
One of the first steps to executing a
successful project is to have good
communication to identify not only
the project objectives, but also the
business objectives.
Emerson assists with the
development of the FEED team to
ensure all key stakeholders
contribute to and align themselves
with the project objectives.
Constraints for timing and budget
are also reviewed and aligned
during identification of the project
premise and scope.
Data gathering
For a project in an existing facility,
data can be collected in the field
using Emerson data management
software on Personal Digital
Assistants (PDA). This software
helps to expedite checkout and
accurately benchmark the existing
equipment and installation. This
method of verification typically
takes half the time of traditional
methods.
All documentation is verified to
minimize risk of unforeseen events
or existing conditions related to the
project.
4
A process for
SUCCESS
Emerson FEED Work Process
5
Structured processes,
proven methods
Basis for design
From detailed design,
construction, commissioning, to
the completion of each successful
startup, our years of experience
help you attain the best solution to
meet all appropriate standards and
codes. Together, we can evaluate
project alternatives are evaluated
to meet process and business
objectives, while reducing cost and
tightening schedules.
Communication and alignment
throughout the project are
important to ensure the design and
deliverables match your project
expectations. Emerson can include
third parties such as installation
contractors to ensure that the
design encompasses the complete
scope. This minimizes field change
orders later in the project.
FEED estimate
The FEED process typically narrows
the cost and benefit estimate down
to +/- 10%, and identifies the risks
and issues that support this
estimate.
The estimate includes:
• Detailed functional scope of the
engineering and design
• Detailed project execution plan
• Detailed procurement plan
Final document
The final FEED document is the
definitive technical and business
project summary including all FEED
deliverable documents to be used
by your organization and your
project team. These documents
include:
Scope definition including
engineering & design
The defined scope of a project is
based on aligning your needs with
a plan that includes the
engineering & design work.
Typical deliverables include:
• Master Project Schedule
• Budget plan
• Alternative analysis report
• Functional design specifications
• Engineering drawings approved
for design
• Required bill of materials
• Required resource allocation plan
Execution/procurement planning
The Project Execution plan
addresses project resources,
migration plans, and required
purchases. Contingency funds can -
be significantly reduced due to
increased accuracy of the budget
estimate.
Economic justification
The FEED definition often includes
the required economic justification
in both investment requirements
and the expected process and
business-related returns. An ROI
calculation can be determined as
part of a FEED study to ensure that
the project clears the required
financial hurdles.
"For the validation project, the front-end work performed by
Emerson was quite important as we needed to have accurate
cost estimates. It is the ultimate goal of every project."
John Wilson - Dow AgroSciences Project Manager
6
The benefits of
SUCCESS
To meet your business
objectives, Emerson focuses
on delivering quantifiable
business results
consistently, from one
project to the next.
Lower costs
Completion of a FEED study results
in a well-defined scope for the rest
of the project, which in turn results
in a more accurate estimate, lower
contingency, and typically lower
overall project costs.
The effort and upfront cost of the
FEED delivers major benefits, as this
is work that would otherwise be
done in the first 10-25% of detailed
engineering. The resulting “blue
print” is further refined during the
detailed design phase of the
project.
Faster implementation
Studies (see opposite page) show
that projects with a thorough FEED
study are more likely to be
completed on time.
Early identification of potential
problem areas and/or necessary
changes allow for early resolution,
resulting in less impact to the
project.
The schedule is defined and the
project planned from start to finish
including resource requirements
and hardware procurement.
Identified and
minimized project risk
With project staff alignment,
business drivers and constraints
defined, the project risk is
identified and minimized. Business
management can proceed with full
disclosure of opportunities to
mitigate risk and/or project
alternatives.
Greater user
involvement and
management support
Studies also show that early
planning, project definition and
goal setting are major factors in
gaining user involvement and
management support. These
factors greatly increase the
opportunity for a successful
process automation project.
Lower costs, and increa
Ref. - Control Magazine Survey - Feb. 2000
7
ease profits and capacity
Cost/schedule down,
utilization/capacity up
According to a Construction
Industry Institute study of 53 large
projects, the group of projects that
spent the most effort on pre-
project planning (another term
used for FEED study) averaged:
• 20% lower costs
• 39% schedule reduction
• 15% utilization/capacity increase
compared to the group that spent
the least effort on pre-project
planning.
Earlier is better
Changes in scope are best made
at a time when they have the least
financial impact to the project. It
is more difficult to improve
project costs later in the project
lifecycle when project execution
and operation of the facility are
already in place.
Major
Influence
Rapidly
Decreasing
Influence
Low
Influence
Influence
Expenditures
Perform
Business
Planning
Perform
Pre-Project
Planning
Execute
Project
Operate
Facility
Pre-Project Planning impact on the Success of 53 projects
Re: Construction Industry Institute Study SD105
“The FEED is important to attain the level of detail, clarity and
deliverables necessary to set the boundaries for the project...Emerson’s
thorough FEED was a significant factor in the project(‘s) being completed
within budget and on schedule.”
William Pouncey - Pfizer Project Manager
The contents of this publication are presented for informational purposes only, and while every effort has
been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or
implied, regarding the products or services described herein or their use or applicability. All sales are
governed by our software licensing agreement and terms and conditions, which are available upon
request. We reserve the right to modify or improve the designs or specifications of our product and
services at any time without notice.
© 2005 EmersonProcess Management, LLLP. All rights reserved.
The Emerson logo is a trademark and service mark of Emerson Electric Co.
PlantWeb, DeltaV, SmartProcess, SureService, FIELDVUE, Rosemount, Fisher, Emerson Process Management
and the Emerson Process Management design are marks of one of the Emerson Process Management group
of companies. All other marks are the property of their respective owners.
Form B-00017 / 3K AQ / 05-05 / Printed in USA
Emerson Process Management
email: industry.solutions@emersonprocess.com
www.EmersonProcess.com/solutions
If you found this brochure valuable, we recommend the following
brochure:
Project Services— When success is
the only option, call upon Emerson experts.
Visit: www.EmersonProcess.com/
solutions/projectservices
Committed through every
phase
As part of pre-project planning, Front End
Engineering Design work is early design
work done after conceptual business
planning and prior to detailed design. -
Emerson can provide a turnkey solution
that includes FEED, equipment selection,
commissioning services, and
implementation and operational
capabilities.
Emerson’s capabilities and experience are
especially valuable when time is at a
premium. When the stakes are high, our
experienced project management,
engineering, and single point of
accountability for the entire
instrumentation and automation system
make a crucial difference.
From full Main Automation Contractor
(MAC) scope, to Main Instrument Vendor
(MIV), to supply of the automation system
and configuration services, Emerson can
help. Contact your local Emerson sales
office or representative today.

Más contenido relacionado

La actualidad más candente

EVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program ManagementEVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program ManagementIRJET Journal
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOEGlen Alleman
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)Glen Alleman
 
Measurement News Webinar
Measurement News WebinarMeasurement News Webinar
Measurement News WebinarGlen Alleman
 
EDM/PDM Implementation
EDM/PDM ImplementationEDM/PDM Implementation
EDM/PDM ImplementationGlen Alleman
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)ShudipPal
 
Critical Success Factors for ERP
Critical Success Factors for ERPCritical Success Factors for ERP
Critical Success Factors for ERPGlen Alleman
 
Measures of Effectiveness, Measures of Performance, Technical Performance Mea...
Measures of Effectiveness, Measures of Performance, Technical Performance Mea...Measures of Effectiveness, Measures of Performance, Technical Performance Mea...
Measures of Effectiveness, Measures of Performance, Technical Performance Mea...Glen Alleman
 
SE1 - Integrating SE and PPM to Increase the Probability of Success
SE1 - Integrating SE and PPM to Increase the Probability of SuccessSE1 - Integrating SE and PPM to Increase the Probability of Success
SE1 - Integrating SE and PPM to Increase the Probability of SuccessGlen Alleman
 
Scrum Lifecycle At Enterprise Levels
Scrum Lifecycle At Enterprise LevelsScrum Lifecycle At Enterprise Levels
Scrum Lifecycle At Enterprise LevelsGlen Alleman
 
Agile project management is systems management
Agile project management is systems managementAgile project management is systems management
Agile project management is systems managementGlen Alleman
 
Earned value, XP and government contracts
Earned value, XP and government contractsEarned value, XP and government contracts
Earned value, XP and government contractsGlen Alleman
 
What Makes a Good Concept of Operations?
What Makes a Good Concept of Operations?What Makes a Good Concept of Operations?
What Makes a Good Concept of Operations?Glen Alleman
 
Introduction to Software Cost Estimation
Introduction to Software Cost EstimationIntroduction to Software Cost Estimation
Introduction to Software Cost EstimationHemanth Raj
 
PM Chapter on Agile IT Project Management Methods
PM Chapter on Agile IT Project Management MethodsPM Chapter on Agile IT Project Management Methods
PM Chapter on Agile IT Project Management MethodsGlen Alleman
 
PGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPMPGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPMGlen Alleman
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesGlen Alleman
 
5 Immutable Principles of Capital Project SUccess
5 Immutable Principles of Capital Project SUccess5 Immutable Principles of Capital Project SUccess
5 Immutable Principles of Capital Project SUccessGlen Alleman
 

La actualidad más candente (20)

EVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program ManagementEVM Without Quality is Unsuitable for Software Project & Program Management
EVM Without Quality is Unsuitable for Software Project & Program Management
 
Improving Project Performance in the DOE
Improving Project Performance in the DOEImproving Project Performance in the DOE
Improving Project Performance in the DOE
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Measurement News Webinar
Measurement News WebinarMeasurement News Webinar
Measurement News Webinar
 
EDM/PDM Implementation
EDM/PDM ImplementationEDM/PDM Implementation
EDM/PDM Implementation
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Critical Success Factors for ERP
Critical Success Factors for ERPCritical Success Factors for ERP
Critical Success Factors for ERP
 
Measures of Effectiveness, Measures of Performance, Technical Performance Mea...
Measures of Effectiveness, Measures of Performance, Technical Performance Mea...Measures of Effectiveness, Measures of Performance, Technical Performance Mea...
Measures of Effectiveness, Measures of Performance, Technical Performance Mea...
 
SE1 - Integrating SE and PPM to Increase the Probability of Success
SE1 - Integrating SE and PPM to Increase the Probability of SuccessSE1 - Integrating SE and PPM to Increase the Probability of Success
SE1 - Integrating SE and PPM to Increase the Probability of Success
 
Unit 2 spm
Unit 2 spmUnit 2 spm
Unit 2 spm
 
Scrum Lifecycle At Enterprise Levels
Scrum Lifecycle At Enterprise LevelsScrum Lifecycle At Enterprise Levels
Scrum Lifecycle At Enterprise Levels
 
Agile project management is systems management
Agile project management is systems managementAgile project management is systems management
Agile project management is systems management
 
Earned value, XP and government contracts
Earned value, XP and government contractsEarned value, XP and government contracts
Earned value, XP and government contracts
 
What Makes a Good Concept of Operations?
What Makes a Good Concept of Operations?What Makes a Good Concept of Operations?
What Makes a Good Concept of Operations?
 
Introduction to Software Cost Estimation
Introduction to Software Cost EstimationIntroduction to Software Cost Estimation
Introduction to Software Cost Estimation
 
PM Chapter on Agile IT Project Management Methods
PM Chapter on Agile IT Project Management MethodsPM Chapter on Agile IT Project Management Methods
PM Chapter on Agile IT Project Management Methods
 
PGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPMPGCS 2019 Master Class Integrating SE with PPM
PGCS 2019 Master Class Integrating SE with PPM
 
Increasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and PracticesIncreasing the Probability of Project Success with Five Principles and Practices
Increasing the Probability of Project Success with Five Principles and Practices
 
5 Immutable Principles of Capital Project SUccess
5 Immutable Principles of Capital Project SUccess5 Immutable Principles of Capital Project SUccess
5 Immutable Principles of Capital Project SUccess
 
JCC RESUME 12.15.2015
JCC RESUME 12.15.2015JCC RESUME 12.15.2015
JCC RESUME 12.15.2015
 

Similar a Feed brochure6 05

MainAutomationContractor_Flyer
MainAutomationContractor_FlyerMainAutomationContractor_Flyer
MainAutomationContractor_FlyerJeroen Olthof
 
Application & Convergence
Application & ConvergenceApplication & Convergence
Application & Convergencefmalaing
 
OpenText Extended ECM for Engineering
OpenText Extended ECM for EngineeringOpenText Extended ECM for Engineering
OpenText Extended ECM for EngineeringVILT
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentSiwawong Wuttipongprasert
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt
 
Dlw resume march 2016 p
Dlw  resume march 2016 pDlw  resume march 2016 p
Dlw resume march 2016 pDavid Wahl
 
Dlw resume july 2016
Dlw  resume july 2016Dlw  resume july 2016
Dlw resume july 2016David Wahl
 
Primer on enterprise_performance_maturity_v0.2
Primer on enterprise_performance_maturity_v0.2Primer on enterprise_performance_maturity_v0.2
Primer on enterprise_performance_maturity_v0.2Trevor Warren
 
ecosys-brochure-digital
ecosys-brochure-digitalecosys-brochure-digital
ecosys-brochure-digitalZoe MacDonald
 
VeeShell presentation
VeeShell presentationVeeShell presentation
VeeShell presentationCherniak Soft
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.commkhilauria
 
Resume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMResume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMJoyce Conrad
 

Similar a Feed brochure6 05 (20)

MainAutomationContractor_Flyer
MainAutomationContractor_FlyerMainAutomationContractor_Flyer
MainAutomationContractor_Flyer
 
SPEC Process Engineering&Construction
SPEC Process Engineering&ConstructionSPEC Process Engineering&Construction
SPEC Process Engineering&Construction
 
Application & Convergence
Application & ConvergenceApplication & Convergence
Application & Convergence
 
EPC Case study - RAY International
EPC Case study - RAY International EPC Case study - RAY International
EPC Case study - RAY International
 
CV - Jahangeer Raza
CV - Jahangeer RazaCV - Jahangeer Raza
CV - Jahangeer Raza
 
OpenText Extended ECM for Engineering
OpenText Extended ECM for EngineeringOpenText Extended ECM for Engineering
OpenText Extended ECM for Engineering
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
PAC Fast Track Implementation Program
PAC Fast Track Implementation ProgramPAC Fast Track Implementation Program
PAC Fast Track Implementation Program
 
John Blatt_ Resume 070615
John Blatt_ Resume 070615John Blatt_ Resume 070615
John Blatt_ Resume 070615
 
Dlw resume march 2016 p
Dlw  resume march 2016 pDlw  resume march 2016 p
Dlw resume march 2016 p
 
Dlw resume july 2016
Dlw  resume july 2016Dlw  resume july 2016
Dlw resume july 2016
 
Primer on enterprise_performance_maturity_v0.2
Primer on enterprise_performance_maturity_v0.2Primer on enterprise_performance_maturity_v0.2
Primer on enterprise_performance_maturity_v0.2
 
Software design
Software designSoftware design
Software design
 
ecosys-brochure-digital
ecosys-brochure-digitalecosys-brochure-digital
ecosys-brochure-digital
 
VeeShell presentation
VeeShell presentationVeeShell presentation
VeeShell presentation
 
Brochure PlanningPackage.com
Brochure PlanningPackage.comBrochure PlanningPackage.com
Brochure PlanningPackage.com
 
Nitin cv 25 07-16
Nitin cv 25 07-16Nitin cv 25 07-16
Nitin cv 25 07-16
 
Resume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRMResume JOYCE CONRAD_0416CRM
Resume JOYCE CONRAD_0416CRM
 
Master Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.comMaster Project Manager for Information Technology: sysenegacademy@gmail.com
Master Project Manager for Information Technology: sysenegacademy@gmail.com
 
TC-CV-2015
TC-CV-2015TC-CV-2015
TC-CV-2015
 

Último

Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 

Último (20)

Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 

Feed brochure6 05

  • 2. CostProfit Time Reduced Capital Spend Traditional Project Cost Breakeven CurveFaster Start-up MAC/Digital Plant Project Cost Breakeven Curve Traditional Start-up Capital Cost Savings Faster Profitability Increased Profit Superior manageability Aligning your project and business objectives while creating a solid, detailed project foundation begins with a Front End Engineering Design (FEED) study from Emerson Process Management. Emerson blends industry expertise, process engineering and project management together with the proven PlantWeb® digital plant architecture to deliver the ROI you expect from your project. 2 The one-stop technology Why EMERSON? Plan for success Build your plan for success the smart way by partnering with the undisputed leader in process automation, Emerson Process Management. Right from the start Whether it’s a large, complex greenfield project or just adding a few upgrades, Emerson delivers a multi-disciplinary approach with industry-standard FEED work processes, industry experts with decades of combined experience, and our deep commitment to operational excellence. An Emerson FEED study provides the foundation for a controllable and profitable project by helping you: •Ensure that the design meets your project’s time, budget, ROI and operating cost criteria •Set scope boundaries by quantifying and justifying the investment required for a given benefit •Encounter fewer changes with better change management •Identify and plan for project risks early so that actions can be taken to minimize their impact •Involve your key stakeholders to make certain your design meets your organization's overall needs •Achieve faster implementation of technology Emerson total value Emerson’s FEED capabilities are part of a total value proposition by which we combine applied expertise and our digital plant technology to create smart plant solutions with great benefits: • Lower capital expenditure to reduce automation costs 20% - 30% • Faster time to profitability • Increased profitability • Superior system manageability Emerson’s Total Solution Value Proposition Benefits
  • 3. Project management •Project managers with the training and experience to deliver consistent results •Global best practices with an organized, structured approach •Budgeting, schedule control and project team communications tools Process automation engineering •Main Automation Contractor (MAC) experience on small to very large projects •DCS design, configuration, migration and connectivity to legacy systems •Engineer control buildings, modular process skids and analyzer housings •Design and implementation of embedded advanced control functionality Instrumentation & electrical •Smart field instrumentation installation, commissioning and start-up •Supplemental electrical engineering related to automation projects •Supplemental mechanical/ structural engineering related to automation projects •Supplemental design, construction, and commissioning of piping related to automation projects Safety system engineering •Certified FEED work processes for safety systems •Process hazard analysis, risk & non-instrumented layers of protection (NLOP) assessments, SIL evaluations •Certified specification, engineering, installation, and commissioning of safety instrumented systems Power engineering •Complete power system engineering from the utility source to the process equipment •Design of emergency/backup power systems for critical equipment •Arc flash hazard assessments to complement your facility's safe work practices Process engineering •Process knowledge and experience to meet performance and reliability objectives •Process definition and analysis •Process descriptions and flow diagrams •P&ID development 3 and services experts “One of the major reasons for the success was due to the excellent front- end engineering… The front-end package generated by Emerson and a small team from Solutia allowed us to develop plans and stick to them.” Greg Kanteres - Solutia Project Manager Multi-disciplinary expertise Emerson provides a wide range of expertise to meet the demands of your project, including the very best engineers and designers in the process automation industry. Our smart field instrumentation technology leadership means you get skilled and experienced engineers to help you design efficient new facilities as well as analyze and improve your existing operations.
  • 4. Emerson’s structured FEED work process includes training project team members to ensure consistency and efficiency throughout the planning process and on into implementation. Proven technology and processes Emerson’s proven FEED work process is built upon the recommended best practices of authorities such as Construction Industry Institute (CII), Project Management Institute (PMI), and Independent Project Analysis (IPA) methodologies. Our project management program is consistent with these guidelines for project implementation. You get a single point of accountability for the instrument and automation system project, and our PlantWeb expertise ensures that your project is technically sound, safe, timely, and that it derives the most benefit from today's digital technologies. FEED planning One of the first steps to executing a successful project is to have good communication to identify not only the project objectives, but also the business objectives. Emerson assists with the development of the FEED team to ensure all key stakeholders contribute to and align themselves with the project objectives. Constraints for timing and budget are also reviewed and aligned during identification of the project premise and scope. Data gathering For a project in an existing facility, data can be collected in the field using Emerson data management software on Personal Digital Assistants (PDA). This software helps to expedite checkout and accurately benchmark the existing equipment and installation. This method of verification typically takes half the time of traditional methods. All documentation is verified to minimize risk of unforeseen events or existing conditions related to the project. 4 A process for SUCCESS Emerson FEED Work Process
  • 5. 5 Structured processes, proven methods Basis for design From detailed design, construction, commissioning, to the completion of each successful startup, our years of experience help you attain the best solution to meet all appropriate standards and codes. Together, we can evaluate project alternatives are evaluated to meet process and business objectives, while reducing cost and tightening schedules. Communication and alignment throughout the project are important to ensure the design and deliverables match your project expectations. Emerson can include third parties such as installation contractors to ensure that the design encompasses the complete scope. This minimizes field change orders later in the project. FEED estimate The FEED process typically narrows the cost and benefit estimate down to +/- 10%, and identifies the risks and issues that support this estimate. The estimate includes: • Detailed functional scope of the engineering and design • Detailed project execution plan • Detailed procurement plan Final document The final FEED document is the definitive technical and business project summary including all FEED deliverable documents to be used by your organization and your project team. These documents include: Scope definition including engineering & design The defined scope of a project is based on aligning your needs with a plan that includes the engineering & design work. Typical deliverables include: • Master Project Schedule • Budget plan • Alternative analysis report • Functional design specifications • Engineering drawings approved for design • Required bill of materials • Required resource allocation plan Execution/procurement planning The Project Execution plan addresses project resources, migration plans, and required purchases. Contingency funds can - be significantly reduced due to increased accuracy of the budget estimate. Economic justification The FEED definition often includes the required economic justification in both investment requirements and the expected process and business-related returns. An ROI calculation can be determined as part of a FEED study to ensure that the project clears the required financial hurdles. "For the validation project, the front-end work performed by Emerson was quite important as we needed to have accurate cost estimates. It is the ultimate goal of every project." John Wilson - Dow AgroSciences Project Manager
  • 6. 6 The benefits of SUCCESS To meet your business objectives, Emerson focuses on delivering quantifiable business results consistently, from one project to the next. Lower costs Completion of a FEED study results in a well-defined scope for the rest of the project, which in turn results in a more accurate estimate, lower contingency, and typically lower overall project costs. The effort and upfront cost of the FEED delivers major benefits, as this is work that would otherwise be done in the first 10-25% of detailed engineering. The resulting “blue print” is further refined during the detailed design phase of the project. Faster implementation Studies (see opposite page) show that projects with a thorough FEED study are more likely to be completed on time. Early identification of potential problem areas and/or necessary changes allow for early resolution, resulting in less impact to the project. The schedule is defined and the project planned from start to finish including resource requirements and hardware procurement. Identified and minimized project risk With project staff alignment, business drivers and constraints defined, the project risk is identified and minimized. Business management can proceed with full disclosure of opportunities to mitigate risk and/or project alternatives. Greater user involvement and management support Studies also show that early planning, project definition and goal setting are major factors in gaining user involvement and management support. These factors greatly increase the opportunity for a successful process automation project. Lower costs, and increa Ref. - Control Magazine Survey - Feb. 2000
  • 7. 7 ease profits and capacity Cost/schedule down, utilization/capacity up According to a Construction Industry Institute study of 53 large projects, the group of projects that spent the most effort on pre- project planning (another term used for FEED study) averaged: • 20% lower costs • 39% schedule reduction • 15% utilization/capacity increase compared to the group that spent the least effort on pre-project planning. Earlier is better Changes in scope are best made at a time when they have the least financial impact to the project. It is more difficult to improve project costs later in the project lifecycle when project execution and operation of the facility are already in place. Major Influence Rapidly Decreasing Influence Low Influence Influence Expenditures Perform Business Planning Perform Pre-Project Planning Execute Project Operate Facility Pre-Project Planning impact on the Success of 53 projects Re: Construction Industry Institute Study SD105 “The FEED is important to attain the level of detail, clarity and deliverables necessary to set the boundaries for the project...Emerson’s thorough FEED was a significant factor in the project(‘s) being completed within budget and on schedule.” William Pouncey - Pfizer Project Manager
  • 8. The contents of this publication are presented for informational purposes only, and while every effort has been made to ensure their accuracy, they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. All sales are governed by our software licensing agreement and terms and conditions, which are available upon request. We reserve the right to modify or improve the designs or specifications of our product and services at any time without notice. © 2005 EmersonProcess Management, LLLP. All rights reserved. The Emerson logo is a trademark and service mark of Emerson Electric Co. PlantWeb, DeltaV, SmartProcess, SureService, FIELDVUE, Rosemount, Fisher, Emerson Process Management and the Emerson Process Management design are marks of one of the Emerson Process Management group of companies. All other marks are the property of their respective owners. Form B-00017 / 3K AQ / 05-05 / Printed in USA Emerson Process Management email: industry.solutions@emersonprocess.com www.EmersonProcess.com/solutions If you found this brochure valuable, we recommend the following brochure: Project Services— When success is the only option, call upon Emerson experts. Visit: www.EmersonProcess.com/ solutions/projectservices Committed through every phase As part of pre-project planning, Front End Engineering Design work is early design work done after conceptual business planning and prior to detailed design. - Emerson can provide a turnkey solution that includes FEED, equipment selection, commissioning services, and implementation and operational capabilities. Emerson’s capabilities and experience are especially valuable when time is at a premium. When the stakes are high, our experienced project management, engineering, and single point of accountability for the entire instrumentation and automation system make a crucial difference. From full Main Automation Contractor (MAC) scope, to Main Instrument Vendor (MIV), to supply of the automation system and configuration services, Emerson can help. Contact your local Emerson sales office or representative today.