OPERATION & MAINTENANCE
OF
HVDC
STATION
Praveen Ranjan
Resident Project Manager
India-Bangladesh Inter-connector Project
Powergrid Corporation Of India Ltd.
 Incorporated in 1989 for transmission of Electric Power
across the country.
 Central Transmission Utility - Navaratna PSU
 Asset over Rs. 56000 Crs
 World's Leading Power Transmission Utility (3rd)
POWERGRID, An OVERVIEW
 76800 Ckt.Km line-128 Substations
 Technology Leader in EHVAC & HVDC Transmission.
 Carries more than 50% of Generated Power Across
Country.
 84500 MVA Transformation Capacity
 22400 MW Interregional Capacity Telecom NLD with
21000 Km Optical Fibre Network & Internet Service
Provider
POWERGRID, An OVERVIEW
ROURKELA
RAIPUR
HIRMA
TALCHER
JAIPUR
NER
ER
WR
NR
SR
B'SHARIF
ALLAHABAD
SIPAT
GAZUWAKA
JEYPORE
CHANDRAPUR
SINGRAULI
VINDHYA-
2000M
W
2000MW
2500MW
1000MW
500MW
LUCKNOW
DIHANG
CHICKEN NECK
TEESTA
TIPAIMUKH
BADARPUR
MISA
DAMWE
KATHAL-
GURI
LEGEND
765 KV LINES
400 KV LINES
HVDC B/B
HVDC BIPOLE
EXISTING/ X PLAN NATIONAL
ZERDA
HISSAR
BONGAIGAON
KOLHAPUR
NARENDRA
KAIGA
PONDA
IX PLAN
MARIANI
NORTH
KAHALGAON
RANGANADI
SEONI
CHEGAON
BHANDARA
DEHGAM
KARAD
LONIKAND
VAPI
GANDHAR/
TALA
BANGLA
BALLABGARH A'PUR
(DELHI RING)
BANGALORE
KOZHIKODE
COCHIN
KAYAMKULAM
TRIVANDRUM
PUGALUR
KAYATHAR
KARAIKUDI
CUDDALORE
SOUTH CHENNAI
KRISHNAPATNAM
CHITTOOR
VIJAYAWADA
SINGARPET
PIPAVAV
LIMBDI
KISHENPUR
DULHASTI
WAGOORA
MOGA
URI
BHUTAN
RAMAGUNDAM
SATLUJRAVI
JULLANDHAR
DESH
VARANASI/UNNAO
M'BAD
PURNEA
KORBA
NAGDA
SILIGURI/BIRPARA
LAKSHADWEEP
TEHRI
MEERUT
BHIWADI
BINA
SATNA
MALANPUR
SHIROHI
KAWAS
AMRAVATI
AKOLA
AGRA
SIRSI
CHAL
JETPUR
AMRELI
BOISAR
TARAPUR
PADGHE
DHABOL
KOYNA
BARH
G'PUR
HOSUR
MYSORE
KUDANKULAM
M'PUR
KARANPURA
MAITHON
JAMSHEDPUR
PARLI
WARDA
BEARILLY
SALEM GRID
XI PLAN
National Grid by 2012
THE POWER
‘HIGHWAY’
Existing HVDC in INDIA
1 – Rihand-Dadri (1500MW)
2 - Vindyachal (500MW)
3 - Chandrapur-Padghe (1500 MW)
4 - Chandrapur-Ramagundam (1000MW)
5 – Gajuwaka (500MW)
6 - Sasaram (500MW)
7 - Talcher-Kolar (2500MW)
8 – Ballia-Bhiwadi(2500 MW)
SALIENT FEATURES OF EXISTING
&
UPCOMING HVDC STATIONS
± 500 kV , 1500 MW Rihand – Dadri HVDC Project.
Approx. Value of the Contract: Rs. 457 Crore
Main Data:
Power rating : 1500MW
No. of Poles : 2
AC Voltage : 400 kV
DC Voltage : + 500 kV
Converter Transformer-
Rihand Terminal : 6 x 315 MVA
Dadri Terminal : 6 x 315 MVA
Length of over head DC line: 816 KM.
Start date: Feb-1986
Completion date: Dec-1991
2 x 250 MW HVDC Vindhyachal Back to Back Station.
Approx. Value of the Contract: Rs. 176 Crore
Start date: Nov 1984
Completion date: April 1989
Main Data:
(i) Power rating : 2 x 250 MW.
(ii) No. of Blocks : 2
(iii) AC Voltage : 400 kV
(iv) DC Voltage : ± 70 kV
(v) Converter Transformer : 8 x 156 MVA
2 x 500 MW HVDC Chandrapur Back to Back
Station.
Start date: November 1993
Completion date: Dec 1997
Main Data:
Power rating : 2 x 500 MW.
No. of Blocks : 2
AC Voltage : 400 kV
DC Voltage : + 205 Kv
Converter Transformer : 12 x 234 MVA
Approx. Value of the Contract: Rs. 702.78 Crore
+ 500 kV ,2000 MW, HVDC Talchar – Kolar
Transmission Line
Approx. Value of the Contract: Rs. 822.46 Crore
Start date: March 2000
Completion date: June 2003
Main Data:
Power rating : 2000 MW
No. of Poles : 2
AC Voltage : 400 kV
DC Voltage : + 500 kV
Converter Transformer-
Talcher : 6 x 398 MVA
Kolar : 6 x 398 MVA
Length of over head DC line: 1369 KM.
 HVDC Talchar – Kolar link was designed for 2000 MW continuous rating
with inherent short term overload capacity depending on-
Ambient temperature
Prevailing voltages at Talcher and Kolar
Cooling mechanism.
 Further, DC Bipole lines with quad conductor was capable to transmit 1250
MW continuously with marginal incremental loss .
 The inherent overload capability was utilized to meet the system
contingencies by up gradation of Talcher – Kolar HVDC link capacity from
2000 MW to 2500 MW .
 This enhanced capacity is to be used only under contingency and not for
increasing HVDC Capacity for firm transfer of 2500 MW
Up gradation of + 500 kV HVDC Talchar – Kolar link from
2000 MW to 2500 MW
•Main objective of this HVDC project is to transfer power from Talcher Super
Thermal Power Station (Eastern Region), to Kolar (Southern Region) of Indian
Grid
•The most important features of the project are
•-Better over all economy as compared to AC Transmission
•-Halved right-of-way requirements,
•-Lower transmission loses, better stability and controllability.
• This is the longest (1369 KM.) commercial HVDC link in India.
Talchar – Kolar HVDC
Transmission Link
Salient Features:
1 x 500 MW HVDC Sasaram Back to Back
Station.
Approx. Value of the Contract: Rs. 204.68 Crore
Start date: March 2000
Completion date: Sep 2002
Main Data
(i) Power rating : 1 x 500 MW.
(ii) No. of Blocks : 1
(iii) AC Voltage : 400 kV
(iv) DC Voltage : 205 kV
(v) Converter Transformer : 6 x 234 MVA
Connects Pusauli (Eastern Region) to Sasaram (Eastern part of Northern Grid) of
Indian Grid (Power Transfer mainly from ER to NR)
2 x 500 MW HVDC Gazuwaka Back to
Back Station.
Approx. Value of the Contract:
Block-1 : Rs. 209.85 Crore
Block-2 : Rs. 231.76Crore
Start date: Block 1 : Dec 1994
Block 2 : Sep 2002
Completion date: Block 1 : Feb 1999
Block 2 : March 2005Main Data:
(i) Power rating : 2 x 500 MW.
(ii) No. of Blocks : 2
(iii) AC Voltage : 400 k
(iv) DC Voltage : 205 kV ( Block 1)
177 kV (Block 2 )
(v) Converter Transformer
Block 1 : 6 x 234 MVA
Block 2 : 6 x 201.2 MVA
+ 500 kV, 2500 MW HVDC Ballia – Bhiwadi
Transmission Line.
Approx. Value of the Contract: Rs. 1365 Crore
Pole 1 Commissioned on 31-03 10
Pole 2: Targetted to be commissioned by 31-10-10
Main Data:
Power rating : 2500 MW
No. of Poles : 2
AC Voltage : 400 kV
DC Voltage : + 500 kV
Length of over head DC line : 780 KM.
Converter Transformer
Ballia : 8 x 498 MVA
Bhiwadi 8 x 498 MVA
HVDC Multi Terminal System
 North-Eastern Region has a large quantum Hydro Electric Power
potential.
 Under Hydro Development program of Govt of India, this power to be
evacuated to load centres of Northern and Western Regions
 POWERGRID installing +/-800 kV, 6000 MW HVDC multi-terminal
system of approx length of 1728 km from North Eastern Region to
Agra.
• One Rectifier station in Biswanath Chariali (pooling station in North Eastern
Region), second one in Alipurduar (pooling station in Eastern Region) and
Inverter station at Agra (in Northern Region)
HVDC Multi Terminal System
•Converter stations at Biswanath Chariali and Alipurduar each handles a
nominal power of 3000 MW and Converter station at Agra handles nominal
power of 6000 MW.
• This Transmission System originates from Assam and passes through West
Bengal, Bihar and terminates in Uttar Pradesh.
Consultancy Assignment:
• 1 x 500 MW India-Bangladesh Interconnecter HVDC Back To Back
Station, Bheramara Bangladesh
Other Upcoming Projects:
2 x 500 MW HVDC BTB Station at Kolhapur between Kolhapur
(Western Region ) and Narendra (Southern Region) of Indian Grid at
Why O&M?
 To Run the system Smoothly to
achieve highest availability and avoid
outages
Operation of HVDC Station
 Preconditions of RFS / RFO
 Circuit Breaker Is Closed
 Cooling System is OK
 No Alarm from Protection System
Operation of HVDC Station
 Selection of Mode of Operation
 Joint / Separate
 Power / Current
 Selection of Direction (Applicable for BTB)
 Setting the Ramp Rate
 Start of Block at Minimum Power Design
Operation of HVDC Station
 Selection of Mode of Operation
 Joint / Separate
 Power / Current
 Selection of Direction (Applicable for BTB)
 Start of Block at Minimum Power Design
BASIC HVDC Single Line
Diagram
DC OH Line
Converter
Transformer
DC Filter:
DT 12/24
DT 12/36
DC Filter:
DT 12/24
DT 12/36
Thyristor
Valves
400 kV
AC Bus
AC Filters
Smoothing Reactor
Converter
Transformer
DC Filter:
DT 12/24
DT 12/36
DC Filter:
DT 12/24
DT 12/36
Thyristor
Valves
400 kV
AC Bus
AC Filters
Smoothing Reactor
Modes of Operation
DC OH Line
Converter
Transformer
Thyristor
Valves
400 kV
AC Bus
AC Filters,
Reactors
Smoothing Reactor
Converter
Transformer
Thyristor
Valves
400 kV
AC Bus
AC Filters
Smoothing Reactor
Bipolar
Current
Current
Modes of Operation
DC OH Line
Converter
Transformer
Thyristor
Valves
400 kV
AC Bus
AC Filters,
Reactors
Smoothing Reactor
Converter
Transformer
Thyristor
Valves
400 kV
AC Bus
AC Filters
Smoothing Reactor
Monopolar Ground Return
Current
Modes of Operation
DC OH Line
Converter
Transformer
Thyristor
Valves
400 kV
AC Bus
AC Filters,
Reactors
Smoothing Reactor
Converter
Transformer
Thyristor
Valves
400 kV
AC Bus
AC Filters
Smoothing Reactor
Monopolar Metallic Return
Current
Operation of HVDC Station
 Type of Shutdowns
 Planned / Forced / Emergency Shutdown
RPC
 Q Mode
 V Mode
 Auto / Manual
Operation of HVDC Station
 Shutdown Procedure of HVDC Station
 Planned
 Emergency
 Charging Procedure After Shutdown
Checking of Annunciation List Before Charging After
Shutdown (Must)
Operation of HVDC Station
 Trouble Shooting
 Alarm System
 Active & Standby System of C&P
Type of Maintenance
 Preventive Maintenance
 Outage Maintenance
Major Areas Of HVDC BTB Station
 Valve Hall
 AC Switchyard Equipments
 Valve Cooling
 Auxiliaries and AC System
 AC/DC Control & Protection System
Valve Hall
 The status of the Thyristor levels in the valve hall is available
online in the Control Room
 Valve Control System monitors continuously, the healthiness of
the thyristors and associated valve hall components while in
service
 Failure of thyristor is reported in the Control Room by Valve
control system for the operator
 Alarm is generated up to 2 thyristor failures in a valve and on
3rd failure, trip is generated (Redundancy of Thyristors differs
from system to system)
 Failure may be in
 Thyristor
 Snubber capacitor
 Snubber resistor
 TE card
 To test the thyristor level – Thyristor Level Test
Unit is used which tests thyristor and associated
components
 Failure of the thyristor can be detected
Valve Hall – Thyristor level testing
Major Work During Yearly
Maintenance
 Cleaning of Valve Hall
 Testing of Thyristors/Snubber Circuit
 Testing of Ground Switches
 Checking of any abnormality
 Checking of Water leakage
 Tightness Checking of Bolts
 Record of Valve Arrestor Readings
 Testing of Fire System
AC SWITCHYARD EQUIPMENTS
Converter Transformer
 Following tests are done during yearly shutdown
 Capacitance and tan δ of the bushings
 Used to determine the healthiness of the bushing insulation
 Checking the operation of the buchholz relays and Pressure Relief
Devices (PRD)
 Checking of the WTI & OTI alarms and trips
 Checking whether all the alarms are reported to HMI system
 Checking the operation of fire fighting deluge valve system
Converter Transformer
 Replacement of the oil filters of OLTC (On-Load tap Changer) –
can be replaced online when the alarm is generated
 Periodic testing of the oil – DGA – to determine the incipient
internal faults of the transformer
 Testing of all the associated protection relays
 Converter Transformer OLTC – Inspection of the OLTC
 Maintenance of OLTC after every 1 lakh operations
 Wear and tear of all mechanical & electrical parts of the
OLTC to be inspected.
 Replacement of mechanical parts with high wear & Tear.
 Cleaning of Fixed and moving contacts.
 Cleaning of OLTC chambers
 Filling with fresh oil
Converter Transformer
 Following Maintenance Carried Out W/SD on Monthly Basis
 Inspection of Bushing Oil Level.
 Inspection of Oil Level in Conservator.
 Inspection of Oil Level in OLTC Conservator.
 Manual Starting of Oil Pumps & Fans
 Checking of Oil Leaks
 Oil Level in Breather Oil Seal
 Condition of Silica Gel
Converter Transformer
Overhauling of OLTC
Overhauling of OLTC
AC Filter
 Maintenance of filter bay equipment includes
 Testing of CT – C & Tan δ
 Capacitance stack measurement and balancing if required
 Inspection of capacitor stack for oil leakage
 Associated breaker testing -Operation timings, alarm,
lockout checks etc.
 Measurement of resistors and reactors – for deviation
 Testing of associated protection systems
Apart from the yearly maintenance, failure of capacitor cans
calls for
 Measurement of individual capacitor stacks /cans
AC Filter
Current Transformer & Voltage
Transformer
 Current Transformer
 Capacitance and Tan δ Measurement (S/D)
 Inspection of CT for oil leakage & Crack in Insulator
 Cleaning of MB (S/D)
 Measurement of Ratio & Secondary Resistance (SOS)
 DGA of Oil (SOS)
 Oil Parameters (SOS)
 IR Measurement (SOS)
Current Transformer & Voltage
Transformer
 Voltage Transformer
 Capacitance and Tan δ Measurement (S/D)
 Inspection of oil leakage & Crack in Insulator
 Cleaning of MB (S/D)
 Measurement of Secondary Voltage
Circuit Breakers
 Timing of Main & Auxiliary Contacts (Y)
 Checking of Pressure Setting of Switches (Y)
 Checking of Pole Discrepancy (Y)
 Checking of Interlocks (Y)
 Trip / Close Coil Currents Measurement
 Maintenance of Air Compressor (In Pneumatic System)
 Cleaning of Support Insulator / PIR & Grading Capacitor /
Interrupter Chamber
Circuit Breaker Contd.
 Lubrication of Chain & Gears / Checking healthiness & Cleaning of
Rollers / Checking healthiness of springs and greasing if required (In
Spring Operated Mechanism)
 Measurement of Static contact resistance measurement (2Y)
 Measurement of DCRM & Contact Travel (2Y)
 Capacitance & Tan Delta Measurement of Grading Capacitor (4Y)
 Dew Point Measurement of SF6 Gas (4Y)
 SF6 Gas Filling (SOS)
 Checking of Grading Capacitor Oil Leakage (M)
Valve Cooling System
Valve cooling
Maintenance of Valve Cooling
 Replacement of resin in the resin chamber yearly
 Cleaning / Painting of Cooling Towers (If available)
(Y)
 Cleaning of Heat Exchangers (If available) (Y)
Valve Cooling
 Cleaning of Filters (SOS)
 Testing of Related Protection System
(Y)
 Maintenance of Pumps (3M)
 Vibration Measurement of Pumps (3M)
 Cleaning of Electrical Contactors (3M)
Auxiliary System
 Yearly servicing of DG sets and protection relays
testing
 Fire Fighting system – checking the hydrant points
 Maintenance of station batteries, chargers and UPS
systems
 LT system – Relay testing & LT breaker
maintenance
Maintenance of LT breakers & Relay testing
Control & Protection System
 Testing of All Control & Protection
System (Y)
 Modification / Replacement / Testing
of Relays & Cards (SOS)
MAJOR PROBLEMS OBSERVED
DURING O&M
 VALVE HALL
 Thyristor Failure (Frequency :Very Low)
 Failure of Surge Arrestor (Frequency :Very Low)
 Water Leakage from Pex Tube (Frequency :Very Low)
MAJOR PROBLEMS OBSERVED
DURING O&M
 VALVE COOLING SYSTEM
 Water Pump Motor Failure (Frequency :Medium)
 Valve Motor Failure (Frequency :Very Low)
 Makeup Water Float Failure (Frequency :Medium)
MAJOR PROBLEMS OBSERVED
DURING O&M
 Control & Protection SYSTEM
 Failure of Control Cards
 Stalling of Software
 Measuring System
O&m of hvdc station power grid india

Más contenido relacionado

La actualidad más candente

Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)Arpit Kurel
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERNitish NIT
 
RGPV NOTES ON FACTS EX8303 unit I & II
RGPV NOTES ON FACTS EX8303 unit I & IIRGPV NOTES ON FACTS EX8303 unit I & II
RGPV NOTES ON FACTS EX8303 unit I & IIMani Deep Dutt
 
Hvdc transmission system
Hvdc transmission systemHvdc transmission system
Hvdc transmission systempradeep0786
 
voltage and power stability of hvdc system
voltage and power stability of hvdc systemvoltage and power stability of hvdc system
voltage and power stability of hvdc systemchandan kumar
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal schedulingASHIRBAD BARIK
 
VSC based HVDC system
VSC based HVDC systemVSC based HVDC system
VSC based HVDC systemmdhsudhan
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
Applications of power electronics in HVDC
Applications of  power electronics in HVDCApplications of  power electronics in HVDC
Applications of power electronics in HVDCKabilesh K
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraRahul Mehra
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training ReportSWAPNILKUMARGUPTA
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substationIshank Ranjan
 
High Voltage DC Transmission
High Voltage DC TransmissionHigh Voltage DC Transmission
High Voltage DC Transmissionkrishna koundinya
 

La actualidad más candente (20)

Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)Simulation and study of multilevel inverter (report)
Simulation and study of multilevel inverter (report)
 
Unit 3 FACTS Technology
Unit 3 FACTS TechnologyUnit 3 FACTS Technology
Unit 3 FACTS Technology
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLER
 
MTDC SYSTEMS
MTDC SYSTEMSMTDC SYSTEMS
MTDC SYSTEMS
 
RGPV NOTES ON FACTS EX8303 unit I & II
RGPV NOTES ON FACTS EX8303 unit I & IIRGPV NOTES ON FACTS EX8303 unit I & II
RGPV NOTES ON FACTS EX8303 unit I & II
 
Hvdc transmission system
Hvdc transmission systemHvdc transmission system
Hvdc transmission system
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
voltage and power stability of hvdc system
voltage and power stability of hvdc systemvoltage and power stability of hvdc system
voltage and power stability of hvdc system
 
HVDC & FACTS
HVDC & FACTSHVDC & FACTS
HVDC & FACTS
 
Hvdc
HvdcHvdc
Hvdc
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal scheduling
 
VSC based HVDC system
VSC based HVDC systemVSC based HVDC system
VSC based HVDC system
 
FAULT ANALYSIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALYSIS IN HVDC & HVAC TRANSMISSION LINEFAULT ANALYSIS IN HVDC & HVAC TRANSMISSION LINE
FAULT ANALYSIS IN HVDC & HVAC TRANSMISSION LINE
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”
“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”
“POWER FACTOR IMPROVEMENT BY SIMULATION AND IMPLEMENTATION OF FC-TCR”
 
Applications of power electronics in HVDC
Applications of  power electronics in HVDCApplications of  power electronics in HVDC
Applications of power electronics in HVDC
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
 
220KV Substation Training Report
220KV Substation Training Report220KV Substation Training Report
220KV Substation Training Report
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
High Voltage DC Transmission
High Voltage DC TransmissionHigh Voltage DC Transmission
High Voltage DC Transmission
 

Destacado

switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scadaHemendra Kumar Rajput
 
High Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionHigh Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionZunAib Ali
 
Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...
Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...
Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...Francisco Gonzalez-Longatt
 
presentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnitpresentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnitSuresh Choudhary
 
Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Mohit Agarwal
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in indiaAnkur Mahajan
 
Power systems voltage and power control
Power systems voltage and power controlPower systems voltage and power control
Power systems voltage and power controlCaner Göksel Sonuzun
 
Hvdc ppt with animated videos
Hvdc ppt with animated videosHvdc ppt with animated videos
Hvdc ppt with animated videosJawad Ali
 
Power line carrier communication (plcc)
Power line carrier communication (plcc)Power line carrier communication (plcc)
Power line carrier communication (plcc)vishwesh sharma
 

Destacado (13)

switching substation, plcc and scada
switching substation, plcc and scadaswitching substation, plcc and scada
switching substation, plcc and scada
 
High Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmissionHigh Voltage Dc (HVDC) transmission
High Voltage Dc (HVDC) transmission
 
Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...
Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...
Future Meshed HVDC Grids: Challenges and Opportunities, 29th October 2015, Po...
 
T&d
T&dT&d
T&d
 
presentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnitpresentation on 400kv gss heerapura @mnit
presentation on 400kv gss heerapura @mnit
 
Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)Power line carrier communication(with awesome animation work)
Power line carrier communication(with awesome animation work)
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Power scenario in india
Power scenario in indiaPower scenario in india
Power scenario in india
 
Power systems voltage and power control
Power systems voltage and power controlPower systems voltage and power control
Power systems voltage and power control
 
Hvdc ppt with animated videos
Hvdc ppt with animated videosHvdc ppt with animated videos
Hvdc ppt with animated videos
 
Reactive power compensation
Reactive power compensationReactive power compensation
Reactive power compensation
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Power line carrier communication (plcc)
Power line carrier communication (plcc)Power line carrier communication (plcc)
Power line carrier communication (plcc)
 

Similar a O&m of hvdc station power grid india

1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...Prannay Kumar Giri
 
HVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading TechnologyHVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading TechnologyDixit Patel
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Avirup Ghosh
 
Emergingtrends
EmergingtrendsEmergingtrends
Emergingtrendsmkanth
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandShadab Khan
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACAravind Panasa
 
Training PPT on DVC Maithon
Training PPT on DVC MaithonTraining PPT on DVC Maithon
Training PPT on DVC MaithonQamre Alam
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)Abhishek Karan
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVCLinkon Khan
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionShailesh Senta
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionShailesh Senta
 
Ehv ac dc ppt u 5
Ehv ac dc ppt u 5Ehv ac dc ppt u 5
Ehv ac dc ppt u 5eeeraviriet
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineeringYogesh Jadoun
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipurramesh kumawat
 

Similar a O&m of hvdc station power grid india (20)

1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...1200 kv  ultra high voltage transmission system  by   prannaya kumar giri & b...
1200 kv ultra high voltage transmission system by prannaya kumar giri & b...
 
HVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading TechnologyHVDC Transmission System Today's Upgrading Technology
HVDC Transmission System Today's Upgrading Technology
 
Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.Industrial Training at Howrah 220 kV Substation.
Industrial Training at Howrah 220 kV Substation.
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
Emergingtrends
EmergingtrendsEmergingtrends
Emergingtrends
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
Ultra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVACUltra High Voltage AC Transmission UHVAC
Ultra High Voltage AC Transmission UHVAC
 
Training PPT on DVC Maithon
Training PPT on DVC MaithonTraining PPT on DVC Maithon
Training PPT on DVC Maithon
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Azadar_Training
Azadar_TrainingAzadar_Training
Azadar_Training
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVC
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmission
 
Power upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmissionPower upgrading of transmission line by combining ac dc transmission
Power upgrading of transmission line by combining ac dc transmission
 
Ehv ac dc ppt u 5
Ehv ac dc ppt u 5Ehv ac dc ppt u 5
Ehv ac dc ppt u 5
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
azadar_training
azadar_trainingazadar_training
azadar_training
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur132 kv gss summer training report from CPWD vidhyadar nagar jaipur
132 kv gss summer training report from CPWD vidhyadar nagar jaipur
 

Último

Gartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptxGartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptxchadhar227
 
怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制
怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制
怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制vexqp
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Valters Lauzums
 
7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.ppt7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.pptibrahimabdi22
 
Dubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls DubaiDubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls Dubaikojalkojal131
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRajesh Mondal
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabiaahmedjiabur940
 
怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制
怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制
怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制vexqp
 
PLE-statistics document for primary schs
PLE-statistics document for primary schsPLE-statistics document for primary schs
PLE-statistics document for primary schscnajjemba
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...nirzagarg
 
一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样wsppdmt
 
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...gajnagarg
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangeThinkInnovation
 
Harnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptxHarnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptxParas Gupta
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Klinik kandungan
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...nirzagarg
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...nirzagarg
 
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book nowVadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book nowgargpaaro
 
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...gajnagarg
 

Último (20)

Gartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptxGartner's Data Analytics Maturity Model.pptx
Gartner's Data Analytics Maturity Model.pptx
 
怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制
怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制
怎样办理圣路易斯大学毕业证(SLU毕业证书)成绩单学校原版复制
 
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
Digital Advertising Lecture for Advanced Digital & Social Media Strategy at U...
 
7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.ppt7. Epi of Chronic respiratory diseases.ppt
7. Epi of Chronic respiratory diseases.ppt
 
Dubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls DubaiDubai Call Girls Peeing O525547819 Call Girls Dubai
Dubai Call Girls Peeing O525547819 Call Girls Dubai
 
Ranking and Scoring Exercises for Research
Ranking and Scoring Exercises for ResearchRanking and Scoring Exercises for Research
Ranking and Scoring Exercises for Research
 
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi ArabiaIn Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
In Riyadh ((+919101817206)) Cytotec kit @ Abortion Pills Saudi Arabia
 
怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制
怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制
怎样办理伦敦大学城市学院毕业证(CITY毕业证书)成绩单学校原版复制
 
PLE-statistics document for primary schs
PLE-statistics document for primary schsPLE-statistics document for primary schs
PLE-statistics document for primary schs
 
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
Top profile Call Girls In Begusarai [ 7014168258 ] Call Me For Genuine Models...
 
一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样
一比一原版(UCD毕业证书)加州大学戴维斯分校毕业证成绩单原件一模一样
 
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In dimapur [ 7014168258 ] Call Me For Genuine Models W...
 
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Surabaya ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With OrangePredicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
Predicting HDB Resale Prices - Conducting Linear Regression Analysis With Orange
 
Harnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptxHarnessing the Power of GenAI for BI and Reporting.pptx
Harnessing the Power of GenAI for BI and Reporting.pptx
 
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
Jual obat aborsi Bandung ( 085657271886 ) Cytote pil telat bulan penggugur ka...
 
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Satna [ 7014168258 ] Call Me For Genuine Models We ...
 
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Tumkur [ 7014168258 ] Call Me For Genuine Models We...
 
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book nowVadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
Vadodara 💋 Call Girl 7737669865 Call Girls in Vadodara Escort service book now
 
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Vadodara [ 7014168258 ] Call Me For Genuine Models ...
 

O&m of hvdc station power grid india

  • 1. OPERATION & MAINTENANCE OF HVDC STATION Praveen Ranjan Resident Project Manager India-Bangladesh Inter-connector Project Powergrid Corporation Of India Ltd.
  • 2.  Incorporated in 1989 for transmission of Electric Power across the country.  Central Transmission Utility - Navaratna PSU  Asset over Rs. 56000 Crs  World's Leading Power Transmission Utility (3rd) POWERGRID, An OVERVIEW
  • 3.  76800 Ckt.Km line-128 Substations  Technology Leader in EHVAC & HVDC Transmission.  Carries more than 50% of Generated Power Across Country.  84500 MVA Transformation Capacity  22400 MW Interregional Capacity Telecom NLD with 21000 Km Optical Fibre Network & Internet Service Provider POWERGRID, An OVERVIEW
  • 4. ROURKELA RAIPUR HIRMA TALCHER JAIPUR NER ER WR NR SR B'SHARIF ALLAHABAD SIPAT GAZUWAKA JEYPORE CHANDRAPUR SINGRAULI VINDHYA- 2000M W 2000MW 2500MW 1000MW 500MW LUCKNOW DIHANG CHICKEN NECK TEESTA TIPAIMUKH BADARPUR MISA DAMWE KATHAL- GURI LEGEND 765 KV LINES 400 KV LINES HVDC B/B HVDC BIPOLE EXISTING/ X PLAN NATIONAL ZERDA HISSAR BONGAIGAON KOLHAPUR NARENDRA KAIGA PONDA IX PLAN MARIANI NORTH KAHALGAON RANGANADI SEONI CHEGAON BHANDARA DEHGAM KARAD LONIKAND VAPI GANDHAR/ TALA BANGLA BALLABGARH A'PUR (DELHI RING) BANGALORE KOZHIKODE COCHIN KAYAMKULAM TRIVANDRUM PUGALUR KAYATHAR KARAIKUDI CUDDALORE SOUTH CHENNAI KRISHNAPATNAM CHITTOOR VIJAYAWADA SINGARPET PIPAVAV LIMBDI KISHENPUR DULHASTI WAGOORA MOGA URI BHUTAN RAMAGUNDAM SATLUJRAVI JULLANDHAR DESH VARANASI/UNNAO M'BAD PURNEA KORBA NAGDA SILIGURI/BIRPARA LAKSHADWEEP TEHRI MEERUT BHIWADI BINA SATNA MALANPUR SHIROHI KAWAS AMRAVATI AKOLA AGRA SIRSI CHAL JETPUR AMRELI BOISAR TARAPUR PADGHE DHABOL KOYNA BARH G'PUR HOSUR MYSORE KUDANKULAM M'PUR KARANPURA MAITHON JAMSHEDPUR PARLI WARDA BEARILLY SALEM GRID XI PLAN National Grid by 2012 THE POWER ‘HIGHWAY’
  • 5. Existing HVDC in INDIA 1 – Rihand-Dadri (1500MW) 2 - Vindyachal (500MW) 3 - Chandrapur-Padghe (1500 MW) 4 - Chandrapur-Ramagundam (1000MW) 5 – Gajuwaka (500MW) 6 - Sasaram (500MW) 7 - Talcher-Kolar (2500MW) 8 – Ballia-Bhiwadi(2500 MW)
  • 6. SALIENT FEATURES OF EXISTING & UPCOMING HVDC STATIONS
  • 7. ± 500 kV , 1500 MW Rihand – Dadri HVDC Project. Approx. Value of the Contract: Rs. 457 Crore Main Data: Power rating : 1500MW No. of Poles : 2 AC Voltage : 400 kV DC Voltage : + 500 kV Converter Transformer- Rihand Terminal : 6 x 315 MVA Dadri Terminal : 6 x 315 MVA Length of over head DC line: 816 KM. Start date: Feb-1986 Completion date: Dec-1991
  • 8. 2 x 250 MW HVDC Vindhyachal Back to Back Station. Approx. Value of the Contract: Rs. 176 Crore Start date: Nov 1984 Completion date: April 1989 Main Data: (i) Power rating : 2 x 250 MW. (ii) No. of Blocks : 2 (iii) AC Voltage : 400 kV (iv) DC Voltage : ± 70 kV (v) Converter Transformer : 8 x 156 MVA
  • 9. 2 x 500 MW HVDC Chandrapur Back to Back Station. Start date: November 1993 Completion date: Dec 1997 Main Data: Power rating : 2 x 500 MW. No. of Blocks : 2 AC Voltage : 400 kV DC Voltage : + 205 Kv Converter Transformer : 12 x 234 MVA Approx. Value of the Contract: Rs. 702.78 Crore
  • 10. + 500 kV ,2000 MW, HVDC Talchar – Kolar Transmission Line Approx. Value of the Contract: Rs. 822.46 Crore Start date: March 2000 Completion date: June 2003 Main Data: Power rating : 2000 MW No. of Poles : 2 AC Voltage : 400 kV DC Voltage : + 500 kV Converter Transformer- Talcher : 6 x 398 MVA Kolar : 6 x 398 MVA Length of over head DC line: 1369 KM.
  • 11.  HVDC Talchar – Kolar link was designed for 2000 MW continuous rating with inherent short term overload capacity depending on- Ambient temperature Prevailing voltages at Talcher and Kolar Cooling mechanism.  Further, DC Bipole lines with quad conductor was capable to transmit 1250 MW continuously with marginal incremental loss .  The inherent overload capability was utilized to meet the system contingencies by up gradation of Talcher – Kolar HVDC link capacity from 2000 MW to 2500 MW .  This enhanced capacity is to be used only under contingency and not for increasing HVDC Capacity for firm transfer of 2500 MW Up gradation of + 500 kV HVDC Talchar – Kolar link from 2000 MW to 2500 MW
  • 12. •Main objective of this HVDC project is to transfer power from Talcher Super Thermal Power Station (Eastern Region), to Kolar (Southern Region) of Indian Grid •The most important features of the project are •-Better over all economy as compared to AC Transmission •-Halved right-of-way requirements, •-Lower transmission loses, better stability and controllability. • This is the longest (1369 KM.) commercial HVDC link in India. Talchar – Kolar HVDC Transmission Link Salient Features:
  • 13. 1 x 500 MW HVDC Sasaram Back to Back Station. Approx. Value of the Contract: Rs. 204.68 Crore Start date: March 2000 Completion date: Sep 2002 Main Data (i) Power rating : 1 x 500 MW. (ii) No. of Blocks : 1 (iii) AC Voltage : 400 kV (iv) DC Voltage : 205 kV (v) Converter Transformer : 6 x 234 MVA Connects Pusauli (Eastern Region) to Sasaram (Eastern part of Northern Grid) of Indian Grid (Power Transfer mainly from ER to NR)
  • 14. 2 x 500 MW HVDC Gazuwaka Back to Back Station. Approx. Value of the Contract: Block-1 : Rs. 209.85 Crore Block-2 : Rs. 231.76Crore Start date: Block 1 : Dec 1994 Block 2 : Sep 2002 Completion date: Block 1 : Feb 1999 Block 2 : March 2005Main Data: (i) Power rating : 2 x 500 MW. (ii) No. of Blocks : 2 (iii) AC Voltage : 400 k (iv) DC Voltage : 205 kV ( Block 1) 177 kV (Block 2 ) (v) Converter Transformer Block 1 : 6 x 234 MVA Block 2 : 6 x 201.2 MVA
  • 15. + 500 kV, 2500 MW HVDC Ballia – Bhiwadi Transmission Line. Approx. Value of the Contract: Rs. 1365 Crore Pole 1 Commissioned on 31-03 10 Pole 2: Targetted to be commissioned by 31-10-10 Main Data: Power rating : 2500 MW No. of Poles : 2 AC Voltage : 400 kV DC Voltage : + 500 kV Length of over head DC line : 780 KM. Converter Transformer Ballia : 8 x 498 MVA Bhiwadi 8 x 498 MVA
  • 16. HVDC Multi Terminal System  North-Eastern Region has a large quantum Hydro Electric Power potential.  Under Hydro Development program of Govt of India, this power to be evacuated to load centres of Northern and Western Regions  POWERGRID installing +/-800 kV, 6000 MW HVDC multi-terminal system of approx length of 1728 km from North Eastern Region to Agra.
  • 17. • One Rectifier station in Biswanath Chariali (pooling station in North Eastern Region), second one in Alipurduar (pooling station in Eastern Region) and Inverter station at Agra (in Northern Region) HVDC Multi Terminal System •Converter stations at Biswanath Chariali and Alipurduar each handles a nominal power of 3000 MW and Converter station at Agra handles nominal power of 6000 MW. • This Transmission System originates from Assam and passes through West Bengal, Bihar and terminates in Uttar Pradesh.
  • 18. Consultancy Assignment: • 1 x 500 MW India-Bangladesh Interconnecter HVDC Back To Back Station, Bheramara Bangladesh Other Upcoming Projects: 2 x 500 MW HVDC BTB Station at Kolhapur between Kolhapur (Western Region ) and Narendra (Southern Region) of Indian Grid at
  • 19. Why O&M?  To Run the system Smoothly to achieve highest availability and avoid outages
  • 20. Operation of HVDC Station  Preconditions of RFS / RFO  Circuit Breaker Is Closed  Cooling System is OK  No Alarm from Protection System
  • 21. Operation of HVDC Station  Selection of Mode of Operation  Joint / Separate  Power / Current  Selection of Direction (Applicable for BTB)  Setting the Ramp Rate  Start of Block at Minimum Power Design
  • 22. Operation of HVDC Station  Selection of Mode of Operation  Joint / Separate  Power / Current  Selection of Direction (Applicable for BTB)  Start of Block at Minimum Power Design
  • 23. BASIC HVDC Single Line Diagram DC OH Line Converter Transformer DC Filter: DT 12/24 DT 12/36 DC Filter: DT 12/24 DT 12/36 Thyristor Valves 400 kV AC Bus AC Filters Smoothing Reactor Converter Transformer DC Filter: DT 12/24 DT 12/36 DC Filter: DT 12/24 DT 12/36 Thyristor Valves 400 kV AC Bus AC Filters Smoothing Reactor
  • 24. Modes of Operation DC OH Line Converter Transformer Thyristor Valves 400 kV AC Bus AC Filters, Reactors Smoothing Reactor Converter Transformer Thyristor Valves 400 kV AC Bus AC Filters Smoothing Reactor Bipolar Current Current
  • 25. Modes of Operation DC OH Line Converter Transformer Thyristor Valves 400 kV AC Bus AC Filters, Reactors Smoothing Reactor Converter Transformer Thyristor Valves 400 kV AC Bus AC Filters Smoothing Reactor Monopolar Ground Return Current
  • 26. Modes of Operation DC OH Line Converter Transformer Thyristor Valves 400 kV AC Bus AC Filters, Reactors Smoothing Reactor Converter Transformer Thyristor Valves 400 kV AC Bus AC Filters Smoothing Reactor Monopolar Metallic Return Current
  • 27. Operation of HVDC Station  Type of Shutdowns  Planned / Forced / Emergency Shutdown
  • 28. RPC  Q Mode  V Mode  Auto / Manual
  • 29. Operation of HVDC Station  Shutdown Procedure of HVDC Station  Planned  Emergency  Charging Procedure After Shutdown Checking of Annunciation List Before Charging After Shutdown (Must)
  • 30. Operation of HVDC Station  Trouble Shooting  Alarm System  Active & Standby System of C&P
  • 31. Type of Maintenance  Preventive Maintenance  Outage Maintenance
  • 32. Major Areas Of HVDC BTB Station  Valve Hall  AC Switchyard Equipments  Valve Cooling  Auxiliaries and AC System  AC/DC Control & Protection System
  • 33. Valve Hall  The status of the Thyristor levels in the valve hall is available online in the Control Room  Valve Control System monitors continuously, the healthiness of the thyristors and associated valve hall components while in service  Failure of thyristor is reported in the Control Room by Valve control system for the operator  Alarm is generated up to 2 thyristor failures in a valve and on 3rd failure, trip is generated (Redundancy of Thyristors differs from system to system)
  • 34.  Failure may be in  Thyristor  Snubber capacitor  Snubber resistor  TE card  To test the thyristor level – Thyristor Level Test Unit is used which tests thyristor and associated components  Failure of the thyristor can be detected Valve Hall – Thyristor level testing
  • 35. Major Work During Yearly Maintenance  Cleaning of Valve Hall  Testing of Thyristors/Snubber Circuit  Testing of Ground Switches  Checking of any abnormality  Checking of Water leakage  Tightness Checking of Bolts  Record of Valve Arrestor Readings  Testing of Fire System
  • 37. Converter Transformer  Following tests are done during yearly shutdown  Capacitance and tan δ of the bushings  Used to determine the healthiness of the bushing insulation  Checking the operation of the buchholz relays and Pressure Relief Devices (PRD)  Checking of the WTI & OTI alarms and trips  Checking whether all the alarms are reported to HMI system  Checking the operation of fire fighting deluge valve system
  • 38. Converter Transformer  Replacement of the oil filters of OLTC (On-Load tap Changer) – can be replaced online when the alarm is generated  Periodic testing of the oil – DGA – to determine the incipient internal faults of the transformer  Testing of all the associated protection relays
  • 39.  Converter Transformer OLTC – Inspection of the OLTC  Maintenance of OLTC after every 1 lakh operations  Wear and tear of all mechanical & electrical parts of the OLTC to be inspected.  Replacement of mechanical parts with high wear & Tear.  Cleaning of Fixed and moving contacts.  Cleaning of OLTC chambers  Filling with fresh oil Converter Transformer
  • 40.  Following Maintenance Carried Out W/SD on Monthly Basis  Inspection of Bushing Oil Level.  Inspection of Oil Level in Conservator.  Inspection of Oil Level in OLTC Conservator.  Manual Starting of Oil Pumps & Fans  Checking of Oil Leaks  Oil Level in Breather Oil Seal  Condition of Silica Gel Converter Transformer
  • 43. AC Filter  Maintenance of filter bay equipment includes  Testing of CT – C & Tan δ  Capacitance stack measurement and balancing if required  Inspection of capacitor stack for oil leakage  Associated breaker testing -Operation timings, alarm, lockout checks etc.  Measurement of resistors and reactors – for deviation  Testing of associated protection systems
  • 44. Apart from the yearly maintenance, failure of capacitor cans calls for  Measurement of individual capacitor stacks /cans AC Filter
  • 45. Current Transformer & Voltage Transformer  Current Transformer  Capacitance and Tan δ Measurement (S/D)  Inspection of CT for oil leakage & Crack in Insulator  Cleaning of MB (S/D)  Measurement of Ratio & Secondary Resistance (SOS)  DGA of Oil (SOS)  Oil Parameters (SOS)  IR Measurement (SOS)
  • 46. Current Transformer & Voltage Transformer  Voltage Transformer  Capacitance and Tan δ Measurement (S/D)  Inspection of oil leakage & Crack in Insulator  Cleaning of MB (S/D)  Measurement of Secondary Voltage
  • 47. Circuit Breakers  Timing of Main & Auxiliary Contacts (Y)  Checking of Pressure Setting of Switches (Y)  Checking of Pole Discrepancy (Y)  Checking of Interlocks (Y)  Trip / Close Coil Currents Measurement  Maintenance of Air Compressor (In Pneumatic System)  Cleaning of Support Insulator / PIR & Grading Capacitor / Interrupter Chamber
  • 48. Circuit Breaker Contd.  Lubrication of Chain & Gears / Checking healthiness & Cleaning of Rollers / Checking healthiness of springs and greasing if required (In Spring Operated Mechanism)  Measurement of Static contact resistance measurement (2Y)  Measurement of DCRM & Contact Travel (2Y)  Capacitance & Tan Delta Measurement of Grading Capacitor (4Y)  Dew Point Measurement of SF6 Gas (4Y)  SF6 Gas Filling (SOS)  Checking of Grading Capacitor Oil Leakage (M)
  • 50. Valve cooling Maintenance of Valve Cooling  Replacement of resin in the resin chamber yearly  Cleaning / Painting of Cooling Towers (If available) (Y)  Cleaning of Heat Exchangers (If available) (Y)
  • 51. Valve Cooling  Cleaning of Filters (SOS)  Testing of Related Protection System (Y)  Maintenance of Pumps (3M)  Vibration Measurement of Pumps (3M)  Cleaning of Electrical Contactors (3M)
  • 52. Auxiliary System  Yearly servicing of DG sets and protection relays testing  Fire Fighting system – checking the hydrant points  Maintenance of station batteries, chargers and UPS systems  LT system – Relay testing & LT breaker maintenance
  • 53. Maintenance of LT breakers & Relay testing
  • 54. Control & Protection System  Testing of All Control & Protection System (Y)  Modification / Replacement / Testing of Relays & Cards (SOS)
  • 55. MAJOR PROBLEMS OBSERVED DURING O&M  VALVE HALL  Thyristor Failure (Frequency :Very Low)  Failure of Surge Arrestor (Frequency :Very Low)  Water Leakage from Pex Tube (Frequency :Very Low)
  • 56. MAJOR PROBLEMS OBSERVED DURING O&M  VALVE COOLING SYSTEM  Water Pump Motor Failure (Frequency :Medium)  Valve Motor Failure (Frequency :Very Low)  Makeup Water Float Failure (Frequency :Medium)
  • 57. MAJOR PROBLEMS OBSERVED DURING O&M  Control & Protection SYSTEM  Failure of Control Cards  Stalling of Software  Measuring System