SUMMER INTERNSHIP 2012 @


LARSEN AND TOUBRO
  CONSTRUCTION
  (ECC DIVISION)



10 July 2012 – 25 August 2012


        Kundan Giri
: L & T AT A GLANCE :



       Founded in 1938 by two Danish
        engineers, Henning Holck-Larsen
        and Soren Kristian Toubro


       One of the largest engineering and
          construction company in India.


       L&T ranks 40 in the top 225
          global contractors 2008 data,
          improved from 47th (2007) &
          54th (2006).
L & T BUSINESSES :




       Projects        Products      Services




     Construction    Electrical &      IT &
                     Electronics    Technology
      E&C Projects                   Services
                     Machinery &
      Heavy Engg.     Industrial     Financial
                       Products      Services
Transport Infrastructure & Water
Buildings & Factories

                        ECCD
                                                Process
jaltikalan powergrid, DELHI
Project Location
Project Highlights

 Projective objective: erection of ICT
  (interconnecting transformer)in power
  grid

 No. of transformers : 13

 Transformer capacity : 765/400kv

 Unit weight of each transformer : 209
  MT

 Transformer’s make : TBEA

  Shenyang(chinese)
Project Synopsis

Name of the project           Erection of 765/400 kv ICT (Interconnecting transformers)

Client                        Power grid Corporation of India (PGCIL)

Project Manager               Mr. SNEHASHISH DEBNATH
Site Engineer                 Mr. Jasmeet Singh
Chief Electrical Engineer     Mr. Tushar kumar
Transformers make             TBEA Shenyang(chinese)/500mva each
Q.S./Cost Estimator           Padghams Swett
LEEDS Certification           Surmount Energy Solutions Pvt Ltd.
Type of Contract              Tender
Contract Value                85 Crore
Contract Duration             11 Months. (8+ 3)
Contractual Start (LOI)Date   9th dec 2011
Contractual Completion
                              8th nov 2012
Date
DLP/Maintenance Period        1 Year
SOME FEATURES OF PROJECT
                          • Project Office, Safety hall, Client's
                          Office etc is setup on MMRDA Plot
                          besides site.




         Infrastructure
         Setup

                          • Infrastructure Setup ( Labour
        Proposed Site     Sheds , Batching Plant , etc ) would
                          be arranged on land provided by
                          Client.
PROJECT CHALLENGES


Tight Project Schedule.
Space Constraint
Higher Volume of Work within Stipulated time.
Mobilization of Transformers weighing 209 MT
 Mobilization of skilled Manpower               Place for transformer
CONSTRUCTION METHODOLOGY – TYPICAL FORMWORK SYSTEM




The whole project
can be described in
following manner :

•   Mobilization of
    transformer in
    parts from import
    site to
    construction site



•   Erection of
    proper vibration
    shielding base at
    the site of
    construction
•   Reassembly of parts of
    transformers at the site
•   Unloading and loading
    of transformers using
    2x100 MT hydraulic
    jacks
•   Fixing the transformers
    using concrete
•   Connection of cooling
    lines, transmission
    lines, grid maintenance
    lines
•   Filling of coolant and
    test run using gen-
    sets.
MOMENTS @ SITE




THANKYOU ….

Más contenido relacionado

La actualidad más candente

Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Raushan Kumar
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resumeprasunkishoreroy
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016subhankar saha
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resumeVEERABHARATHI MUNI
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015Somnath Das
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nicolae Vasiliu
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERAMIT BISWAS
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)Irfan Vali
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentationSomejit Chakraborty
 
A Review of Low Power Novel Gate Design
A Review of Low Power Novel Gate DesignA Review of Low Power Novel Gate Design
A Review of Low Power Novel Gate DesignIRJET Journal
 

La actualidad más candente (20)

Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
Resume of Raushan Kumar having 9 Yrs of Exp in Power Distribution
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
CV Solar
CV SolarCV Solar
CV Solar
 
Director Power Projects Resume
Director Power Projects ResumeDirector Power Projects Resume
Director Power Projects Resume
 
Gensol - EPC Services
Gensol - EPC ServicesGensol - EPC Services
Gensol - EPC Services
 
Subhankar resumé-2016
Subhankar  resumé-2016Subhankar  resumé-2016
Subhankar resumé-2016
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015CV_Somnath Das - 22.06.2015
CV_Somnath Das - 22.06.2015
 
Ashish Resume
Ashish ResumeAshish Resume
Ashish Resume
 
Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017Nick Vasiliu Resume Electrical Design Engineer 2017
Nick Vasiliu Resume Electrical Design Engineer 2017
 
RESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEERRESUME ELECTRICAL ENGINEER
RESUME ELECTRICAL ENGINEER
 
Gensol Permits Procurement Services
Gensol Permits Procurement ServicesGensol Permits Procurement Services
Gensol Permits Procurement Services
 
Yahya Khan CV(1)
Yahya Khan CV(1)Yahya Khan CV(1)
Yahya Khan CV(1)
 
SHAIK IRFAN VALI resume (solar)
SHAIK IRFAN VALI  resume (solar)SHAIK IRFAN VALI  resume (solar)
SHAIK IRFAN VALI resume (solar)
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
Resume
ResumeResume
Resume
 
cv umar
cv umarcv umar
cv umar
 
A Review of Low Power Novel Gate Design
A Review of Low Power Novel Gate DesignA Review of Low Power Novel Gate Design
A Review of Low Power Novel Gate Design
 

Destacado

Destacado (9)

Project e-kit
Project e-kitProject e-kit
Project e-kit
 
L & t training project
L & t training projectL & t training project
L & t training project
 
the e- kit
the e- kitthe e- kit
the e- kit
 
kamal seminaar ppt
kamal seminaar pptkamal seminaar ppt
kamal seminaar ppt
 
Ncl summer training report
Ncl summer training reportNcl summer training report
Ncl summer training report
 
motorized bike j2ee ppt explanation of project
motorized bike j2ee ppt explanation of projectmotorized bike j2ee ppt explanation of project
motorized bike j2ee ppt explanation of project
 
E-bike ppt
E-bike pptE-bike ppt
E-bike ppt
 
Material Management
Material Management Material Management
Material Management
 
Packaging for the Logistics
Packaging for the LogisticsPackaging for the Logistics
Packaging for the Logistics
 

Similar a Summertraining l&t

Similar a Summertraining l&t (20)

PECL PROJECTS
PECL PROJECTSPECL PROJECTS
PECL PROJECTS
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
Venkat CV
Venkat CVVenkat CV
Venkat CV
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
Alwin CV 032016_neW.
Alwin CV 032016_neW.Alwin CV 032016_neW.
Alwin CV 032016_neW.
 
Arul Jose
Arul JoseArul Jose
Arul Jose
 
DELTAPOWER Comapny Profile
DELTAPOWER Comapny ProfileDELTAPOWER Comapny Profile
DELTAPOWER Comapny Profile
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
Ambrose Elugbe - CV
Ambrose Elugbe - CVAmbrose Elugbe - CV
Ambrose Elugbe - CV
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCEVIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
VIJAYABASKAR_ELECTRICAL _8YEARS_EXPERIENCE
 
John_Buckley_CV_V9
John_Buckley_CV_V9John_Buckley_CV_V9
John_Buckley_CV_V9
 
Muditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineerMuditha dasanayake telecommunications engineer
Muditha dasanayake telecommunications engineer
 
Resume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year expResume for Estimation Engineer Electrical 3 year exp
Resume for Estimation Engineer Electrical 3 year exp
 
Electrical_Engineer_CV
Electrical_Engineer_CVElectrical_Engineer_CV
Electrical_Engineer_CV
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 

Summertraining l&t

  • 1. SUMMER INTERNSHIP 2012 @ LARSEN AND TOUBRO CONSTRUCTION (ECC DIVISION) 10 July 2012 – 25 August 2012 Kundan Giri
  • 2. : L & T AT A GLANCE :  Founded in 1938 by two Danish engineers, Henning Holck-Larsen and Soren Kristian Toubro  One of the largest engineering and construction company in India.  L&T ranks 40 in the top 225 global contractors 2008 data, improved from 47th (2007) & 54th (2006).
  • 3. L & T BUSINESSES : Projects Products Services Construction Electrical & IT & Electronics Technology E&C Projects Services Machinery & Heavy Engg. Industrial Financial Products Services
  • 4. Transport Infrastructure & Water Buildings & Factories ECCD Process
  • 7. Project Highlights  Projective objective: erection of ICT (interconnecting transformer)in power grid  No. of transformers : 13  Transformer capacity : 765/400kv  Unit weight of each transformer : 209 MT  Transformer’s make : TBEA Shenyang(chinese)
  • 8. Project Synopsis Name of the project Erection of 765/400 kv ICT (Interconnecting transformers) Client Power grid Corporation of India (PGCIL) Project Manager Mr. SNEHASHISH DEBNATH Site Engineer Mr. Jasmeet Singh Chief Electrical Engineer Mr. Tushar kumar Transformers make TBEA Shenyang(chinese)/500mva each Q.S./Cost Estimator Padghams Swett LEEDS Certification Surmount Energy Solutions Pvt Ltd. Type of Contract Tender Contract Value 85 Crore Contract Duration 11 Months. (8+ 3) Contractual Start (LOI)Date 9th dec 2011 Contractual Completion 8th nov 2012 Date DLP/Maintenance Period 1 Year
  • 9. SOME FEATURES OF PROJECT • Project Office, Safety hall, Client's Office etc is setup on MMRDA Plot besides site. Infrastructure Setup • Infrastructure Setup ( Labour Proposed Site Sheds , Batching Plant , etc ) would be arranged on land provided by Client.
  • 10. PROJECT CHALLENGES Tight Project Schedule. Space Constraint Higher Volume of Work within Stipulated time. Mobilization of Transformers weighing 209 MT  Mobilization of skilled Manpower Place for transformer
  • 11. CONSTRUCTION METHODOLOGY – TYPICAL FORMWORK SYSTEM The whole project can be described in following manner : • Mobilization of transformer in parts from import site to construction site • Erection of proper vibration shielding base at the site of construction
  • 12. Reassembly of parts of transformers at the site • Unloading and loading of transformers using 2x100 MT hydraulic jacks • Fixing the transformers using concrete • Connection of cooling lines, transmission lines, grid maintenance lines • Filling of coolant and test run using gen- sets.