2. Items Units
Weave, drawing-in and lifting plan -
Fabric width Cm
Warp density Ends/cm
Weft density Picks/cm
Warping (Colour pattern) -
Wefting (Colour pattern) -
Warp crimp %
Weft crimp %
Warp count & material Tex
Weft count & material Tex
Fabric weight Gm/sq. m
Points to be noted for calculation
3. Fabric Weight Calculation
• This is done by calculation of fabric size 1 m x 1 m.
• The formula for warp weight:
• Warp weight (gm/sq m.) = [ends/cm x 100 x tex x (1+warp crimp%)] ÷ 1000
• The formula for weft weight:
• Weft weight (gm/sq m.) = [picks/cm x 100 x tex x (1+weft crimp%)] ÷ 1000
• Fabric Weight (gm/sq. m) = warp weight + weft weight
Vignesh Dhanabalan - vignesh dhanabalan@hotmail.com
5. Finding crimp% and yarn count
• Crimp%=
[(extended length) – (sample length) x100%] ÷ (sample length).
• For yarn count, it is determined through the weight of specific
length and then calculate the count.
• Yarn count (tex) = yarn weight (gm) per 1000 meter.
Vignesh Dhanabalan - vignesh dhanabalan@hotmail.com
6. Weft Consumption per pick
• In the shuttleless weaving machine the weft consumption
in meters per pick is:
Where,
b – is the reed width
K –is the co-efficient of the take-up in percent
x –is the length of the weft extending from the fabric.
Vignesh Dhanabalan - vignesh dhanabalan@hotmail.com
7. Weft Consumption per shift
• Number of supply packages consumed with in eight hours shift
at a 100% machine efficiency:
Where,
Nm –is the metric count of the weft thread
G –is the weight in kg of the weft yarn package on the bobbin
n –is the machine speed in rpm
Vignesh Dhanabalan - vignesh dhanabalan@hotmail.com