 Design of Flyover at level crossing
No. 528 situated on NewDelhi-
Mumbai C.S.T connecting Sri
Krishna Janambhoomi Road with
NH-2 in distt. Mathura.
 About the Project
-Side view of Flyover
 Design of Super Structure
-Pigeaud’s Method
-Courbon’s Method
 Design of Deck Slab
 Design of Longitudinal Girders
 Design of Cross Girders
 Design of Bearing
 Design of Piers
 Design of Foundation
 Total Summary of Project
 References
 Total length of Flyover is 787.8m.
 Flyover consists:
-4 Different span arrangement of length
[2*23.3+17*24.0+2*12.0+19.9*1+37.9*1] c/c of
expansion
joint.
-22 Piers
-2 Abutments
 Carriage Way Width=7.5m(2 lane)
 The kerbs of width 475mm will be provide in both
directions.
NH2 SIDEJANMBHOOMI SIDE
P8
24m SLAB
 Flyover is designed for Class A loading.
 Design Speed as per AASHTO= 40kmph.
 Neoprene Bearing is used.
 Railing- Crash Barrier.
 T Cross section bridge with 3 Beam arrangement in all
spans.
 The deck slab , cross girder and longitudinal girder are
casted monolithically.
 Concrete grades :
- Lean Concrete M10
- Foundation M30
- Substructure M35
- Beams M40
- Deck slab M40
- Crash Barrier M40
 High yield deformed bars of Fe415 grade will be
used(IS1786).
 Seismic zone - IV
 Importance Factor -1.2
 Sa/g -2.5
 Bearing capacity of soil at site
- at 2.5m below G.L. =14.2T/m2
- at3.0m below G.L. =16.8T/m2
 Gradient on both side of railway portion - 1:30
 There is very little effect of centrifugal force hence it is
neglected.
 The summit and valley curves are used as vertical curves
 The Deck Slab and Longitudinal Girders of
superstructure are designed by two methods:
- Pigeaud’s Method(for Deck Slab)
- Courbon’s Method(for Longitudinal
girder)
 For slabs spanning in two directions, Pigeaud’s
Method is used, the moments in two directions
can be obtained by rational method. The use of
curves given by M. Pigeaud is recommended.
 Pigeaud’s method is applicable to rectangular
slabs supported freely on all four sides and
subjected to a symmetrical placed load.
 Let L and B – be the span lengths
 a and b- the dimensions of the tyre contact area in the
long and short span directions.
 u and v be the dimensions of the load spread after
allowing for dispersions through the deck slab.
 K – the ratio of short span to long span.
 M1 and M2- the moments along the short and long
span.
 m1 and m2- the coefficients for moments along short
and long span.
 poissons’s ratio(k) =0.15
 P- load from the wheel under consideration.
 M1 and M2 can be calculated by following equations:
M1=(m1+km2)P
M2=(m2+km1)P
 According to courbon’s method, the reaction Ri of the
cross beam on any girder i of a bridge consisting of
multiple parallel beams is computed by assuming a
linear variation of deflection in the transverse direction
.
 The deflection will be maximum on the exterior girder
on the side of the eccentric load and minimum on the
other exterior girder.
Ri= PIi/∑Ii[1+(∑Ii/∑Iidi
2)*edi]
Where,
P – total live load
e – eccentricity of live load
di– distance of girder i from the axis of
bridge
I – Moment of inertia of girder
 Design Data:
Effective span= 24m
Clear Roadway width for 2 lane= 7.5m
Assume 3 longitudinal beams spaced at 2.5m
c/c intervals,
7 cross beams are taken to make the slab as two-
way at 4m c/c intervals.
(the preliminary dimensions may be assumed for
simplicity)
Clear cover for reinforcement is 25mm.
 Thickness of slab= 250mm
 Thickness of wearing course= 75mm
 Panel size= (2.2m*3.7m)
Panel of
deck slab
MAXIMUM BENDING MOMENT DUE TO
DEAD LOAD
 Weight of deck slab=6.25 kN/m2
 Weight of bearing course=1.65kN/m2
 Total weight=7.9kN/m2
by Pigeaud’s curve, using the value of K and 1/K the
moment coefficients along long span and short span
(m1&m2) will be calculated .
Where,
K = short span/ long span
K=.594,
1/K=1.681
m1 = 0.0488,
m2= 0.015(curves)
P = 55.43
now,
M1=2.829 kNm
M2=1.237kNm
WHEEL 1
u = 0.6965 ,v = 0.4717,K = 0.5949
u/b = 0.3166 , v/l = 0.1275
m1 = 0.177, m2 = 0.131
Impact factor = 15%, P = 65.11kN
M1 = 12.9 kNm, M2 = 10.35kNm
WHEEL 2
M1 = 1.765kNm, M2 = 0.245kNm
Total moment along short span= 17.4kNm
Total moment along long span= 11.8kNm
Reinforcement:-
σcbc = 13.33 N/mm2
σst = 230N/mm2
m = 7, k = 0.711, j = 0.763, Q = 3.61
Ast1 = 561mm2, Ast2 = 415mm2
S1 = 358mm, S2 = 487mm
Provide 16mm dia bars in both directions at 300mm c/c of
bottom face.
12mm dia bars in both directions at 300mmc/c of top face.
Cantilever slab is designed for one-way.
Total Dead Load Moment of slab=12.4kNm
Total Live Load Moment = 37kNm
Design Moment= 49.4kNm
Ast= 1062mm2, Spacing=190mm
Provide 16mm dia bars at 180mm c/c at top face.
BM for transverse direction= .2DLM+.3LLM
= 13.6kNm
Ast= 307mm2,
Provide 12mm dia bars at 300mm c/c in transverse
direction at top face.
And provide 12mm dia bars in both directions at
250mm c/c at bottom face.
1. Intermediate Longitudinal Girders
Total Dead Load Moment on Girder= 2616kNm
Reaction Factor by Courbon’s Method
Ra = 1.89w, Rb = 1.33w,Rc = 0.78w
I.F = 15%
Total Live Load Moment with I.F = 1460kNm
Total Design Moment = 4075kNm
Ast = 11585mm2
No. of 32mm dia bars = 14.4
Provide 15 bars of 32mm dia in 3 rows of 5 bars
each.
Provide 4 legged 8mm dia bars at 250mmc/c in
transverse direction of longitudinal girder.
2. End Longitudinal Girders:
The design of end longitudinal girder is same as
intermediate girder only difference is that the live
load moment is increased by 10%.
Provide 15 bars of 32mm dia in 3 rows of 5
bars each.
Provide 4 legged 8mm dia bars at 250mmc/c in
transverse direction of End Longitudinal
Girders.
 Effective span for cross girder = 2.2m
 I.F.=.55
 Bending moment due to Dead Load
+ve BM = 4.581kNm
-ve BM = 8.713kNm
 BM due to Live Load
+ve BM = 29.34kNm
-ve BM = 28.37kNm
 Design +ve BM = 33.921kNm
 Design -ve BM = 37.083kNm
 Ast = 129mm2
 According to codal provisions, provide 3 bars of 25mm
dia. in longitudinal direction of all cross beams.
 And Provide 4 legged 12mm dia bars at 250mm c/c in
transverse direction of cross girders.
 And provide 2 bars of 22mm dia as cranked bars as
additional provision to cater to diagonal tension.
Design of P8
Dia of piers:-
2.5m for height above 4.5m
2.0m for height up to 4.5m
Gross Area, Ag = 4908738.521mm2
Clear cover = 40mm
Dia of longitudinal bars= 28m
Effective dia= 2446mm
Safe stress in concrete = 10N/mm2
Safe stress in steel = 230N/mm2
Provide 0.5% longitudinal steel of gross dia as per IRC
21:2000.
Asc = 25453.7mm2
No. of bars = 39.85
Hence privide 40 bars of 28mm.
Transverse Reinforcement:
Dia of transverse reinforcement should not less than one
quarter of longitudinal bars=7mm
Hence, take 8mm dia bars at 300mm c/c in transverse
direction.
 For columns height up to 4.5m:
Dia of bars = 25mm
M30 grade concrete used and Fe415 HYSD bars are used
Dia of columns = 2m
Gross Dia, Ag = 3141542.65mm2
Asc= 15707.96mm2
No. of bars = 32
Provide 32 bars of 25mm dia in longitudinal direction.
Provide 8mm dia bars at 300mm c/c in transverse direction.
 Assume total dead load and live load on column=
10,000kN.
 As per code provision, weight of footing is 10% of total
load on column= 1000kN
Total load in footing= 11,000kN
 Safe bearing capacity of soil= 165kN/m2
 Area of footing= 66.66m2
So provide 8.5m*10.75m= 91.375m2 area at 3m below
ground level.
And provide 9.0m*8.5m area at 2.5m below ground level.
 Isolated footing of depth 500mm at end of footing and 1.7m
near the column face.
Provide 150mm lean concrete below foundation.
 As per IRC6:2000, minimum Ast is 0.3% of gross dia,
so provide 0.5% of gross dia.
=24543.64mm2
Provide 25mm dia at 130mm c/c in l direction for both
cases of columns(above 4.5m and up to 4.5m)
Provide 28mm and 25mm dia bars in b direction at
130mm c/c for above 4.5m and upto 4.5m columns
respectively.
 Total length of flyover = 787.77m
 No. of Piers = 22 piers + 2 abutments
 Span Arrangement
- 24m*17
- 12m*2
- 23.325m*2
- 37.87m*1
- 19.87m*1
 Thickness of deck slab = 250mm
 Thickness of wearing coat = 75mm
 Depth of longitudinal girder = 1.575m
 Depth of cross girder = 1.275m
 Provide thickness of longitudinal and cross girders = 300mm
 SLAB 1(24m):
No. of longitudinal girder = 3(for all slabs)
No. of cross girders = 7
-Provide 16mm dia bars in both direction at 300mm c/c at bottom face.
-12mm dia bars in both direction at 300mmc/c at top face.
- Provide 16mm dia bars at 180mm c/c in cantilever portion of slab.
- Provide 12mm dia bars at 300mm c/c in transverse direction of cantilever
slab.
 LONGITUDINAL GIRDER:
- Provide 15 bars of 32mm dia in 3 rows at bottom of the T rib.
- Provide 4 legged 8mm dia bars at 250mmc/c in transverse direction.
- Provide 6 bars of 22mm dia as additional provision to cater to diagonal
tension.
 CROSS GIRDERS:
Provide 3 bars of 25mm dia in all cross beams.
Provide 4 legged stirrups of 10mm dia bars at 150mm c/c.
Provide 2 bars of 22mm dia as cranked bars as additional
provision to cater to diagonal tension.
 PIER:
Dia of pier = 2m (height up to 4.5m)
Dia of pier = 2.5m(height above 4.5m)
Provide 40 longitudinal bars of 28mm dia (for height above
4.5m) 8mm dia bars at 300 mm c/c for transverse reinforcement.
Provide 40 longitudinal bars of 25mm dia and 8mm dia bars at
300 mm c/c for transverse reinforcement(for height up to 4.5m)
 FOUNDATION:
Provided area of foundation
= 10.75m*8.5m (for height above 4.5m)
= 9m*8.5m (for height up to 4.5m)
Provide 25mm dia bars at 130mm c/c in longitudinal
direction of footing.
Provide 28mm dia bars at 130mm c/c in transverse
direction of footing.
 Essentials of bridge engineering:-
by D. Johnson Victor
 Design of reinforced concrete structure:-
by S. Ramamrutham
 IS codes:-
IRC:6-2000
IRC:21-2000
IRC:38-1988
IS:456-2000
IS:1786
Design of flyover presented by Vikas GLNAIT, Mathura

Más contenido relacionado

La actualidad más candente (20)

Chapter 4 seepage theories
Chapter 4 seepage theoriesChapter 4 seepage theories
Chapter 4 seepage theories
 
Balanced Cantilever Bridge
Balanced Cantilever BridgeBalanced Cantilever Bridge
Balanced Cantilever Bridge
 
UNDERWATER CONCRETING TECHNIQUES
UNDERWATER CONCRETING TECHNIQUESUNDERWATER CONCRETING TECHNIQUES
UNDERWATER CONCRETING TECHNIQUES
 
L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3 L4 engineering surveys for highways 1.3
L4 engineering surveys for highways 1.3
 
Water tank design ppt
Water tank design pptWater tank design ppt
Water tank design ppt
 
GEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETEGEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETE
 
1 st 20 year road plan
1 st 20 year road plan1 st 20 year road plan
1 st 20 year road plan
 
Circular slabs
Circular slabsCircular slabs
Circular slabs
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Design of combined footing ppt
Design of combined footing pptDesign of combined footing ppt
Design of combined footing ppt
 
water tank
water tankwater tank
water tank
 
energy dissipator in hydraulic structure
energy dissipator  in  hydraulic structure energy dissipator  in  hydraulic structure
energy dissipator in hydraulic structure
 
Superelevation
SuperelevationSuperelevation
Superelevation
 
Pavements PPT
 Pavements PPT  Pavements PPT
Pavements PPT
 
Design of columns as per IS 456-2000
Design of columns as per IS 456-2000Design of columns as per IS 456-2000
Design of columns as per IS 456-2000
 
7. Traffic Engineering.pdf
7. Traffic Engineering.pdf7. Traffic Engineering.pdf
7. Traffic Engineering.pdf
 
Stilling basin
Stilling basinStilling basin
Stilling basin
 
Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000Design of slender columns as per IS 456-2000
Design of slender columns as per IS 456-2000
 
Is 1343 2012
Is 1343   2012Is 1343   2012
Is 1343 2012
 

Similar a Design of flyover presented by Vikas GLNAIT, Mathura

Combined footings
Combined footingsCombined footings
Combined footingsseemavgiri
 
project ppt 2 pdf.pdf
project ppt 2 pdf.pdfproject ppt 2 pdf.pdf
project ppt 2 pdf.pdfKarthikMasky
 
INDUSTRIAL BUILDING GANTRY GIRDER
INDUSTRIAL BUILDING  GANTRY GIRDERINDUSTRIAL BUILDING  GANTRY GIRDER
INDUSTRIAL BUILDING GANTRY GIRDERHarsh Shani
 
C09 m-403032016 som
C09 m-403032016 somC09 m-403032016 som
C09 m-403032016 somvinodh kumar
 
Memorial Hall- Design Project
Memorial Hall- Design ProjectMemorial Hall- Design Project
Memorial Hall- Design ProjectMartha Jennifer
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNAkshika Mahanama
 
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERINGDESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERINGLiyaWilson4
 
Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...
Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...
Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...IRJET Journal
 
Residential Building using Pre-Engineered Steel Beam-Column(G+1)
Residential Building using Pre-Engineered  Steel Beam-Column(G+1)Residential Building using Pre-Engineered  Steel Beam-Column(G+1)
Residential Building using Pre-Engineered Steel Beam-Column(G+1)Humaayun Mohamed
 
Rigid pavement design
Rigid pavement designRigid pavement design
Rigid pavement designgeorgezac
 
Design of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptxDesign of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptxSharpEyu
 
design-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdfdesign-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdfyohannesmesfin7
 

Similar a Design of flyover presented by Vikas GLNAIT, Mathura (20)

Combined footings
Combined footingsCombined footings
Combined footings
 
project ppt 2 pdf.pdf
project ppt 2 pdf.pdfproject ppt 2 pdf.pdf
project ppt 2 pdf.pdf
 
bridge final ppt.pptx
bridge final ppt.pptxbridge final ppt.pptx
bridge final ppt.pptx
 
INDUSTRIAL BUILDING GANTRY GIRDER
INDUSTRIAL BUILDING  GANTRY GIRDERINDUSTRIAL BUILDING  GANTRY GIRDER
INDUSTRIAL BUILDING GANTRY GIRDER
 
Footing design
Footing designFooting design
Footing design
 
C09 m-403032016 som
C09 m-403032016 somC09 m-403032016 som
C09 m-403032016 som
 
Memorial Hall- Design Project
Memorial Hall- Design ProjectMemorial Hall- Design Project
Memorial Hall- Design Project
 
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMNCONSTRUCTION TECHNOLOGY COSTING OF COLUMN
CONSTRUCTION TECHNOLOGY COSTING OF COLUMN
 
unit-3.ppt
unit-3.pptunit-3.ppt
unit-3.ppt
 
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERINGDESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
DESIGN OF DECK SLAB AND GIRDERS- BRIDGE ENGINEERING
 
Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...
Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...
Performance Evaluation of Elastomeric Pads as Bridge Bearings under Earthquak...
 
Residential Building using Pre-Engineered Steel Beam-Column(G+1)
Residential Building using Pre-Engineered  Steel Beam-Column(G+1)Residential Building using Pre-Engineered  Steel Beam-Column(G+1)
Residential Building using Pre-Engineered Steel Beam-Column(G+1)
 
Project 2b (1) (2)
Project 2b  (1) (2)Project 2b  (1) (2)
Project 2b (1) (2)
 
Rigid pavement design
Rigid pavement designRigid pavement design
Rigid pavement design
 
1 th 07
1 th 071 th 07
1 th 07
 
Design of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptxDesign of composite steel and concrete structures.pptx
Design of composite steel and concrete structures.pptx
 
1622828460.pdf
1622828460.pdf1622828460.pdf
1622828460.pdf
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
presentation1_28.pptx
presentation1_28.pptxpresentation1_28.pptx
presentation1_28.pptx
 
design-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdfdesign-of-combined-footings-by-is-456-ppt.pdf
design-of-combined-footings-by-is-456-ppt.pdf
 

Último

Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxbingyichin04
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789CristineGraceAcuyan
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证wpkuukw
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...nirzagarg
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxMdBokhtiyarHossainNi
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...Amil baba
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证eqaqen
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement 210303105569
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyIsadora Agency
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...gajnagarg
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherrymeghakumariji156
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...instagramfab782445
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfamanda2495
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证eeanqy
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfOffice Furniture Plus - Irving
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Nitya salvi
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样yhavx
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxtrose8
 

Último (20)

Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
Q4-Trends-Networks-Module-3.pdfqquater days sheets123456789
 
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
一比一定(购)滑铁卢大学毕业证(UW毕业证)成绩单学位证
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
Eye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docxEye-Catching Web Design Crafting User Interfaces .docx
Eye-Catching Web Design Crafting User Interfaces .docx
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
一比一定(购)西悉尼大学毕业证(WSU毕业证)成绩单学位证
 
Resume all my skills and educations and achievement
Resume all my skills and educations and  achievement Resume all my skills and educations and  achievement
Resume all my skills and educations and achievement
 
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best ServiceHigh Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
High Profile Escorts Nerul WhatsApp +91-9930687706, Best Service
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
Design-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora AgencyDesign-System - FinTech - Isadora Agency
Design-System - FinTech - Isadora Agency
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
怎样办理巴斯大学毕业证(Bath毕业证书)成绩单留信认证
 
How to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdfHow to Create a Productive Workspace Trends and Tips.pdf
How to Create a Productive Workspace Trends and Tips.pdf
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptx
 

Design of flyover presented by Vikas GLNAIT, Mathura

  • 1.
  • 2. SUBMITTED TO:- DEPARTMENT OF CIVIL ENGG. GLNAIT(MATHURA) SUBMITTED BY:- KRISHNA GOPAL(GL) JITENDRA SHARMA VIKAS KUMAR GAURAV CHAUDHARY
  • 3.  Design of Flyover at level crossing No. 528 situated on NewDelhi- Mumbai C.S.T connecting Sri Krishna Janambhoomi Road with NH-2 in distt. Mathura.
  • 4.  About the Project -Side view of Flyover  Design of Super Structure -Pigeaud’s Method -Courbon’s Method  Design of Deck Slab  Design of Longitudinal Girders  Design of Cross Girders  Design of Bearing  Design of Piers  Design of Foundation  Total Summary of Project  References
  • 5.  Total length of Flyover is 787.8m.  Flyover consists: -4 Different span arrangement of length [2*23.3+17*24.0+2*12.0+19.9*1+37.9*1] c/c of expansion joint. -22 Piers -2 Abutments  Carriage Way Width=7.5m(2 lane)  The kerbs of width 475mm will be provide in both directions.
  • 7.  Flyover is designed for Class A loading.  Design Speed as per AASHTO= 40kmph.  Neoprene Bearing is used.  Railing- Crash Barrier.  T Cross section bridge with 3 Beam arrangement in all spans.  The deck slab , cross girder and longitudinal girder are casted monolithically.
  • 8.  Concrete grades : - Lean Concrete M10 - Foundation M30 - Substructure M35 - Beams M40 - Deck slab M40 - Crash Barrier M40  High yield deformed bars of Fe415 grade will be used(IS1786).
  • 9.  Seismic zone - IV  Importance Factor -1.2  Sa/g -2.5  Bearing capacity of soil at site - at 2.5m below G.L. =14.2T/m2 - at3.0m below G.L. =16.8T/m2  Gradient on both side of railway portion - 1:30  There is very little effect of centrifugal force hence it is neglected.  The summit and valley curves are used as vertical curves
  • 10.  The Deck Slab and Longitudinal Girders of superstructure are designed by two methods: - Pigeaud’s Method(for Deck Slab) - Courbon’s Method(for Longitudinal girder)
  • 11.  For slabs spanning in two directions, Pigeaud’s Method is used, the moments in two directions can be obtained by rational method. The use of curves given by M. Pigeaud is recommended.  Pigeaud’s method is applicable to rectangular slabs supported freely on all four sides and subjected to a symmetrical placed load.
  • 12.
  • 13.  Let L and B – be the span lengths  a and b- the dimensions of the tyre contact area in the long and short span directions.  u and v be the dimensions of the load spread after allowing for dispersions through the deck slab.  K – the ratio of short span to long span.  M1 and M2- the moments along the short and long span.
  • 14.  m1 and m2- the coefficients for moments along short and long span.  poissons’s ratio(k) =0.15  P- load from the wheel under consideration.  M1 and M2 can be calculated by following equations: M1=(m1+km2)P M2=(m2+km1)P
  • 15.  According to courbon’s method, the reaction Ri of the cross beam on any girder i of a bridge consisting of multiple parallel beams is computed by assuming a linear variation of deflection in the transverse direction .  The deflection will be maximum on the exterior girder on the side of the eccentric load and minimum on the other exterior girder.
  • 16. Ri= PIi/∑Ii[1+(∑Ii/∑Iidi 2)*edi] Where, P – total live load e – eccentricity of live load di– distance of girder i from the axis of bridge I – Moment of inertia of girder
  • 17.  Design Data: Effective span= 24m Clear Roadway width for 2 lane= 7.5m Assume 3 longitudinal beams spaced at 2.5m c/c intervals, 7 cross beams are taken to make the slab as two- way at 4m c/c intervals. (the preliminary dimensions may be assumed for simplicity) Clear cover for reinforcement is 25mm.
  • 18.  Thickness of slab= 250mm  Thickness of wearing course= 75mm  Panel size= (2.2m*3.7m) Panel of deck slab
  • 19.
  • 20.
  • 21. MAXIMUM BENDING MOMENT DUE TO DEAD LOAD  Weight of deck slab=6.25 kN/m2  Weight of bearing course=1.65kN/m2  Total weight=7.9kN/m2 by Pigeaud’s curve, using the value of K and 1/K the moment coefficients along long span and short span (m1&m2) will be calculated . Where, K = short span/ long span
  • 22. K=.594, 1/K=1.681 m1 = 0.0488, m2= 0.015(curves) P = 55.43 now, M1=2.829 kNm M2=1.237kNm
  • 23.
  • 24. WHEEL 1 u = 0.6965 ,v = 0.4717,K = 0.5949 u/b = 0.3166 , v/l = 0.1275 m1 = 0.177, m2 = 0.131 Impact factor = 15%, P = 65.11kN M1 = 12.9 kNm, M2 = 10.35kNm WHEEL 2 M1 = 1.765kNm, M2 = 0.245kNm
  • 25. Total moment along short span= 17.4kNm Total moment along long span= 11.8kNm Reinforcement:- σcbc = 13.33 N/mm2 σst = 230N/mm2 m = 7, k = 0.711, j = 0.763, Q = 3.61 Ast1 = 561mm2, Ast2 = 415mm2 S1 = 358mm, S2 = 487mm Provide 16mm dia bars in both directions at 300mm c/c of bottom face. 12mm dia bars in both directions at 300mmc/c of top face.
  • 26.
  • 27. Cantilever slab is designed for one-way. Total Dead Load Moment of slab=12.4kNm Total Live Load Moment = 37kNm Design Moment= 49.4kNm Ast= 1062mm2, Spacing=190mm Provide 16mm dia bars at 180mm c/c at top face. BM for transverse direction= .2DLM+.3LLM = 13.6kNm Ast= 307mm2, Provide 12mm dia bars at 300mm c/c in transverse direction at top face. And provide 12mm dia bars in both directions at 250mm c/c at bottom face.
  • 28.
  • 29. 1. Intermediate Longitudinal Girders Total Dead Load Moment on Girder= 2616kNm Reaction Factor by Courbon’s Method Ra = 1.89w, Rb = 1.33w,Rc = 0.78w
  • 30. I.F = 15% Total Live Load Moment with I.F = 1460kNm Total Design Moment = 4075kNm Ast = 11585mm2 No. of 32mm dia bars = 14.4 Provide 15 bars of 32mm dia in 3 rows of 5 bars each. Provide 4 legged 8mm dia bars at 250mmc/c in transverse direction of longitudinal girder.
  • 31. 2. End Longitudinal Girders: The design of end longitudinal girder is same as intermediate girder only difference is that the live load moment is increased by 10%. Provide 15 bars of 32mm dia in 3 rows of 5 bars each. Provide 4 legged 8mm dia bars at 250mmc/c in transverse direction of End Longitudinal Girders.
  • 32.
  • 33.  Effective span for cross girder = 2.2m  I.F.=.55  Bending moment due to Dead Load +ve BM = 4.581kNm -ve BM = 8.713kNm  BM due to Live Load +ve BM = 29.34kNm -ve BM = 28.37kNm
  • 34.  Design +ve BM = 33.921kNm  Design -ve BM = 37.083kNm  Ast = 129mm2  According to codal provisions, provide 3 bars of 25mm dia. in longitudinal direction of all cross beams.  And Provide 4 legged 12mm dia bars at 250mm c/c in transverse direction of cross girders.  And provide 2 bars of 22mm dia as cranked bars as additional provision to cater to diagonal tension.
  • 35.
  • 36. Design of P8 Dia of piers:- 2.5m for height above 4.5m 2.0m for height up to 4.5m Gross Area, Ag = 4908738.521mm2 Clear cover = 40mm Dia of longitudinal bars= 28m Effective dia= 2446mm Safe stress in concrete = 10N/mm2 Safe stress in steel = 230N/mm2
  • 37. Provide 0.5% longitudinal steel of gross dia as per IRC 21:2000. Asc = 25453.7mm2 No. of bars = 39.85 Hence privide 40 bars of 28mm. Transverse Reinforcement: Dia of transverse reinforcement should not less than one quarter of longitudinal bars=7mm Hence, take 8mm dia bars at 300mm c/c in transverse direction.
  • 38.  For columns height up to 4.5m: Dia of bars = 25mm M30 grade concrete used and Fe415 HYSD bars are used Dia of columns = 2m Gross Dia, Ag = 3141542.65mm2 Asc= 15707.96mm2 No. of bars = 32 Provide 32 bars of 25mm dia in longitudinal direction. Provide 8mm dia bars at 300mm c/c in transverse direction.
  • 39.
  • 40.  Assume total dead load and live load on column= 10,000kN.  As per code provision, weight of footing is 10% of total load on column= 1000kN Total load in footing= 11,000kN  Safe bearing capacity of soil= 165kN/m2  Area of footing= 66.66m2 So provide 8.5m*10.75m= 91.375m2 area at 3m below ground level. And provide 9.0m*8.5m area at 2.5m below ground level.  Isolated footing of depth 500mm at end of footing and 1.7m near the column face. Provide 150mm lean concrete below foundation.
  • 41.
  • 42.  As per IRC6:2000, minimum Ast is 0.3% of gross dia, so provide 0.5% of gross dia. =24543.64mm2 Provide 25mm dia at 130mm c/c in l direction for both cases of columns(above 4.5m and up to 4.5m) Provide 28mm and 25mm dia bars in b direction at 130mm c/c for above 4.5m and upto 4.5m columns respectively.
  • 43.
  • 44.
  • 45.  Total length of flyover = 787.77m  No. of Piers = 22 piers + 2 abutments  Span Arrangement - 24m*17 - 12m*2 - 23.325m*2 - 37.87m*1 - 19.87m*1  Thickness of deck slab = 250mm  Thickness of wearing coat = 75mm  Depth of longitudinal girder = 1.575m  Depth of cross girder = 1.275m  Provide thickness of longitudinal and cross girders = 300mm
  • 46.  SLAB 1(24m): No. of longitudinal girder = 3(for all slabs) No. of cross girders = 7 -Provide 16mm dia bars in both direction at 300mm c/c at bottom face. -12mm dia bars in both direction at 300mmc/c at top face. - Provide 16mm dia bars at 180mm c/c in cantilever portion of slab. - Provide 12mm dia bars at 300mm c/c in transverse direction of cantilever slab.  LONGITUDINAL GIRDER: - Provide 15 bars of 32mm dia in 3 rows at bottom of the T rib. - Provide 4 legged 8mm dia bars at 250mmc/c in transverse direction. - Provide 6 bars of 22mm dia as additional provision to cater to diagonal tension.
  • 47.  CROSS GIRDERS: Provide 3 bars of 25mm dia in all cross beams. Provide 4 legged stirrups of 10mm dia bars at 150mm c/c. Provide 2 bars of 22mm dia as cranked bars as additional provision to cater to diagonal tension.  PIER: Dia of pier = 2m (height up to 4.5m) Dia of pier = 2.5m(height above 4.5m) Provide 40 longitudinal bars of 28mm dia (for height above 4.5m) 8mm dia bars at 300 mm c/c for transverse reinforcement. Provide 40 longitudinal bars of 25mm dia and 8mm dia bars at 300 mm c/c for transverse reinforcement(for height up to 4.5m)
  • 48.  FOUNDATION: Provided area of foundation = 10.75m*8.5m (for height above 4.5m) = 9m*8.5m (for height up to 4.5m) Provide 25mm dia bars at 130mm c/c in longitudinal direction of footing. Provide 28mm dia bars at 130mm c/c in transverse direction of footing.
  • 49.  Essentials of bridge engineering:- by D. Johnson Victor  Design of reinforced concrete structure:- by S. Ramamrutham  IS codes:- IRC:6-2000 IRC:21-2000 IRC:38-1988 IS:456-2000 IS:1786