Introduction
Every organization, however small, needs to know how long jobs take in order to carry out its
business. The small retailer, the provider of a local service, the larger factory or farm, even
public sector and other nonprofit making organizations cannot plan their work effectively
without this information.
In a small or simple organization, the data may not be collected in a formal manner, or even
recorded at all, for the person who plans the work will probably just carry it out. But as firms
grow larger or more complex it becomes desirable to make a specialist function of the setting of
time standards, and the building up of data which can be used by people in the organization who
are responsible for planning, costing, scheduling and payments.
In the past, there is no doubt that Work Measurement, and especially its main technique, Time
Study, gained a bad reputation due mainly to its misuse by certain firms and individuals.
Specifically, this resulted from two main causes; firstly the confusing of Work Measurement
with schemes, particularly 'Payment By Results Incentive Schemes', which use the data, and
secondly the failure of management to realize that Work Measurement often highlights
inefficiency in the organization rather than that being attributed to the worker.
Work measurement consists of a series of techniques the purpose of which is to define tasks,
measure them, and finally issue time standards to the people and departments who either use, or
are affected by, the information.
The five main techniques used in measuring work are Time
Study, Synthesis, Analytical Estimation, Pre-Determined Motion Time Systems
and Activity Sampling.
Time Study
Time study is a technique for recording the times and rates of working for the elements of a
specified job, carried out under specified conditions; the data is analyzed so as to obtain the time
necessary to carry out the work at a defined level of performance (BS 31001).
Before commencing a Time Study it is necessary to break down the job into elements, an
element being a distinctive part of the job, selected for the convenience of observation. The
period from the beginning of the first element of the operation to the same point in a repetition of
the operation is known as the Work Cycle. The instant at which one element in a work cycle
ends and another begins is called the Break Point. It is necessary to break down work into
elements for at least the following reasons:
1. To ensure that effective time is separated from ineffective time.
2. To permit the rate of performance to be assessed accurately.
3. To enable the correct relaxation allowance to be given to each element.
4. To enable time standards to be checked or modified in the light of future changes.
5. To enable a Work Specification to be drawn up.
6. To facilitate the compilation of Synthetic Times.
Timing Methods
Historical ways at arriving at job times include reference to past records, timing a complete batch
and estimation. These give accurate results and time study was developed in the interests both of
accuracy and objectivity. Elements are usually timed with a stop-watch in three main ways; fly-
back, cumulative and differential timing.
 Flyback Timing - uses a watch on which the hand, having recorded the length of an
element, can be made to return to zero and immediately begin timing the next element.
 Cumulative Timing - here the hand of the watch moves continuously throughout the
study. Reading of element times are taken as they occur, the time for each element being
subsequently obtained by subtraction - some Trade Union Agreements were drawn up in
the 1960's specifying only the use of continuous timing, since a view was held that time
was lost to the operator in the flyback technique.
 Differential Timing - this is a method of obtaining the time for a very small element.
Elements are timed in groups first including and then excluding the small element, the
time for which is subsequently obtained by subtraction.
Advantages and Disadvantages
1. With the flyback method, no further calculations are needed to obtain elemental times.
The subtraction needed with the continuous method can be a time consuming task on a
long activity.
2. The continuous method gives a total time for the study, but with the flyback method an
independent check is needed.
3. With the flyback method, a slight loss of time is experienced over a long study, but this
should be negligible in the case of a trained and experienced Time Study Practitioner.

Más contenido relacionado

La actualidad más candente

cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
Pratibha Khemchandani
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
Laxmikant Deshmukh
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
Harinadh Karimikonda
 

La actualidad más candente (20)

Work study presentation
Work study presentationWork study presentation
Work study presentation
 
Line Balancing In Garments Industry
Line Balancing In Garments IndustryLine Balancing In Garments Industry
Line Balancing In Garments Industry
 
Time study
Time studyTime study
Time study
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Work study
Work studyWork study
Work study
 
Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing Apparel Merchandising and Lean Manufacturing
Apparel Merchandising and Lean Manufacturing
 
Work measurement
Work measurementWork measurement
Work measurement
 
Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...Analysis of sewing section efficiency by time study technique in apparel indu...
Analysis of sewing section efficiency by time study technique in apparel indu...
 
Method study
Method studyMethod study
Method study
 
Presentation on time study of apparel industry
Presentation on time study of apparel industryPresentation on time study of apparel industry
Presentation on time study of apparel industry
 
Standard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importanceStandard minute value( SMV) in garments, calculation and importance
Standard minute value( SMV) in garments, calculation and importance
 
Project Report on Textile Industrial Engineering
Project Report on Textile Industrial EngineeringProject Report on Textile Industrial Engineering
Project Report on Textile Industrial Engineering
 
History of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job designHistory of workstudy - Workmeasurement - Job design
History of workstudy - Workmeasurement - Job design
 
Production planning and control
Production planning and controlProduction planning and control
Production planning and control
 
Work Study: Method Study & Work Measurement
Work Study: Method Study & Work MeasurementWork Study: Method Study & Work Measurement
Work Study: Method Study & Work Measurement
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 
Garment manufacturing process from fabric to poduct
Garment manufacturing process from fabric to poductGarment manufacturing process from fabric to poduct
Garment manufacturing process from fabric to poduct
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 

Similar a Cumulative and flyback timing

Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
Rajeev Sharan
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
Akash Bakshi
 

Similar a Cumulative and flyback timing (20)

Unit 3 problems
Unit 3 problemsUnit 3 problems
Unit 3 problems
 
Work measurement
Work measurementWork measurement
Work measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
work-measurement-ppt.pptx
work-measurement-ppt.pptxwork-measurement-ppt.pptx
work-measurement-ppt.pptx
 
Work study work measurement
Work study   work measurementWork study   work measurement
Work study work measurement
 
Work Measurement
Work MeasurementWork Measurement
Work Measurement
 
Work measurement
Work measurementWork measurement
Work measurement
 
137 work study
137 work study137 work study
137 work study
 
4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx4th-IE-BSS.pptx.pptx
4th-IE-BSS.pptx.pptx
 
Work measurement
Work measurementWork measurement
Work measurement
 
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptxPREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
PREDETERMINED MOTION TIME SYSTEM (PMTS).pptx
 
Production and material management
Production and material managementProduction and material management
Production and material management
 
Good work measurement
Good work measurementGood work measurement
Good work measurement
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Industrial egineering
Industrial egineeringIndustrial egineering
Industrial egineering
 
Work study Training Manual
Work study Training ManualWork study Training Manual
Work study Training Manual
 
Work sampling
Work samplingWork sampling
Work sampling
 
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
Facility Layout/Production Planning & Control(PPC)/ Method Study/ Capacity Pl...
 
Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...Analysis of sewing section efficiency by using time study technique in Appare...
Analysis of sewing section efficiency by using time study technique in Appare...
 
7. work study and method measurement
7. work study and method measurement7. work study and method measurement
7. work study and method measurement
 

Más de Atmiya Institute of Technology and Science, Rajkot

Más de Atmiya Institute of Technology and Science, Rajkot (16)

ind engg and mgmt O P KHANNA.pdf
ind engg and mgmt  O P KHANNA.pdfind engg and mgmt  O P KHANNA.pdf
ind engg and mgmt O P KHANNA.pdf
 
C chart.pdf
C chart.pdfC chart.pdf
C chart.pdf
 
FPC.pdf
FPC.pdfFPC.pdf
FPC.pdf
 
howto_histogram.pdf
howto_histogram.pdfhowto_histogram.pdf
howto_histogram.pdf
 
Acceptance sampling.pdf
Acceptance sampling.pdfAcceptance sampling.pdf
Acceptance sampling.pdf
 
22657 - Industrial Engineering and Quality Control-syllabus.pdf
22657 - Industrial Engineering and Quality Control-syllabus.pdf22657 - Industrial Engineering and Quality Control-syllabus.pdf
22657 - Industrial Engineering and Quality Control-syllabus.pdf
 
3351904.pdf
3351904.pdf3351904.pdf
3351904.pdf
 
cumulative and flyback timing.pdf
cumulative and flyback timing.pdfcumulative and flyback timing.pdf
cumulative and flyback timing.pdf
 
calculation of process capability.pdf
calculation of process capability.pdfcalculation of process capability.pdf
calculation of process capability.pdf
 
Howto histogram
Howto histogramHowto histogram
Howto histogram
 
Fpc
FpcFpc
Fpc
 
Calculation of process capability
Calculation of process capabilityCalculation of process capability
Calculation of process capability
 
C chart
C chartC chart
C chart
 
Acceptance sampling
Acceptance samplingAcceptance sampling
Acceptance sampling
 
3351904
33519043351904
3351904
 
22657 industrial engineering and quality control-syllabus
22657   industrial engineering and quality control-syllabus22657   industrial engineering and quality control-syllabus
22657 industrial engineering and quality control-syllabus
 

Último

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Último (20)

ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

Cumulative and flyback timing

  • 1. Introduction Every organization, however small, needs to know how long jobs take in order to carry out its business. The small retailer, the provider of a local service, the larger factory or farm, even public sector and other nonprofit making organizations cannot plan their work effectively without this information. In a small or simple organization, the data may not be collected in a formal manner, or even recorded at all, for the person who plans the work will probably just carry it out. But as firms grow larger or more complex it becomes desirable to make a specialist function of the setting of time standards, and the building up of data which can be used by people in the organization who are responsible for planning, costing, scheduling and payments. In the past, there is no doubt that Work Measurement, and especially its main technique, Time Study, gained a bad reputation due mainly to its misuse by certain firms and individuals. Specifically, this resulted from two main causes; firstly the confusing of Work Measurement with schemes, particularly 'Payment By Results Incentive Schemes', which use the data, and secondly the failure of management to realize that Work Measurement often highlights inefficiency in the organization rather than that being attributed to the worker. Work measurement consists of a series of techniques the purpose of which is to define tasks, measure them, and finally issue time standards to the people and departments who either use, or are affected by, the information. The five main techniques used in measuring work are Time Study, Synthesis, Analytical Estimation, Pre-Determined Motion Time Systems and Activity Sampling. Time Study Time study is a technique for recording the times and rates of working for the elements of a specified job, carried out under specified conditions; the data is analyzed so as to obtain the time necessary to carry out the work at a defined level of performance (BS 31001). Before commencing a Time Study it is necessary to break down the job into elements, an element being a distinctive part of the job, selected for the convenience of observation. The period from the beginning of the first element of the operation to the same point in a repetition of the operation is known as the Work Cycle. The instant at which one element in a work cycle ends and another begins is called the Break Point. It is necessary to break down work into elements for at least the following reasons: 1. To ensure that effective time is separated from ineffective time. 2. To permit the rate of performance to be assessed accurately. 3. To enable the correct relaxation allowance to be given to each element.
  • 2. 4. To enable time standards to be checked or modified in the light of future changes. 5. To enable a Work Specification to be drawn up. 6. To facilitate the compilation of Synthetic Times. Timing Methods Historical ways at arriving at job times include reference to past records, timing a complete batch and estimation. These give accurate results and time study was developed in the interests both of accuracy and objectivity. Elements are usually timed with a stop-watch in three main ways; fly- back, cumulative and differential timing.  Flyback Timing - uses a watch on which the hand, having recorded the length of an element, can be made to return to zero and immediately begin timing the next element.  Cumulative Timing - here the hand of the watch moves continuously throughout the study. Reading of element times are taken as they occur, the time for each element being subsequently obtained by subtraction - some Trade Union Agreements were drawn up in the 1960's specifying only the use of continuous timing, since a view was held that time was lost to the operator in the flyback technique.  Differential Timing - this is a method of obtaining the time for a very small element. Elements are timed in groups first including and then excluding the small element, the time for which is subsequently obtained by subtraction. Advantages and Disadvantages 1. With the flyback method, no further calculations are needed to obtain elemental times. The subtraction needed with the continuous method can be a time consuming task on a long activity. 2. The continuous method gives a total time for the study, but with the flyback method an independent check is needed. 3. With the flyback method, a slight loss of time is experienced over a long study, but this should be negligible in the case of a trained and experienced Time Study Practitioner.