1.0 Case study- Stadium UiTM




 UiTM    Stadium is a small stadium located at Shah
 Alam, Malaysia. It capacity is 10,000. The stadium is build for the
 UiTM University and the UiTM FC team . It is sometimes use for
 football matches from the local team. It can also use as
 a rugby pitch. UiTM Stadium sometimes uses for activities made
 by the university
                                            4/10/2013
2.0 Annual Maintenance And Repair
Contribution
•A million ringgit Malaysia will be used for civil, electrical and landscape maintenance
in area which covers all area in Universiti Teknologi MARA Shah Alam.
•Other than this budget will be separated for each area to maintain its facility,
building, stadium, and sport complex.
 Each year, maintenance department will review based on report produced by taking
over all factor which include frequency of used stadium especially.

             Department of Stadium            Maintenance Budget
                      Cleaning                   RM 24,000/Year
                   Civil Structure                RM 5,000/Year
                      Electrical                  RM 5,000/Year

            Allocation Maintenance Budget According to Department
            of Stadium


                                                      4/10/2013
3.0 Maintenance Section

 •Structural systems
 •Interior and exterior Building Finishes
 •Grounds and Landscaping Facilities
 •Housekeeping
 •Mechanical System and Equipment
 •Electrical Equipment and System
 •Maintenance Management

  Contractor appoint by UiTM :

 •Asas Bina Resources for building maintenance.
 •Cahaya kejayaan Resources for cleaning work
 •Thursina Service for Maintain the electrical system

                                                        4/10/2013
3.1 Importance Of Maintenance Of
Stadium Uitm

 •Enhance of quality game
 •Safety requirement for player, expectators and visitors.
 •Reduce an Injury
 •Increase Usage
 •Economy purpose
 •Image of UiTM Organization




                                                      4/10/2013
3.2 Maintenance Element
 • Wall
 •Audio System
 •Lighting
 •Field / Track
 •Seat
 •Toilet
 •Main Stage
 •Sport Facility
 •Drainage
 •Roof




                          4/10/2013
i. Wall




•As we can see, the Uitm Stadium is an old one. So the paint on the wall
already fade.
•The wall of this stadium will maintain when VIP’s will come or when
the big even which planned by UiTM or external organization.
•Basically the maintenance of stadium wall is ad-hoc and not based on
the schedule. If any report by other people or the maintenance workers,
so after that UiTM will appoint contractor to solve the wall problem.


                                                 4/10/2013
ii. Audio System




•The use of stadium UiTM is low especially for big event which need use an audio system. Based
on that situation, we can imagine the audio system in this stadium is not managed well.
•So the role of facilities department to maintain this audio system and to control the audio system
from the control room which located at the main stage.
•Basically the audio system will be maintain only when there is a function in this stadium. That
means the time to make a maintenance work is not specific.
•Make sure the audio system is functional when necessary.

                                                                 4/10/2013
iii. Lighting




•The lighting is the important component to be maintained. If the lighting is
not functioning this will bring a bad image for the institutional.
•The lighting system is use for everyday. The inspection of this lighting
system also everyday.


                                                  4/10/2013
iv. Field / Track




 •Usually the grass of the stadium need to maintain base on the FIFA requirement
 especially the high of grass.
 •The quality grass needs such as Light, Temperature, Water, Nutrient Level, Soil Level,
 Soil Aeration and traffic.
 •The reduced light intensities under shaded conditions limit the carbohydrate reserves
 and the growth of roots, shoots, rhizomes and stolons.
 •4 principle of maintenance of turf football system:
       1. Grooming (Cut)
       2. Brushing (Grass)
       3. Vacuum Cleaning (Any Unnecessary object)
                                                          4/10/2013
       4. ACS (Compacting Soil Material)
v. Seat




•The seat have a high potential to damage due by the weather. Either rain and
sun light.
•That situation will give some affect to the seat such as the change of seat color.
•Repairing the seat is depending on the damage. If the damage is cannot to
repair, so department of facilities have a right to change that seat into new one.
•Usually for small damage, department of facilities will ignore that as long as the
seat can still be used

                                                       4/10/2013
vi. Toilet


 •The case reported often is clogged toilet.
 •The cost of building maintenance is huge for
 the repair of a toilet.
 •The maintenance work is depending on
 condition. They did not have a stated time.




                                 4/10/2013
vii. Main Stage




•The main stage need to be a maintain because the VIP’s will sit here to watch
the game.
•If any damage on the main stage, Department of facilities will appoint the
contractor to solve the problem.
•The work to maintain on this main stage is related to seat, decoration stage,
lighting and ventilation.

                                                   4/10/2013
iix. Sport Equipment




•Stadium UiTM provide many sport equipment . So they need to maintain all
the equipment to give comfortable for people.
•Sometime they forgot to maintain the equipment. The result is this all
equipment cannot be use for future event.
                                               4/10/2013
ix. Drainage


•The component will be maintain if receive any report from other people.
•Besides that, the janitor or facility workers have their own initiative to
check all the infrastructure.
•The problem of the drainage system usually due the clogged drain when
heavy rain.




                                                   4/10/2013
x. Roof




•When the facility worker check the building, they use a 3D concept.
•3D concept is making a observation to floor, wall and roof.
•So if any problem, they will trace fast and nothing is left.
•They did not have a schedule when they need to do inspection for roof. They
will make an inspection if any report from other people or the facility worker.


                                                      4/10/2013
4.0 Procedure to Report
• Make the online complaint form fields or communicate directly with the parties
met at the office of the maintenance.
•After analyzing the problems faced by details of information given by the
complainant the maintenance will act within three days after the complaint is made
           This includes online complaint details such as:
           •Reporting by who (name)
           •Title
           •No. office phone
           •No. mobile phone
           •Email
           •Date of report
           •The complaints
           •How complaints
           •Section
           •Element
           •The officer can be contacted
           •Status
           •Period of repair
           •Repair before/on
           •The amount of time delayed
           •Problems
           •And other evidence.
                                                             4/10/2013
5.0 Maintenance Work Procedure
        i. Received the Offer Job


        ii. Open the Contractor’s File


        iii. Site Meeting


        iv. Site Checking


        v. Supervising the Contractor’s job


        vi. Authorized the Job Done


        vii. Received Report from The Contractor


        iix. Release Payment


        ix. Prepare Monthly Report




                                                   4/10/2013
6.0 Conclusion
  Good facilities is not limited with the aesthetic value of the
  building only, but it comes with element of how good we apply
  the technology and how well we maintain it. How well we
  maintain a facility is depends on how good the operator operates
  it. So the idea of maintaining should be consider form the early
  stage during designing the building.
  Recently, it become more and more importance, it is a field that
  everybody involve in construction should know because this will
  become more importance to us in the future.




                                                4/10/2013

Más contenido relacionado

La actualidad más candente

Architecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportArchitecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportNaqiuddin Johari
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]JerotichMaswan
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)Soh Shing
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II ReportBolin Loong
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent buildingMohd. Ikhwan
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Nekumi Kida
 
Btech report final
Btech report finalBtech report final
Btech report finalSarah Esa
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMAnep Botak
 
Construction site
Construction siteConstruction site
Construction siteTimun Loh
 

La actualidad más candente (20)

Architecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportArchitecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation Report
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
Building construction-report (1)
Building construction-report (1)Building construction-report (1)
Building construction-report (1)
 
Morphology factors
Morphology factorsMorphology factors
Morphology factors
 
Building Construction II Report
Building Construction II ReportBuilding Construction II Report
Building Construction II Report
 
Ct1 assignment
Ct1 assignmentCt1 assignment
Ct1 assignment
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Intelligent building
Intelligent buildingIntelligent building
Intelligent building
 
Telekom Tower
Telekom TowerTelekom Tower
Telekom Tower
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
Steel formwork
Steel formworkSteel formwork
Steel formwork
 
Arkitek Azman Zainal Profile
Arkitek Azman Zainal ProfileArkitek Azman Zainal Profile
Arkitek Azman Zainal Profile
 
Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)Building Technology 1_Report_IBS (Industralized Building System)
Building Technology 1_Report_IBS (Industralized Building System)
 
klcc
klccklcc
klcc
 
Btech report final
Btech report finalBtech report final
Btech report final
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Construction site
Construction siteConstruction site
Construction site
 
Highland towers tragedy
Highland towers tragedyHighland towers tragedy
Highland towers tragedy
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 

Destacado

Building maintenance management in malaysia
Building maintenance management in malaysiaBuilding maintenance management in malaysia
Building maintenance management in malaysiaNur Zakaria
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.Satyaki Sikdar
 
PPPs in Russian Transportation Sector
PPPs in Russian Transportation SectorPPPs in Russian Transportation Sector
PPPs in Russian Transportation Sectoratalbeck
 
Laterite Bricks with Nylon Fiber
Laterite Bricks with Nylon FiberLaterite Bricks with Nylon Fiber
Laterite Bricks with Nylon FiberMohd. Ikhwan
 
Enterprise Budgets and Production Costs for Organic Production
Enterprise Budgets and Production Costs for Organic ProductionEnterprise Budgets and Production Costs for Organic Production
Enterprise Budgets and Production Costs for Organic ProductionElisaMendelsohn
 
Public Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail TransitPublic Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail TransitKapil Sinha
 
Neonatal intensive care unit nicu
Neonatal intensive care unit nicuNeonatal intensive care unit nicu
Neonatal intensive care unit nicuKiran
 
FIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCH
FIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCHFIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCH
FIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCHJaclyn Hwang
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Mohd. Ikhwan
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration TestMohd. Ikhwan
 
ARCHITECTURAL PORTFOLIO-SHIVAM CHAUHAN
ARCHITECTURAL PORTFOLIO-SHIVAM CHAUHANARCHITECTURAL PORTFOLIO-SHIVAM CHAUHAN
ARCHITECTURAL PORTFOLIO-SHIVAM CHAUHANSHIVAM CHAUHAN
 
Aggregate Planning Problem
Aggregate Planning ProblemAggregate Planning Problem
Aggregate Planning ProblemJoseph Konnully
 
Buildings Maintenance Issues
Buildings Maintenance IssuesBuildings Maintenance Issues
Buildings Maintenance IssuesClimate Solutions
 

Destacado (20)

Building maintenance management in malaysia
Building maintenance management in malaysiaBuilding maintenance management in malaysia
Building maintenance management in malaysia
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
 
Audio and Visual
Audio and VisualAudio and Visual
Audio and Visual
 
PPPs in Russian Transportation Sector
PPPs in Russian Transportation SectorPPPs in Russian Transportation Sector
PPPs in Russian Transportation Sector
 
Laterite Bricks with Nylon Fiber
Laterite Bricks with Nylon FiberLaterite Bricks with Nylon Fiber
Laterite Bricks with Nylon Fiber
 
Fiscal Theory
Fiscal TheoryFiscal Theory
Fiscal Theory
 
Enterprise Budgets and Production Costs for Organic Production
Enterprise Budgets and Production Costs for Organic ProductionEnterprise Budgets and Production Costs for Organic Production
Enterprise Budgets and Production Costs for Organic Production
 
jhj
jhjjhj
jhj
 
Public Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail TransitPublic Private Partnership in Urban Rail Transit
Public Private Partnership in Urban Rail Transit
 
Neonatal intensive care unit nicu
Neonatal intensive care unit nicuNeonatal intensive care unit nicu
Neonatal intensive care unit nicu
 
Law of Tort
Law of TortLaw of Tort
Law of Tort
 
FIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCH
FIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCHFIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCH
FIRST ASSIGNMENT STEPS ON PRODUCING AN ATTRACTIVE SKETCH
 
Fully Demolition
Fully Demolition Fully Demolition
Fully Demolition
 
Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)Build,Operate,Own,Transfer (BOOT)
Build,Operate,Own,Transfer (BOOT)
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration Test
 
ARCHITECTURAL PORTFOLIO-SHIVAM CHAUHAN
ARCHITECTURAL PORTFOLIO-SHIVAM CHAUHANARCHITECTURAL PORTFOLIO-SHIVAM CHAUHAN
ARCHITECTURAL PORTFOLIO-SHIVAM CHAUHAN
 
Architec design introduction
Architec design introductionArchitec design introduction
Architec design introduction
 
Aggregate Planning Problem
Aggregate Planning ProblemAggregate Planning Problem
Aggregate Planning Problem
 
Buildings Maintenance Issues
Buildings Maintenance IssuesBuildings Maintenance Issues
Buildings Maintenance Issues
 
Research report
Research reportResearch report
Research report
 

Similar a UiTM Stadium (Building Maintenance)

A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingIRJET Journal
 
Job layout of cinstruction site
Job layout of cinstruction siteJob layout of cinstruction site
Job layout of cinstruction siteraj balar
 
WTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdfWTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdfhazwanisapar
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMAvjverma123
 
Advanced Building Measurement
Advanced Building MeasurementAdvanced Building Measurement
Advanced Building MeasurementSultan M Muzahir
 
Job Layout
Job LayoutJob Layout
Job LayoutBahzad5
 
Residential Building Construction Report
Residential Building Construction ReportResidential Building Construction Report
Residential Building Construction ReportMdSuhailAkhtar
 
INTERN REPORT PPT.pptx
INTERN REPORT PPT.pptxINTERN REPORT PPT.pptx
INTERN REPORT PPT.pptxAbsThHros
 
GROUP-2-COMMON-REPORT.pptx
GROUP-2-COMMON-REPORT.pptxGROUP-2-COMMON-REPORT.pptx
GROUP-2-COMMON-REPORT.pptxRomeoJosefConel
 
Indoor air quality monitoring system
Indoor air quality monitoring systemIndoor air quality monitoring system
Indoor air quality monitoring systemKasim M
 
Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Anil Kumar Gupta
 
Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential areaJamie Lee
 

Similar a UiTM Stadium (Building Maintenance) (20)

Advance management for civil engineering
Advance management for civil engineeringAdvance management for civil engineering
Advance management for civil engineering
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
 
OP YADAV PROJECT
OP YADAV PROJECTOP YADAV PROJECT
OP YADAV PROJECT
 
Job layout of cinstruction site
Job layout of cinstruction siteJob layout of cinstruction site
Job layout of cinstruction site
 
WTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdfWTP 1043 REINFORCEMENT WORKS.pdf
WTP 1043 REINFORCEMENT WORKS.pdf
 
SUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMASUMMER TRAINING REPORT BY VIJAY VERMA
SUMMER TRAINING REPORT BY VIJAY VERMA
 
Advanced Building Measurement
Advanced Building MeasurementAdvanced Building Measurement
Advanced Building Measurement
 
Thesis Report
Thesis ReportThesis Report
Thesis Report
 
Job Layout
Job LayoutJob Layout
Job Layout
 
Residential Building Construction Report
Residential Building Construction ReportResidential Building Construction Report
Residential Building Construction Report
 
Rishabh kumar
Rishabh kumarRishabh kumar
Rishabh kumar
 
INTERN REPORT PPT.pptx
INTERN REPORT PPT.pptxINTERN REPORT PPT.pptx
INTERN REPORT PPT.pptx
 
Site selection and plant layout
Site selection and plant layoutSite selection and plant layout
Site selection and plant layout
 
GROUP-2-COMMON-REPORT.pptx
GROUP-2-COMMON-REPORT.pptxGROUP-2-COMMON-REPORT.pptx
GROUP-2-COMMON-REPORT.pptx
 
Indoor air quality monitoring system
Indoor air quality monitoring systemIndoor air quality monitoring system
Indoor air quality monitoring system
 
Project Brief
Project BriefProject Brief
Project Brief
 
Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016Management Control System- Delhi Metro_10042016
Management Control System- Delhi Metro_10042016
 
Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential area
 
Legnetto GI Maintenance Presentation 2014
Legnetto GI Maintenance Presentation 2014Legnetto GI Maintenance Presentation 2014
Legnetto GI Maintenance Presentation 2014
 
Practical Assessment 3 - Reinforcement
Practical Assessment 3 - ReinforcementPractical Assessment 3 - Reinforcement
Practical Assessment 3 - Reinforcement
 

Último

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 

Último (20)

Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 

UiTM Stadium (Building Maintenance)

  • 1. UITM’ STADIUM -BUILDING MAINTENANCE Building Maintenance For Sport Complex HANIS BIN NIZAR 2009107745 MOHD. IKHWAN BIN ABDULLAH 2009994441 MUHAMMAD ZAHID BIN SARPIN 2009725315 LECTURER’S NAME : PM Haji Jamaluddin Mohd Aris 4/10/2013
  • 2. 1.0 Case study- Stadium UiTM  UiTM Stadium is a small stadium located at Shah Alam, Malaysia. It capacity is 10,000. The stadium is build for the UiTM University and the UiTM FC team . It is sometimes use for football matches from the local team. It can also use as a rugby pitch. UiTM Stadium sometimes uses for activities made by the university 4/10/2013
  • 3. 2.0 Annual Maintenance And Repair Contribution •A million ringgit Malaysia will be used for civil, electrical and landscape maintenance in area which covers all area in Universiti Teknologi MARA Shah Alam. •Other than this budget will be separated for each area to maintain its facility, building, stadium, and sport complex. Each year, maintenance department will review based on report produced by taking over all factor which include frequency of used stadium especially. Department of Stadium Maintenance Budget Cleaning RM 24,000/Year Civil Structure RM 5,000/Year Electrical RM 5,000/Year Allocation Maintenance Budget According to Department of Stadium 4/10/2013
  • 4. 3.0 Maintenance Section •Structural systems •Interior and exterior Building Finishes •Grounds and Landscaping Facilities •Housekeeping •Mechanical System and Equipment •Electrical Equipment and System •Maintenance Management Contractor appoint by UiTM : •Asas Bina Resources for building maintenance. •Cahaya kejayaan Resources for cleaning work •Thursina Service for Maintain the electrical system 4/10/2013
  • 5. 3.1 Importance Of Maintenance Of Stadium Uitm •Enhance of quality game •Safety requirement for player, expectators and visitors. •Reduce an Injury •Increase Usage •Economy purpose •Image of UiTM Organization 4/10/2013
  • 6. 3.2 Maintenance Element • Wall •Audio System •Lighting •Field / Track •Seat •Toilet •Main Stage •Sport Facility •Drainage •Roof 4/10/2013
  • 7. i. Wall •As we can see, the Uitm Stadium is an old one. So the paint on the wall already fade. •The wall of this stadium will maintain when VIP’s will come or when the big even which planned by UiTM or external organization. •Basically the maintenance of stadium wall is ad-hoc and not based on the schedule. If any report by other people or the maintenance workers, so after that UiTM will appoint contractor to solve the wall problem. 4/10/2013
  • 8. ii. Audio System •The use of stadium UiTM is low especially for big event which need use an audio system. Based on that situation, we can imagine the audio system in this stadium is not managed well. •So the role of facilities department to maintain this audio system and to control the audio system from the control room which located at the main stage. •Basically the audio system will be maintain only when there is a function in this stadium. That means the time to make a maintenance work is not specific. •Make sure the audio system is functional when necessary. 4/10/2013
  • 9. iii. Lighting •The lighting is the important component to be maintained. If the lighting is not functioning this will bring a bad image for the institutional. •The lighting system is use for everyday. The inspection of this lighting system also everyday. 4/10/2013
  • 10. iv. Field / Track •Usually the grass of the stadium need to maintain base on the FIFA requirement especially the high of grass. •The quality grass needs such as Light, Temperature, Water, Nutrient Level, Soil Level, Soil Aeration and traffic. •The reduced light intensities under shaded conditions limit the carbohydrate reserves and the growth of roots, shoots, rhizomes and stolons. •4 principle of maintenance of turf football system: 1. Grooming (Cut) 2. Brushing (Grass) 3. Vacuum Cleaning (Any Unnecessary object) 4/10/2013 4. ACS (Compacting Soil Material)
  • 11. v. Seat •The seat have a high potential to damage due by the weather. Either rain and sun light. •That situation will give some affect to the seat such as the change of seat color. •Repairing the seat is depending on the damage. If the damage is cannot to repair, so department of facilities have a right to change that seat into new one. •Usually for small damage, department of facilities will ignore that as long as the seat can still be used 4/10/2013
  • 12. vi. Toilet •The case reported often is clogged toilet. •The cost of building maintenance is huge for the repair of a toilet. •The maintenance work is depending on condition. They did not have a stated time. 4/10/2013
  • 13. vii. Main Stage •The main stage need to be a maintain because the VIP’s will sit here to watch the game. •If any damage on the main stage, Department of facilities will appoint the contractor to solve the problem. •The work to maintain on this main stage is related to seat, decoration stage, lighting and ventilation. 4/10/2013
  • 14. iix. Sport Equipment •Stadium UiTM provide many sport equipment . So they need to maintain all the equipment to give comfortable for people. •Sometime they forgot to maintain the equipment. The result is this all equipment cannot be use for future event. 4/10/2013
  • 15. ix. Drainage •The component will be maintain if receive any report from other people. •Besides that, the janitor or facility workers have their own initiative to check all the infrastructure. •The problem of the drainage system usually due the clogged drain when heavy rain. 4/10/2013
  • 16. x. Roof •When the facility worker check the building, they use a 3D concept. •3D concept is making a observation to floor, wall and roof. •So if any problem, they will trace fast and nothing is left. •They did not have a schedule when they need to do inspection for roof. They will make an inspection if any report from other people or the facility worker. 4/10/2013
  • 17. 4.0 Procedure to Report • Make the online complaint form fields or communicate directly with the parties met at the office of the maintenance. •After analyzing the problems faced by details of information given by the complainant the maintenance will act within three days after the complaint is made This includes online complaint details such as: •Reporting by who (name) •Title •No. office phone •No. mobile phone •Email •Date of report •The complaints •How complaints •Section •Element •The officer can be contacted •Status •Period of repair •Repair before/on •The amount of time delayed •Problems •And other evidence. 4/10/2013
  • 18. 5.0 Maintenance Work Procedure i. Received the Offer Job ii. Open the Contractor’s File iii. Site Meeting iv. Site Checking v. Supervising the Contractor’s job vi. Authorized the Job Done vii. Received Report from The Contractor iix. Release Payment ix. Prepare Monthly Report 4/10/2013
  • 19. 6.0 Conclusion Good facilities is not limited with the aesthetic value of the building only, but it comes with element of how good we apply the technology and how well we maintain it. How well we maintain a facility is depends on how good the operator operates it. So the idea of maintaining should be consider form the early stage during designing the building. Recently, it become more and more importance, it is a field that everybody involve in construction should know because this will become more importance to us in the future. 4/10/2013