Coal-fired Power Plant
2 x 22 MW
Galang Batang – Bintan - Indonesia
Date : 02MAY2012
Prepared by : Werner S.
Approved by : WS
File Name : PIC 01/0512
P T C T I I n d o n e s i a P i c t u r e s d u r i n g C o n s t r u c t i o n Page 1 of 2
Steel Structures of Turbine House (left) & Boiler
House (right)
Front View STG 1788 GEC-ALSTOM – on Foundation,
Turbine type: C24L/E60/12.5 Straight Condensing
Side View STG 1788 GEC - ALSTOM Best View STG 1788 GEC-ALSTOM, waiting for next
process alignment
Follow up, check every progress and make sure that
everything goes according to the project plan.
Every mistake caused increasing project cost and
extending project schedule and everybody will not
happy working under pressure.
Coal-fired Power Plant
2 x 22 MW
Galang Batang – Bintan - Indonesia
Date : 02MAY2012
Prepared by : Werner S.
Approved by : WS
File Name : PIC 01/0512
P T C T I I n d o n e s i a P i c t u r e s d u r i n g C o n s t r u c t i o n Page 2 of 2
Boiler House Steel Structuring, Roofing, Side wall structure and reinforcement.
Guest House, Meeting Room and Guard house are basically ready to use (picture at bottom right),
still waiting for finishing touch and Office furniture.

Más contenido relacionado

La actualidad más candente

211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...
211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...
211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...BambangEkaSyaputra
 
Mke 15-4-15-laya-tugasharsa27
Mke 15-4-15-laya-tugasharsa27Mke 15-4-15-laya-tugasharsa27
Mke 15-4-15-laya-tugasharsa27Harsa Rizano
 
laporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALI
laporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALIlaporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALI
laporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALISyaifa Altari
 
Laporan cooling sistem habibi
Laporan cooling sistem habibiLaporan cooling sistem habibi
Laporan cooling sistem habibiMulianiAni2
 
Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...
Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...
Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...GLC
 
Essay praktikum dasar teknik elektro
Essay praktikum dasar teknik elektroEssay praktikum dasar teknik elektro
Essay praktikum dasar teknik elektroIbrohim Ibrohim
 
GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex neeraj prasad
 
Materi i teknik mesin m6 kb3
Materi i teknik mesin m6 kb3Materi i teknik mesin m6 kb3
Materi i teknik mesin m6 kb3PPGhybrid3
 
01 dokumen pengadaan ac 2015
01 dokumen pengadaan ac 201501 dokumen pengadaan ac 2015
01 dokumen pengadaan ac 2015jaiyyu
 
Presentation_Ijin_Transport_Dirjen_Migas FINAL
Presentation_Ijin_Transport_Dirjen_Migas FINALPresentation_Ijin_Transport_Dirjen_Migas FINAL
Presentation_Ijin_Transport_Dirjen_Migas FINALAristya Prima Mahardhika
 
RKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdf
RKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdfRKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdf
RKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdfcendanapermai
 
2.kontrak konsultan pengawas
2.kontrak konsultan pengawas2.kontrak konsultan pengawas
2.kontrak konsultan pengawasLeo Agus
 
Materi 05 Pengadaan Barang/Jasa Secara Swakelola
Materi 05 Pengadaan Barang/Jasa Secara SwakelolaMateri 05 Pengadaan Barang/Jasa Secara Swakelola
Materi 05 Pengadaan Barang/Jasa Secara SwakelolaMassaputro Delly TP
 
Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...
Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...
Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...GLC
 
Jurnal pemasaran internasional
Jurnal pemasaran internasionalJurnal pemasaran internasional
Jurnal pemasaran internasionalpangarso_adi
 

La actualidad más candente (20)

211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...
211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...
211656541 laporan-pkl-politeknik-negeri-banjarmasin-di-nusantara-indah-sistem...
 
Mke 15-4-15-laya-tugasharsa27
Mke 15-4-15-laya-tugasharsa27Mke 15-4-15-laya-tugasharsa27
Mke 15-4-15-laya-tugasharsa27
 
Turbin uap
Turbin uapTurbin uap
Turbin uap
 
laporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALI
laporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALIlaporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALI
laporan prektek kerja nyata di PT WIJAYA KARYA BOYOLALI
 
Laporan cooling sistem habibi
Laporan cooling sistem habibiLaporan cooling sistem habibi
Laporan cooling sistem habibi
 
Pertemuan 6 boiler ok edit
Pertemuan 6 boiler ok editPertemuan 6 boiler ok edit
Pertemuan 6 boiler ok edit
 
Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...
Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...
Contoh Perjanjian Survei Lahan Pengembangan Kelapa Sawit (Beli Perjanjian, Hu...
 
LAPORAN PKL Tromol
LAPORAN PKL TromolLAPORAN PKL Tromol
LAPORAN PKL Tromol
 
3 surat balasan
3 surat balasan3 surat balasan
3 surat balasan
 
Essay praktikum dasar teknik elektro
Essay praktikum dasar teknik elektroEssay praktikum dasar teknik elektro
Essay praktikum dasar teknik elektro
 
GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex GAIL(India)Ltd.,PATA Petrochemical Complex
GAIL(India)Ltd.,PATA Petrochemical Complex
 
Superheater & reheater
Superheater & reheaterSuperheater & reheater
Superheater & reheater
 
Materi i teknik mesin m6 kb3
Materi i teknik mesin m6 kb3Materi i teknik mesin m6 kb3
Materi i teknik mesin m6 kb3
 
01 dokumen pengadaan ac 2015
01 dokumen pengadaan ac 201501 dokumen pengadaan ac 2015
01 dokumen pengadaan ac 2015
 
Presentation_Ijin_Transport_Dirjen_Migas FINAL
Presentation_Ijin_Transport_Dirjen_Migas FINALPresentation_Ijin_Transport_Dirjen_Migas FINAL
Presentation_Ijin_Transport_Dirjen_Migas FINAL
 
RKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdf
RKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdfRKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdf
RKS Lanjutan Ruang Terbuka Hijau RTH Eks Pasar BoneBone.pdf
 
2.kontrak konsultan pengawas
2.kontrak konsultan pengawas2.kontrak konsultan pengawas
2.kontrak konsultan pengawas
 
Materi 05 Pengadaan Barang/Jasa Secara Swakelola
Materi 05 Pengadaan Barang/Jasa Secara SwakelolaMateri 05 Pengadaan Barang/Jasa Secara Swakelola
Materi 05 Pengadaan Barang/Jasa Secara Swakelola
 
Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...
Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...
Contoh Perjanjian Kerjasama Konsorsium Riset Proyek Terbaru (Beli Perjanjian,...
 
Jurnal pemasaran internasional
Jurnal pemasaran internasionalJurnal pemasaran internasional
Jurnal pemasaran internasional
 

Destacado

Pembangkit listrik tenaga uap
Pembangkit listrik tenaga uapPembangkit listrik tenaga uap
Pembangkit listrik tenaga uapMuhammad Irham
 
Data Project PLTU 2x25 MW Mamuju -West Sulawesi - Indonesia
Data Project PLTU 2x25 MW Mamuju -West Sulawesi - IndonesiaData Project PLTU 2x25 MW Mamuju -West Sulawesi - Indonesia
Data Project PLTU 2x25 MW Mamuju -West Sulawesi - IndonesiaWaldi Anwar
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler okBunk Bonk
 

Destacado (6)

Pembangkit listrik tenaga uap
Pembangkit listrik tenaga uapPembangkit listrik tenaga uap
Pembangkit listrik tenaga uap
 
Data Project PLTU 2x25 MW Mamuju -West Sulawesi - Indonesia
Data Project PLTU 2x25 MW Mamuju -West Sulawesi - IndonesiaData Project PLTU 2x25 MW Mamuju -West Sulawesi - Indonesia
Data Project PLTU 2x25 MW Mamuju -West Sulawesi - Indonesia
 
06 procedure of start up boiler ok
06 procedure of start up boiler ok06 procedure of start up boiler ok
06 procedure of start up boiler ok
 
ppt Turbin Uap
ppt Turbin Uapppt Turbin Uap
ppt Turbin Uap
 
Boiler PLTU
Boiler PLTUBoiler PLTU
Boiler PLTU
 
Pembangkit Listrik Tenaga Uap (PLTU)
Pembangkit Listrik Tenaga Uap (PLTU)Pembangkit Listrik Tenaga Uap (PLTU)
Pembangkit Listrik Tenaga Uap (PLTU)
 

PLTU CTI BINTAN

  • 1. Coal-fired Power Plant 2 x 22 MW Galang Batang – Bintan - Indonesia Date : 02MAY2012 Prepared by : Werner S. Approved by : WS File Name : PIC 01/0512 P T C T I I n d o n e s i a P i c t u r e s d u r i n g C o n s t r u c t i o n Page 1 of 2 Steel Structures of Turbine House (left) & Boiler House (right) Front View STG 1788 GEC-ALSTOM – on Foundation, Turbine type: C24L/E60/12.5 Straight Condensing Side View STG 1788 GEC - ALSTOM Best View STG 1788 GEC-ALSTOM, waiting for next process alignment Follow up, check every progress and make sure that everything goes according to the project plan. Every mistake caused increasing project cost and extending project schedule and everybody will not happy working under pressure.
  • 2. Coal-fired Power Plant 2 x 22 MW Galang Batang – Bintan - Indonesia Date : 02MAY2012 Prepared by : Werner S. Approved by : WS File Name : PIC 01/0512 P T C T I I n d o n e s i a P i c t u r e s d u r i n g C o n s t r u c t i o n Page 2 of 2 Boiler House Steel Structuring, Roofing, Side wall structure and reinforcement. Guest House, Meeting Room and Guard house are basically ready to use (picture at bottom right), still waiting for finishing touch and Office furniture.