PMP & CAPM
Exam Preparation
  January 17, 2013
Sessions
1. About the exam
2. Integration & Scope Management
3. Time & Cost Management
4. Quality & HR Management
5. Communication & Risk
   Management
6. Procurement Management
PMP Exam Information

• Number of questions: 200 (25 pretest questions)
• Maximum time allowed: 4 hours (exclude 15-minute
  computer tutorial)
• Domains:
  –   Initiating (13%)  26 questions
  –   Planning (24%)  48 questions
  –   Executing (30%)  60 questions
  –   Monitoring & Controlling (25%)  50 questions
  –   Closing (8%)  16 questions
PMP Exam Information

•   Situational questions
•   Random pretest questions
•   Using formal and informal terminologies
•   Might contain unnecessary information
•   Some questions might not be answerable
•   Tricky questions (tips: always follow PMI
    process)
CAPM Exam Information

• Number of questions: 150 (15 pretest questions)
• Maximum time allowed: 3 hours (exclude 15-minute
  computer tutorial)
• PMBOK Chapters:
  –   1 (4%)  6 questions
  –   2 (4%)  6 questions
  –   3 (11%)  16-17 questions
  –   4 (11%)  16-17 questions
  –   5 (11%)  16-17 questions
CAPM Exam Information

• PMBOK Chapters:
  –   6 (11%)  16-17 questions
  –   7 (9%)  13-14 questions
  –   8 (7%)  10-11 questions
  –   9 (7%)  10-11 questions
  –   10 (7%)  10-11 questions
  –   11 (11%)  16-17 questions
  –   12 (7%)  10-11 questions
CAPM Exam Information

• Entirely based on PMBOK
• Random pretest questions
• Using formal terminologies
Exam Preparation

• Primary book: PMBOK
• Secondary book:
  – PMP in Depth by Dr. Paul Sanghera, PMP
  – Head First PMP
  – Joseph Phillips PMP/CAPM Exam Guide
  – PMP/CAPM Exam Prep by Rita Mulcahy, PMP
  – etc
Exam Preparation

• Online tests simulation:
  – http://www.headfirstlabs.com/PMP/pmp_exam/v
    2/quiz.html

  – http://www.pmstudy.com/PMP-Exam-
    Resources/freeSimulatedTest.asp

  – http://www.simplilearn.com/slportal/test/list.do
Exam Preparation

• Online tests simulation:
  – http://www.edwel.com/pmp-certification-exam-
    prep/pmp-practice-exam#usermessage4a

  – http://pmzilla.com/pmp-simulation-test-free-200-
    questions-4-hour-test

  – http://www.examcentral.net/pmp/practice-exam
Exam Preparation

• Online tests simulation:
  – http://www.oliverlehmann.com/pmp-self-test/75-
    free-questions.htm
Study Plan

• 2 Hours per day; 4 Hours weekend
• Assign mnemonic to formal terminologies
• Study PMP, Exam for CAPM…
• 1 Online Test as Mid Term with Passing Grade
  75%
• 2 Online Test as Final Term with Passing Grade
  85%
General Concepts

•   5 Process Groups
•   9 Knowledge Areas
•   Projects vs Operations
•   Projects vs Programs vs Portfolio
•   Project documents vs Project management
    plan
General Concepts

• Project management processes
• Input, Tools & Techniques, Output
• Organizational Structure
General Concepts

• Enterprise Environment Factors
  – Culture and structure (environment and
    management way of doing things)
  – Processes and standards (quality standard, legal
    requirement, or other industry standard)
  – Infrastructures (facility, communication channel,
    estimation tools, work authorization system)
  – Internal and external conditions (risk tolerance,
    market condition, political climate)
General Concepts

• Organizational Process Assets
  – Standardized processes and procedures
     • HSE policy
     • Project management / ethics policy
     • Quality checklist
  – Standard guidelines
     • Closure guidelines
     • Evaluation criteria
     • Acceptance criteria
General Concepts

• Organizational Process Assets
  – Templates
     • Project documents template
     • Project management plan template
  – Knowledge base
     •   Project files (issues log, change request document, etc)
     •   Historical information / lessons learned
     •   Financial database
     •   Configuration management
General Concepts

• Formula
  – Link to file
Sample Questions

Which of the following are the essential
characteristics that make a group of activities
a project?
A. It takes multiple individuals to perform these
   activities and it creates a new product.
B. The work is managed by a project manager.
C. The group has a plan and a budget.
D. The group has a start date and a finish date, and
   its outcome will be a new product.
Sample Questions

Which of the following is a project?
A. Running a donut shop
B. Building another library in your area
C. Keeping a network up and running in a university
   department
D. Running a warehouse
Sample Questions

Which of the following are the process
groups?
A. Starting, planning, executing, monitoring and
   controlling, and closing
B. Initiating, organizing and preparing, executing,
   monitoring and controlling, and closing
C. Initiating, planning, implementing, monitoring
   and controlling, and closing
D. Initiating, planning, executing, monitoring and
   controlling, and closing
Sample Questions

Which of the following is not a project
management knowledge area?
A.   Project procurement management
B.   Project risk management
C.   Project quality management
D.   Project team management
Sample Questions

Which of the following is the best definition of
progressive elaboration?
A. Taking the project from concept to project
   management plan
B. Taking the project to its completion
C. Continuous effort to improve a plan by working
   out more details as the project progresses
D. Decomposing the project objectives into smaller,
   more manageable work pieces
Sample Questions

In which of the following organizational
structures does the project manager have the
greatest authority?
A.   Functional
B.   Projectized
C.   Matrix
D.   Leveled
Sample Questions

In which of the following organizational
structures does the project manager have the
least authority?
A.   Functional
B.   Projectized
C.   Matrix
D.   Leveled
Sample Questions

Your project depends on two business partners: On The Fly,
Inc. (OTF) and The Sure Thing, Inc. (ST) delivering their
products to you on time. The chances are three out of four
that OTF will make the delivery on time and two out of three
that ST will not make the delivery on time. The probability
that OTF and ST will both deliver on time is equal to:
A. 0.25
B. 0.5
C. 5/7
D. 4/7
Sample Questions

All of the following are true about a project except:
A. Cost is low and stakeholder influence is highest in the
     beginning.
B. Staffing levels and the ability to influence the product
     characteristics are both low at the end of the project.
C. When the project is executing, both cost and
     stakeholders’ influence are at their highest.
D. Uncertainty is at its highest in the beginning of the
     project.
Sample Questions

Both projects and operations share all the following
characteristics except:
A. Performed by individuals
B. Planned, executed, monitored and controlled, and closed
C. Limited by constraints
D. Performed to achieve the strategic objectives of the
    organization
Sample Questions
You are being interviewed by a functional manager who says,
“We have this huge undertaking of launching an online
education website that contains different components, such
as designing the website; developing the content; developing
the administrative system, including registration and
payment; marketing the courses on the website; integrating
different components of the website; and finally going live.
Each component is functionally complex and large enough
that it will be better served under a different management.”
The manager is most likely describing a:
 A. Project
 B. Program
 C. Operation
 D. Portfolio
Sample Questions
Effective project management requires that a project manager
must have the following characteristics:
A. Project management knowledge, ability to apply the
    knowledge effectively to the project at hand, and
    computer expertise
B. Project management knowledge, leadership skills, and
    expertise in the application area of the project
C. Project management knowledge; ability to apply the
    knowledge to the project at hand; and personal style and
    behavior, including personal effectiveness and leadership
D. Project management knowledge, ability to apply the
    knowledge effectively to the project at hand, and project
    management experience
Sample Questions

The role of a project manager is more of a coordinator or an
expediter in organizations with the following structures:
A. Strong matrix and weak matrix
B. Projectized
C. Functional and weak matrix
D. Hierarchical
Sample Questions

The project manager is responsible for achieving project
objectives in an organization with the following structure:
A. Projectized only
B. Strong matrix and projectized only
C. Matrix and projectized only
D. All structures
Sample Questions

You have just joined an organization as a project manager and
are studying the enterprise environmental factors of the
organization to find out how you can leverage them for the
success of your upcoming projects. Enterprise environmental
factors may have what kind of influence on the projects?
 A. Positive only
 B. Negative only
 C. Positive or negative
 D. None

Más contenido relacionado

La actualidad más candente

PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
ejlp12
 
Zimmerman
ZimmermanZimmerman
Zimmerman
NASAPMC
 

La actualidad más candente (20)

PMP-Cost Management area
PMP-Cost Management areaPMP-Cost Management area
PMP-Cost Management area
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
 
14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects14. Developing Custom Processes For IT Projects
14. Developing Custom Processes For IT Projects
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
7- PMP Training - Quality Management
7- PMP Training - Quality Management7- PMP Training - Quality Management
7- PMP Training - Quality Management
 
5. PMP Training - Time management
5. PMP Training - Time management5. PMP Training - Time management
5. PMP Training - Time management
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
07 projectcostmanagement
07 projectcostmanagement07 projectcostmanagement
07 projectcostmanagement
 
Organizational project maturity model (opm3)
Organizational project maturity model (opm3)Organizational project maturity model (opm3)
Organizational project maturity model (opm3)
 
Zimmerman
ZimmermanZimmerman
Zimmerman
 
Spm lecture 1
Spm lecture 1Spm lecture 1
Spm lecture 1
 
PMP Module 4 - Cost
PMP Module 4 - CostPMP Module 4 - Cost
PMP Module 4 - Cost
 
PMI - ACP: Domain 6 - Problem Detection and resolution-v2.2_lite_4_60_pages
PMI - ACP: Domain 6 - Problem Detection and resolution-v2.2_lite_4_60_pagesPMI - ACP: Domain 6 - Problem Detection and resolution-v2.2_lite_4_60_pages
PMI - ACP: Domain 6 - Problem Detection and resolution-v2.2_lite_4_60_pages
 
Spm lecture-3
Spm lecture-3Spm lecture-3
Spm lecture-3
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project management professional (pmi) study guide
Project management professional (pmi) study guideProject management professional (pmi) study guide
Project management professional (pmi) study guide
 
Pmp time chapter 6
Pmp time chapter 6Pmp time chapter 6
Pmp time chapter 6
 
10- PMP Training - Risk Management
10- PMP Training - Risk Management 10- PMP Training - Risk Management
10- PMP Training - Risk Management
 
Understanding Software Project Management
Understanding Software Project ManagementUnderstanding Software Project Management
Understanding Software Project Management
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - Foundation
 

Destacado

Project Scope Management Plan New
Project Scope Management Plan NewProject Scope Management Plan New
Project Scope Management Plan New
MelanieRos
 

Destacado (20)

PMP CAPM study guide Scope
PMP CAPM study guide ScopePMP CAPM study guide Scope
PMP CAPM study guide Scope
 
Research Methodology
Research MethodologyResearch Methodology
Research Methodology
 
Testing and extending the capital asset pricing model
Testing and extending the capital asset pricing modelTesting and extending the capital asset pricing model
Testing and extending the capital asset pricing model
 
PMP : Change is Coming - Know how it affects you
PMP : Change is Coming - Know how it affects youPMP : Change is Coming - Know how it affects you
PMP : Change is Coming - Know how it affects you
 
Similarities and differences between PMBOK® Guide and PRINCE2® method
Similarities and differences between PMBOK® Guide and PRINCE2® methodSimilarities and differences between PMBOK® Guide and PRINCE2® method
Similarities and differences between PMBOK® Guide and PRINCE2® method
 
Pmp session 3
Pmp session 3Pmp session 3
Pmp session 3
 
WBS And Scheduling for eLearning Project Managament
WBS And Scheduling for eLearning Project ManagamentWBS And Scheduling for eLearning Project Managament
WBS And Scheduling for eLearning Project Managament
 
Inse 62301 Project Management Development Plan Presentation Group#20
Inse 62301   Project Management Development Plan Presentation   Group#20Inse 62301   Project Management Development Plan Presentation   Group#20
Inse 62301 Project Management Development Plan Presentation Group#20
 
Pmp integration chapter 4
Pmp integration chapter 4Pmp integration chapter 4
Pmp integration chapter 4
 
A study on empherical testing of capital asset pricing model
A  study on empherical testing of capital asset pricing modelA  study on empherical testing of capital asset pricing model
A study on empherical testing of capital asset pricing model
 
Pmp risk chapter 11
Pmp risk chapter 11Pmp risk chapter 11
Pmp risk chapter 11
 
Pmp stakeholder chapter 13
Pmp stakeholder chapter 13Pmp stakeholder chapter 13
Pmp stakeholder chapter 13
 
Pmp procurement chapter 12
Pmp procurement chapter 12Pmp procurement chapter 12
Pmp procurement chapter 12
 
Project Scope Management Plan New
Project Scope Management Plan NewProject Scope Management Plan New
Project Scope Management Plan New
 
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
 
PMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - FormulasPMP Key Exam Concepts - Formulas
PMP Key Exam Concepts - Formulas
 
Social Media Project Charter Template
Social Media Project Charter TemplateSocial Media Project Charter Template
Social Media Project Charter Template
 
Mobile Marketing Project Charter
Mobile Marketing Project CharterMobile Marketing Project Charter
Mobile Marketing Project Charter
 
PMPProcessGroupTasks
PMPProcessGroupTasksPMPProcessGroupTasks
PMPProcessGroupTasks
 
Project Charter Guide
Project Charter GuideProject Charter Guide
Project Charter Guide
 

Similar a Pmp session 1

Lean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution EngineLean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution Engine
Mark Cichonski
 
Session 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM CertificationsSession 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM Certifications
Seshne Govender
 
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designers
Kimberly Kaye
 
PMP.Essentials.150121
PMP.Essentials.150121PMP.Essentials.150121
PMP.Essentials.150121
Rakesh P
 
Fundamentals of Organizational Change Management
Fundamentals of Organizational Change ManagementFundamentals of Organizational Change Management
Fundamentals of Organizational Change Management
Dave Angelow
 
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
RaheelMuhammad5
 

Similar a Pmp session 1 (20)

Lean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution EngineLean Six Sigma-An Execution Engine
Lean Six Sigma-An Execution Engine
 
Session 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM CertificationsSession 3 Everything You Should Know About PMP & CAPM Certifications
Session 3 Everything You Should Know About PMP & CAPM Certifications
 
CI retooling FINAL.pptx
CI retooling FINAL.pptxCI retooling FINAL.pptx
CI retooling FINAL.pptx
 
Pmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinarPmp exam changes march 2021) webinar
Pmp exam changes march 2021) webinar
 
Project management for instructional designers
Project management for instructional designersProject management for instructional designers
Project management for instructional designers
 
Life of a pragmatic tester
Life of a pragmatic testerLife of a pragmatic tester
Life of a pragmatic tester
 
Req-usingDesignSprint.pdf
Req-usingDesignSprint.pdfReq-usingDesignSprint.pdf
Req-usingDesignSprint.pdf
 
PMP Exam Prep_sample slides
PMP Exam Prep_sample slidesPMP Exam Prep_sample slides
PMP Exam Prep_sample slides
 
Project Management
Project ManagementProject Management
Project Management
 
M & E Presentation DSK.ppt
M & E Presentation DSK.pptM & E Presentation DSK.ppt
M & E Presentation DSK.ppt
 
PMP.Essentials.150121
PMP.Essentials.150121PMP.Essentials.150121
PMP.Essentials.150121
 
PMI-ACP Training Deck
PMI-ACP Training DeckPMI-ACP Training Deck
PMI-ACP Training Deck
 
Stephen "Steve" Muzzy Memphis Schools Presentation
Stephen "Steve" Muzzy Memphis Schools PresentationStephen "Steve" Muzzy Memphis Schools Presentation
Stephen "Steve" Muzzy Memphis Schools Presentation
 
Project_Integration_Managemen.pptx
Project_Integration_Managemen.pptxProject_Integration_Managemen.pptx
Project_Integration_Managemen.pptx
 
Fundamentals of Organizational Change Management
Fundamentals of Organizational Change ManagementFundamentals of Organizational Change Management
Fundamentals of Organizational Change Management
 
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
pmicertificationpreparationintegrationmanagementvvujovic20170307-170308083758...
 
Project Management 101: Communication is 90% of the Job
Project Management 101: Communication is 90% of the JobProject Management 101: Communication is 90% of the Job
Project Management 101: Communication is 90% of the Job
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
The Agile Way with PMI-ACP
The Agile Way with PMI-ACPThe Agile Way with PMI-ACP
The Agile Way with PMI-ACP
 
Large Enterprise - Best Practices - Developing a CoE (1).pdf
Large Enterprise - Best Practices - Developing a CoE (1).pdfLarge Enterprise - Best Practices - Developing a CoE (1).pdf
Large Enterprise - Best Practices - Developing a CoE (1).pdf
 

Último

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 

Pmp session 1

  • 1. PMP & CAPM Exam Preparation January 17, 2013
  • 2. Sessions 1. About the exam 2. Integration & Scope Management 3. Time & Cost Management 4. Quality & HR Management 5. Communication & Risk Management 6. Procurement Management
  • 3. PMP Exam Information • Number of questions: 200 (25 pretest questions) • Maximum time allowed: 4 hours (exclude 15-minute computer tutorial) • Domains: – Initiating (13%)  26 questions – Planning (24%)  48 questions – Executing (30%)  60 questions – Monitoring & Controlling (25%)  50 questions – Closing (8%)  16 questions
  • 4. PMP Exam Information • Situational questions • Random pretest questions • Using formal and informal terminologies • Might contain unnecessary information • Some questions might not be answerable • Tricky questions (tips: always follow PMI process)
  • 5. CAPM Exam Information • Number of questions: 150 (15 pretest questions) • Maximum time allowed: 3 hours (exclude 15-minute computer tutorial) • PMBOK Chapters: – 1 (4%)  6 questions – 2 (4%)  6 questions – 3 (11%)  16-17 questions – 4 (11%)  16-17 questions – 5 (11%)  16-17 questions
  • 6. CAPM Exam Information • PMBOK Chapters: – 6 (11%)  16-17 questions – 7 (9%)  13-14 questions – 8 (7%)  10-11 questions – 9 (7%)  10-11 questions – 10 (7%)  10-11 questions – 11 (11%)  16-17 questions – 12 (7%)  10-11 questions
  • 7. CAPM Exam Information • Entirely based on PMBOK • Random pretest questions • Using formal terminologies
  • 8. Exam Preparation • Primary book: PMBOK • Secondary book: – PMP in Depth by Dr. Paul Sanghera, PMP – Head First PMP – Joseph Phillips PMP/CAPM Exam Guide – PMP/CAPM Exam Prep by Rita Mulcahy, PMP – etc
  • 9. Exam Preparation • Online tests simulation: – http://www.headfirstlabs.com/PMP/pmp_exam/v 2/quiz.html – http://www.pmstudy.com/PMP-Exam- Resources/freeSimulatedTest.asp – http://www.simplilearn.com/slportal/test/list.do
  • 10. Exam Preparation • Online tests simulation: – http://www.edwel.com/pmp-certification-exam- prep/pmp-practice-exam#usermessage4a – http://pmzilla.com/pmp-simulation-test-free-200- questions-4-hour-test – http://www.examcentral.net/pmp/practice-exam
  • 11. Exam Preparation • Online tests simulation: – http://www.oliverlehmann.com/pmp-self-test/75- free-questions.htm
  • 12. Study Plan • 2 Hours per day; 4 Hours weekend • Assign mnemonic to formal terminologies • Study PMP, Exam for CAPM… • 1 Online Test as Mid Term with Passing Grade 75% • 2 Online Test as Final Term with Passing Grade 85%
  • 13. General Concepts • 5 Process Groups • 9 Knowledge Areas • Projects vs Operations • Projects vs Programs vs Portfolio • Project documents vs Project management plan
  • 14. General Concepts • Project management processes • Input, Tools & Techniques, Output • Organizational Structure
  • 15. General Concepts • Enterprise Environment Factors – Culture and structure (environment and management way of doing things) – Processes and standards (quality standard, legal requirement, or other industry standard) – Infrastructures (facility, communication channel, estimation tools, work authorization system) – Internal and external conditions (risk tolerance, market condition, political climate)
  • 16. General Concepts • Organizational Process Assets – Standardized processes and procedures • HSE policy • Project management / ethics policy • Quality checklist – Standard guidelines • Closure guidelines • Evaluation criteria • Acceptance criteria
  • 17. General Concepts • Organizational Process Assets – Templates • Project documents template • Project management plan template – Knowledge base • Project files (issues log, change request document, etc) • Historical information / lessons learned • Financial database • Configuration management
  • 18. General Concepts • Formula – Link to file
  • 19. Sample Questions Which of the following are the essential characteristics that make a group of activities a project? A. It takes multiple individuals to perform these activities and it creates a new product. B. The work is managed by a project manager. C. The group has a plan and a budget. D. The group has a start date and a finish date, and its outcome will be a new product.
  • 20. Sample Questions Which of the following is a project? A. Running a donut shop B. Building another library in your area C. Keeping a network up and running in a university department D. Running a warehouse
  • 21. Sample Questions Which of the following are the process groups? A. Starting, planning, executing, monitoring and controlling, and closing B. Initiating, organizing and preparing, executing, monitoring and controlling, and closing C. Initiating, planning, implementing, monitoring and controlling, and closing D. Initiating, planning, executing, monitoring and controlling, and closing
  • 22. Sample Questions Which of the following is not a project management knowledge area? A. Project procurement management B. Project risk management C. Project quality management D. Project team management
  • 23. Sample Questions Which of the following is the best definition of progressive elaboration? A. Taking the project from concept to project management plan B. Taking the project to its completion C. Continuous effort to improve a plan by working out more details as the project progresses D. Decomposing the project objectives into smaller, more manageable work pieces
  • 24. Sample Questions In which of the following organizational structures does the project manager have the greatest authority? A. Functional B. Projectized C. Matrix D. Leveled
  • 25. Sample Questions In which of the following organizational structures does the project manager have the least authority? A. Functional B. Projectized C. Matrix D. Leveled
  • 26. Sample Questions Your project depends on two business partners: On The Fly, Inc. (OTF) and The Sure Thing, Inc. (ST) delivering their products to you on time. The chances are three out of four that OTF will make the delivery on time and two out of three that ST will not make the delivery on time. The probability that OTF and ST will both deliver on time is equal to: A. 0.25 B. 0.5 C. 5/7 D. 4/7
  • 27. Sample Questions All of the following are true about a project except: A. Cost is low and stakeholder influence is highest in the beginning. B. Staffing levels and the ability to influence the product characteristics are both low at the end of the project. C. When the project is executing, both cost and stakeholders’ influence are at their highest. D. Uncertainty is at its highest in the beginning of the project.
  • 28. Sample Questions Both projects and operations share all the following characteristics except: A. Performed by individuals B. Planned, executed, monitored and controlled, and closed C. Limited by constraints D. Performed to achieve the strategic objectives of the organization
  • 29. Sample Questions You are being interviewed by a functional manager who says, “We have this huge undertaking of launching an online education website that contains different components, such as designing the website; developing the content; developing the administrative system, including registration and payment; marketing the courses on the website; integrating different components of the website; and finally going live. Each component is functionally complex and large enough that it will be better served under a different management.” The manager is most likely describing a: A. Project B. Program C. Operation D. Portfolio
  • 30. Sample Questions Effective project management requires that a project manager must have the following characteristics: A. Project management knowledge, ability to apply the knowledge effectively to the project at hand, and computer expertise B. Project management knowledge, leadership skills, and expertise in the application area of the project C. Project management knowledge; ability to apply the knowledge to the project at hand; and personal style and behavior, including personal effectiveness and leadership D. Project management knowledge, ability to apply the knowledge effectively to the project at hand, and project management experience
  • 31. Sample Questions The role of a project manager is more of a coordinator or an expediter in organizations with the following structures: A. Strong matrix and weak matrix B. Projectized C. Functional and weak matrix D. Hierarchical
  • 32. Sample Questions The project manager is responsible for achieving project objectives in an organization with the following structure: A. Projectized only B. Strong matrix and projectized only C. Matrix and projectized only D. All structures
  • 33. Sample Questions You have just joined an organization as a project manager and are studying the enterprise environmental factors of the organization to find out how you can leverage them for the success of your upcoming projects. Enterprise environmental factors may have what kind of influence on the projects? A. Positive only B. Negative only C. Positive or negative D. None

Notas del editor

  1. 5 Process Groups: Initiating, Planning, Executing, Monitoring and Controlling, Closing9 Knowledge Area: Integration, Scope, Time, Cost, Quality, HR, Communication, Risk, Procurement