THE SHANGHAI TOWER CASE STUDY
Once completed in 2014, the Shanghai
Tower, a super tall skyscraper, will be the
tallest building in China and the second
tallest in the world. Undertaking the
design for such a mammoth project is no
easy feat. With all the complexities,
issues, and possibilities involved, what
important lessons can be learned? What
are the main highlights of this iconic
building? And why did Marshall Strabala,
Shanghai Tower’s Chief Architect said, in
exclusive interview with IQPC’s Darwin
Jayson Mariano, that in designing façade
for super tall skyscraper, “movements”
matter a great deal?
BY: DARWIN JAYSON MARIANO
PHOTOS COURTESY OF NICKY ALMSBY and
2DEFINE ARCHITECTURE

Like a battle of two Goliaths, emerging economies from Latin
America and Southeast Asia are toughing it out in the world
stage as both regions try to outdo each other in the arena of
Private Equity deals and investments. According to data
released by the Latin American Private Equity and Venture
Capital Association (LAVCA), private equity (PE) and venture
capital (VC) investing in Latin America hits 5-year high in 2012
with firms committing a total of $7.9 billion, representing 21%
increase over 2011.
Darwin Jayson Mariano: What is your definition of
‘high performance building facade’? Do you notice
a pattern or trend when it comes to envelope
engineering/design, particularly in China?
Marshall Strabala: “High performance building
façade” is a label that we attach to a building to say
that it’s very sustainable. Basically, this label refers
to a unitized system that is factory built to highperformance specifications, be it for high- or low-rise
construction projects.

Installing a factory-assembled exterior wall system is
a lot easier, safer, and advantageous than
constructing a system on the building from
individual parts. The latter is a basic stick system,
and the former is a “unitized system”. In a unitized
system, your tolerances are tighter, and more
consistent. You can actually get 8mm joints that
work better because, when you construct a glass and
aluminium wall in situ, weather dominates the
process. That is wind, rain and temperature can have
big impact on the wall. The contractor has to fight
the elements in a stick system, where a unitized
system is created in a controlled factory
environment at the right humidity and temperature.
The High performance coating we use on glass need
special handling to produce a well-sealed building.
Dust and dirt is another factor that goes away when
not building in situ.
Right now, China is on an upward curve – it’s
approaching the standards of Europe and America,
and I imagine they’ll overtake these standards in a
few years. So the next step is understanding the
patterns that are transferred when it comes to
envelope and engineering design.
The trend in Asia is moving towards high quality and
energy efficiency. Most building performance
criteria is controlled by the government, and there
is a certain minimum performance that the
envelope of all new construction must meet. In
addition, the building must be safe for the public,
and this is why we are seeing more laminated glass
walls to limit the chance of large glass shards falling
off buildings.

Because of higher performance requirements and
sustainability goals of clients, the façade is getting
to the point where we have to increase the number
of layers in the skin to reduce the amount of energy
that transmits through the façade. We are seeing K
values of 1.4/1.35, whereas a couple of years ago we
were seeing K values of 1.6/1.7. Today, the total
envelope of the building has much more stringent
insulation requirements than it used to, and this will
continue to rise in the future.

Please talk about your recent project, the
Shanghai Tower. Could you discuss some of the
building’s highlights and design strengths? How
would you characterize its envelope design?
The Shanghai Tower has a very ambitious design. It
will be the world’s tallest double skin building. From
the beginning, we tried to minimize the amount of
façade on the building in order to increase the value
of the Project. Basically, what we’re designing is a
thermos bottle, a bottle within a bottle that actually
increase the insulation value of the building. This is
www.facadechina.com
like wearing a sweater. You can take the sweater off in the summer,
and when it gets colder, you can put it back on to achieve the desired
level of comfort. The double skin allows us to use less energy per year
than a single skin building.
The outer skin or what we call the A wall is not attached to a slab. The
A wall is attached to a 350mm dia steel girt, that is from 2 – 12m away
from any concrete slab – so there is no adjacent area to install the
wall. Yuanda and the General contractor developed a unique set of
hanging platforms to install both the Curtain wall Supporting structure,
and the exterior wall.
Most super tall buildings are only for the use of the tenants, and this
means 95% of the building is not public. The public is only allowed on
the observation deck through the purchase of a ticket. The Shanghai
Tower from the beginning was a building designed for people – both
public and private. The completed building takes advantage of the 5 sky
lobbies that not only reduce the size of the core because we can stack
the elevators, but also create vertical neighbour hoods containing
restaurants and other public uses. We call these “Amenity Floors”.
This double skin system allows a building to have an enclosed atrium
space at each “Amenity Floors” for extra public space beyond the
lobby. This “in-between space” allows public access to the edge. Levels
22,37,52,68 and 101 are designed like this. The 83 floor contains a pool
and gym, and 118 and above are for the observation population.
The double skin is created in eight zones, where each zone has a central
cylinder of useable space surrounded by a rounded triangle. These
crescents in the atria are from 12m to 7m deep. Therefore, when you
www.facadechina.com
The Shanghai Tower has a very ambitious
design. It will be the world’s tallest double
skin building.
- Marshall Strabala, Chief Architect, Shanghai Tower

get to the edge of your office, you don’t feel like
you’re more than 14 stories above the atria, but in
reality you are 50 -60 floors above the ground. It’s a
very comforting feeling that if the glass broke, you
wouldn’t be hanging out in the middle of space 70
floors up.
Architecture is the art of making buildings both
beautiful and safe. In the Shanghai Tower, there are
redundant safety features. The exterior wall on the
outside of the building or the “A Wall” is two pieces
of Low-E and low iron glass laminated with a product
call SGP by DuPont. This is the strongest lamination
system we have in the industry, and it creates a very
safe environment if a glass panel should break. This
lamination keeps the broken pieces of glass from
falling and causing injuries. The BME system is
designed to both clean and replace the windows. All
the system’s materials are chosen for the highest
level of performance and sustainability. .
The inner wall or the “B wall” was originally thought
to be a very simple and easy design; however it
became the most technically complex wall I have
ever worked on. Conversely, we thought the outer
skin would be very complicated, but it turned out to
be very easy instead. John Perry was the façade
consultant on the project, and his background in
structural engineering helped us with the interface
of the “Curtain Wall Supporting Structure” – CWSS
The inner skin is a very rare system because of the 1
hour fire separation required between the office
space and the atria. The core of wall is a formed steel
tube clad in aluminium and glazed with a DBF high
temperature glass. This glass wall achieves both the
fire rating and visual requirements.

The lessons we learned was to always go in with
open eyes and be prepared for the worst, and just
jump for joy when something works out very well.
One of the biggest challenges is where the two wall
come together and create a structural link to the
primary building. There are three points where the
CWSS is linked to the base structure actually
touching the façade of the building.
The inner wall could actually be bolted to the slab,
and you could actually work from the slab and have
workmen and materials being delivered from the
slab area, like in any other building on the planet.
However, for the outside skin, there’s no slab, or
sometimes the slab is 10 meters away, so it’s a lot
harder to install the equipment or the exterior wall
panels. You need a platform adjacent to it as you’re
installing it, so one had to be developed and installed
by Yuanda, the contractor who’s doing the outer
skin. Yuanda, the fabricator, installed on a special set
of moveable platforms. As the façade is going up,
our role becomes that of quality control and we
assist in any odd conditions that could come up. We
work with all three contractors: Yuanda, Jangho,
and Lingyun to refine the design and make sure the
detailing is quite tidy and looks good from all angles.
In proposing a façade engineering design, do you
see a conflict between aesthetics and ROI?
Always! All commercial buildings, anywhere in the
world, are built for a return on investment. Even
museums are built to a budget. Buildings need
identity, just like people. Some attract people to the
city and others bring people to different parts of the

www.facadechina.com
city. A large corporate office building or hotel
expects a certain level of return, and every operator
has a different set of criteria. These design criteria
set the cost, acoustics, and performance levels for
the project. If done at the beginning the project
becomes better. If changed often during design and
construction, it will lead to a less than satisfactory
result. Every hotel operator requires acoustic
separation from room to room, and the façade must
meet this criteria. This is done so guests in one room
don’t hear the people in the next room through the
façade. Putting acoustic separation between hotel
rooms is rather easy through drywall and insulation
but sometimes, the weak point is in the façade or the
interface between wall and façade.
So, this struggle between return on investment,
performance and aesthetics is always out there, and
what you try to do is to achieve the criteria with as
minimum amount of material as possible. This
minimum amount of material always has a safety
factor. The wall should be robust enough so it does
not deflect when the average wind blows or creak
and break when the building moves.
In all exterior walls, movement is required. In super
tall buildings, the movements are more extreme and
require another level of solutions. Too much
movement and the wall leaks, not enough and the
wall breaks under pressure. In terms of ROI, the
exterior wall of any building is about 20% of the cost,
yet the wall is 90% of the look of the building. This
piece of equipment is an investment and should be
treated as such. You need to maintain it, clean it ( at
least twice a year) and repair it, and even replace it,
because it really contributes to the image of the
building and the image of the building is the first
thing people react to. Buildings gain reputation. If
something does not work well, people talk and the

building becomes a bad place to live or work. This
Curbside feeling of quality is very important to
leasing. Also, if you let the dirt build up on the
façade, it will take longer to clean and hurt the
image of the project. So is it easy to clean? Is it easy
to replace? Does it look good between cleanings?
These are the question we always ask.
Here’s a key thing: if you can design your façade so
the dirt and the rain don’t actually show up between
cleanings, you’re ahead of the game. The gaps
between the façade pieces actually channel the rain
and the particles in the air, so it doesn’t look like it’s
dirty between cleanings. That’s what we strive to do.
We try to plan where the water goes so we’re not
getting stains and dirt doesn’t build up where we
don’t want them; we always specify weeps in our
building to get internal moisture out of the building.
We actually look for a high return on investment not
5 or 6 years, but 50 years, and I think that looking
longer-term is the right way to do it.
Do you think building owners are receptive to these
ideas?
Yes, all building owners want a good ROI and these
criteria help improve the profit. Sometimes with very
complex and unusual shapes the fabricators can help
you achieve the right aesthetics with the lowest cost.
The owner sets the price, the architect sets the look,
the façade team sets the performance and the
fabricators pull them all together. And sometimes,
the fabricator comes up and says, if we change this
and adjust that, we can reduce the cost of façade and
make it look like 90% of what the architect had in
mind. You should always be a little flexible and listen.
Allowing the fabricator input early on is always good
for the ROI.
www.facadechina.com
Once completed, the Shanghai Tower will be the
tallest building in China. What important lessons
one must learn in designing façade for super tall
skyscraper?

The lessons learnt are Movement, Movement and
more Movement.
First of all, the overall movement of the building.
This can be as much as two meters at the top! The
distance the building moves must be accounted for
in the façade. From a comfort standpoint, you need
to control the acceleration, not the distance. It’s
important to fine-tune the structural system to allow
enough movement so earthquakes and wind forces
are balanced and correctly mitigated. This overall
movement is very high at the top and very low at the
bottom. Panels at the top can be significantly
damaged, while the panels at the bottom of the
building might not have much impact at all. In super
tall buildings, the details might change as you go
up.

But there is fourth movement that you need to be
aware of, especially in this idea of a double-skin
building: the movement induced by high
temperatures, or fire. We don’t want fire to cause
breakage and movements in the structure that
might cause something else to break. In the rare
event of a fire, you need to make sure that smoke
does not migrate from one part of the building to
another. We also need to think of what a fire does to
the façade, which can result in pieces falling off.
Thirdly, after the fire is out, did the temperature
impact the system that might make it unsafe for the
fireman who is putting out the fire? We have to
make sure that there are no “second-order
repercussions” from a fire. This gets very
complicated and we often employ RJA as a fire
consultant to review the work.
At the end of the day, it really comes to down to
Movement, Movement, Movement, Movement, and
even more Movement.

The second movement pertains to all the nonreversible changes in the size of members (i.e.,
column shortening). Under loading things change.
In super tall buildings, this can be very significant.
Then there is settlement of the entire structure that
might affect the façade. There is movement vis-àvis deflection. Deflection is the reversible beam
movement under load. So we have to account for
that when designing the façade system. If we had 12
meter long beams, the exterior wall panels need to
accommodate this centre beam deflect so as not
to lockup under the overall building movements.
Panels in the middle of the span need enough
adjustments to make the appearance level on the
outside of the building.
Then we get to the third, a non-reversible
movement in tall buildings, called concrete creep. As
you start stacking these floors on top of each other
and going up to, say, 120 floors, the columns start to
get a little shorter on the ground level. So you have
to plan for that column shortening either in the
façade or in the concrete itself. Generally, we start
adding taller “stack” joints in the façade at the
bottom than at the top.

www.facadechina.com
Marshall Strabala AIA AFAAR LEED ap. is the co -Founder and Design Partner of 2DEFINE Architecture.
He is an American architect, living in Shanghai, who has lead the design team of three of the ten tallest
“constructed” buildings in the world. For the last three years, Strabala has been the principal of his own
architectural firm, with over 30 years of combined experience. He was an Associate Partner at SOM in
Chicago, and the only Director of Design M. Arthur Gensler Jr. & Associates, Inc. Currently, Strabala and
2DEFINE Architecture are the chief architect for the Shanghai tower scheduled for completion in 2014.
Hear more from Marshall Strabala and other distinguished speakers at the 3rd Annual Facades Design and
Engineering China 2013, happening on 18-21 June at Shanghai, China.

www.facadechina.com
About the Author:
Darwin Jayson Mariano is the Online Content Manager and Regional Editor - Asia for International Quality & Productivity Center
(IQPC), a leading producer of events and conferences for business leaders around the world. Connect via LinkedIn or email
darwin.mariano@iqpc.com.sg
Disclaimer:
Please note that we do all we can to ensure accuracy and timeliness of the information presented herein but errors may still understandably occur in some cases. If you believe that
a serious inaccuracy has been made, please email darwin.mariano@iqpc.com.sg. This article is provided for information purposes only. IQPC accepts no responsibility whatsoever
for any direct or indirect losses arising from the use of this report or its contents.

Más contenido relacionado

La actualidad más candente

World's tallest buildings
World's tallest buildingsWorld's tallest buildings
World's tallest buildings
Marilen Ebrada
 

La actualidad más candente (20)

SKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the WorldSKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
 
Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011Shanghai tower facade_design_process_11_10_2011
Shanghai tower facade_design_process_11_10_2011
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Vertical cities presentation
Vertical cities presentationVertical cities presentation
Vertical cities presentation
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
KOHINOOR SQUARE (High Rise Mixed use building) - Mumbai Case Study By Anurag ...
 
Seminar on capital gate building
Seminar on capital gate buildingSeminar on capital gate building
Seminar on capital gate building
 
World's tallest buildings
World's tallest buildingsWorld's tallest buildings
World's tallest buildings
 
Hearst Tower
Hearst TowerHearst Tower
Hearst Tower
 
Burj khalifa
Burj khalifaBurj khalifa
Burj khalifa
 
Report of cayan tower
Report of cayan towerReport of cayan tower
Report of cayan tower
 
Petronas towers
Petronas towersPetronas towers
Petronas towers
 
High Rise Structures case study - The Gherkin & Shanghai financial center.
High Rise Structures  case study - The Gherkin & Shanghai financial center.High Rise Structures  case study - The Gherkin & Shanghai financial center.
High Rise Structures case study - The Gherkin & Shanghai financial center.
 
Case study kohinoor square Mumbai
Case study kohinoor square MumbaiCase study kohinoor square Mumbai
Case study kohinoor square Mumbai
 
High rise building
High rise buildingHigh rise building
High rise building
 
IFC
IFCIFC
IFC
 
Cayan tower
Cayan towerCayan tower
Cayan tower
 
Skyscraper
SkyscraperSkyscraper
Skyscraper
 
Modern Architecture
Modern ArchitectureModern Architecture
Modern Architecture
 
Skyscrapers Architecture Analysis
Skyscrapers Architecture AnalysisSkyscrapers Architecture Analysis
Skyscrapers Architecture Analysis
 

Destacado

Construction Planning and Techniques used in skyscrapers
Construction Planning and Techniques used in skyscrapersConstruction Planning and Techniques used in skyscrapers
Construction Planning and Techniques used in skyscrapers
Sneha Kaira
 
Skyscraper Shapes and Wind Forces
Skyscraper Shapes and Wind ForcesSkyscraper Shapes and Wind Forces
Skyscraper Shapes and Wind Forces
ayanys
 
Skyscraper history
Skyscraper historySkyscraper history
Skyscraper history
alvinne29
 

Destacado (20)

Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Shanghai tower
Shanghai towerShanghai tower
Shanghai tower
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Skyscraper
SkyscraperSkyscraper
Skyscraper
 
Construction Planning and Techniques used in skyscrapers
Construction Planning and Techniques used in skyscrapersConstruction Planning and Techniques used in skyscrapers
Construction Planning and Techniques used in skyscrapers
 
Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )Shanghai tower(Sustainability specifications )
Shanghai tower(Sustainability specifications )
 
Shanghai tower Elevator and escalators
Shanghai  tower Elevator and escalators Shanghai  tower Elevator and escalators
Shanghai tower Elevator and escalators
 
Skyscrapers
SkyscrapersSkyscrapers
Skyscrapers
 
Birth of skyscrapers
Birth of skyscrapersBirth of skyscrapers
Birth of skyscrapers
 
Shanghai World Financial Center
Shanghai World Financial CenterShanghai World Financial Center
Shanghai World Financial Center
 
Architectural Wonders - The History and Future of Skyscrapers
Architectural Wonders - The History and Future of SkyscrapersArchitectural Wonders - The History and Future of Skyscrapers
Architectural Wonders - The History and Future of Skyscrapers
 
Skyscrapers
Skyscrapers Skyscrapers
Skyscrapers
 
Skyscraper Shapes and Wind Forces
Skyscraper Shapes and Wind ForcesSkyscraper Shapes and Wind Forces
Skyscraper Shapes and Wind Forces
 
Skyscraper history
Skyscraper historySkyscraper history
Skyscraper history
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
Burj khalifa presentation ppt
Burj khalifa presentation pptBurj khalifa presentation ppt
Burj khalifa presentation ppt
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
High Rise Building Research Document
High Rise Building Research DocumentHigh Rise Building Research Document
High Rise Building Research Document
 
skyscraper cities
skyscraper  citiesskyscraper  cities
skyscraper cities
 

Similar a Designing a Super Tall Skyscraper

How effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat lossHow effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat loss
Darwin Jayson Mariano
 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
eileen_0692
 
Glaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 RGlaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 R
Chris Andersen
 

Similar a Designing a Super Tall Skyscraper (20)

How effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat lossHow effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat loss
 
Ct
CtCt
Ct
 
Ct
CtCt
Ct
 
Ct
CtCt
Ct
 
Ct
CtCt
Ct
 
Construction technology assignment
Construction technology assignmentConstruction technology assignment
Construction technology assignment
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
Ct assignment
Ct assignmentCt assignment
Ct assignment
 
Architect201402
Architect201402Architect201402
Architect201402
 
Zak World of Facades South East Asia - Singapore 2016
Zak World of Facades South East Asia - Singapore 2016Zak World of Facades South East Asia - Singapore 2016
Zak World of Facades South East Asia - Singapore 2016
 
O2 booklet
O2 bookletO2 booklet
O2 booklet
 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
 
O2 booklet
O2 bookletO2 booklet
O2 booklet
 
Architecture@future 09.01.12
Architecture@future 09.01.12Architecture@future 09.01.12
Architecture@future 09.01.12
 
Aldar Headqaurter
Aldar Headqaurter  Aldar Headqaurter
Aldar Headqaurter
 
Tensile Structure Manufacturer in India
Tensile Structure Manufacturer in IndiaTensile Structure Manufacturer in India
Tensile Structure Manufacturer in India
 
Innovative Tensile Pvt Ltd
Innovative Tensile Pvt Ltd Innovative Tensile Pvt Ltd
Innovative Tensile Pvt Ltd
 
High rise
High riseHigh rise
High rise
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Glaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 RGlaziers.com Company Profile 2014 R
Glaziers.com Company Profile 2014 R
 

Más de Darwin Jayson Mariano

Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]
Darwin Jayson Mariano
 
The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity
Darwin Jayson Mariano
 
Aiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in AsiaAiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Darwin Jayson Mariano
 
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
Darwin Jayson Mariano
 
Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)
Darwin Jayson Mariano
 
The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form
Darwin Jayson Mariano
 
Latin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity SupremacyLatin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity Supremacy
Darwin Jayson Mariano
 
The Best Private Equity Exit Strategy
The Best Private Equity Exit StrategyThe Best Private Equity Exit Strategy
The Best Private Equity Exit Strategy
Darwin Jayson Mariano
 
What you don’t know about Membrane Solutions
What you don’t know about Membrane SolutionsWhat you don’t know about Membrane Solutions
What you don’t know about Membrane Solutions
Darwin Jayson Mariano
 

Más de Darwin Jayson Mariano (20)

The Best Measure of SCADA Success
The Best Measure of SCADA SuccessThe Best Measure of SCADA Success
The Best Measure of SCADA Success
 
Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]
 
Cash Forecasting Trends in Asia
Cash Forecasting Trends in Asia Cash Forecasting Trends in Asia
Cash Forecasting Trends in Asia
 
The India BPO Industry Report 2013
The India BPO Industry Report 2013The India BPO Industry Report 2013
The India BPO Industry Report 2013
 
The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity
 
Aiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in AsiaAiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
 
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
 
Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)
 
The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form
 
Latin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity SupremacyLatin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity Supremacy
 
The Best Private Equity Exit Strategy
The Best Private Equity Exit StrategyThe Best Private Equity Exit Strategy
The Best Private Equity Exit Strategy
 
What you don’t know about Membrane Solutions
What you don’t know about Membrane SolutionsWhat you don’t know about Membrane Solutions
What you don’t know about Membrane Solutions
 
7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]
 
Process Safety Blind Spots: EXPOSED [Infographic]
Process Safety Blind Spots: EXPOSED [Infographic]Process Safety Blind Spots: EXPOSED [Infographic]
Process Safety Blind Spots: EXPOSED [Infographic]
 
The Changing Face of Asia's Geospatial Intelligence
The Changing Face of Asia's Geospatial Intelligence The Changing Face of Asia's Geospatial Intelligence
The Changing Face of Asia's Geospatial Intelligence
 
Battle of Mega Bridges - The 7 Highly Notable Mega Bridge Projects
Battle of Mega Bridges - The 7 Highly Notable Mega Bridge Projects Battle of Mega Bridges - The 7 Highly Notable Mega Bridge Projects
Battle of Mega Bridges - The 7 Highly Notable Mega Bridge Projects
 
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013 TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
 
The Chinese Luxury Market - A Visual Story
The Chinese Luxury Market - A Visual Story The Chinese Luxury Market - A Visual Story
The Chinese Luxury Market - A Visual Story
 
The World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades TodayThe World's Most Fascinating Building Facades Today
The World's Most Fascinating Building Facades Today
 
The Best Thing about Ground Freezing Technique
The Best Thing about Ground Freezing TechniqueThe Best Thing about Ground Freezing Technique
The Best Thing about Ground Freezing Technique
 

Último

unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Sheetaleventcompany
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
amitlee9823
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
dlhescort
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 

Último (20)

Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
(Anamika) VIP Call Girls Napur Call Now 8617697112 Napur Escorts 24x7
 
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
Call Girls In Majnu Ka Tilla 959961~3876 Shot 2000 Night 8000
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 

Designing a Super Tall Skyscraper

  • 1. THE SHANGHAI TOWER CASE STUDY Once completed in 2014, the Shanghai Tower, a super tall skyscraper, will be the tallest building in China and the second tallest in the world. Undertaking the design for such a mammoth project is no easy feat. With all the complexities, issues, and possibilities involved, what important lessons can be learned? What are the main highlights of this iconic building? And why did Marshall Strabala, Shanghai Tower’s Chief Architect said, in exclusive interview with IQPC’s Darwin Jayson Mariano, that in designing façade for super tall skyscraper, “movements” matter a great deal? BY: DARWIN JAYSON MARIANO PHOTOS COURTESY OF NICKY ALMSBY and 2DEFINE ARCHITECTURE Like a battle of two Goliaths, emerging economies from Latin America and Southeast Asia are toughing it out in the world stage as both regions try to outdo each other in the arena of Private Equity deals and investments. According to data released by the Latin American Private Equity and Venture Capital Association (LAVCA), private equity (PE) and venture capital (VC) investing in Latin America hits 5-year high in 2012 with firms committing a total of $7.9 billion, representing 21% increase over 2011.
  • 2. Darwin Jayson Mariano: What is your definition of ‘high performance building facade’? Do you notice a pattern or trend when it comes to envelope engineering/design, particularly in China? Marshall Strabala: “High performance building façade” is a label that we attach to a building to say that it’s very sustainable. Basically, this label refers to a unitized system that is factory built to highperformance specifications, be it for high- or low-rise construction projects. Installing a factory-assembled exterior wall system is a lot easier, safer, and advantageous than constructing a system on the building from individual parts. The latter is a basic stick system, and the former is a “unitized system”. In a unitized system, your tolerances are tighter, and more consistent. You can actually get 8mm joints that work better because, when you construct a glass and aluminium wall in situ, weather dominates the process. That is wind, rain and temperature can have big impact on the wall. The contractor has to fight the elements in a stick system, where a unitized system is created in a controlled factory environment at the right humidity and temperature. The High performance coating we use on glass need special handling to produce a well-sealed building. Dust and dirt is another factor that goes away when not building in situ. Right now, China is on an upward curve – it’s approaching the standards of Europe and America, and I imagine they’ll overtake these standards in a few years. So the next step is understanding the patterns that are transferred when it comes to envelope and engineering design. The trend in Asia is moving towards high quality and energy efficiency. Most building performance criteria is controlled by the government, and there is a certain minimum performance that the envelope of all new construction must meet. In addition, the building must be safe for the public, and this is why we are seeing more laminated glass walls to limit the chance of large glass shards falling off buildings. Because of higher performance requirements and sustainability goals of clients, the façade is getting to the point where we have to increase the number of layers in the skin to reduce the amount of energy that transmits through the façade. We are seeing K values of 1.4/1.35, whereas a couple of years ago we were seeing K values of 1.6/1.7. Today, the total envelope of the building has much more stringent insulation requirements than it used to, and this will continue to rise in the future. Please talk about your recent project, the Shanghai Tower. Could you discuss some of the building’s highlights and design strengths? How would you characterize its envelope design? The Shanghai Tower has a very ambitious design. It will be the world’s tallest double skin building. From the beginning, we tried to minimize the amount of façade on the building in order to increase the value of the Project. Basically, what we’re designing is a thermos bottle, a bottle within a bottle that actually increase the insulation value of the building. This is www.facadechina.com
  • 3. like wearing a sweater. You can take the sweater off in the summer, and when it gets colder, you can put it back on to achieve the desired level of comfort. The double skin allows us to use less energy per year than a single skin building. The outer skin or what we call the A wall is not attached to a slab. The A wall is attached to a 350mm dia steel girt, that is from 2 – 12m away from any concrete slab – so there is no adjacent area to install the wall. Yuanda and the General contractor developed a unique set of hanging platforms to install both the Curtain wall Supporting structure, and the exterior wall. Most super tall buildings are only for the use of the tenants, and this means 95% of the building is not public. The public is only allowed on the observation deck through the purchase of a ticket. The Shanghai Tower from the beginning was a building designed for people – both public and private. The completed building takes advantage of the 5 sky lobbies that not only reduce the size of the core because we can stack the elevators, but also create vertical neighbour hoods containing restaurants and other public uses. We call these “Amenity Floors”. This double skin system allows a building to have an enclosed atrium space at each “Amenity Floors” for extra public space beyond the lobby. This “in-between space” allows public access to the edge. Levels 22,37,52,68 and 101 are designed like this. The 83 floor contains a pool and gym, and 118 and above are for the observation population. The double skin is created in eight zones, where each zone has a central cylinder of useable space surrounded by a rounded triangle. These crescents in the atria are from 12m to 7m deep. Therefore, when you www.facadechina.com
  • 4. The Shanghai Tower has a very ambitious design. It will be the world’s tallest double skin building. - Marshall Strabala, Chief Architect, Shanghai Tower get to the edge of your office, you don’t feel like you’re more than 14 stories above the atria, but in reality you are 50 -60 floors above the ground. It’s a very comforting feeling that if the glass broke, you wouldn’t be hanging out in the middle of space 70 floors up. Architecture is the art of making buildings both beautiful and safe. In the Shanghai Tower, there are redundant safety features. The exterior wall on the outside of the building or the “A Wall” is two pieces of Low-E and low iron glass laminated with a product call SGP by DuPont. This is the strongest lamination system we have in the industry, and it creates a very safe environment if a glass panel should break. This lamination keeps the broken pieces of glass from falling and causing injuries. The BME system is designed to both clean and replace the windows. All the system’s materials are chosen for the highest level of performance and sustainability. . The inner wall or the “B wall” was originally thought to be a very simple and easy design; however it became the most technically complex wall I have ever worked on. Conversely, we thought the outer skin would be very complicated, but it turned out to be very easy instead. John Perry was the façade consultant on the project, and his background in structural engineering helped us with the interface of the “Curtain Wall Supporting Structure” – CWSS The inner skin is a very rare system because of the 1 hour fire separation required between the office space and the atria. The core of wall is a formed steel tube clad in aluminium and glazed with a DBF high temperature glass. This glass wall achieves both the fire rating and visual requirements. The lessons we learned was to always go in with open eyes and be prepared for the worst, and just jump for joy when something works out very well. One of the biggest challenges is where the two wall come together and create a structural link to the primary building. There are three points where the CWSS is linked to the base structure actually touching the façade of the building. The inner wall could actually be bolted to the slab, and you could actually work from the slab and have workmen and materials being delivered from the slab area, like in any other building on the planet. However, for the outside skin, there’s no slab, or sometimes the slab is 10 meters away, so it’s a lot harder to install the equipment or the exterior wall panels. You need a platform adjacent to it as you’re installing it, so one had to be developed and installed by Yuanda, the contractor who’s doing the outer skin. Yuanda, the fabricator, installed on a special set of moveable platforms. As the façade is going up, our role becomes that of quality control and we assist in any odd conditions that could come up. We work with all three contractors: Yuanda, Jangho, and Lingyun to refine the design and make sure the detailing is quite tidy and looks good from all angles. In proposing a façade engineering design, do you see a conflict between aesthetics and ROI? Always! All commercial buildings, anywhere in the world, are built for a return on investment. Even museums are built to a budget. Buildings need identity, just like people. Some attract people to the city and others bring people to different parts of the www.facadechina.com
  • 5. city. A large corporate office building or hotel expects a certain level of return, and every operator has a different set of criteria. These design criteria set the cost, acoustics, and performance levels for the project. If done at the beginning the project becomes better. If changed often during design and construction, it will lead to a less than satisfactory result. Every hotel operator requires acoustic separation from room to room, and the façade must meet this criteria. This is done so guests in one room don’t hear the people in the next room through the façade. Putting acoustic separation between hotel rooms is rather easy through drywall and insulation but sometimes, the weak point is in the façade or the interface between wall and façade. So, this struggle between return on investment, performance and aesthetics is always out there, and what you try to do is to achieve the criteria with as minimum amount of material as possible. This minimum amount of material always has a safety factor. The wall should be robust enough so it does not deflect when the average wind blows or creak and break when the building moves. In all exterior walls, movement is required. In super tall buildings, the movements are more extreme and require another level of solutions. Too much movement and the wall leaks, not enough and the wall breaks under pressure. In terms of ROI, the exterior wall of any building is about 20% of the cost, yet the wall is 90% of the look of the building. This piece of equipment is an investment and should be treated as such. You need to maintain it, clean it ( at least twice a year) and repair it, and even replace it, because it really contributes to the image of the building and the image of the building is the first thing people react to. Buildings gain reputation. If something does not work well, people talk and the building becomes a bad place to live or work. This Curbside feeling of quality is very important to leasing. Also, if you let the dirt build up on the façade, it will take longer to clean and hurt the image of the project. So is it easy to clean? Is it easy to replace? Does it look good between cleanings? These are the question we always ask. Here’s a key thing: if you can design your façade so the dirt and the rain don’t actually show up between cleanings, you’re ahead of the game. The gaps between the façade pieces actually channel the rain and the particles in the air, so it doesn’t look like it’s dirty between cleanings. That’s what we strive to do. We try to plan where the water goes so we’re not getting stains and dirt doesn’t build up where we don’t want them; we always specify weeps in our building to get internal moisture out of the building. We actually look for a high return on investment not 5 or 6 years, but 50 years, and I think that looking longer-term is the right way to do it. Do you think building owners are receptive to these ideas? Yes, all building owners want a good ROI and these criteria help improve the profit. Sometimes with very complex and unusual shapes the fabricators can help you achieve the right aesthetics with the lowest cost. The owner sets the price, the architect sets the look, the façade team sets the performance and the fabricators pull them all together. And sometimes, the fabricator comes up and says, if we change this and adjust that, we can reduce the cost of façade and make it look like 90% of what the architect had in mind. You should always be a little flexible and listen. Allowing the fabricator input early on is always good for the ROI. www.facadechina.com
  • 6. Once completed, the Shanghai Tower will be the tallest building in China. What important lessons one must learn in designing façade for super tall skyscraper? The lessons learnt are Movement, Movement and more Movement. First of all, the overall movement of the building. This can be as much as two meters at the top! The distance the building moves must be accounted for in the façade. From a comfort standpoint, you need to control the acceleration, not the distance. It’s important to fine-tune the structural system to allow enough movement so earthquakes and wind forces are balanced and correctly mitigated. This overall movement is very high at the top and very low at the bottom. Panels at the top can be significantly damaged, while the panels at the bottom of the building might not have much impact at all. In super tall buildings, the details might change as you go up. But there is fourth movement that you need to be aware of, especially in this idea of a double-skin building: the movement induced by high temperatures, or fire. We don’t want fire to cause breakage and movements in the structure that might cause something else to break. In the rare event of a fire, you need to make sure that smoke does not migrate from one part of the building to another. We also need to think of what a fire does to the façade, which can result in pieces falling off. Thirdly, after the fire is out, did the temperature impact the system that might make it unsafe for the fireman who is putting out the fire? We have to make sure that there are no “second-order repercussions” from a fire. This gets very complicated and we often employ RJA as a fire consultant to review the work. At the end of the day, it really comes to down to Movement, Movement, Movement, Movement, and even more Movement. The second movement pertains to all the nonreversible changes in the size of members (i.e., column shortening). Under loading things change. In super tall buildings, this can be very significant. Then there is settlement of the entire structure that might affect the façade. There is movement vis-àvis deflection. Deflection is the reversible beam movement under load. So we have to account for that when designing the façade system. If we had 12 meter long beams, the exterior wall panels need to accommodate this centre beam deflect so as not to lockup under the overall building movements. Panels in the middle of the span need enough adjustments to make the appearance level on the outside of the building. Then we get to the third, a non-reversible movement in tall buildings, called concrete creep. As you start stacking these floors on top of each other and going up to, say, 120 floors, the columns start to get a little shorter on the ground level. So you have to plan for that column shortening either in the façade or in the concrete itself. Generally, we start adding taller “stack” joints in the façade at the bottom than at the top. www.facadechina.com
  • 7. Marshall Strabala AIA AFAAR LEED ap. is the co -Founder and Design Partner of 2DEFINE Architecture. He is an American architect, living in Shanghai, who has lead the design team of three of the ten tallest “constructed” buildings in the world. For the last three years, Strabala has been the principal of his own architectural firm, with over 30 years of combined experience. He was an Associate Partner at SOM in Chicago, and the only Director of Design M. Arthur Gensler Jr. & Associates, Inc. Currently, Strabala and 2DEFINE Architecture are the chief architect for the Shanghai tower scheduled for completion in 2014. Hear more from Marshall Strabala and other distinguished speakers at the 3rd Annual Facades Design and Engineering China 2013, happening on 18-21 June at Shanghai, China. www.facadechina.com About the Author: Darwin Jayson Mariano is the Online Content Manager and Regional Editor - Asia for International Quality & Productivity Center (IQPC), a leading producer of events and conferences for business leaders around the world. Connect via LinkedIn or email darwin.mariano@iqpc.com.sg Disclaimer: Please note that we do all we can to ensure accuracy and timeliness of the information presented herein but errors may still understandably occur in some cases. If you believe that a serious inaccuracy has been made, please email darwin.mariano@iqpc.com.sg. This article is provided for information purposes only. IQPC accepts no responsibility whatsoever for any direct or indirect losses arising from the use of this report or its contents.