SlideShare una empresa de Scribd logo
1 de 2
COMPETITIVE BID PROCESS

AREA OF
RESPONSIBILITY


          Estimator           1                           3          4           5                      6                       8                                                       12    13                     14           15     16          17                    19    20




            Planner                                       3          4                                  6                                    9               10             11                13




           Engineer                                       3          4                      5           6          7                         9                              11                13




            Finance                                                                                                                                                                                                                      16




      Management                              2
                                                                                                                                                                                                                                                               18


          TIMELINE 1/1             3/4                                   7/14                    7/14                                 7/21            3/24                       3/27              7/34                   3/37                3/40                  3/43

                                                                                                                              Tak
       RESULT                                                                                                                 e Off
    (Note: In order to
  produce the result,
         the member                                                                                                                                                        Tabulate plant
  responsible for the                                                                                                                                                      and labour
result must have the                                                                                                                                                       requirement
       competency to                                                                                                                                                       based on MIP      Tabulate Direct        Costing Direct
 generate the result.                                                                                                                                                      and finalised     and Indirect           and Indirect
  These competency                                                                   List on Review                                                                        Costing for       Cost,                  Cost,
   can be the area of                                                                of Technical                                                                          Material and      Preliminary            Preliminary          Summary of
    trainning that HR                                         List on Review         Specification,                                                                        labour based      Items, Camp            Items, Camp          Total Cost            Tabulation of
         may provide )                                        of the Condition       Special                                                              Master           on the Choice     Requirement            Requirement          and Cash              Final Cost
                             Summary of                       of Contracts           requirement            Site Visit                                Implementation       of Construction   and Enabling           and Enabling         Flow                  Breakdown
                             Project Brief                    and Risk               and Risk               Report                                         Plan            Method            Works Item             Works Item           Projection            and Marked Up
                                    A                               B                      C                 D                        E                      F                    G                 H                       I                 J                     K

                         LEGEND

                         1        Prepare Project Brief                                           6         Inspect jobsite / Site Visit                                                11   Prepare Costing Sheet (Plant and Labour Tabulation)          16        Analysis of Cashflow


                         2        Decide whether to bid or not                                    7         Prepare Site Visit report                                                   12   Costing for Labour and Equipment                             17        Tabulation of Cost Breakdown


                         3        Form Tender team                                                8         Prepare Costing Sheet                                                       13   Prepare Costing Sheet (Direct & Indirect Cost Tabulation) 18           Review by Manangement


                         4        Study Plan and Specification                                    9         Select Construction Method / Plant, Material Handing and Labour requirement 14   Costing for Direct / Indirect Cost                           19        Inking and documenting submission


                         5        Prepare Extract of Specification (Contracts) and (Technical)   10         Prepare Construction Schedule                                               15   Tabulation of Total Cost                                     20        Submit Tender
LEGEND

1    Prepare Project Brief

2    Decide whether to bid or not

3    Form Tender team

4    Study Plan and Specification

5    Prepare Extract of Specification (Contracts) and (Technical)

6    Inspect jobsite / Site Visit

7    Prepare Site Visit report

8    Prepare Costing Sheet

9    Select Construction Method / Plant, Material Handing and Labour requirement

10   Prepare Construction Schedule

11   Prepare Costing Sheet (Plant and Labour Tabulation)

12   Costing for Labour and Equipment

13   Prepare Costing Sheet (Direct & Indirect Cost Tabulation)

14   Costing for Direct / Indirect Cost

15   Tabulation of Total Cost

16   Analysis of Cashflow

17   Tabulation of Cost Breakdown

18   Review by Manangement

19   Inking and documenting submission

20   Submit Tender

Más contenido relacionado

Similar a Competitive Bid Process

4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-144fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14Sathish Paul
 
Outsourcing AP can reduce costs, but can it improve your service delivery too?
Outsourcing AP can reduce costs, but can it improve your service delivery too?Outsourcing AP can reduce costs, but can it improve your service delivery too?
Outsourcing AP can reduce costs, but can it improve your service delivery too?sharedserviceslink.com
 
Financial Analysis - Technip SA designs and constructs industrial facilities....
Financial Analysis - Technip SA designs and constructs industrial facilities....Financial Analysis - Technip SA designs and constructs industrial facilities....
Financial Analysis - Technip SA designs and constructs industrial facilities....BCV
 
工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)
工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)
工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)Andy Liu
 
Finance for non financial managers ppt by paramesh a
Finance for non financial managers ppt by paramesh aFinance for non financial managers ppt by paramesh a
Finance for non financial managers ppt by paramesh aAlisetti Paramesh. ACMA,CGMA
 
Lynton Aviation Performance management final
Lynton Aviation Performance management finalLynton Aviation Performance management final
Lynton Aviation Performance management finalbsrcrgrieve
 
Bharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu SamantaBharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu SamantaDr. Asokendu Samanta
 
Financial Analysis - China Communications Construction Company Ltd. is a tran...
Financial Analysis - China Communications Construction Company Ltd. is a tran...Financial Analysis - China Communications Construction Company Ltd. is a tran...
Financial Analysis - China Communications Construction Company Ltd. is a tran...BCV
 
Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentationbtharp
 
Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…
Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…
Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…BCV
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 
9ª Conferência Anual Brasil Santander *
9ª Conferência Anual Brasil Santander *9ª Conferência Anual Brasil Santander *
9ª Conferência Anual Brasil Santander *CPFL RI
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*CPFL RI
 

Similar a Competitive Bid Process (20)

4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-144fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
4fc89288c1399 skm draft-report_-_review_of_lrmc_parameters_for_2013-14
 
Outsourcing AP can reduce costs, but can it improve your service delivery too?
Outsourcing AP can reduce costs, but can it improve your service delivery too?Outsourcing AP can reduce costs, but can it improve your service delivery too?
Outsourcing AP can reduce costs, but can it improve your service delivery too?
 
HR Metrics
HR MetricsHR Metrics
HR Metrics
 
Financial Analysis - Technip SA designs and constructs industrial facilities....
Financial Analysis - Technip SA designs and constructs industrial facilities....Financial Analysis - Technip SA designs and constructs industrial facilities....
Financial Analysis - Technip SA designs and constructs industrial facilities....
 
工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)
工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)
工業局補助40%!【思辨顧問】軟體專案估算實作研習(週末開班)
 
Finance for non financial managers ppt by paramesh a
Finance for non financial managers ppt by paramesh aFinance for non financial managers ppt by paramesh a
Finance for non financial managers ppt by paramesh a
 
Lynton Aviation Performance management final
Lynton Aviation Performance management finalLynton Aviation Performance management final
Lynton Aviation Performance management final
 
Bharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu SamantaBharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
Bharat Forge Limited : A Project of Corporate Finance by Asokendu Samanta
 
Financial Analysis - China Communications Construction Company Ltd. is a tran...
Financial Analysis - China Communications Construction Company Ltd. is a tran...Financial Analysis - China Communications Construction Company Ltd. is a tran...
Financial Analysis - China Communications Construction Company Ltd. is a tran...
 
Altarum DC Presentation
Altarum DC PresentationAltarum DC Presentation
Altarum DC Presentation
 
Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…
Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…
Financial Analysis - Zhejiang Expressway Co., ltd., through its subsidiari…
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 
9ª Conferência Anual Brasil Santander *
9ª Conferência Anual Brasil Santander *9ª Conferência Anual Brasil Santander *
9ª Conferência Anual Brasil Santander *
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 
9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*9ª Conferência Anual Brasil Santander*
9ª Conferência Anual Brasil Santander*
 

Competitive Bid Process

  • 1. COMPETITIVE BID PROCESS AREA OF RESPONSIBILITY Estimator 1 3 4 5 6 8 12 13 14 15 16 17 19 20 Planner 3 4 6 9 10 11 13 Engineer 3 4 5 6 7 9 11 13 Finance 16 Management 2 18 TIMELINE 1/1 3/4 7/14 7/14 7/21 3/24 3/27 7/34 3/37 3/40 3/43 Tak RESULT e Off (Note: In order to produce the result, the member Tabulate plant responsible for the and labour result must have the requirement competency to based on MIP Tabulate Direct Costing Direct generate the result. and finalised and Indirect and Indirect These competency List on Review Costing for Cost, Cost, can be the area of of Technical Material and Preliminary Preliminary Summary of trainning that HR List on Review Specification, labour based Items, Camp Items, Camp Total Cost Tabulation of may provide ) of the Condition Special Master on the Choice Requirement Requirement and Cash Final Cost Summary of of Contracts requirement Site Visit Implementation of Construction and Enabling and Enabling Flow Breakdown Project Brief and Risk and Risk Report Plan Method Works Item Works Item Projection and Marked Up A B C D E F G H I J K LEGEND 1 Prepare Project Brief 6 Inspect jobsite / Site Visit 11 Prepare Costing Sheet (Plant and Labour Tabulation) 16 Analysis of Cashflow 2 Decide whether to bid or not 7 Prepare Site Visit report 12 Costing for Labour and Equipment 17 Tabulation of Cost Breakdown 3 Form Tender team 8 Prepare Costing Sheet 13 Prepare Costing Sheet (Direct & Indirect Cost Tabulation) 18 Review by Manangement 4 Study Plan and Specification 9 Select Construction Method / Plant, Material Handing and Labour requirement 14 Costing for Direct / Indirect Cost 19 Inking and documenting submission 5 Prepare Extract of Specification (Contracts) and (Technical) 10 Prepare Construction Schedule 15 Tabulation of Total Cost 20 Submit Tender
  • 2. LEGEND 1 Prepare Project Brief 2 Decide whether to bid or not 3 Form Tender team 4 Study Plan and Specification 5 Prepare Extract of Specification (Contracts) and (Technical) 6 Inspect jobsite / Site Visit 7 Prepare Site Visit report 8 Prepare Costing Sheet 9 Select Construction Method / Plant, Material Handing and Labour requirement 10 Prepare Construction Schedule 11 Prepare Costing Sheet (Plant and Labour Tabulation) 12 Costing for Labour and Equipment 13 Prepare Costing Sheet (Direct & Indirect Cost Tabulation) 14 Costing for Direct / Indirect Cost 15 Tabulation of Total Cost 16 Analysis of Cashflow 17 Tabulation of Cost Breakdown 18 Review by Manangement 19 Inking and documenting submission 20 Submit Tender