The document discusses an expansion project at a polypropylene plant to increase production capacity. It outlines the stages of the project from developing the initial process design package to detailed engineering. Several challenges arose during detailed engineering due to lack of front-end engineering work and constraints around utilities. The author played a key role in resolving technical issues and ensuring project requirements were met.