1. Rig #: BENNEVIS PIC Signature Approving JSA:
Work Activity (Job): MA 025 TRANSFER CASING
Work Team (Crew Members): Barge Master / Deck crew / Crane Operator
Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards
Who?
Initials
Casing joint to be lifted from
pipe rack to the walk way
Casing fall (broken sling)
Person hit by a joint
Sling checked prior to use
Tag lines attached to the joint
Personnel to stand clear
Lift the casing joint from walk
way to the rig floor
Casing fall (broken sling or tugger)
Person hit by a joint
Lifting equipments checked
Personnel to stand clear
Watchman to restrict the access to the ramp
Casing on the Vdoor ramp
Damage to equipment
Casing fall
Casing to be lowered on the ramp good communication
between tugger operators required
Ramp stoppers to be correctly installed and pined
Casing lifted by the block Protector falls on the ramp
Protector to be checked prior the joint is lifted
Personnel to stand clear of the ramp and walkways
Watchman to restrict the access to the ramp
Safety Equipment To Do This Job
Hard Hats X Cotton Gloves X Face Shield ( Fire Extinguishers (
Safety Boots X Work Vest ( Goggles ( Lockout/Tagout (
Safety Glasses X Safety Harness ( Barricades ( Work Permit Required (
Uncontrolled When Printed Page 1
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
2. Uncontrolled When Printed Page 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2