Rig #: BENNEVIS PIC Signature Approving JSA:
Work Activity (Job): MA 025 TRANSFER CASING
Work Team (Crew Members): Barge Master / Deck crew / Crane Operator
Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards
Who?
Initials
Casing joint to be lifted from
pipe rack to the walk way
Casing fall (broken sling)
Person hit by a joint
Sling checked prior to use
Tag lines attached to the joint
Personnel to stand clear
Lift the casing joint from walk
way to the rig floor
Casing fall (broken sling or tugger)
Person hit by a joint
Lifting equipments checked
Personnel to stand clear
Watchman to restrict the access to the ramp
Casing on the Vdoor ramp
Damage to equipment
Casing fall
Casing to be lowered on the ramp good communication
between tugger operators required
Ramp stoppers to be correctly installed and pined
Casing lifted by the block Protector falls on the ramp
Protector to be checked prior the joint is lifted
Personnel to stand clear of the ramp and walkways
Watchman to restrict the access to the ramp
Safety Equipment To Do This Job
Hard Hats X Cotton Gloves X Face Shield ( Fire Extinguishers (
Safety Boots X Work Vest ( Goggles ( Lockout/Tagout (
Safety Glasses X Safety Harness ( Barricades ( Work Permit Required (
Uncontrolled When Printed Page 1
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2
Uncontrolled When Printed Page 2
Pyramid Drilling S.A
Manual Title: Personnel Safety Manual
Form Name: Job Safety Analysis
Issue Date
02-Sept-07
Revision No.
2
Revision Date
04-MAR 08
Prepared By
QA/HSE
Approved By
HM
Level No.
2

Más contenido relacionado

Destacado

Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
Yousif Fikry
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
Yousif Fikry
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
Yousif Fikry
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
Yousif Fikry
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
Yousif Fikry
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
Yousif Fikry
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
Yousif Fikry
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
Yousif Fikry
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
Yousif Fikry
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
Yousif Fikry
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
Yousif Fikry
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
Yousif Fikry
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
Yousif Fikry
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
Yousif Fikry
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
Yousif Fikry
 

Destacado (16)

Ma 037 cleaning with air brush
Ma 037 cleaning with air brushMa 037 cleaning with air brush
Ma 037 cleaning with air brush
 
Ma 023 change out butter fly valve for bulk system
Ma 023  change out butter fly valve for bulk systemMa 023  change out butter fly valve for bulk system
Ma 023 change out butter fly valve for bulk system
 
Ma 115 boom crane cable tray repair
Ma 115  boom crane cable tray repairMa 115  boom crane cable tray repair
Ma 115 boom crane cable tray repair
 
Ma 038 painting on derrick set
Ma 038 painting on derrick setMa 038 painting on derrick set
Ma 038 painting on derrick set
 
Ma 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boatMa 031 transfer brine from or to supply boat
Ma 031 transfer brine from or to supply boat
 
Ma 027 jsa general lifting on the deck
Ma 027  jsa general lifting on the deckMa 027  jsa general lifting on the deck
Ma 027 jsa general lifting on the deck
 
Ma 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obmMa 026 offloading or backloading fuel, base oil, obm
Ma 026 offloading or backloading fuel, base oil, obm
 
Ma 028 jsa open seachest
Ma 028    jsa open seachestMa 028    jsa open seachest
Ma 028 jsa open seachest
 
Ma 024 working on ladder
Ma 024 working on ladderMa 024 working on ladder
Ma 024 working on ladder
 
Ma 034 jsa general lifting on the deck
Ma 034   jsa general lifting on the deckMa 034   jsa general lifting on the deck
Ma 034 jsa general lifting on the deck
 
Ma 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boatMa 032 transfer water from or to supply boat
Ma 032 transfer water from or to supply boat
 
Ma 035 jsa open seachest
Ma 035   jsa open seachestMa 035   jsa open seachest
Ma 035 jsa open seachest
 
Welding operation
Welding operationWelding operation
Welding operation
 
Ma 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boatMa 029 loading & offloading tubulars from a supply boat
Ma 029 loading & offloading tubulars from a supply boat
 
Ma 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rackMa 033 jsa rack pup joint in the stb rack
Ma 033 jsa rack pup joint in the stb rack
 
Ma 039 jsa emergency load lowering
Ma 039 jsa emergency load loweringMa 039 jsa emergency load lowering
Ma 039 jsa emergency load lowering
 

Similar a Ma 025 transfer casing

Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
IrfanAwan25
 
Fall Protection in Constuction
Fall Protection in ConstuctionFall Protection in Constuction
Fall Protection in Constuction
vtsiri
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Waqas Ahmad
 
Ladders 5 31 11
Ladders 5 31 11Ladders 5 31 11
Ladders 5 31 11
vtsiri
 
Scaffold Safety Part 3
Scaffold Safety Part 3Scaffold Safety Part 3
Scaffold Safety Part 3
Larry Riley
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
Deepu Rajan
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
Debajit Roy
 

Similar a Ma 025 transfer casing (20)

Quality Control Operator Training &.pptx
Quality Control Operator Training &.pptxQuality Control Operator Training &.pptx
Quality Control Operator Training &.pptx
 
MEWP TRAINING.pptx
MEWP TRAINING.pptxMEWP TRAINING.pptx
MEWP TRAINING.pptx
 
Scaffolding safety training.ppt
Scaffolding safety training.pptScaffolding safety training.ppt
Scaffolding safety training.ppt
 
100721 FROG-3 Passenger Induction Rev 03
100721 FROG-3 Passenger Induction Rev 03100721 FROG-3 Passenger Induction Rev 03
100721 FROG-3 Passenger Induction Rev 03
 
presentation on mobile cranes
presentation on mobile cranespresentation on mobile cranes
presentation on mobile cranes
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentation
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentation
 
Fall Protection in Constuction
Fall Protection in ConstuctionFall Protection in Constuction
Fall Protection in Constuction
 
Excavations Safety Training by Safety Excellence
Excavations Safety Training by Safety ExcellenceExcavations Safety Training by Safety Excellence
Excavations Safety Training by Safety Excellence
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
Safety practice ( SWEDISH COLLEGE OF ENGINEERING WAHCANTT)
 
Ladders 5 31 11
Ladders 5 31 11Ladders 5 31 11
Ladders 5 31 11
 
Ladders 5 31 11
Ladders 5 31 11Ladders 5 31 11
Ladders 5 31 11
 
Safety in construction site
Safety in construction siteSafety in construction site
Safety in construction site
 
Scaffold Safety Part 3
Scaffold Safety Part 3Scaffold Safety Part 3
Scaffold Safety Part 3
 
What are the causes falling from heights.
What are the causes falling from heights.What are the causes falling from heights.
What are the causes falling from heights.
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Job safety Analysis
Job safety Analysis Job safety Analysis
Job safety Analysis
 
Construction safety
Construction safetyConstruction safety
Construction safety
 
Construction site safety
Construction site safetyConstruction site safety
Construction site safety
 

Más de Yousif Fikry

Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
Yousif Fikry
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
Yousif Fikry
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
Yousif Fikry
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
Yousif Fikry
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
Yousif Fikry
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Yousif Fikry
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
Yousif Fikry
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
Yousif Fikry
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
Yousif Fikry
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
Yousif Fikry
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
Yousif Fikry
 

Más de Yousif Fikry (12)

Ma 022 preloading
Ma 022 preloadingMa 022 preloading
Ma 022 preloading
 
Ma 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boatMa 021 backload flare boom on supply-boat
Ma 021 backload flare boom on supply-boat
 
Ma 020 launching lifeboats to sea
Ma 020 launching lifeboats to seaMa 020 launching lifeboats to sea
Ma 020 launching lifeboats to sea
 
Ma 019 preloads dump valves maintenance
Ma 019  preloads dump valves maintenanceMa 019  preloads dump valves maintenance
Ma 019 preloads dump valves maintenance
 
Ma 018 changing lifeboats wires
Ma 018 changing lifeboats wiresMa 018 changing lifeboats wires
Ma 018 changing lifeboats wires
 
Ma 017 backloading coiled tubing real on boat
Ma 017  backloading coiled tubing real on boatMa 017  backloading coiled tubing real on boat
Ma 017 backloading coiled tubing real on boat
 
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
Ma 016  unloading coiled tubing real from boat & install it on cantilever deckMa 016  unloading coiled tubing real from boat & install it on cantilever deck
Ma 016 unloading coiled tubing real from boat & install it on cantilever deck
 
Ma 015 boom crane paint maintenance
Ma 015  boom crane paint maintenanceMa 015  boom crane paint maintenance
Ma 015 boom crane paint maintenance
 
Ma 014 changing boom pendants on both cranes
Ma 014  changing boom pendants on both cranesMa 014  changing boom pendants on both cranes
Ma 014 changing boom pendants on both cranes
 
Ma 013 testing lifeboats capsules
Ma 013  testing  lifeboats  capsulesMa 013  testing  lifeboats  capsules
Ma 013 testing lifeboats capsules
 
Ma 012 using working personnel basket
Ma 012 using working personnel basketMa 012 using working personnel basket
Ma 012 using working personnel basket
 
Ma 011 crane wire replacement ( main hook line )
Ma 011  crane wire replacement ( main hook line )Ma 011  crane wire replacement ( main hook line )
Ma 011 crane wire replacement ( main hook line )
 

Ma 025 transfer casing

  • 1. Rig #: BENNEVIS PIC Signature Approving JSA: Work Activity (Job): MA 025 TRANSFER CASING Work Team (Crew Members): Barge Master / Deck crew / Crane Operator Sequence of Basic Job Steps Potential Accidents or Hazards Recommendation to Eliminate or Reduce Potential Hazards Who? Initials Casing joint to be lifted from pipe rack to the walk way Casing fall (broken sling) Person hit by a joint Sling checked prior to use Tag lines attached to the joint Personnel to stand clear Lift the casing joint from walk way to the rig floor Casing fall (broken sling or tugger) Person hit by a joint Lifting equipments checked Personnel to stand clear Watchman to restrict the access to the ramp Casing on the Vdoor ramp Damage to equipment Casing fall Casing to be lowered on the ramp good communication between tugger operators required Ramp stoppers to be correctly installed and pined Casing lifted by the block Protector falls on the ramp Protector to be checked prior the joint is lifted Personnel to stand clear of the ramp and walkways Watchman to restrict the access to the ramp Safety Equipment To Do This Job Hard Hats X Cotton Gloves X Face Shield ( Fire Extinguishers ( Safety Boots X Work Vest ( Goggles ( Lockout/Tagout ( Safety Glasses X Safety Harness ( Barricades ( Work Permit Required ( Uncontrolled When Printed Page 1 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2
  • 2. Uncontrolled When Printed Page 2 Pyramid Drilling S.A Manual Title: Personnel Safety Manual Form Name: Job Safety Analysis Issue Date 02-Sept-07 Revision No. 2 Revision Date 04-MAR 08 Prepared By QA/HSE Approved By HM Level No. 2