1. THE KINGDOM OF MOROCCO NATIONAL OFFICE OF ELECTRICITY " ONE " Renewable Energy Projects in Morocco
2.
3. More than 4 million customers Public industrial and commercial establishment created in 1963 Turnover around 19,5 billion DH in 2010 (1700 Million € approx.) An investment of 3,8 milliards DH in 2010 (330 Million € approx.) Installed Capacity of 6372 MW at the end of 2010 ONE IN FIGURES More than 8 900 employees nationalwide
4. Coal power plants 1 785 Fuel power plants 600 Natural Gas Combined-Cycle (Tahaddart) 380 Thermosolar power plant (Aïn Beni Mathar) 470 Gas turbines 915 Diesel Units 202 Hydraulic 1 306 Wind Power 253 Pump Storage Station (Afourer) 464 TOTAL 6375 Centrale Mohammedia Installed power (MW) at the end of 2010 Parc éolien de Tanger Centrale thermosolaire
5. Lines Lenght HV & VHV 20 877 km MV 63 310 km LV 162 385 km Interconnection Morocco - Spain 1400 MW Interconnection Morocco - Algeria 1400 MW
16. SITES DE PARCS EOLIENS LOCATIONS OF THE COMPLEMENTARY PROGRAM WIND PROJECTS Taza : 150 MW Tanger II : 150 MW Tiskrad : 300 MW Boujdour: 100 MW Midelt : 150 MW Jbel Al Hadid : 150 MW
17. PREQUALIFIED COMPANIES : ENEL - MITSUI /EDF - IP/NAREVA FIRST PROJECT – TAZA : KEY MILESTONES Mid 2014 Commissioning June 2010 Integrated Wind program launch December 2010 Tenders prequalification process May 2011 Call for tenders December 2011 Tenders Opening February 2012 Tenders Evaluation
18. March 2012 Call for tenders November 2011 Prequalification Launching Late 2013 Tenders Opening Late 2015 Commissioning of the1 st park KEY MILESTONES OF THE OTHER PROJECTS
23. OBJETIVES OF THE INTEGRATED PROGRAM Electricity production Industrial Integration Training Research & Dévelopment Creation of competitive socio-economic sectors
29. EXISTING HYDRAULIC PLANTS 1700MW Beginning of production Pi (MW) Prod (GWh) TANAFNIT – EL BORJ 2009 -2010 40 220 STEP AFOURER 2005 464 720 AIT MESSOUD 2003 6 34 AHMED EL HANSALI 2003 92 400 AL WAHDA 1998 240 220 ALLAL EL FASSI 1994 240 265 HASSAN I 1991 67 115 AL MASSIRA 1980 128 240 OUED EL MAKHAZINE 1979 36 72 IDRISS I 1978 41 54 M. DAHBI 1974 10 30 MOULEY YOUSSEF 1974 24 60 MOHAMMED V 1967 23 70 AFOURER 1954 94 473 BINE EL OUIDANE 1953 135 250 IMFOUT 1947 31 54 LALLA TAKERKOUST 1938 12 22 EL KANSARA 1935 14 29 AUTRES - 72 -
30. OCEAN ATLANTIQUE Existing Hydraulic Plants STEP Centrales hydrauliques classiques TANGER MER MÉDITERRANÉE Tarfaya Boujdour Lagouira Projets en cours de MES EXISTING HYDRAULIC PLANTS LOCALIZATIONS
31. Factory RIVER P i (MW) Prod (GWh) Current Stage Imezdilfane OER 63 90 Studied Projects (274MW) Taskdert 38 55 Tajemout 28 40 Merija OER 30 40 Mechra Sfa 30 40 Tarmast OER 14 25 SidiDriss Lakhdar 3 17 Asfalou Asfalou 20 30 Boutchilit Issen 28 46 Tilougguit Ahan ç al 20 69 STEP Ifahsa - 300 700 Projects being studied (320MW) Ouljet Essoltane Beht 20 33 M ’ dez Sebou 45 35 Projects in Launching Stage (520MW) El Menzel 125 265 STEP Abdelmoumen Issen 350 612 CURRENT PROJECTS PORTFOLIO
32. MER MÉDITERRANÉE Tarfaya Boujdour Lagouira Projets en cours de MES HYDRAULIC PROJECTS BEING DEVELOPED CURRENTLY