Energy Management and the
Evolution of Intelligent Motor
Control and Drives
Craig Resnick
Research Director
ARC Advisory Group
cresnick@arcweb.com
2
© ARC Advisory Group
Energy Management and the Evolution of
Intelligent Motor Control and Drives
• Intelligent motor control & drives once provided a safe,
flexible & centralized means to control & protect motors
• Today, these devices have evolved to ‘smart’ energy
managers that bring advances ranging from complex
drive systems to basic control of fan or pump motors
• In high demand where uptime & equipment reliability
are critical, in applications where even a short period of
downtime can prove extremely costly & damaging
• These devices perform critical protective &
troubleshooting functions & detailed diagnostics to help
improve productivity & minimize downtime
3
© ARC Advisory Group
Energy Management and the Evolution of
Intelligent Motor Control and Drives
• This session will address advances in
intelligent motor control and drives technology
• How devices leverage real-time monitoring &
integration into plant-wide networks
• Session is designed for end users, equipment
suppliers, and engineering service firms
• Those interested in Motor Control, Drives and
Energy Management Success Stories, as well as
all types of Electrical Power Systems
4
© ARC Advisory Group
Energy Management and the Evolution of
Intelligent Motor Control and Drives
• Users of electrical power systems have
struggled with the issue of determining when
the useful lives of their systems are over
• Since these systems are crucial to the success
of operations from so many aspects, having a
strategy based on best practices is essential
• Modern electrical power systems are comprised
of many components that each have different
life expectancies, ranging from 5-50 years
5
© ARC Advisory Group
Energy Management and the Evolution of
Intelligent Motor Control and Drives
• ARC conducted a best practices web survey for
electrical power systems that have extended
their life far beyond the original expectation
• Final results of web survey is based on 131
responses from end users, OEMs, & SIs
• The purpose of the survey is to determine the
current state of the market is & how it relates
to electrical power systems best practices
6
© ARC Advisory Group
Are you an end user of Electrical Systems (ES), OEM, or
Systems Integrator?
 A vast majority of the comments came from end
users, demonstrating that the subject of
Electrical Power Systems Lifecycle Management
is getting quite a bit of attention at the plant
level and visibility with upper management
7
© ARC Advisory Group
What is your industry?
 Industry split between refining, petrochemical,
chemical, and power generation, which will provide a
good representation of a similar scale of businesses and
operations with common issues and challenges
 Other industries represented include cement & glass,
upstream oil & gas, automotive, and aerospace
8
© ARC Advisory Group
What region are you in?
 North America dominated the respondents,
indicating that this is a bigger issue for older,
established plants and not yet on the priority
lists of newer plants in developing countries,
especially in China and Eastern Europe
9
© ARC Advisory Group
Approximately, how many industrial plants/facilities does
your company operate that contain electric power systems?
 Interesting that the companies with the most
plants had the most interest in this survey,
but the issues also strongly resonated with
companies with a single plant as well as the
mid-size companies with 11-20 plants
10
© ARC Advisory Group
When a new Electrical System/Equipment is installed in a
facility, what to you expect the operable lifecycle of the
system and equipment/components to be?
 Transformers had by far the longest lifecycle
expectation (>40 years), followed by Switchgear
and Motor Control Centers. Uninterruptable
Power Systems and Variable Speed Drives had
the shortest lifecycle expectations (<15 years)
11
© ARC Advisory Group
Approximately, what is the average age of
installed Electrical Systems in your Company?
 65 percent of the respondent's installed
systems were between the ages on 11 and 30
years old, demonstrating that this is the time
period where lifecycle management is most
prevalent on the plant’s priority lists
12
© ARC Advisory Group
Do you consider the supplier's published obsolescence date, the date which
repair of components & technical support is no longer offered by the supplier,
to be the date an electrical system or equipment is considered obsolete?
 A mixed opinion regarding published
obsolescence dates, with some companies
feeling that if the secondary market and third
parties can support the product, as well as their
own inventory of parts and components, then
the product is not considered obsolete
13
© ARC Advisory Group
Have you utilized electrical equipment or systems beyond
the supplier's stated obsolescence date? If yes, how long?
 Virtually all respondents use their electrical
equipment beyond the stated obsolescence date,
with the majority exceeding that date by
between 1-5, 5-10, and over 10 years, with the
feeling that the obsolescence date is supplier -
biased towards shortening product lifecycle
14
© ARC Advisory Group
Do you use a standard lifecycle criteria
when accepting new Electrical Equipment?
 A surprising number of companies had no
standard lifecycle criteria when accepting new
equipment, and many others just relied on the
minimum MTBF/MTTR information provided by
the suppliers as the standard lifecycle criteria
15
© ARC Advisory Group
Indicate the practices you use for justification for
upgrade projects for your Electrical Equipment/Systems
 Practices for
upgrade
justification varied
somewhat evenly
between Lost
Production, Failure
Costs, and Failure
Frequency, with
Improved
Performance and
Obsolescence
slightly behind.
However, Amortized
Costs were virtually
not a significant end
of life factor at all
16
© ARC Advisory Group
Do you have an Electrical System Lifecycle
Management Policy?
 Somewhat surprising how many of the
respondent’s companies had no official
electrical system lifecycle management policy,
relying on the individual opinions of plant
personnel for decision making criteria
17
© ARC Advisory Group
Which of the following is most likely to trigger upgrade
planning for your Electrical Equipment/Systems?
 The most common
factor to trigger
upgrade planning is
lost production,
because it gets the
most attention of
the plant personnel
and visibility of
management,
making it easier to
financially justify
getting capital
funds approved
18
© ARC Advisory Group
Do you conduct System/Equipment
condition assessment before the upgrade?
 Conducting a Systems/Equipment condition
assessment before an upgrade is an essential
step, especially to take advantage of the
scheduled downtime by upgrading all that
needs to be done to best prevent potential
future unscheduled downtime incidents
19
© ARC Advisory Group
Considering that a typical Electrical System is made up of multiple layers or
subsystems with different life expectancies, would you or have you planned
on wholesale migration to a new Electrical System or would you do in phases
 Strong response that any Electrical Systems
migration would be performed in phases, in a
scalable fashion, designed to minimize any lost
production time, regardless of the number of
layers, subsystems, or different equipment life
cycles of the existing systems
20
© ARC Advisory Group
Survey Conclusions
• The sizeable and rapidly aging installed base must be
upgraded, but management will only approve projects
that have specific beneficial econometrics
• For justification & approval to upgrade electrical power
systems, with scarce CAPEX funds, emphasize the costs
of lost production, the cost of failure, energy savings ROI
• Getting justification based simply on upgrading to the
latest version is not a successful strategy, or even trying
to use argument regarding equipment obsolescence
• Leverage the success stories from Woodard and Curran
& MGM Resorts International to help you with the
justification needed to upgrade MCCs and Drives
Thank You
For more information, contact the author at
cresnick@arcweb.com or visit our web pages at
www.arcweb.com

Más contenido relacionado

La actualidad más candente

GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency ConditionGSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency ConditionEditor IJMTER
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm udaypallyreddy
 
Integration of Renewable Energy Sources
Integration of Renewable Energy SourcesIntegration of Renewable Energy Sources
Integration of Renewable Energy SourcesSandeep Kaushal
 
SMART LOAD SHEDDING
SMART LOAD SHEDDINGSMART LOAD SHEDDING
SMART LOAD SHEDDINGHariram R
 
Wireless monitoring and control for smart grid and home appliances
Wireless monitoring and control for smart grid and home appliancesWireless monitoring and control for smart grid and home appliances
Wireless monitoring and control for smart grid and home appliancesUmayal Saravana Selvan
 
PREPAID ENERGY METER USING SMART CARD
PREPAID ENERGY METER USING  SMART CARD PREPAID ENERGY METER USING  SMART CARD
PREPAID ENERGY METER USING SMART CARD Athul Vinoy
 
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...IRJET Journal
 
Powergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engrPowergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engrAbhijit Sahare
 
Power quality improvement of distributed generation integrated ne
Power quality improvement of distributed generation integrated nePower quality improvement of distributed generation integrated ne
Power quality improvement of distributed generation integrated neNagaraj Madival
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentationAneeque Qaiser
 
automatic phase changer in three phase supply
automatic phase changer in three phase supplyautomatic phase changer in three phase supply
automatic phase changer in three phase supplyamaljo joju e
 
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11Ijcem Journal
 
Pre paid energy meter
Pre paid energy meterPre paid energy meter
Pre paid energy meterSuman Padhy
 
Monitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White PaperMonitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White PaperEltek
 
IRJET- Implementation of Grid Tied Inverter in Solar Panel
IRJET-  	  Implementation of Grid Tied Inverter in Solar PanelIRJET-  	  Implementation of Grid Tied Inverter in Solar Panel
IRJET- Implementation of Grid Tied Inverter in Solar PanelIRJET Journal
 
presentation on power grid system
presentation on power grid systempresentation on power grid system
presentation on power grid systemrahul123gupta
 

La actualidad más candente (20)

GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency ConditionGSM Based Wireless Load-Shedding Management System for Non Emergency Condition
GSM Based Wireless Load-Shedding Management System for Non Emergency Condition
 
Smart grid Technology
Smart grid TechnologySmart grid Technology
Smart grid Technology
 
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
2014 PV Distribution System Modeling Workshop: Capabilities of Advanced Inver...
 
prepaid energy meter using gsm
prepaid energy meter using gsm prepaid energy meter using gsm
prepaid energy meter using gsm
 
Integration of Renewable Energy Sources
Integration of Renewable Energy SourcesIntegration of Renewable Energy Sources
Integration of Renewable Energy Sources
 
SMART LOAD SHEDDING
SMART LOAD SHEDDINGSMART LOAD SHEDDING
SMART LOAD SHEDDING
 
Wireless monitoring and control for smart grid and home appliances
Wireless monitoring and control for smart grid and home appliancesWireless monitoring and control for smart grid and home appliances
Wireless monitoring and control for smart grid and home appliances
 
PREPAID ENERGY METER USING SMART CARD
PREPAID ENERGY METER USING  SMART CARD PREPAID ENERGY METER USING  SMART CARD
PREPAID ENERGY METER USING SMART CARD
 
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
IRJET- Inductive Power Transfer System using Digital Controller based Matrix ...
 
Powergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engrPowergrid ppt campus_v1.33 engr
Powergrid ppt campus_v1.33 engr
 
Power quality improvement of distributed generation integrated ne
Power quality improvement of distributed generation integrated nePower quality improvement of distributed generation integrated ne
Power quality improvement of distributed generation integrated ne
 
Power system interconnection presentation
Power system interconnection presentationPower system interconnection presentation
Power system interconnection presentation
 
automatic phase changer in three phase supply
automatic phase changer in three phase supplyautomatic phase changer in three phase supply
automatic phase changer in three phase supply
 
14 berdner hawaiian adv inverters
14 berdner   hawaiian adv inverters14 berdner   hawaiian adv inverters
14 berdner hawaiian adv inverters
 
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
New prepaid-energy-meter-for-billing-system-using-recharge-card-and-ldr-2-1-2-11
 
Pre paid energy meter
Pre paid energy meterPre paid energy meter
Pre paid energy meter
 
Monitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White PaperMonitoring of Lead Acid Batteries - an Eltek White Paper
Monitoring of Lead Acid Batteries - an Eltek White Paper
 
IRJET- Implementation of Grid Tied Inverter in Solar Panel
IRJET-  	  Implementation of Grid Tied Inverter in Solar PanelIRJET-  	  Implementation of Grid Tied Inverter in Solar Panel
IRJET- Implementation of Grid Tied Inverter in Solar Panel
 
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
2014 PV Distribution System Modeling Workshop: CA Rule 21 Update: Tom Bialek,...
 
presentation on power grid system
presentation on power grid systempresentation on power grid system
presentation on power grid system
 

Destacado

Electrical engg project
Electrical engg projectElectrical engg project
Electrical engg projectjitu2189
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008ZAINI ABDUL WAHAB
 
Electrical power system management
Electrical power system managementElectrical power system management
Electrical power system managementAkshay Awadhani
 
National Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft ReportNational Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft Reportnationalconsumersleague
 
Digital Environment Home Energy Management System
Digital Environment Home Energy Management SystemDigital Environment Home Energy Management System
Digital Environment Home Energy Management Systemmdda
 
Hardware prototype of smart home energy management system
Hardware prototype of smart home energy management systemHardware prototype of smart home energy management system
Hardware prototype of smart home energy management systemeSAT Journals
 
Under frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case studyUnder frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case studyIAEME Publication
 
Energy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HANEnergy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HANZin Kyaw
 
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...ASHOKKUMAR RAMAR
 
full report original
full report originalfull report original
full report originalgokulnath R.S
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11shivram21957
 
Power Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidPower Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidIEEEP Karachi
 
Optimum energy management system
Optimum energy management systemOptimum energy management system
Optimum energy management systemMuhammad Zubair
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAhmed Aslam
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviyaAnuj Bansal
 
PF correction using SEPIC
PF correction using SEPICPF correction using SEPIC
PF correction using SEPICSoumya Dash
 
Automtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution systemAutomtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution systemrajani51
 
PLC based load managment
PLC based load managmentPLC based load managment
PLC based load managmentmanishkumarm
 

Destacado (20)

Electrical engg project
Electrical engg projectElectrical engg project
Electrical engg project
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008
 
Electrical power system management
Electrical power system managementElectrical power system management
Electrical power system management
 
National Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft ReportNational Consumers League 2013 State of ID Theft Report
National Consumers League 2013 State of ID Theft Report
 
Digital Environment Home Energy Management System
Digital Environment Home Energy Management SystemDigital Environment Home Energy Management System
Digital Environment Home Energy Management System
 
Hardware prototype of smart home energy management system
Hardware prototype of smart home energy management systemHardware prototype of smart home energy management system
Hardware prototype of smart home energy management system
 
Under frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case studyUnder frequency load shedding for energy management using anfis case study
Under frequency load shedding for energy management using anfis case study
 
Energy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HANEnergy Management Systems in the Home: Gateway to the Customer HAN
Energy Management Systems in the Home: Gateway to the Customer HAN
 
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
LATEST ELECTRICAL PROJECTS ABSTRACT-POWER SHARING OF TRANSFORMER WITH OVERLOA...
 
full report original
full report originalfull report original
full report original
 
Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11Project Report Shivram Mukherjee (Energy Management), 2009 11
Project Report Shivram Mukherjee (Energy Management), 2009 11
 
report
reportreport
report
 
Power Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By WajidPower Supply Management System Of A Small Satellite By Wajid
Power Supply Management System Of A Small Satellite By Wajid
 
Optimum energy management system
Optimum energy management systemOptimum energy management system
Optimum energy management system
 
Automation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR RequirementAutomation of capacitor banks based on MVAR Requirement
Automation of capacitor banks based on MVAR Requirement
 
Power Management in BMS
Power Management in BMSPower Management in BMS
Power Management in BMS
 
Madan mohan malaviya
Madan mohan malaviyaMadan mohan malaviya
Madan mohan malaviya
 
PF correction using SEPIC
PF correction using SEPICPF correction using SEPIC
PF correction using SEPIC
 
Automtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution systemAutomtaic Cyclic Load shedding in Distribution system
Automtaic Cyclic Load shedding in Distribution system
 
PLC based load managment
PLC based load managmentPLC based load managment
PLC based load managment
 

Similar a Energy Management and the Evolution of Intelligent Motor Control and Drives @ ARC's 2011 Industry Forum

WorkTric Business Overview (EN)
WorkTric Business Overview (EN)WorkTric Business Overview (EN)
WorkTric Business Overview (EN)LeninMartinez32
 
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010ARC Advisory Group
 
Top 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCTop 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCMassRecycle
 
Aat Overview 2 9 2010 Jj Handout Copy
Aat Overview 2 9 2010 Jj Handout CopyAat Overview 2 9 2010 Jj Handout Copy
Aat Overview 2 9 2010 Jj Handout Copymls1964
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden, Inc.
 
NARUC Joins the Debate on DERs
NARUC Joins the Debate on DERsNARUC Joins the Debate on DERs
NARUC Joins the Debate on DERsScottMadden, Inc.
 
Industrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.docIndustrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.docRay Hawksley
 
Measuring the value of energy storage
Measuring the value of energy storageMeasuring the value of energy storage
Measuring the value of energy storageBushveld Energy
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)ARC Advisory Group
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsARC Advisory Group
 
How the Traditional Utility Model is Being Challenged by Disruptive Technolog...
How the Traditional Utility Model is Being Challenged by Disruptive Technolog...How the Traditional Utility Model is Being Challenged by Disruptive Technolog...
How the Traditional Utility Model is Being Challenged by Disruptive Technolog...Career Communications Group
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisSchneider Electric
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsScottMadden, Inc.
 
Smart Grid training course description V_2.1
Smart Grid training course description V_2.1Smart Grid training course description V_2.1
Smart Grid training course description V_2.1Håkan Johansson
 
System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV Smarter Grid Solutions
 

Similar a Energy Management and the Evolution of Intelligent Motor Control and Drives @ ARC's 2011 Industry Forum (20)

WorkTric Business Overview (EN)
WorkTric Business Overview (EN)WorkTric Business Overview (EN)
WorkTric Business Overview (EN)
 
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
ARC's Larry O'Brien Process Automation Presentation @ ARC Industry Forum 2010
 
Top 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOCTop 10 Products That Save Money - David McDougall, EnerNOC
Top 10 Products That Save Money - David McDougall, EnerNOC
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
 
Aat Overview 2 9 2010 Jj Handout Copy
Aat Overview 2 9 2010 Jj Handout CopyAat Overview 2 9 2010 Jj Handout Copy
Aat Overview 2 9 2010 Jj Handout Copy
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
Asset management
Asset managementAsset management
Asset management
 
The 51st State Initiative
The 51st State InitiativeThe 51st State Initiative
The 51st State Initiative
 
ScottMadden's 51st State Roadmap
ScottMadden's 51st State RoadmapScottMadden's 51st State Roadmap
ScottMadden's 51st State Roadmap
 
NARUC Joins the Debate on DERs
NARUC Joins the Debate on DERsNARUC Joins the Debate on DERs
NARUC Joins the Debate on DERs
 
Industrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.docIndustrial RCx Smith_Hawksley.doc
Industrial RCx Smith_Hawksley.doc
 
Measuring the value of energy storage
Measuring the value of energy storageMeasuring the value of energy storage
Measuring the value of energy storage
 
Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)Stork Presentation on Migration (Willem Hazenberg)
Stork Presentation on Migration (Willem Hazenberg)
 
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes SolutionsCombined Fluid Power and Mechatronic Technology Optimizes Solutions
Combined Fluid Power and Mechatronic Technology Optimizes Solutions
 
How the Traditional Utility Model is Being Challenged by Disruptive Technolog...
How the Traditional Utility Model is Being Challenged by Disruptive Technolog...How the Traditional Utility Model is Being Challenged by Disruptive Technolog...
How the Traditional Utility Model is Being Challenged by Disruptive Technolog...
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
 
About TBA - PT Toyosae Berkah Abadi
About TBA - PT Toyosae Berkah AbadiAbout TBA - PT Toyosae Berkah Abadi
About TBA - PT Toyosae Berkah Abadi
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/Projects
 
Smart Grid training course description V_2.1
Smart Grid training course description V_2.1Smart Grid training course description V_2.1
Smart Grid training course description V_2.1
 
System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV System Level Data and Technology Requirements of REV
System Level Data and Technology Requirements of REV
 

Más de ARC Advisory Group

Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldARC Advisory Group
 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumARC Advisory Group
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelARC Advisory Group
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum ARC Advisory Group
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...ARC Advisory Group
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...ARC Advisory Group
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum ARC Advisory Group
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...ARC Advisory Group
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum ARC Advisory Group
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortARC Advisory Group
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumARC Advisory Group
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?ARC Advisory Group
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayARC Advisory Group
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersARC Advisory Group
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesARC Advisory Group
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingARC Advisory Group
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairARC Advisory Group
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003ARC Advisory Group
 
Collaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureCollaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureARC Advisory Group
 

Más de ARC Advisory Group (20)

Eam guide-video-2015
Eam guide-video-2015Eam guide-video-2015
Eam guide-video-2015
 
Information Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected WorldInformation Driven Enterprise for the Connected World
Information Driven Enterprise for the Connected World
 
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry ForumAsset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
Asset Information Management (AIM) Presentation @ ARC's 2011 Industry Forum
 
Three market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next levelThree market trends drive collaborative value networks to the next level
Three market trends drive collaborative value networks to the next level
 
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
Mobile Technologies and Supply Chain @ ARC's 2011 Industry Forum
 
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
Enterprise Mobility - Current Practices and Future Plans for Mobility Systems...
 
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
Energy Management Strategies for Operational Excellence @ ARC's 2011 Industry...
 
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
Driving Innovation, Sustainability and Performance @ ARC's 2011 Industry Forum
 
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
Anti-counterfeiting and Brand Protection (ABP) Workshop @ ARC's 2011 Industry...
 
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
Strategies for Asset Performance Management @ ARC's 2011 Industry Forum
 
Current Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall ShortCurrent Automation Purchasing Strategies Fall Short
Current Automation Purchasing Strategies Fall Short
 
CPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC ForumCPM Identified as RPM Engine at ARC Forum
CPM Identified as RPM Engine at ARC Forum
 
Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?Controls to CPM Connection: Are We There?
Controls to CPM Connection: Are We There?
 
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the WayConoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
Conoco on Path to Reliability Centered Loop Management: Enhancing ROA on the Way
 
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics ProvidersComponent Based Solutions Well Aligned with Needs of Service Logistics Providers
Component Based Solutions Well Aligned with Needs of Service Logistics Providers
 
Collaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and StrategiesCollaborative Asset Lifecycle Management Vision and Strategies
Collaborative Asset Lifecycle Management Vision and Strategies
 
Closing the Gap on Digital Manufacturing
Closing the Gap on Digital ManufacturingClosing the Gap on Digital Manufacturing
Closing the Gap on Digital Manufacturing
 
Cautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover FairCautious Optimism Pervades Hanover Fair
Cautious Optimism Pervades Hanover Fair
 
Capital Expenditure Survey 2003
Capital Expenditure Survey 2003Capital Expenditure Survey 2003
Capital Expenditure Survey 2003
 
Collaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the FutureCollaborative Discrete Automation Systems Define the Factory of the Future
Collaborative Discrete Automation Systems Define the Factory of the Future
 

Último

AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024The Digital Insurer
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistandanishmna97
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...apidays
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 

Último (20)

AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 

Energy Management and the Evolution of Intelligent Motor Control and Drives @ ARC's 2011 Industry Forum

  • 1. Energy Management and the Evolution of Intelligent Motor Control and Drives Craig Resnick Research Director ARC Advisory Group cresnick@arcweb.com
  • 2. 2 © ARC Advisory Group Energy Management and the Evolution of Intelligent Motor Control and Drives • Intelligent motor control & drives once provided a safe, flexible & centralized means to control & protect motors • Today, these devices have evolved to ‘smart’ energy managers that bring advances ranging from complex drive systems to basic control of fan or pump motors • In high demand where uptime & equipment reliability are critical, in applications where even a short period of downtime can prove extremely costly & damaging • These devices perform critical protective & troubleshooting functions & detailed diagnostics to help improve productivity & minimize downtime
  • 3. 3 © ARC Advisory Group Energy Management and the Evolution of Intelligent Motor Control and Drives • This session will address advances in intelligent motor control and drives technology • How devices leverage real-time monitoring & integration into plant-wide networks • Session is designed for end users, equipment suppliers, and engineering service firms • Those interested in Motor Control, Drives and Energy Management Success Stories, as well as all types of Electrical Power Systems
  • 4. 4 © ARC Advisory Group Energy Management and the Evolution of Intelligent Motor Control and Drives • Users of electrical power systems have struggled with the issue of determining when the useful lives of their systems are over • Since these systems are crucial to the success of operations from so many aspects, having a strategy based on best practices is essential • Modern electrical power systems are comprised of many components that each have different life expectancies, ranging from 5-50 years
  • 5. 5 © ARC Advisory Group Energy Management and the Evolution of Intelligent Motor Control and Drives • ARC conducted a best practices web survey for electrical power systems that have extended their life far beyond the original expectation • Final results of web survey is based on 131 responses from end users, OEMs, & SIs • The purpose of the survey is to determine the current state of the market is & how it relates to electrical power systems best practices
  • 6. 6 © ARC Advisory Group Are you an end user of Electrical Systems (ES), OEM, or Systems Integrator?  A vast majority of the comments came from end users, demonstrating that the subject of Electrical Power Systems Lifecycle Management is getting quite a bit of attention at the plant level and visibility with upper management
  • 7. 7 © ARC Advisory Group What is your industry?  Industry split between refining, petrochemical, chemical, and power generation, which will provide a good representation of a similar scale of businesses and operations with common issues and challenges  Other industries represented include cement & glass, upstream oil & gas, automotive, and aerospace
  • 8. 8 © ARC Advisory Group What region are you in?  North America dominated the respondents, indicating that this is a bigger issue for older, established plants and not yet on the priority lists of newer plants in developing countries, especially in China and Eastern Europe
  • 9. 9 © ARC Advisory Group Approximately, how many industrial plants/facilities does your company operate that contain electric power systems?  Interesting that the companies with the most plants had the most interest in this survey, but the issues also strongly resonated with companies with a single plant as well as the mid-size companies with 11-20 plants
  • 10. 10 © ARC Advisory Group When a new Electrical System/Equipment is installed in a facility, what to you expect the operable lifecycle of the system and equipment/components to be?  Transformers had by far the longest lifecycle expectation (>40 years), followed by Switchgear and Motor Control Centers. Uninterruptable Power Systems and Variable Speed Drives had the shortest lifecycle expectations (<15 years)
  • 11. 11 © ARC Advisory Group Approximately, what is the average age of installed Electrical Systems in your Company?  65 percent of the respondent's installed systems were between the ages on 11 and 30 years old, demonstrating that this is the time period where lifecycle management is most prevalent on the plant’s priority lists
  • 12. 12 © ARC Advisory Group Do you consider the supplier's published obsolescence date, the date which repair of components & technical support is no longer offered by the supplier, to be the date an electrical system or equipment is considered obsolete?  A mixed opinion regarding published obsolescence dates, with some companies feeling that if the secondary market and third parties can support the product, as well as their own inventory of parts and components, then the product is not considered obsolete
  • 13. 13 © ARC Advisory Group Have you utilized electrical equipment or systems beyond the supplier's stated obsolescence date? If yes, how long?  Virtually all respondents use their electrical equipment beyond the stated obsolescence date, with the majority exceeding that date by between 1-5, 5-10, and over 10 years, with the feeling that the obsolescence date is supplier - biased towards shortening product lifecycle
  • 14. 14 © ARC Advisory Group Do you use a standard lifecycle criteria when accepting new Electrical Equipment?  A surprising number of companies had no standard lifecycle criteria when accepting new equipment, and many others just relied on the minimum MTBF/MTTR information provided by the suppliers as the standard lifecycle criteria
  • 15. 15 © ARC Advisory Group Indicate the practices you use for justification for upgrade projects for your Electrical Equipment/Systems  Practices for upgrade justification varied somewhat evenly between Lost Production, Failure Costs, and Failure Frequency, with Improved Performance and Obsolescence slightly behind. However, Amortized Costs were virtually not a significant end of life factor at all
  • 16. 16 © ARC Advisory Group Do you have an Electrical System Lifecycle Management Policy?  Somewhat surprising how many of the respondent’s companies had no official electrical system lifecycle management policy, relying on the individual opinions of plant personnel for decision making criteria
  • 17. 17 © ARC Advisory Group Which of the following is most likely to trigger upgrade planning for your Electrical Equipment/Systems?  The most common factor to trigger upgrade planning is lost production, because it gets the most attention of the plant personnel and visibility of management, making it easier to financially justify getting capital funds approved
  • 18. 18 © ARC Advisory Group Do you conduct System/Equipment condition assessment before the upgrade?  Conducting a Systems/Equipment condition assessment before an upgrade is an essential step, especially to take advantage of the scheduled downtime by upgrading all that needs to be done to best prevent potential future unscheduled downtime incidents
  • 19. 19 © ARC Advisory Group Considering that a typical Electrical System is made up of multiple layers or subsystems with different life expectancies, would you or have you planned on wholesale migration to a new Electrical System or would you do in phases  Strong response that any Electrical Systems migration would be performed in phases, in a scalable fashion, designed to minimize any lost production time, regardless of the number of layers, subsystems, or different equipment life cycles of the existing systems
  • 20. 20 © ARC Advisory Group Survey Conclusions • The sizeable and rapidly aging installed base must be upgraded, but management will only approve projects that have specific beneficial econometrics • For justification & approval to upgrade electrical power systems, with scarce CAPEX funds, emphasize the costs of lost production, the cost of failure, energy savings ROI • Getting justification based simply on upgrading to the latest version is not a successful strategy, or even trying to use argument regarding equipment obsolescence • Leverage the success stories from Woodard and Curran & MGM Resorts International to help you with the justification needed to upgrade MCCs and Drives
  • 21. Thank You For more information, contact the author at cresnick@arcweb.com or visit our web pages at www.arcweb.com