sustainable solutions. for a better life.

Page 1
P097-T0002-001

VA TECH WABAG

195 MLD Water Treatment Plant
For
Public Health Engineering Department,
Bhopal
Training Boucher
Water Treatment Plant
Section I
Section II
Section III
sustainable solutions. for a better life.

-

Process
Mechanical
Electrical & Instrumentation
Page 2
P097-T0002-001

VA TECH WABAG

INTRODUCTION

 M/S Public Health Engineering Department has entrusted M/S. VA Tech
Wabag Ltd.(JV) for the execution of 195 MLD Water Treatment Plant of
normal works output at Khatpura Village (Shahganj), Seshore (Dt), Bhopal,
supplies drinking water to Bhopal.
 The WTP receives raw water from the river Narmada at village Hirani on
Shahganj-Budni Road, pumped through 1400 mm dia MS pipe.
 The WTP is based on the Clariflocculator Technology for clarification
followed by filtration in Rapid Gravity Sand Filters.
 The scope also includes disinfection of filtered water for making it
suitable for drinking purposes at WTP site Khatpura and chlorine boosting
arrangement at clear water sump at Ahmedpur, Bhopal.
sustainable solutions. for a better life.

Page 3
P097-T0002-001

DESIGN BASIS

VA TECH WABAG

The Water treatment plant is designed for the Normal Works output of 195 MLD, based
on the following raw water quality. The treated water quality to be achieved are as below.
Raw water
S. No.

Parameter
Minimum

Maximum

Clarified
water

Treated water after filtration and
disinfection as per CPHEEO

1

Turbidity (NTU)

3

15000

< 15

1

2

Taste and odour

-

-

-

Unobjectionable

3

Colour (units on platinum cobalt scale)

-

-

-

5

4

pH

7.0 to 8.5

6.5 to 8.5

-

7.0 – 8.5

5

Specific conductance (m/m mho)

0.33

0.5

-

-

6

Total alkalinity (mg/L)

-

300

-

200

7

Chloride (mg/L)

-

50

-

-

8

Nitrate (mg/L)

0.4

40

-

45

9

Total hardness (mg/L as CaCO3)

-

300

-

200

10

Total Dissolved Solids (mg/L)

-

-

-

500

11

Total solids (mg/L)

-

350

< 15

-

12

Iron (mg/L)

Nil

15

-

0.1

13

Chloride (mg/L)

-

-

-

200

14

Fluoride (mg/L)

Nil

0.25

-

1

15

Sulphate (mg/L)

-

20

-

200

16

Coliform organism at 37 C (MPN / 100 mL)

-

500

-

Must not be detectable in any 100 mL
sample

17

Faecal E.coli at 44 C (Unit/ 100 mL)

-

54

-

Must not be detectable in any 100 mL
sample

18

Residual aluminium (mg/L)

-

-

0.5

0.03

19

Residual chlorine (mg/L)

-

-

-

0.2

sustainable solutions. for a better life.

Page 4
P097-T0002-001

VA TECH WABAG

SECTION – 1 A
Water Treatment
Philosophy

sustainable solutions. for a better life.

Page 5
P097-T0002-001

VA TECH WABAG

WATER TREATMENT PHILOSOPHY


The raw water in this scheme undergo the following treatment
steps so that it can be used for the purpose of drinking water.

1)

Aeration

2)

Pre-chlorination

3)

Alum and Lime dosing

4)

Flocculation

5)

Clarification

6)

Filtration

7)

Post-chlorination

sustainable solutions. for a better life.

Page 6
P097-T0002-001

VA TECH WABAG

AERATION
The primary objectives of aeration of raw water are,
to expel dissolved gases such as Carbon Dioxide and volatile substances
that cause taste and odour.

to increase Dissolved Oxygen of raw water.
to precipitate Iron and Manganese from their soluble form to insoluble
form.

CHLORINATION
The primary objectives of the pre chlorination of raw water are:
to control the growth of algae and other microorganisms that might
interfere with coagulation and flocculation and to reduce the coagulant
dose.
keeping filter media free of slime growths and mud balls which not only
impair the filtration efficiency but also interfere with proper backwashing.
The post chlorination of filtered water ensures disinfection of filtered water
to make it suitable for human consumption as drinking water, killing all the
germs present in the filtered water.
sustainable solutions. for a better life.

Page 7
P097-T0002-001

VA TECH WABAG

CHLORINATION (Contd.)
Chlorine is used
 Due to its oxidizing effect on organic matter and
 Its germicidal effect in killing germs and viruses.
 Chlorine gas when dissolved in water, hydrolyzes rapidly :
Cl2 + H2O  H+ + Cl - + HOCl
The weak hypochlorous acid (HOCl) undergoes partial dissociation:
HOCl  

sustainable solutions. for a better life.

Page 8

H+ + OCl -
P097-T0002-001

VA TECH WABAG

CHLORINATION (Contd.)

 At 7.5 pH, the undissociated hypochlorous acid (HOCl) and the hypochlorite
ion (OCl -) is 50:50. The lower the pH values, the amount of HOCl becomes
proportionately higher which has germicidal efficiency better than the OCl –
ions.


The raw water supply is from Narmada river and its pH range is 6.5 to
8.5 and the pH of raw water is mostly expected to be around 7.0 which is
conducive for the predominant presence of HOCl ions which in turn
ensure effective chlorination.

sustainable solutions. for a better life.

Page 9
P097-T0002-001

VA TECH WABAG

FLASH MIXING

 Turbidity is caused by fine suspended solids, colloids and color.
 The particles are negatively charged.
 The particles remain in stable suspension by the action of electrostatic forces
of repulsion.
 Dose Alum (coagulant) and Lime (adding alkalinity)
charges.

to neutralized the

 Ensures uniform dispersion of the chemical by rapid mixing in Flash Mixer.
Ensure the flocs formation.
 Ascertain the optimum dosage of coagulant by Jar Test, under optimum pH
zone. Lime is dosed to bring about optimum pH zone.
 Alum is used as the coagulant chemical and dosed at the inlet channel of
Flash Mixer.

sustainable solutions. for a better life.

Page 10
P097-T0002-001

VA TECH WABAG

FLASH MIXER (Contd.)

A typical reaction of alum may be expressed as :
Al2 (SO4)3.18 H2O → 2 Al 3+ + 3 SO4 - + 18 H2O
2 Al 3+ + 6 OH-

→ Al2O3. 3 H2O

Hydroxyl ions must be supplied by alkalinity either natural or added for the
aluminium oxide to hydrate. The required alkalinity is supplied by addition of Lime.
Ca (OH)2 → Ca + 2 OHpH of water plays a very important part in the coagulation phenomenon. The
required alum and lime dosage, as determined by Jar Test, to be maintained to
ensure good coagulation.
The mixing of the chemicals with raw water is provided in the Flash Mixer.
This helps in the formation of microflocs.

sustainable solutions. for a better life.

Page 11
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATION

What is clariflocculation?
Clariflocculation means “ SEDIMENTATION WITH FLOCCULATION
IN A SINGLE UNIT”.
Unit comprises of two circular concentric tanks viz. inner tank where
flocculation is happening and outer tank where settling is happening.
Principle of clariflocculation
The particles do not keep their individuality, but tend to agglomerate
helped by some coagulants. The sludge floc size increases and, as a
consequence, the sedimentation speed increases too.
A retention time of 30 minutes is provided for flocculation along with
gentle and prolonged mixing also.

sustainable solutions. for a better life.

Page 12
P097-T0002-001

VA TECH WABAG

CLARIFLOCCLATION (contd.)

Optimum dosage requirement of Alum / Lime for flocculation is determined by
the Jar Test, as a daily routine.

The most significant design aspect is the available settling area, since the
throughput (m3/h) divided by the tank area (m2) must not exceed the settling
velocity of the slowest settling particle to be separated – usually to 1 to 2 m/h
 The efficiency depends
It is independent of depth.

on

the

Surface

Overflow

Rate

SOR = flow rate through the clarifier divided by the settling area
=Q/A

sustainable solutions. for a better life.

Page 13

(SOR).
P097-T0002-001

VA TECH WABAG

CLARIFLOCCLATION (contd.)

Stages of clariflocculation
A complete process of clariflocculation mainly consists of three subsequent
stages:
• Mixing of the inflow (raw water) with the reagents (Alum and lime)
• Flocculation
• Sedimentation
The raw water mixing with the reagents must be made very quickly and with a
strong stirring. On the contrary, the flocculation must be slow in order to allow
the flocs agglomeration and any turbulent motion must be avoided.
The clarified water is then collected in the upper part through circular or radial
launders and the sludge on the tank bottom is conveyed into a sludge sump by
some scrapers.

sustainable solutions. for a better life.

Page 14
P097-T0002-001

VA TECH WABAG

CLARIFLOCCLATION (contd.)

Concept of clariflocculation
a process of contact between the pre-existing sludge and the incoming water
to obtain larger flocs which tend to sediment more easily;
a process of sedimentation based on Stokes‟ law.
There is a small, but well stirred, contact zone between the sludge and the
incoming waste water where the intimate contact is ensured.
After the intimate mixing, the period of contact is kept in a “calm” volume,
there is no narrowing so the flocs integrity is respected and they can gather and
become larger in the next calm zone.
The “calm” volume allows to convey the water to be treated to the
sedimentation zone, at a very low elevation, without any turbulence and with a
gradual slowing down due to the section widening along the waste water
flowing upwards.
sustainable solutions. for a better life.

Page 15
P097-T0002-001

VA TECH WABAG

CLARIFLOCCLATOR (in full and empty condition)

sustainable solutions. for a better life.

Page 16
P097-T0002-001

VA TECH WABAG

MAJOR FACTORS AFFECTING THE PERFORMANCE
OF CLARIFLOCCULATOR
Expected quality of clarified water is 15 NTU
However the performance may be impaired due to:


Right dosage of coagulant / lime, as per Jar Test, is not dosed.



Formation of larger flocs in flocculation tank is not properly
achieved.



Sludge withdrawal programme not properly operated, resulting in
sludge buildup.

sustainable solutions. for a better life.

Page 17
P097-T0002-001

VA TECH WABAG

FILTRATION



Filtration is a process for separating suspended and colloidal impurities, held in
suspension, from water through a porous medium or media.



Removal of turbidity is essential not only for aesthetic acceptability but also for
efficient disinfection which is difficult in the presence of suspended solids and
colloidal impurities.



Filters can be classified according to
(1) the direction of flow

(2) types of filter media and beds
(3) the driving force
(4) the method of flow rate control


The Filters adopted for the project are of down flow, granular mono media, rapid
gravity filters operating at declining rate.

sustainable solutions. for a better life.

Page 18
P097-T0002-001

VA TECH WABAG

FILTRATION (Contd.,)



Conceptually the removal of particles within a deep granular medium filter
takes place because of few or more of the following phenomena:

1.

Sedimentation – particles settle on the filter medium.

2.

Impaction – heavy particles will not follow the flow streamlines.

3.

Interception – many particles that move along in the streamline are
removed when they come in contact with surface of filtering medium.

4.

Adsorption – bonding, chemical interaction or physical adsorption.

5.

Adhesion – Flocculants particles get attached to surface of medium are
sheared away and pushed deep inside the bed due to force of flowing water
and as the bed becomes clogged the surface shear force increases at
which no additional matter can be removed.

6.

Flocculation – Large particles overtake small particles, join them, and form
still larger particles and gets removed by any of the above mechanisms.

7.

Biological growth – Biological growth within the filter reduces the pore
volume and may enhance the removal mechanism by any of the above
mechanisms.

sustainable solutions. for a better life.

Page 19
P097-T0002-001

VA TECH WABAG

FILTRATION (Contd.,)



Each filter bed is provided with state-of-the-art underdrain system,
incorporating „sand tight‟ polypropylene nozzles fixed on a monolithic
reinforced concrete false floor at 60 nos. per m²



The system ensures
- uniform draw-off of filtered water & its efficient collection and
- efficient control of the uniform distribution of air and wash water, over the
whole area of the filter, during filter cleaning.



The filters shall be cleaned on a 24 hour cycle or when the filter bed is
clogged up to the admissible filter loss.

sustainable solutions. for a better life.

Page 20
TYPICAL FILTER ARRANGEMENT

P097-T0002-001

VA TECH WABAG

Inlet
Valve

Clarified
water

Dirty
Backwash
Outlet

Air
Inlet
Backwash
Water
Inlet

Sand Media

Filtered
Water
Outlet
Valve
Opened
Filtered Water

sustainable solutions. for a better life.

Page 21
P097-T0002-001

VA TECH WABAG

SECTION – 1 B
Process Units

sustainable solutions. for a better life.

Page 22
P097-T0002-001

VA TECH WABAG

PROCESS UNITS
WTP consists of the following process units:














Cascade Aerator
Primary Sedimentation Tank
Flash Mixer
Clariflocculator
Rapid Gravity Filters
Overhead Backwash Water Tank
Dirty Backwash Water Collection Tank
Clear Water Sump
Sludge Sump
Sludge Drying Bed
Alum Solution Preparation and Dosing System
Lime Solution Preparation and Dosing system
Chlorine Dosing Facilities

sustainable solutions. for a better life.

Page 23
P097-T0002-001

VA TECH WABAG

CASCADE AERATOR

 Raw water is received through a 1400 mm dia. pumping main into the Cascade
Aerator inlet. A manual butterfly valve is provided on the inlet line for isolation
purpose. The raw water is aerated in the Aerator, by allowing raw water to fall over
three circular steps.
One no. Parshall Flume with ultrasonic transmitter is provided at the outlet of
Cascade Aerator / Primary Sedimentation Tank for monitoring the raw water flow.
Local cum remote indication for the same is provided with cumulative flow
totaliser.
Chlorine is dosed at 2 ppm at the outlet channel through a diffuser.
The pre-chlorinated raw water is conveyed through the Aerator outlet channel to
the Primary Sedimentation Tank followed by Flash Mixer or directly to Flash Mixer
or bypassing the entire system and fed into the Rapid Gravity Sand Filters
depends on the turbidity of Raw water / any maintenance.
pH analyzer, turbidity analyzer and DO analyzer are provided at the inlet of the
pipeline to determine the raw water characteristics.
Also raw water samples are drawn from the Aerator inlet for routine monitoring of
pH, turbidity and DO.
sustainable solutions. for a better life.

Page 24
P097-T0002-001

VA TECH WABAG

PRIMARY SEDIMENTATION TANK

 2 nos. Primary Sedimentation Tanks are provided after cascade aerator.
Manual gates are provided to isolate the primary sedimentation tanks in case of
maintenance.
Manual gate is provided in the main channel to bypass both the primary
sedimentation tanks.
The primary sedimentation tanks are peripheral type of clarifiers 58.8 m diameter
used for suspended solids removal and is designed for the retention time of 3 h.

Settled sludge is withdrawn from the sedimentation tanks through respective
sludge withdrawal lines.
Gate valves are provided for isolation of the sludge lines. Flushing connections
are provided on these lines for maintenance purpose.
Additionally drain of sludge to plant overall drain facility is provided to bypass the
entire sludge to Nalla during high turbidity inflows.

sustainable solutions. for a better life.

Page 25
P097-T0002-001

VA TECH WABAG

FLASH MIXER

 The raw water after flow measurement by Parshall Flume is received in a Flash
Mixer designed for the retention time of 0.75 min at a design flow of 8478 m³/hr.
Alum and lime solution are dosed into the raw water at the upstream of Parshall
flume and entering into the Flash Mixer.
The Flash Mixer is constructed in RCC and is equipped with agitators for
intimate mixing of raw water with chemicals.
 Dirty wash water from the Dirty Wash Water collection Tank is recycled into the
Flash Mixer.
Each of the Flash Mixers can be isolated by gates.
A bypass gate is provided in the main channel from Parshall flume to bypass the
Flash Mixers and Clariflocculators and feed raw water directly into the filters.
Butterfly valves are provided for draining the Flash Mixer during maintenance.

sustainable solutions. for a better life.

Page 26
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR

 Raw water from the flash mixers is conveyed to Clariflocculators through a
distribution chamber with isolation gates for each of the clariflocculator.
 4 nos. Clariflocculators constructed in RCC are provided with a flocculation
chamber and clarifier with a design capacity of 195 MLD.
Size of each Clariflocculator 43.9 m dia x 3.5 m LD and each Clariflocculator
is capable of handling the flow of 48.75 MLD.
The retention time of 30 min is provided in the flocculator zone and 2 h is
provided in the clarifier zone.
 Each of the unit is equipped with 4 nos. flocculator mechanisms in the
flocculator zone and a peripherally driven sludge raking mechanism in the
clarifier zone. The clarified water is passed through the submerged orifices
provided on the peripheral double weir launders of the Clariflocculator.
The clarified water from Clariflocculators is conveyed by gravity to the inlet
channel of the Rapid Gravity Filters.
sustainable solutions. for a better life.

Page 27
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR (contd.)
 The sludge from the Clariflocculator is withdrawn through a telescopic sludge
bleeding arrangement.
 Isolation valves are provided on the main sludge withdrawal line of the
clarriflocculators.
 Drain valves are provided to drain the sludge into the plant overall drainage
system routed to Nalla. Flushing connections are provided on the sludge line for
routine maintenance.
 Sampling point with isolation gate valve is provided to collect the sample of
the clarified water.
 The Clariflocculator is designed for 2780 mg/L of SS.

sustainable solutions. for a better life.

Page 28
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR (contd.)

Water enters at the bottom of the central pier of the Clariflocculator and
flows through the openings in the central pier into the Flocculation zone.
After entering the Flocculation zone, the water flows into the clarifier
zone. The incoming solids get distributed whereby the flocs can enter the
clarifier zone in the outer portion and the clarified water overflow takes
place over the weirs.

 Clarified water is directed to the overflow launders, which lead clarified
water to Rapid Gravity Filters and to Clear Water sump based on the
turbidity. Sampling point is provided in the common outlet channel of
clariflocculator.
The sludge settling on the floor of the Clariflocculators will be scrapped
by mechanical scrapper, to the central pit.
 The sludge from each clarifier is discharged to the Sludge Sump,
intermittently.
 A torque switch will trip the scraper mechanism due to high torque,
when there is overload or if there is any obstacle for the scraper to move.
sustainable solutions. for a better life.

Page 29
P097-T0002-001

VA TECH WABAG

DESLUDGING OF CLARIFLOCCULATOR
The desludging operation of Clariflocculator is designed for discharging
the sludge by intermittent bleed.

 The intermittent desludging operation helps in increasing the
consistency of sludge, which minimises the water losses.
The desludging control has been programmed for desludging the
clarifiers, every hour. The cycle starts from Clariflocculator-1 and
proceeds to other and the cycle restarts again. The duration of desludging
of each clarifier depends on the incoming raw water turbidity load.
The sludge from each Clariflocculator is discharged through the sludge
withdrawal pipe to the Sludge Sump.
A drain connection is also provided in the sludge withdrawal line for
draining the Clariflocculator.
Flushing water connections are provided to facilitate flushing of sludge
pipes, in the event of blockages / also to prevent blockages.
sustainable solutions. for a better life.

Page 30
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – START UP

 Ensure the overflow weir plates are properly leveled. Seal the gaps in
between the weir plates and launders.
Keep the outlet gate leading to the Clear Water sump, drain valves and
sludge drain valves closed.
 Ensure the oil level in the gear reducer / drive unit of scraper mechanism
is o.k.
 Keep the torque switch in working condition.

 Switch on scrapper bridge mechanism.
 Open the outlet gate of the Flash Mixer and receive the coagulated water
through the central pier.
 Keep the flocculator paddles running at the optimum speed, to ensure
good flocculation.
The flocculated raw water enters Lamella Clarifier under its overflow
channels and flows upwards , in between the inclined parallel plates.
sustainable solutions. for a better life.

Page 31
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – START UP (Contd.)
Check the torque indicator for any overload due to obstruction of the
scraper mechanism and check the smooth rotation of the scraper
mechanism.

Desludge the clariflocculator once sludge is more. (Actual cycles and
duration of sludge bleed depends on the actual raw water suspended
solids, turbidity and raw water flow).
Defer the de-sludging if the sludge level in the sludge sump is high.
Flush the individual sludge line by opening the flushing valves provided
(once a week).
Collect-clarified water through the sampling valve (GV-217) provided in
the clarified water channel and ensure the quality conforms to desired
quality. In case of high turbidity of clarified water, check for correct
chemical dosing rate and sludge bleed. Also ensure all flocculators and
scraper mechanisms are running.
sustainable solutions. for a better life.

Page 32
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – START UP (Contd.)

Look out for any algal growth on the weir surface and tank walls. If
growth is observed, ensure residual chlorine at clarifier outlet is at least
0.5 to 0.6 mg/L.
Adjust the dosage rate of the alum / lime solution , if required, to ensure
the turbidity of clarified water is within the design values.
Reschedule the sludge withdrawal programme, as required, in case of
wide changes in the raw water turbidity and raw water flow.
In case of trip of scrapper due to high torque, do not attempt to restart
the scrapper mechanism without proper investigation.

sustainable solutions. for a better life.

Page 33
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – SHUT DOWN

SHUT DOWN FOR MAINTENANCE
 Close the outlet gate of the Flash Mixer which fed the coagulated water
to the clarifloculator to be isolated and drain the sludge by opening its
sludge valves. Keep the paddles and scraper mechanism running.
 Defer the desludging of other Clariflocculator till the emptying is
completed.
 Allow the sludge into the sludge sump.

Stop the paddles and scraper mechanism at local or at MCC when the
water level is lowered exposing them.
Isolate the unit and the power supply for the equipment at MCC and
handover for maintenance.

sustainable solutions. for a better life.

Page 34
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – SHUT DOWN (CONTD.)

PARTIAL SHUT DOWN WITHOUT MAINTENANCE
In case of partial shut down for the reduced inflow, isolate the
Clariflocculator which is not required, by closing the outlet gates of the
corresponding Flash Mixer.
Reduce the dosing rate of chlorine, lime and alum proportionate to the
requirement of turn down capacity.
Before isolating, it shall be ensured that the accumulated sludge in the
clariflocculator, to be isolated, shall be desludged.
It is preferable to keep the paddle and scraper mechanism running.

sustainable solutions. for a better life.

Page 35
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – SHUT DOWN (CONTD.)

COMPLETE SHUT DOWN
 Inform the raw water pumping station in-charge to stop pumping water
to the Water Treatment Plant, if it is decided to go in for complete shut
down of the plant.
 Ensure that sludge in the Clariflocculators shall be fully drained out.
 Ensure all the sludge lines are properly flushed clean, the units and
the equipment shall be stopped / isolated.

 Stop the running equipment at local.
 Isolate the power supply for the equipment at MCC, if it is to be taken
up for maintenance.
 Isolate all the chemical dosing system.

sustainable solutions. for a better life.

Page 36
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – CLEANING

 As a matter of routine, a Clariflocculator can be isolated for cleaning of
overflow launders, once a week, deteriorating the quality of clarified
water.
Before isolating the Clariflocculator that is to be cleaned, ensure the
other Clariflocculator and its connected Flash Mixer are in service.
Then isolate the Clarifier selected for cleaning
corresponding outlet gate of Flash Mixer.

by closing the

Keep the paddles and scraper mechanism running.
Schedule the cleaning programme preferably when there is no much of
sunshine.
Deploy two labourers for the cleaning task.
Equip one labourer with a soft brush with a short handle and the other
with a wiper attached to a long handle.

sustainable solutions. for a better life.

Page 37
P097-T0002-001

VA TECH WABAG

CLARIFLOCCULATOR – CLEANING (contd.)

Drain the Clariflocculator so that water level falls by 100 mm, so that
washings do not get into the overflow launders.
Let them be careful not to spill the washings into the overflow launder.
Once cleaning is completed, de-sludge the Clariflocculator, every one
hour for a duration of about 5 to 10 minutes, till the water level is
lowered by about 0.7m.
In case algae patches are found on the concrete, mop them up with
chlorinated water.
Now the Clariflocculator is fairly clean and ready for next service run.

sustainable solutions. for a better life.

Page 38
P097-T0002-001

VA TECH WABAG

FILTERS



A total of 16 nos. Filters, each of 94.5 m² ( 10.5 m x 4.5 m with twin beds)
filtering area are provided with 8 nos. in each row, separated by a pipe gallery.



The filtration plant consists of the air scour blowers and Dirty Wash Water
Collection Tank, Overhead Backwash water tank.



The filtration plant operation is monitored and controlled at Filter console,
located on the viewing walkway, opposite to each filter.



The relevant data are displayed via PLC.



The Filters are two equal size beds separated by a central gullet and down flow
open to sky gravity units.



They operate at declining rate on the principle of influent flow division and are
capable of achieving a turbidity of ≤I.0 NTU in the filtered water.



The filters are designed for higher average filtration rates of 6 m³/m²/h (when all
15 filters in operation).

sustainable solutions. for a better life.

Page 39
P097-T0002-001

VA TECH WABAG

FILTERS (contd.)

 Each filter has twin beds of sand of 950 mm depth and central gullet.
 Coarser sand (Effective size= 0.65 mm; Uniformity coefficient = 1.5)
selected to utilize greater depths of filter media to trap influent solids.

is

 Each filter bed is provided with „sand tight‟ polypropylene nozzles, 60 nos.
per m², fixed on a monolithic reinforced concrete false floor construction,
over which the filter medium is laid.
 The under drain system ensures uniform draw-off of filtered water and its
efficient collection and for efficient control of the uniform distribution of air
and wash water, over the whole area of the filter, during filter cleaning.
 The filters shall be cleaned on a 24 hour cycle or when the filter bed is
clogged up to the admissible filter head loss of 1.8 m.
 No sectional backwash is envisaged, to reduce down time of Filters.

sustainable solutions. for a better life.

Page 40
P097-T0002-001

VA TECH WABAG

FILTERS (Contd.)

Filter backwashing is manually initiated and controlled using PLC.
 Select the bed, which is operated for 24 h cycle or which is clogged. Keep
the other beds in service.



Ensure water level in overhead backwash tank not low, level in dirty wash
water collection tank not high and no other filter is in backwash mode.



The backwashing sequence is set by the program in PLC



The following sequence is followed for backwashing;
1)

Close the inlet gate and let the filter drain starts. When the water level in
the bed reaches to about 100 mm above the filter media, close the
outlet valve.

2)

Now open the washout valve.

3)

After the filter drain, open air inlet valve. Start one no. air blower and
agitate the bed for about 3- 5 minutes.

sustainable solutions. for a better life.

Page 41
P097-T0002-001

VA TECH WABAG

FILTERS (Contd.)
4) Now open backwash water inlet valve and backwash bed with
combined air-water wash for about 2 minutes at 15 m3/m2/h i.e. 1418 m3/h
of backwash water flow rate.
5) Stop air blower and close air inlet valve. Release the trapped air
through air vent valve of the filter which is under backwashing.
6)Without stopping the wash water sequence, open the motorized
backwash outlet gate and rinse the bed with wash water at 45 m3/m2/h i.e.
at a flow rate of 4252 m3/ h for about 4 minutes.
7)After completing the above steps, close the wash water. Close the
backwash outlet gate after used wash water is drained out from the
central gullet. Close the air vent valve.

sustainable solutions. for a better life.

Page 42
P097-T0002-001

VA TECH WABAG

FILTERS (Contd.)

sustainable solutions. for a better life.

Page 43
P097-T0002-001

VA TECH WABAG

FILTERS (Contd.)

sustainable solutions. for a better life.

Page 44
P097-T0002-001

RAPID GRAVITY FILTER – FILTRATION STAGE

VA TECH WABAG

Inlet
Valve

Clarified
water

Dirty
Backwash
Outlet

Air
Inlet
Backwash
Water
Inlet

Sand Media
Trapping
of particles
between
sand
grains

sustainable solutions. for a better life.

Filtered
Water
Outlet
Valve
Opened
Filtered Water

Page 45
P097-T0002-001

RAPID GRAVITY FILTER – BACKWASH STAGE

VA TECH WABAG
Valve
opened

VALVE CLOSED

Dirty water
out

Inlet
Valv
e
Dirty
Backwash
Outlet
Air
Inlet
Backwash
Water
Inlet
Filtered
Water
Outlet

Fluidised Sand Layer
Loosened Sand Layer
Dirty Sand Layer
Cleaned Sand Layer
Air supply
Air
stopped
Valve
Closed

Valve
Opened
Backwash
water

sustainable solutions. for a better life.

Page 46
P097-T0002-001

Backwash stage 1: Combined wash (air & water)

VA TECH WABAG

Dirty Sand Layer

Fluidisation
of Sand
Layer

A closer look
at the
functioning of
nozzles in
filters
sustainable solutions. for a better life.

Air

Backwash
water

Page 47
Back Wash Stage 2: Water Only

P097-T0002-001

VA TECH WABAG

Fluidised Sand Layer

Cleansing
of Sand
Layer

A closer look
at the
functioning of
nozzles in
filters
sustainable solutions. for a better life.

Air flow
stopped
Backwash
water
rate
increased

Page 48
P097-T0002-001

VA TECH WABAG

FILTERS (Contd.)



Three units (2 W+1 S) of twin lobe type Air Blowers each of capacity 4250
m³/h are provided.



Each filter outlet pipe work is connected to Clear Water Reservoir through a
weir chamber. Chlorine solution is dosed (post-chlorination) at the inlet of
the Clear Water Reservoir.



Filtered water samples are drawn from the common filter outlet with the help
of sampling pump and is delivered to the laboratory for continuous
measurement of filtered water quality.



Sampling point provision is also made to check the individual filters
performance.



Level transmitter is provided in the common filter outlet.



Flow meter is provided to monitor the treated water flow into the Clear
Water Reservoir.

sustainable solutions. for a better life.

Page 49
P097-T0002-001

VA TECH WABAG

FILTERS (Start up)

FILTRATION MODE


Ensure the two inlet channels feeding to the filters on both rows are charged with the
clarified water from the Clariflocculator.



Ensure all the Filters for ready to take into service, to receive 195 MLD .



In the worst scenario, 13 nos. filters can be put in operation (one backwash, one drain and
one under maintenance) output of 185 MLD is possible.



Ensure the pneumatic air is available at required pressure for the operation of all the
pneumatically operated filter valves.



Keep the inlet valves to Clear Water Reservoir .



Ensure that chlorine is dosed (post-chlorination) at the inlet of Clear Water Reservoir.



Open the inlet valves of the Filters.



Stagger the schedule of bringing the Filters one after the other by fully opening the filtered
water inlet valve and allow the clarified water to filter through the beds.



Let the excess incoming clarified water overflows the weir in the Clarified water feeding
channels to the Filters, till the filtering operation is streamlined.



Let the filtered water enter the Clear Water Reservoir.



Maintain individual filter service run for 24 hours, achieving the required filtrate quality.

sustainable solutions. for a better life.

Page 50
P097-T0002-001

VA TECH WABAG

FILTERS – Start up (Contd.)

BACKWASHING MODE


When a filter clocks 24 hours service run or when its differential indicator
senses the pre set high differential head loss, filter will be taken out for
backwashing operation, while the others will continue with the filtration.



Prior to backwashing operation during start-up, ensure adequate amount of
water is available in the Backwash water Storage Tank. If adequate water to
meet the backwashing water requirement is not available, defer the
backwashing till adequate level of water builds up in Storage Tank, receiving the
filtered water from Treated Water Reservoir by pumping.



Select the Filter for backwashing, after ensuring the water level in the Dirty wash
water tank is low, to accommodate the wash water of one filter.



Do the backwashing operation of the Filters, from the dedicated Manual Wash
Control Console for each Filter.



Bring the washed filter back to service run.

sustainable solutions. for a better life.

Page 51
P097-T0002-001

VA TECH WABAG

FILTERS – Shut down
PARTIAL SHUTDOWN


Before isolating, it is preferred to identify the filters which has run for longer
hours and isolate them one after the other, after backwashing.



For isolating purpose, it is adequate to close the filtered water outlet valve,
keeping the filter inlet valve open. Leave the isolated filters with standing
water over the sand bed, to avoid bed cracking.



The bed shall be drained, only when it is required to attend to the false bottom
floor nozzles or when going in for the replacement of sand by sieving, more
than the requirement of just topping up.



After draining is completed, ensure proper ventilation to the maintenance
person who will enter the filter box through the man hole, located below the
false bottom floor of the filter.

sustainable solutions. for a better life.

Page 52
P097-T0002-001

VA TECH WABAG

FILTERS – Shut down (contd.)

COMPLETE SHUT DOWN


If it is decided to go in for complete shut down of the plant, ensure all the
filters are backwashed clean before they are isolated by closing the filter
outlet valves.



Stop chlorination



In case of making use of the complete shut down period for maintenance
of filers, the selected Filters, that have to be taken out for maintenance,
shall be drained and the drained water shall be pumped to the Dirty wash
water Collection Tank. The Filter shall be thoroughly inspected, damaged
nozzles shall be replaced and any filter media loss shall be topped up.



All the stagnant water from any units or channels shall be pumped out
using portable submersible pumps to the site drainage system.



Stop the running equipment at local and at MCC.



Ensure all the valves and gates are in close position, once the plant is
shut down.

sustainable solutions. for a better life.

Page 53
P097-T0002-001

VA TECH WABAG

COMMON PROBLEMS ENCOUNTERED IN
FILTRATION OPERATION

 Increase in turbidity more than the design values or certain
microorganisms in the clarified water will shorten filter runs. Ensure
adequate dosing of chlorine solution.
The floc breakthrough may also result in short filter runs. This can be
avoided by operating the clarification section with optimum dosage of
chemicals, to ensure proper settling of flocs in the Clariflocculators.
When the head loss increases, then the Filter has to be necessarily taken
out for backwashing.
Growth of filter grains due to coating of the materials filtered, bed
shrinkage and media pulling away from filter side walls are related
problems. Use of adequate backwash will avoid all these problems.
sustainable solutions. for a better life.

Page 54
P097-T0002-001

VA TECH WABAG

COMMON PROBLEMS ENCOUNTERED IN
FILTRATION OPERATION (contd.)

 Mud ball due to general buildup of materials accumulate at or near the
surface, leading to clogging of media. By proper coagulation and settling in the
clarification stage, mud ball formation could be considerably reduced. Mud ball
formation may not be experienced because of adequate design backwash rate.
However prolonged air scouring followed by higher backwash shall be used,
when mud ball formation is encountered.

Sand leakage is prevented by the careful selection of the sand size and the
size of slots in the nozzles. However, the fines that may develop due to attrition
can result in the downward migration and escape of fines with the filtered water.
The topping up of lost media have to be taken up when it exceeds 2%.
 Any observation of loss of media during backwashing shall be immediately
attended by reducing backwash water rate. The backwash duration can be
prolonged, if required, to effect complete back-washing of the bed.
sustainable solutions. for a better life.

Page 55
P097-T0002-001

VA TECH WABAG

COMMON PROBLEMS ENCOUNTERED IN
FILTRATION OPERATION (contd.)

 Air binding and subsequent release during service may not be a problem. Do
not operate the filters with less liquid depth to overcome this problem.
 Sometimes careless operation may lead to bumping or lifting of the filter beds
when resuming filtration without going through the full backwash cycle. This
practice should be discouraged as the filtrate water quality deteriorates
considerably.
 When slime or algae growths are noticed on filters, increase the dosage rate of
chlorine solution to the extent required.
 During air scouring if any improper distribution of air is noticed watch out for
any deterioration of filtrate quality from that particular filter in the subsequent
filtration cycles. If found beyond the acceptable levels of turbidity, then isolate the
filter and rectify the defects such as replacement of worn out nozzle, or to clean
the filter media free from stubborn choking.
sustainable solutions. for a better life.

Page 56
P097-T0002-001

VA TECH WABAG

CLEAR WATER RESERVOIR



For chlorine dosing to the filtered water, diffuser arrangement is made. The
Clear water Reservoir provides approximately 30 minutes retention time of
185 MLD for disinfection.



FRC monitoring to be done to check for residual chlorine in the filtered water
at the outlet of Clear Water Reservoir.

sustainable solutions. for a better life.

Page 57
P097-T0002-001

VA TECH WABAG

OVERHEAD BACKWASH WATER TANK


A fully covered overhead backwash water Tank of RCC is provided with
adequate elevation.



The size of the tank is 45.0 m x 7.3 m x 2.3 m LD.



Two nos. overhead tank filling Pumps (1W+1S), which draw water from the
Filer outlet channel, are provided for supplying water to the Overhead
backwash water tank. Each pump is having capacity of 760 m3/ h.



The tank is provided with a level switch for High High & Low Low levels with
alarms and for tripping of the supply pumps at High High levels.



The duty pump is automatically started when a medium level is detected by
the level transmitter.



Wash water is delivered direct to the filters by gravity. A flow indicator and
integrator for indicating the wash water flow rate is provided in the backwash
water line.

sustainable solutions. for a better life.

Page 58
P097-T0002-001

VA TECH WABAG

DIRTY WASH WATER COLLECTION TANK



The dirty wash water from the backwashing of filters is received into the Dirty
Wash water Collection Tank (with two compartments) by gravity. The wash
water is recycled back to the Flash Mixer.



The overflow from the tank is conveyed to the site drainage.



The tank compartments are provided with inlet gates in the inlet chamber and
also interconnected by a gate at the bottom floor level, to allow one to be
taken out of service for maintenance, whilst other remaining operational.



Two nos. (1W +1S) submersible type Dirty Wash water Transfer Pumps, each
of 350 m3/h capacity, are provided to pump wash water to the inlet works.



When the level in the tank compartment reaches medium level, the duty
pump is started automatically with the help of level transmitter and the
running pump is tripped at low level , sensed by the level switch provided in
the compartments.



Filter backwash is inhibited when the level in the Dirty Wash water Collection
Tank is High.



This tank also receives the filtrate of the Sludge Drying Beds.

sustainable solutions. for a better life.

Page 59
P097-T0002-001

VA TECH WABAG

SLUDGE SUMP
 The settled sludge from the Clariflocculator is bled intermittently into the
Sludge Sump.

 The sludge from the Sludge Sump is pumped to eight nos. Sludge Drying
Beds with the help of 2 nos. (1 W+1 S) Sludge pumps.
 Each duty thickener feed pump is started automatically at medium level
detected by level transmitter.

 The running thickener feed pumps are tripped at low level sensed by level
switch.
 When the sludge level reaches high in the Sludge Sump, clariflocculator desludging schedule is inhibited.

 When one bed is out of service for maintenance, isolate the bed with the gate
provided.

sustainable solutions. for a better life.

Page 60
P097-T0002-001

VA TECH WABAG

ALUMINIUM SULPHATE DOSING SYSTEM
 Aluminium Sulphate (Alum) is used for the coagulation of suspended solids
in the raw water.
 Two nos. (1 W+ 1 S) each of having size 3.6 m x 2.6 m LD, is provided on
the basis of 23 hours dosing requirement.
 To prepare required strength of Alum (10%) and for the complete
dissolution of alum, dosing tank is equipped with alum mixing agitators.
 The tanks are constructed in RCC with acid alkali proof tile lining on inside
surface.
 The tank is provided with a dissolving basket and the alum and service
water is added into the dissolving tray.
 3 nos. alum dosing pumps of 2600 LPH capacity (2W+1S) are provided to
transfer to the dosing point at the upstream of the parshall flume.

sustainable solutions. for a better life.

Page 61
P097-T0002-001

VA TECH WABAG

ALUMINIUM SULPHATE DOSING SYSTEM (contd.)
 The level indicator/ transmitter is provided in the respective tanks and is
interlocked with 3 nos. alum dosing pumps.
 The alum solution preparation and dosing is manually controlled from local
control panel with the help of push button stations.
 Each dosing tank is provided with a level switch for giving Low level alarms.

 The running alum feed pump and respective agitator are tripped at low level
with the help of level switch.

sustainable solutions. for a better life.

Page 62
P097-T0002-001

VA TECH WABAG

ALUMINIUM SULPHATE DOSING INTO RAW WATER
CHANNEL

sustainable solutions. for a better life.

Page 63
P097-T0002-001

VA TECH WABAG

LIME DOSING SYSTEM
 Lime is used to increase the alkalinity of the raw water.
 Two nos. (1 W+ 1 S) each of having size 3.6 m x 2.6 m LD, is provided on
the basis of 23 hours dosing requirement.
 To prepare required strength of Lime (5%) and for the complete dissolution
of lime, dosing tank is equipped with lime mixing agitators.
 The tanks are constructed in RCC with epoxy coating on inside surface.
 The tank is provided with a dissolving basket and the lime and service water
is added into the dissolving tray.
 3 nos. lime dosing pumps of 10 m3/h capacity (2W+1S) are provided to
transfer to the dosing point at the upstream of the parshall flume.

sustainable solutions. for a better life.

Page 64
P097-T0002-001

VA TECH WABAG

LIME DOSING SYSTEM (contd.)
 The level indicator/ transmitter is provided in the respective tanks and is
interlocked with 3 nos. lime dosing pumps.
 The lime solution preparation and dosing is manually controlled from local
control panel with the help of push button stations.
 Each dosing tank is provided with a level switch for giving Low level
alarms.
 The running lime feed pump and respective agitator are tripped at low
level with the help of level switch.

sustainable solutions. for a better life.

Page 65
P097-T0002-001

VA TECH WABAG

CHLORINE PLANT

 The Chlorine Plant and its equipments are located in a self contained
separate building and consists of
a) Drum Room
b) Chlorinator and Ejector Room
 Two no. chlorinator of capacity 56.25 kg/h is provided for pre-chlorination for
dosing chlorine at 2mg/L and post chlorination for dosing chlorine at Chlorine
3 mg/L.
 All the chlorinators are vacuum operated with remote operated ejector.
 Clear water from clear water pump house is used as motive water to dose the
chlorine using booster pumps (1W+1S) which has the capacity of 15 m3/h.

sustainable solutions. for a better life.

Page 66
P097-T0002-001

VA TECH WABAG

CHLORINE PLANT (contd.)

 The chlorine gas is withdrawn from chlorine ton containers gets filtered
through gas filter and reaches the chlorine ejector.
 The motive water creates vacuum in the ejector and the chlorine gas gets
mixed with the motive water to form a solution of chlorine. This chlorinated
water is added after cascade aerator and at the clear water channel before
the clear water sump.
 An automatic changeover system is provided at the chlorine withdrawal
system, such that when one ton container is empty, the other toner comes
online automatically and hence the chlorine supply is continuous.
 The two delivery pipe lines are interconnected and an arrangement of
isolating valves is provided to permit the use of any two of the four
chlorinators independently for pre-chlorination and/or post chlorination.

 Chlorine leak detectors (3 nos.) are provided for monitoring the abnormal
chlorine gas concentration and for indicating chlorine gas leakage. The
chlorine room is built in such a way that it can store 93 nos. ton containers.
sustainable solutions. for a better life.

Page 67
P097-T0002-001

VA TECH WABAG

CHLORINE PLANT (contd.)

 The chlorine-dosing rate for pre-chlorination is regulated by manually
adjusting the chlorine gas control valve of the chlorinator.
 For post-chlorination, select one motive water pump. Keep the inlet valve of
the standby chlorinator and ejector closed.
 The chlorine dose for post-chlorination is regulated w. r. t residual chlorine to
be maintained in the treated water.

sustainable solutions. for a better life.

Page 68
P097-T0002-001

VA TECH WABAG

CHLORINE PLANT (contd.)

sustainable solutions. for a better life.

Page 69
P097-T0002-001

VA TECH WABAG

CHLORINE PLANT (contd.)

sustainable solutions. for a better life.

Page 70
P097-T0002-001

VA TECH WABAG

SECTION – 1 C
Emergency Procedures

sustainable solutions. for a better life.

Page 71
P097-T0002-001

VA TECH WABAG

EMERGENCY PROCEDURES
IN CASE OF POWER FAILURE

 If raw water is still received in the plant, allow the water to pass
through the entire plant.

- Continue dosing the alum and lime solution from the available stock.

- De-sludge the Clarifiers manually, as per the routine, using manual
override facility of sludge bleed valves.

- Let the filters be in service mode.

sustainable solutions. for a better life.

Page 72
P097-T0002-001

VA TECH WABAG

EMERGENCY PROCEDURES (Contd.)
 If raw water has stopped
- Stop the alum and lime dosing.

- De-sludge the Clarifiers manually, as per the routine, using manual
override facility of sludge bleed valves, to complete one cycle
desludging operation.

- Isolate the filters by closing the filtered water outlet valves, manually,
to avoid the filters from running dry.

Under power failure conditions, all the drives shall be isolated locally
and restarted on resumption of power, ensuring no overload conditions.

sustainable solutions. for a better life.

Page 73
P097-T0002-001

VA TECH WABAG

EMERGENCY PROCEDURES (Contd.)
 Backwashing during failure of auto operation of valve
- When the motorized operation is non-functional and manual operation needs
to be carried out for the backwashing of Filters, ensure the following:

- Isolate the air supply and vent out the air from the actuator.

-Position two operators, one at the control desk of the Filter (Operator 1) which
is to be taken up for backwashing and the other (Operator 2), for backwash
flow control.

- Let the operator at the control desk initiate the backwash operation of the
selected Filter, sequentially.

- When the Conjunctive air plus water wash is to be commenced, Operator 1
will convey the message to the Operator 2.
sustainable solutions. for a better life.

Page 74
P097-T0002-001

VA TECH WABAG

EMERGENCY PROCEDURES (Contd.)
 Backwashing during failure of auto operation (Contd.)
- Operator 2 will close the backwash valve provided with the help of hand
wheel. Operate the hand wheel manually.

- The hand wheel needs to be operated to maintain the flow as necessary.

-The manual operation of the valves at the pipe gallery for carrying out the
backwashing operation shall be attended to, by the Operator 1.

-When the duration of final wash step is over, close the B/W valve.

- A close coordination is required between the two operators, to complete the
backwashing operation, manually.
sustainable solutions. for a better life.

Page 75

Más contenido relacionado

La actualidad más candente

Report On Visit Of WTP (Nimeta) and STP (Gajrawadi)
Report On Visit Of WTP (Nimeta) and STP (Gajrawadi) Report On Visit Of WTP (Nimeta) and STP (Gajrawadi)
Report On Visit Of WTP (Nimeta) and STP (Gajrawadi) Yash Pandya
 
design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution SystemMian Umair Afzal
 
WATER & WASTE WATER ENGINEERING - water treatment process & units
WATER & WASTE WATER ENGINEERING -  water treatment process & unitsWATER & WASTE WATER ENGINEERING -  water treatment process & units
WATER & WASTE WATER ENGINEERING - water treatment process & unitsEddy Ankit Gangani
 
Water treatment
Water treatmentWater treatment
Water treatmentGokul Saud
 
Unit III Quality and Treatment
Unit  III Quality and TreatmentUnit  III Quality and Treatment
Unit III Quality and TreatmentMadhukarJadhav8
 
Mixing , coagulation
Mixing , coagulationMixing , coagulation
Mixing , coagulationAhmed Hasham
 
Introduction To Water Treatment
Introduction To Water TreatmentIntroduction To Water Treatment
Introduction To Water TreatmentPeter Hillis
 
Water purification techniques
Water purification techniquesWater purification techniques
Water purification techniquesRashid Tk
 
Environmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAOEnvironmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAOSatGur Masters Academy
 
Sedimentation Tanks: Design and Working
Sedimentation Tanks: Design and WorkingSedimentation Tanks: Design and Working
Sedimentation Tanks: Design and WorkingRohit Kumar Tiwari
 
Water Treatment Plant Design project
Water Treatment Plant Design projectWater Treatment Plant Design project
Water Treatment Plant Design projectchris30277
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment PlantDhruvin Patel
 
Design of sewerage system
Design of sewerage systemDesign of sewerage system
Design of sewerage systemManoj Mota
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculationSharifah Ain
 
Water softining
Water softiningWater softining
Water softiningManoj Mota
 
Sewage Treatment Plant
Sewage Treatment PlantSewage Treatment Plant
Sewage Treatment PlantDeepak Samal
 

La actualidad más candente (20)

Report On Visit Of WTP (Nimeta) and STP (Gajrawadi)
Report On Visit Of WTP (Nimeta) and STP (Gajrawadi) Report On Visit Of WTP (Nimeta) and STP (Gajrawadi)
Report On Visit Of WTP (Nimeta) and STP (Gajrawadi)
 
design and analysis of water distribution System
design and analysis of water distribution Systemdesign and analysis of water distribution System
design and analysis of water distribution System
 
Objects, location and lay out of water treatment plant
Objects, location and lay out of water treatment plantObjects, location and lay out of water treatment plant
Objects, location and lay out of water treatment plant
 
WATER & WASTE WATER ENGINEERING - water treatment process & units
WATER & WASTE WATER ENGINEERING -  water treatment process & unitsWATER & WASTE WATER ENGINEERING -  water treatment process & units
WATER & WASTE WATER ENGINEERING - water treatment process & units
 
Water treatment
Water treatmentWater treatment
Water treatment
 
Unit III Quality and Treatment
Unit  III Quality and TreatmentUnit  III Quality and Treatment
Unit III Quality and Treatment
 
Mixing , coagulation
Mixing , coagulationMixing , coagulation
Mixing , coagulation
 
Introduction To Water Treatment
Introduction To Water TreatmentIntroduction To Water Treatment
Introduction To Water Treatment
 
Water purification techniques
Water purification techniquesWater purification techniques
Water purification techniques
 
Environmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAOEnvironmental-pollution-control-by-CS RAO
Environmental-pollution-control-by-CS RAO
 
Sedimentation Tanks: Design and Working
Sedimentation Tanks: Design and WorkingSedimentation Tanks: Design and Working
Sedimentation Tanks: Design and Working
 
Water Treatment
Water TreatmentWater Treatment
Water Treatment
 
Water Treatment Plant Design project
Water Treatment Plant Design projectWater Treatment Plant Design project
Water Treatment Plant Design project
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
Design of sewerage system
Design of sewerage systemDesign of sewerage system
Design of sewerage system
 
Sewage treatment plant design calculation
Sewage treatment plant design calculationSewage treatment plant design calculation
Sewage treatment plant design calculation
 
L 17 coagulation and flocculation
L 17 coagulation and flocculationL 17 coagulation and flocculation
L 17 coagulation and flocculation
 
Water softining
Water softiningWater softining
Water softining
 
Sewage Treatment Plant
Sewage Treatment PlantSewage Treatment Plant
Sewage Treatment Plant
 
Solids determination
Solids determinationSolids determination
Solids determination
 

Destacado

Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboAnton Ricalovskis
 
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier Richa_Environmental
 
Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)Nishith Tripathi
 
water treatment slides
water treatment slideswater treatment slides
water treatment slidesAnand Keshri
 
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water Jaidev Singh
 
Burner management systems
Burner management systemsBurner management systems
Burner management systemsemmasmith8866
 
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...Robert Oostenveld
 
Group analyses with FieldTrip
Group analyses with FieldTripGroup analyses with FieldTrip
Group analyses with FieldTripRobert Oostenveld
 
Envt 110 water treatment plant operator intro
Envt 110  water treatment plant operator introEnvt 110  water treatment plant operator intro
Envt 110 water treatment plant operator introMJ Oliveri
 
Resume Ayman Shaikh
Resume Ayman ShaikhResume Ayman Shaikh
Resume Ayman ShaikhAyman Shaikh
 
Power point at water treatment plant
Power point at water treatment plantPower point at water treatment plant
Power point at water treatment plantAnoop Kumar
 
Automatic water treatment process
Automatic water treatment processAutomatic water treatment process
Automatic water treatment processFecsolution
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment PlantAmberStacy
 
Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Nguyễn Khoa
 

Destacado (20)

Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in Colombo
 
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
cost of Sewage Treatment Plants , Effluent Treatment Plant , Lamella Clarifier
 
Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)Effluent Treatment Plant(ETP)
Effluent Treatment Plant(ETP)
 
water treatment slides
water treatment slideswater treatment slides
water treatment slides
 
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
 
Main Cataloug
Main CatalougMain Cataloug
Main Cataloug
 
Water quality
Water qualityWater quality
Water quality
 
B W P
B W PB W P
B W P
 
Plant Com
Plant  ComPlant  Com
Plant Com
 
Burner management systems
Burner management systemsBurner management systems
Burner management systems
 
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
On the large scale of studying dynamics with MEG: Lessons learned from the Hu...
 
Group analyses with FieldTrip
Group analyses with FieldTripGroup analyses with FieldTrip
Group analyses with FieldTrip
 
Power Plant Water Treatment
 Power Plant Water Treatment Power Plant Water Treatment
Power Plant Water Treatment
 
Envt 110 water treatment plant operator intro
Envt 110  water treatment plant operator introEnvt 110  water treatment plant operator intro
Envt 110 water treatment plant operator intro
 
Resume Ayman Shaikh
Resume Ayman ShaikhResume Ayman Shaikh
Resume Ayman Shaikh
 
Power point at water treatment plant
Power point at water treatment plantPower point at water treatment plant
Power point at water treatment plant
 
Automatic water treatment process
Automatic water treatment processAutomatic water treatment process
Automatic water treatment process
 
Water Treatment Plant
Water Treatment PlantWater Treatment Plant
Water Treatment Plant
 
Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)Binh Hung Waste water treatment (Ho Chi Minh City)
Binh Hung Waste water treatment (Ho Chi Minh City)
 

Similar a Training process manual for wtp narmada

Brimsu presentation
Brimsu presentationBrimsu presentation
Brimsu presentationDennis Komla
 
SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODS
 SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODS SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODS
SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODSHencyRose
 
Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.Syed Aqeel Ahmed
 
UNIT -III Coagulation and flocculation.ppt
UNIT -III  Coagulation and flocculation.pptUNIT -III  Coagulation and flocculation.ppt
UNIT -III Coagulation and flocculation.pptmadhukarjadhav10
 
Water treatment and quality control of dialysate.
Water treatment and quality control of dialysate.Water treatment and quality control of dialysate.
Water treatment and quality control of dialysate.Vishal Golay
 
Pre and post treatment of water
Pre and post treatment of waterPre and post treatment of water
Pre and post treatment of waterPrudhvi raj
 
Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02Sashi Sharma
 
Quick Reference Guide to Compendial Water Standards
Quick Reference Guide to Compendial Water Standards Quick Reference Guide to Compendial Water Standards
Quick Reference Guide to Compendial Water Standards Jesse McLaughlin
 
Water Analysis.pdf
Water Analysis.pdfWater Analysis.pdf
Water Analysis.pdfDr.Timy Jose
 
Presentation_about_WATER_PURIFICATION.pptx
Presentation_about_WATER_PURIFICATION.pptxPresentation_about_WATER_PURIFICATION.pptx
Presentation_about_WATER_PURIFICATION.pptxPriyankaSharma89719
 
Sludge thickening and stabilization processes
Sludge thickening and stabilization processes  Sludge thickening and stabilization processes
Sludge thickening and stabilization processes Natthu Shrirame
 
Water analysis from_intake_well_to_boiler_drum-n
Water analysis from_intake_well_to_boiler_drum-nWater analysis from_intake_well_to_boiler_drum-n
Water analysis from_intake_well_to_boiler_drum-npriyank.modi
 

Similar a Training process manual for wtp narmada (20)

Brimsu presentation
Brimsu presentationBrimsu presentation
Brimsu presentation
 
SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODS
 SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODS SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODS
SIMPLE NOTES ON WATER HARDNESS AND SOFTENING METHODS
 
Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.Basic Thermal Power Plant Chemistry, for Operational Staff.
Basic Thermal Power Plant Chemistry, for Operational Staff.
 
Treatment of water
Treatment of waterTreatment of water
Treatment of water
 
UNIT -III Coagulation and flocculation.ppt
UNIT -III  Coagulation and flocculation.pptUNIT -III  Coagulation and flocculation.ppt
UNIT -III Coagulation and flocculation.ppt
 
Water treatment and quality control of dialysate.
Water treatment and quality control of dialysate.Water treatment and quality control of dialysate.
Water treatment and quality control of dialysate.
 
Pre and post treatment of water
Pre and post treatment of waterPre and post treatment of water
Pre and post treatment of water
 
Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02Effluenttreatmentplantetp 090630115120-phpapp02
Effluenttreatmentplantetp 090630115120-phpapp02
 
wtp_ppt_ub.ppt
wtp_ppt_ub.pptwtp_ppt_ub.ppt
wtp_ppt_ub.ppt
 
Quick Reference Guide to Compendial Water Standards
Quick Reference Guide to Compendial Water Standards Quick Reference Guide to Compendial Water Standards
Quick Reference Guide to Compendial Water Standards
 
Chapter12 coagulation
Chapter12 coagulationChapter12 coagulation
Chapter12 coagulation
 
Water Treatment
Water TreatmentWater Treatment
Water Treatment
 
Water Analysis.pdf
Water Analysis.pdfWater Analysis.pdf
Water Analysis.pdf
 
Presentation_about_WATER_PURIFICATION.pptx
Presentation_about_WATER_PURIFICATION.pptxPresentation_about_WATER_PURIFICATION.pptx
Presentation_about_WATER_PURIFICATION.pptx
 
Lecture on purification of water by
Lecture on purification of water byLecture on purification of water by
Lecture on purification of water by
 
Sludge thickening and stabilization processes
Sludge thickening and stabilization processes  Sludge thickening and stabilization processes
Sludge thickening and stabilization processes
 
Water analysis from_intake_well_to_boiler_drum-n
Water analysis from_intake_well_to_boiler_drum-nWater analysis from_intake_well_to_boiler_drum-n
Water analysis from_intake_well_to_boiler_drum-n
 
INTERN
INTERNINTERN
INTERN
 
Aqua silencer
Aqua silencerAqua silencer
Aqua silencer
 
COCA COLA
COCA COLACOCA COLA
COCA COLA
 

Último

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 

Último (20)

DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 

Training process manual for wtp narmada

  • 1. P097-T0002-001 VA TECH WABAG TRAINING PROGRAMME WATER TREATMENT PLANT FOR PHED, BHOPAL sustainable solutions. for a better life. Page 1
  • 2. P097-T0002-001 VA TECH WABAG 195 MLD Water Treatment Plant For Public Health Engineering Department, Bhopal Training Boucher Water Treatment Plant Section I Section II Section III sustainable solutions. for a better life. - Process Mechanical Electrical & Instrumentation Page 2
  • 3. P097-T0002-001 VA TECH WABAG INTRODUCTION  M/S Public Health Engineering Department has entrusted M/S. VA Tech Wabag Ltd.(JV) for the execution of 195 MLD Water Treatment Plant of normal works output at Khatpura Village (Shahganj), Seshore (Dt), Bhopal, supplies drinking water to Bhopal.  The WTP receives raw water from the river Narmada at village Hirani on Shahganj-Budni Road, pumped through 1400 mm dia MS pipe.  The WTP is based on the Clariflocculator Technology for clarification followed by filtration in Rapid Gravity Sand Filters.  The scope also includes disinfection of filtered water for making it suitable for drinking purposes at WTP site Khatpura and chlorine boosting arrangement at clear water sump at Ahmedpur, Bhopal. sustainable solutions. for a better life. Page 3
  • 4. P097-T0002-001 DESIGN BASIS VA TECH WABAG The Water treatment plant is designed for the Normal Works output of 195 MLD, based on the following raw water quality. The treated water quality to be achieved are as below. Raw water S. No. Parameter Minimum Maximum Clarified water Treated water after filtration and disinfection as per CPHEEO 1 Turbidity (NTU) 3 15000 < 15 1 2 Taste and odour - - - Unobjectionable 3 Colour (units on platinum cobalt scale) - - - 5 4 pH 7.0 to 8.5 6.5 to 8.5 - 7.0 – 8.5 5 Specific conductance (m/m mho) 0.33 0.5 - - 6 Total alkalinity (mg/L) - 300 - 200 7 Chloride (mg/L) - 50 - - 8 Nitrate (mg/L) 0.4 40 - 45 9 Total hardness (mg/L as CaCO3) - 300 - 200 10 Total Dissolved Solids (mg/L) - - - 500 11 Total solids (mg/L) - 350 < 15 - 12 Iron (mg/L) Nil 15 - 0.1 13 Chloride (mg/L) - - - 200 14 Fluoride (mg/L) Nil 0.25 - 1 15 Sulphate (mg/L) - 20 - 200 16 Coliform organism at 37 C (MPN / 100 mL) - 500 - Must not be detectable in any 100 mL sample 17 Faecal E.coli at 44 C (Unit/ 100 mL) - 54 - Must not be detectable in any 100 mL sample 18 Residual aluminium (mg/L) - - 0.5 0.03 19 Residual chlorine (mg/L) - - - 0.2 sustainable solutions. for a better life. Page 4
  • 5. P097-T0002-001 VA TECH WABAG SECTION – 1 A Water Treatment Philosophy sustainable solutions. for a better life. Page 5
  • 6. P097-T0002-001 VA TECH WABAG WATER TREATMENT PHILOSOPHY  The raw water in this scheme undergo the following treatment steps so that it can be used for the purpose of drinking water. 1) Aeration 2) Pre-chlorination 3) Alum and Lime dosing 4) Flocculation 5) Clarification 6) Filtration 7) Post-chlorination sustainable solutions. for a better life. Page 6
  • 7. P097-T0002-001 VA TECH WABAG AERATION The primary objectives of aeration of raw water are, to expel dissolved gases such as Carbon Dioxide and volatile substances that cause taste and odour. to increase Dissolved Oxygen of raw water. to precipitate Iron and Manganese from their soluble form to insoluble form. CHLORINATION The primary objectives of the pre chlorination of raw water are: to control the growth of algae and other microorganisms that might interfere with coagulation and flocculation and to reduce the coagulant dose. keeping filter media free of slime growths and mud balls which not only impair the filtration efficiency but also interfere with proper backwashing. The post chlorination of filtered water ensures disinfection of filtered water to make it suitable for human consumption as drinking water, killing all the germs present in the filtered water. sustainable solutions. for a better life. Page 7
  • 8. P097-T0002-001 VA TECH WABAG CHLORINATION (Contd.) Chlorine is used  Due to its oxidizing effect on organic matter and  Its germicidal effect in killing germs and viruses.  Chlorine gas when dissolved in water, hydrolyzes rapidly : Cl2 + H2O  H+ + Cl - + HOCl The weak hypochlorous acid (HOCl) undergoes partial dissociation: HOCl   sustainable solutions. for a better life. Page 8 H+ + OCl -
  • 9. P097-T0002-001 VA TECH WABAG CHLORINATION (Contd.)  At 7.5 pH, the undissociated hypochlorous acid (HOCl) and the hypochlorite ion (OCl -) is 50:50. The lower the pH values, the amount of HOCl becomes proportionately higher which has germicidal efficiency better than the OCl – ions.  The raw water supply is from Narmada river and its pH range is 6.5 to 8.5 and the pH of raw water is mostly expected to be around 7.0 which is conducive for the predominant presence of HOCl ions which in turn ensure effective chlorination. sustainable solutions. for a better life. Page 9
  • 10. P097-T0002-001 VA TECH WABAG FLASH MIXING  Turbidity is caused by fine suspended solids, colloids and color.  The particles are negatively charged.  The particles remain in stable suspension by the action of electrostatic forces of repulsion.  Dose Alum (coagulant) and Lime (adding alkalinity) charges. to neutralized the  Ensures uniform dispersion of the chemical by rapid mixing in Flash Mixer. Ensure the flocs formation.  Ascertain the optimum dosage of coagulant by Jar Test, under optimum pH zone. Lime is dosed to bring about optimum pH zone.  Alum is used as the coagulant chemical and dosed at the inlet channel of Flash Mixer. sustainable solutions. for a better life. Page 10
  • 11. P097-T0002-001 VA TECH WABAG FLASH MIXER (Contd.) A typical reaction of alum may be expressed as : Al2 (SO4)3.18 H2O → 2 Al 3+ + 3 SO4 - + 18 H2O 2 Al 3+ + 6 OH- → Al2O3. 3 H2O Hydroxyl ions must be supplied by alkalinity either natural or added for the aluminium oxide to hydrate. The required alkalinity is supplied by addition of Lime. Ca (OH)2 → Ca + 2 OHpH of water plays a very important part in the coagulation phenomenon. The required alum and lime dosage, as determined by Jar Test, to be maintained to ensure good coagulation. The mixing of the chemicals with raw water is provided in the Flash Mixer. This helps in the formation of microflocs. sustainable solutions. for a better life. Page 11
  • 12. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATION What is clariflocculation? Clariflocculation means “ SEDIMENTATION WITH FLOCCULATION IN A SINGLE UNIT”. Unit comprises of two circular concentric tanks viz. inner tank where flocculation is happening and outer tank where settling is happening. Principle of clariflocculation The particles do not keep their individuality, but tend to agglomerate helped by some coagulants. The sludge floc size increases and, as a consequence, the sedimentation speed increases too. A retention time of 30 minutes is provided for flocculation along with gentle and prolonged mixing also. sustainable solutions. for a better life. Page 12
  • 13. P097-T0002-001 VA TECH WABAG CLARIFLOCCLATION (contd.) Optimum dosage requirement of Alum / Lime for flocculation is determined by the Jar Test, as a daily routine. The most significant design aspect is the available settling area, since the throughput (m3/h) divided by the tank area (m2) must not exceed the settling velocity of the slowest settling particle to be separated – usually to 1 to 2 m/h  The efficiency depends It is independent of depth. on the Surface Overflow Rate SOR = flow rate through the clarifier divided by the settling area =Q/A sustainable solutions. for a better life. Page 13 (SOR).
  • 14. P097-T0002-001 VA TECH WABAG CLARIFLOCCLATION (contd.) Stages of clariflocculation A complete process of clariflocculation mainly consists of three subsequent stages: • Mixing of the inflow (raw water) with the reagents (Alum and lime) • Flocculation • Sedimentation The raw water mixing with the reagents must be made very quickly and with a strong stirring. On the contrary, the flocculation must be slow in order to allow the flocs agglomeration and any turbulent motion must be avoided. The clarified water is then collected in the upper part through circular or radial launders and the sludge on the tank bottom is conveyed into a sludge sump by some scrapers. sustainable solutions. for a better life. Page 14
  • 15. P097-T0002-001 VA TECH WABAG CLARIFLOCCLATION (contd.) Concept of clariflocculation a process of contact between the pre-existing sludge and the incoming water to obtain larger flocs which tend to sediment more easily; a process of sedimentation based on Stokes‟ law. There is a small, but well stirred, contact zone between the sludge and the incoming waste water where the intimate contact is ensured. After the intimate mixing, the period of contact is kept in a “calm” volume, there is no narrowing so the flocs integrity is respected and they can gather and become larger in the next calm zone. The “calm” volume allows to convey the water to be treated to the sedimentation zone, at a very low elevation, without any turbulence and with a gradual slowing down due to the section widening along the waste water flowing upwards. sustainable solutions. for a better life. Page 15
  • 16. P097-T0002-001 VA TECH WABAG CLARIFLOCCLATOR (in full and empty condition) sustainable solutions. for a better life. Page 16
  • 17. P097-T0002-001 VA TECH WABAG MAJOR FACTORS AFFECTING THE PERFORMANCE OF CLARIFLOCCULATOR Expected quality of clarified water is 15 NTU However the performance may be impaired due to:  Right dosage of coagulant / lime, as per Jar Test, is not dosed.  Formation of larger flocs in flocculation tank is not properly achieved.  Sludge withdrawal programme not properly operated, resulting in sludge buildup. sustainable solutions. for a better life. Page 17
  • 18. P097-T0002-001 VA TECH WABAG FILTRATION  Filtration is a process for separating suspended and colloidal impurities, held in suspension, from water through a porous medium or media.  Removal of turbidity is essential not only for aesthetic acceptability but also for efficient disinfection which is difficult in the presence of suspended solids and colloidal impurities.  Filters can be classified according to (1) the direction of flow (2) types of filter media and beds (3) the driving force (4) the method of flow rate control  The Filters adopted for the project are of down flow, granular mono media, rapid gravity filters operating at declining rate. sustainable solutions. for a better life. Page 18
  • 19. P097-T0002-001 VA TECH WABAG FILTRATION (Contd.,)  Conceptually the removal of particles within a deep granular medium filter takes place because of few or more of the following phenomena: 1. Sedimentation – particles settle on the filter medium. 2. Impaction – heavy particles will not follow the flow streamlines. 3. Interception – many particles that move along in the streamline are removed when they come in contact with surface of filtering medium. 4. Adsorption – bonding, chemical interaction or physical adsorption. 5. Adhesion – Flocculants particles get attached to surface of medium are sheared away and pushed deep inside the bed due to force of flowing water and as the bed becomes clogged the surface shear force increases at which no additional matter can be removed. 6. Flocculation – Large particles overtake small particles, join them, and form still larger particles and gets removed by any of the above mechanisms. 7. Biological growth – Biological growth within the filter reduces the pore volume and may enhance the removal mechanism by any of the above mechanisms. sustainable solutions. for a better life. Page 19
  • 20. P097-T0002-001 VA TECH WABAG FILTRATION (Contd.,)  Each filter bed is provided with state-of-the-art underdrain system, incorporating „sand tight‟ polypropylene nozzles fixed on a monolithic reinforced concrete false floor at 60 nos. per m²  The system ensures - uniform draw-off of filtered water & its efficient collection and - efficient control of the uniform distribution of air and wash water, over the whole area of the filter, during filter cleaning.  The filters shall be cleaned on a 24 hour cycle or when the filter bed is clogged up to the admissible filter loss. sustainable solutions. for a better life. Page 20
  • 21. TYPICAL FILTER ARRANGEMENT P097-T0002-001 VA TECH WABAG Inlet Valve Clarified water Dirty Backwash Outlet Air Inlet Backwash Water Inlet Sand Media Filtered Water Outlet Valve Opened Filtered Water sustainable solutions. for a better life. Page 21
  • 22. P097-T0002-001 VA TECH WABAG SECTION – 1 B Process Units sustainable solutions. for a better life. Page 22
  • 23. P097-T0002-001 VA TECH WABAG PROCESS UNITS WTP consists of the following process units:              Cascade Aerator Primary Sedimentation Tank Flash Mixer Clariflocculator Rapid Gravity Filters Overhead Backwash Water Tank Dirty Backwash Water Collection Tank Clear Water Sump Sludge Sump Sludge Drying Bed Alum Solution Preparation and Dosing System Lime Solution Preparation and Dosing system Chlorine Dosing Facilities sustainable solutions. for a better life. Page 23
  • 24. P097-T0002-001 VA TECH WABAG CASCADE AERATOR  Raw water is received through a 1400 mm dia. pumping main into the Cascade Aerator inlet. A manual butterfly valve is provided on the inlet line for isolation purpose. The raw water is aerated in the Aerator, by allowing raw water to fall over three circular steps. One no. Parshall Flume with ultrasonic transmitter is provided at the outlet of Cascade Aerator / Primary Sedimentation Tank for monitoring the raw water flow. Local cum remote indication for the same is provided with cumulative flow totaliser. Chlorine is dosed at 2 ppm at the outlet channel through a diffuser. The pre-chlorinated raw water is conveyed through the Aerator outlet channel to the Primary Sedimentation Tank followed by Flash Mixer or directly to Flash Mixer or bypassing the entire system and fed into the Rapid Gravity Sand Filters depends on the turbidity of Raw water / any maintenance. pH analyzer, turbidity analyzer and DO analyzer are provided at the inlet of the pipeline to determine the raw water characteristics. Also raw water samples are drawn from the Aerator inlet for routine monitoring of pH, turbidity and DO. sustainable solutions. for a better life. Page 24
  • 25. P097-T0002-001 VA TECH WABAG PRIMARY SEDIMENTATION TANK  2 nos. Primary Sedimentation Tanks are provided after cascade aerator. Manual gates are provided to isolate the primary sedimentation tanks in case of maintenance. Manual gate is provided in the main channel to bypass both the primary sedimentation tanks. The primary sedimentation tanks are peripheral type of clarifiers 58.8 m diameter used for suspended solids removal and is designed for the retention time of 3 h. Settled sludge is withdrawn from the sedimentation tanks through respective sludge withdrawal lines. Gate valves are provided for isolation of the sludge lines. Flushing connections are provided on these lines for maintenance purpose. Additionally drain of sludge to plant overall drain facility is provided to bypass the entire sludge to Nalla during high turbidity inflows. sustainable solutions. for a better life. Page 25
  • 26. P097-T0002-001 VA TECH WABAG FLASH MIXER  The raw water after flow measurement by Parshall Flume is received in a Flash Mixer designed for the retention time of 0.75 min at a design flow of 8478 m³/hr. Alum and lime solution are dosed into the raw water at the upstream of Parshall flume and entering into the Flash Mixer. The Flash Mixer is constructed in RCC and is equipped with agitators for intimate mixing of raw water with chemicals.  Dirty wash water from the Dirty Wash Water collection Tank is recycled into the Flash Mixer. Each of the Flash Mixers can be isolated by gates. A bypass gate is provided in the main channel from Parshall flume to bypass the Flash Mixers and Clariflocculators and feed raw water directly into the filters. Butterfly valves are provided for draining the Flash Mixer during maintenance. sustainable solutions. for a better life. Page 26
  • 27. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR  Raw water from the flash mixers is conveyed to Clariflocculators through a distribution chamber with isolation gates for each of the clariflocculator.  4 nos. Clariflocculators constructed in RCC are provided with a flocculation chamber and clarifier with a design capacity of 195 MLD. Size of each Clariflocculator 43.9 m dia x 3.5 m LD and each Clariflocculator is capable of handling the flow of 48.75 MLD. The retention time of 30 min is provided in the flocculator zone and 2 h is provided in the clarifier zone.  Each of the unit is equipped with 4 nos. flocculator mechanisms in the flocculator zone and a peripherally driven sludge raking mechanism in the clarifier zone. The clarified water is passed through the submerged orifices provided on the peripheral double weir launders of the Clariflocculator. The clarified water from Clariflocculators is conveyed by gravity to the inlet channel of the Rapid Gravity Filters. sustainable solutions. for a better life. Page 27
  • 28. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR (contd.)  The sludge from the Clariflocculator is withdrawn through a telescopic sludge bleeding arrangement.  Isolation valves are provided on the main sludge withdrawal line of the clarriflocculators.  Drain valves are provided to drain the sludge into the plant overall drainage system routed to Nalla. Flushing connections are provided on the sludge line for routine maintenance.  Sampling point with isolation gate valve is provided to collect the sample of the clarified water.  The Clariflocculator is designed for 2780 mg/L of SS. sustainable solutions. for a better life. Page 28
  • 29. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR (contd.) Water enters at the bottom of the central pier of the Clariflocculator and flows through the openings in the central pier into the Flocculation zone. After entering the Flocculation zone, the water flows into the clarifier zone. The incoming solids get distributed whereby the flocs can enter the clarifier zone in the outer portion and the clarified water overflow takes place over the weirs.  Clarified water is directed to the overflow launders, which lead clarified water to Rapid Gravity Filters and to Clear Water sump based on the turbidity. Sampling point is provided in the common outlet channel of clariflocculator. The sludge settling on the floor of the Clariflocculators will be scrapped by mechanical scrapper, to the central pit.  The sludge from each clarifier is discharged to the Sludge Sump, intermittently.  A torque switch will trip the scraper mechanism due to high torque, when there is overload or if there is any obstacle for the scraper to move. sustainable solutions. for a better life. Page 29
  • 30. P097-T0002-001 VA TECH WABAG DESLUDGING OF CLARIFLOCCULATOR The desludging operation of Clariflocculator is designed for discharging the sludge by intermittent bleed.  The intermittent desludging operation helps in increasing the consistency of sludge, which minimises the water losses. The desludging control has been programmed for desludging the clarifiers, every hour. The cycle starts from Clariflocculator-1 and proceeds to other and the cycle restarts again. The duration of desludging of each clarifier depends on the incoming raw water turbidity load. The sludge from each Clariflocculator is discharged through the sludge withdrawal pipe to the Sludge Sump. A drain connection is also provided in the sludge withdrawal line for draining the Clariflocculator. Flushing water connections are provided to facilitate flushing of sludge pipes, in the event of blockages / also to prevent blockages. sustainable solutions. for a better life. Page 30
  • 31. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – START UP  Ensure the overflow weir plates are properly leveled. Seal the gaps in between the weir plates and launders. Keep the outlet gate leading to the Clear Water sump, drain valves and sludge drain valves closed.  Ensure the oil level in the gear reducer / drive unit of scraper mechanism is o.k.  Keep the torque switch in working condition.  Switch on scrapper bridge mechanism.  Open the outlet gate of the Flash Mixer and receive the coagulated water through the central pier.  Keep the flocculator paddles running at the optimum speed, to ensure good flocculation. The flocculated raw water enters Lamella Clarifier under its overflow channels and flows upwards , in between the inclined parallel plates. sustainable solutions. for a better life. Page 31
  • 32. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – START UP (Contd.) Check the torque indicator for any overload due to obstruction of the scraper mechanism and check the smooth rotation of the scraper mechanism. Desludge the clariflocculator once sludge is more. (Actual cycles and duration of sludge bleed depends on the actual raw water suspended solids, turbidity and raw water flow). Defer the de-sludging if the sludge level in the sludge sump is high. Flush the individual sludge line by opening the flushing valves provided (once a week). Collect-clarified water through the sampling valve (GV-217) provided in the clarified water channel and ensure the quality conforms to desired quality. In case of high turbidity of clarified water, check for correct chemical dosing rate and sludge bleed. Also ensure all flocculators and scraper mechanisms are running. sustainable solutions. for a better life. Page 32
  • 33. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – START UP (Contd.) Look out for any algal growth on the weir surface and tank walls. If growth is observed, ensure residual chlorine at clarifier outlet is at least 0.5 to 0.6 mg/L. Adjust the dosage rate of the alum / lime solution , if required, to ensure the turbidity of clarified water is within the design values. Reschedule the sludge withdrawal programme, as required, in case of wide changes in the raw water turbidity and raw water flow. In case of trip of scrapper due to high torque, do not attempt to restart the scrapper mechanism without proper investigation. sustainable solutions. for a better life. Page 33
  • 34. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – SHUT DOWN SHUT DOWN FOR MAINTENANCE  Close the outlet gate of the Flash Mixer which fed the coagulated water to the clarifloculator to be isolated and drain the sludge by opening its sludge valves. Keep the paddles and scraper mechanism running.  Defer the desludging of other Clariflocculator till the emptying is completed.  Allow the sludge into the sludge sump. Stop the paddles and scraper mechanism at local or at MCC when the water level is lowered exposing them. Isolate the unit and the power supply for the equipment at MCC and handover for maintenance. sustainable solutions. for a better life. Page 34
  • 35. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – SHUT DOWN (CONTD.) PARTIAL SHUT DOWN WITHOUT MAINTENANCE In case of partial shut down for the reduced inflow, isolate the Clariflocculator which is not required, by closing the outlet gates of the corresponding Flash Mixer. Reduce the dosing rate of chlorine, lime and alum proportionate to the requirement of turn down capacity. Before isolating, it shall be ensured that the accumulated sludge in the clariflocculator, to be isolated, shall be desludged. It is preferable to keep the paddle and scraper mechanism running. sustainable solutions. for a better life. Page 35
  • 36. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – SHUT DOWN (CONTD.) COMPLETE SHUT DOWN  Inform the raw water pumping station in-charge to stop pumping water to the Water Treatment Plant, if it is decided to go in for complete shut down of the plant.  Ensure that sludge in the Clariflocculators shall be fully drained out.  Ensure all the sludge lines are properly flushed clean, the units and the equipment shall be stopped / isolated.  Stop the running equipment at local.  Isolate the power supply for the equipment at MCC, if it is to be taken up for maintenance.  Isolate all the chemical dosing system. sustainable solutions. for a better life. Page 36
  • 37. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – CLEANING  As a matter of routine, a Clariflocculator can be isolated for cleaning of overflow launders, once a week, deteriorating the quality of clarified water. Before isolating the Clariflocculator that is to be cleaned, ensure the other Clariflocculator and its connected Flash Mixer are in service. Then isolate the Clarifier selected for cleaning corresponding outlet gate of Flash Mixer. by closing the Keep the paddles and scraper mechanism running. Schedule the cleaning programme preferably when there is no much of sunshine. Deploy two labourers for the cleaning task. Equip one labourer with a soft brush with a short handle and the other with a wiper attached to a long handle. sustainable solutions. for a better life. Page 37
  • 38. P097-T0002-001 VA TECH WABAG CLARIFLOCCULATOR – CLEANING (contd.) Drain the Clariflocculator so that water level falls by 100 mm, so that washings do not get into the overflow launders. Let them be careful not to spill the washings into the overflow launder. Once cleaning is completed, de-sludge the Clariflocculator, every one hour for a duration of about 5 to 10 minutes, till the water level is lowered by about 0.7m. In case algae patches are found on the concrete, mop them up with chlorinated water. Now the Clariflocculator is fairly clean and ready for next service run. sustainable solutions. for a better life. Page 38
  • 39. P097-T0002-001 VA TECH WABAG FILTERS  A total of 16 nos. Filters, each of 94.5 m² ( 10.5 m x 4.5 m with twin beds) filtering area are provided with 8 nos. in each row, separated by a pipe gallery.  The filtration plant consists of the air scour blowers and Dirty Wash Water Collection Tank, Overhead Backwash water tank.  The filtration plant operation is monitored and controlled at Filter console, located on the viewing walkway, opposite to each filter.  The relevant data are displayed via PLC.  The Filters are two equal size beds separated by a central gullet and down flow open to sky gravity units.  They operate at declining rate on the principle of influent flow division and are capable of achieving a turbidity of ≤I.0 NTU in the filtered water.  The filters are designed for higher average filtration rates of 6 m³/m²/h (when all 15 filters in operation). sustainable solutions. for a better life. Page 39
  • 40. P097-T0002-001 VA TECH WABAG FILTERS (contd.)  Each filter has twin beds of sand of 950 mm depth and central gullet.  Coarser sand (Effective size= 0.65 mm; Uniformity coefficient = 1.5) selected to utilize greater depths of filter media to trap influent solids. is  Each filter bed is provided with „sand tight‟ polypropylene nozzles, 60 nos. per m², fixed on a monolithic reinforced concrete false floor construction, over which the filter medium is laid.  The under drain system ensures uniform draw-off of filtered water and its efficient collection and for efficient control of the uniform distribution of air and wash water, over the whole area of the filter, during filter cleaning.  The filters shall be cleaned on a 24 hour cycle or when the filter bed is clogged up to the admissible filter head loss of 1.8 m.  No sectional backwash is envisaged, to reduce down time of Filters. sustainable solutions. for a better life. Page 40
  • 41. P097-T0002-001 VA TECH WABAG FILTERS (Contd.) Filter backwashing is manually initiated and controlled using PLC.  Select the bed, which is operated for 24 h cycle or which is clogged. Keep the other beds in service.  Ensure water level in overhead backwash tank not low, level in dirty wash water collection tank not high and no other filter is in backwash mode.  The backwashing sequence is set by the program in PLC  The following sequence is followed for backwashing; 1) Close the inlet gate and let the filter drain starts. When the water level in the bed reaches to about 100 mm above the filter media, close the outlet valve. 2) Now open the washout valve. 3) After the filter drain, open air inlet valve. Start one no. air blower and agitate the bed for about 3- 5 minutes. sustainable solutions. for a better life. Page 41
  • 42. P097-T0002-001 VA TECH WABAG FILTERS (Contd.) 4) Now open backwash water inlet valve and backwash bed with combined air-water wash for about 2 minutes at 15 m3/m2/h i.e. 1418 m3/h of backwash water flow rate. 5) Stop air blower and close air inlet valve. Release the trapped air through air vent valve of the filter which is under backwashing. 6)Without stopping the wash water sequence, open the motorized backwash outlet gate and rinse the bed with wash water at 45 m3/m2/h i.e. at a flow rate of 4252 m3/ h for about 4 minutes. 7)After completing the above steps, close the wash water. Close the backwash outlet gate after used wash water is drained out from the central gullet. Close the air vent valve. sustainable solutions. for a better life. Page 42
  • 43. P097-T0002-001 VA TECH WABAG FILTERS (Contd.) sustainable solutions. for a better life. Page 43
  • 44. P097-T0002-001 VA TECH WABAG FILTERS (Contd.) sustainable solutions. for a better life. Page 44
  • 45. P097-T0002-001 RAPID GRAVITY FILTER – FILTRATION STAGE VA TECH WABAG Inlet Valve Clarified water Dirty Backwash Outlet Air Inlet Backwash Water Inlet Sand Media Trapping of particles between sand grains sustainable solutions. for a better life. Filtered Water Outlet Valve Opened Filtered Water Page 45
  • 46. P097-T0002-001 RAPID GRAVITY FILTER – BACKWASH STAGE VA TECH WABAG Valve opened VALVE CLOSED Dirty water out Inlet Valv e Dirty Backwash Outlet Air Inlet Backwash Water Inlet Filtered Water Outlet Fluidised Sand Layer Loosened Sand Layer Dirty Sand Layer Cleaned Sand Layer Air supply Air stopped Valve Closed Valve Opened Backwash water sustainable solutions. for a better life. Page 46
  • 47. P097-T0002-001 Backwash stage 1: Combined wash (air & water) VA TECH WABAG Dirty Sand Layer Fluidisation of Sand Layer A closer look at the functioning of nozzles in filters sustainable solutions. for a better life. Air Backwash water Page 47
  • 48. Back Wash Stage 2: Water Only P097-T0002-001 VA TECH WABAG Fluidised Sand Layer Cleansing of Sand Layer A closer look at the functioning of nozzles in filters sustainable solutions. for a better life. Air flow stopped Backwash water rate increased Page 48
  • 49. P097-T0002-001 VA TECH WABAG FILTERS (Contd.)  Three units (2 W+1 S) of twin lobe type Air Blowers each of capacity 4250 m³/h are provided.  Each filter outlet pipe work is connected to Clear Water Reservoir through a weir chamber. Chlorine solution is dosed (post-chlorination) at the inlet of the Clear Water Reservoir.  Filtered water samples are drawn from the common filter outlet with the help of sampling pump and is delivered to the laboratory for continuous measurement of filtered water quality.  Sampling point provision is also made to check the individual filters performance.  Level transmitter is provided in the common filter outlet.  Flow meter is provided to monitor the treated water flow into the Clear Water Reservoir. sustainable solutions. for a better life. Page 49
  • 50. P097-T0002-001 VA TECH WABAG FILTERS (Start up) FILTRATION MODE  Ensure the two inlet channels feeding to the filters on both rows are charged with the clarified water from the Clariflocculator.  Ensure all the Filters for ready to take into service, to receive 195 MLD .  In the worst scenario, 13 nos. filters can be put in operation (one backwash, one drain and one under maintenance) output of 185 MLD is possible.  Ensure the pneumatic air is available at required pressure for the operation of all the pneumatically operated filter valves.  Keep the inlet valves to Clear Water Reservoir .  Ensure that chlorine is dosed (post-chlorination) at the inlet of Clear Water Reservoir.  Open the inlet valves of the Filters.  Stagger the schedule of bringing the Filters one after the other by fully opening the filtered water inlet valve and allow the clarified water to filter through the beds.  Let the excess incoming clarified water overflows the weir in the Clarified water feeding channels to the Filters, till the filtering operation is streamlined.  Let the filtered water enter the Clear Water Reservoir.  Maintain individual filter service run for 24 hours, achieving the required filtrate quality. sustainable solutions. for a better life. Page 50
  • 51. P097-T0002-001 VA TECH WABAG FILTERS – Start up (Contd.) BACKWASHING MODE  When a filter clocks 24 hours service run or when its differential indicator senses the pre set high differential head loss, filter will be taken out for backwashing operation, while the others will continue with the filtration.  Prior to backwashing operation during start-up, ensure adequate amount of water is available in the Backwash water Storage Tank. If adequate water to meet the backwashing water requirement is not available, defer the backwashing till adequate level of water builds up in Storage Tank, receiving the filtered water from Treated Water Reservoir by pumping.  Select the Filter for backwashing, after ensuring the water level in the Dirty wash water tank is low, to accommodate the wash water of one filter.  Do the backwashing operation of the Filters, from the dedicated Manual Wash Control Console for each Filter.  Bring the washed filter back to service run. sustainable solutions. for a better life. Page 51
  • 52. P097-T0002-001 VA TECH WABAG FILTERS – Shut down PARTIAL SHUTDOWN  Before isolating, it is preferred to identify the filters which has run for longer hours and isolate them one after the other, after backwashing.  For isolating purpose, it is adequate to close the filtered water outlet valve, keeping the filter inlet valve open. Leave the isolated filters with standing water over the sand bed, to avoid bed cracking.  The bed shall be drained, only when it is required to attend to the false bottom floor nozzles or when going in for the replacement of sand by sieving, more than the requirement of just topping up.  After draining is completed, ensure proper ventilation to the maintenance person who will enter the filter box through the man hole, located below the false bottom floor of the filter. sustainable solutions. for a better life. Page 52
  • 53. P097-T0002-001 VA TECH WABAG FILTERS – Shut down (contd.) COMPLETE SHUT DOWN  If it is decided to go in for complete shut down of the plant, ensure all the filters are backwashed clean before they are isolated by closing the filter outlet valves.  Stop chlorination  In case of making use of the complete shut down period for maintenance of filers, the selected Filters, that have to be taken out for maintenance, shall be drained and the drained water shall be pumped to the Dirty wash water Collection Tank. The Filter shall be thoroughly inspected, damaged nozzles shall be replaced and any filter media loss shall be topped up.  All the stagnant water from any units or channels shall be pumped out using portable submersible pumps to the site drainage system.  Stop the running equipment at local and at MCC.  Ensure all the valves and gates are in close position, once the plant is shut down. sustainable solutions. for a better life. Page 53
  • 54. P097-T0002-001 VA TECH WABAG COMMON PROBLEMS ENCOUNTERED IN FILTRATION OPERATION  Increase in turbidity more than the design values or certain microorganisms in the clarified water will shorten filter runs. Ensure adequate dosing of chlorine solution. The floc breakthrough may also result in short filter runs. This can be avoided by operating the clarification section with optimum dosage of chemicals, to ensure proper settling of flocs in the Clariflocculators. When the head loss increases, then the Filter has to be necessarily taken out for backwashing. Growth of filter grains due to coating of the materials filtered, bed shrinkage and media pulling away from filter side walls are related problems. Use of adequate backwash will avoid all these problems. sustainable solutions. for a better life. Page 54
  • 55. P097-T0002-001 VA TECH WABAG COMMON PROBLEMS ENCOUNTERED IN FILTRATION OPERATION (contd.)  Mud ball due to general buildup of materials accumulate at or near the surface, leading to clogging of media. By proper coagulation and settling in the clarification stage, mud ball formation could be considerably reduced. Mud ball formation may not be experienced because of adequate design backwash rate. However prolonged air scouring followed by higher backwash shall be used, when mud ball formation is encountered. Sand leakage is prevented by the careful selection of the sand size and the size of slots in the nozzles. However, the fines that may develop due to attrition can result in the downward migration and escape of fines with the filtered water. The topping up of lost media have to be taken up when it exceeds 2%.  Any observation of loss of media during backwashing shall be immediately attended by reducing backwash water rate. The backwash duration can be prolonged, if required, to effect complete back-washing of the bed. sustainable solutions. for a better life. Page 55
  • 56. P097-T0002-001 VA TECH WABAG COMMON PROBLEMS ENCOUNTERED IN FILTRATION OPERATION (contd.)  Air binding and subsequent release during service may not be a problem. Do not operate the filters with less liquid depth to overcome this problem.  Sometimes careless operation may lead to bumping or lifting of the filter beds when resuming filtration without going through the full backwash cycle. This practice should be discouraged as the filtrate water quality deteriorates considerably.  When slime or algae growths are noticed on filters, increase the dosage rate of chlorine solution to the extent required.  During air scouring if any improper distribution of air is noticed watch out for any deterioration of filtrate quality from that particular filter in the subsequent filtration cycles. If found beyond the acceptable levels of turbidity, then isolate the filter and rectify the defects such as replacement of worn out nozzle, or to clean the filter media free from stubborn choking. sustainable solutions. for a better life. Page 56
  • 57. P097-T0002-001 VA TECH WABAG CLEAR WATER RESERVOIR  For chlorine dosing to the filtered water, diffuser arrangement is made. The Clear water Reservoir provides approximately 30 minutes retention time of 185 MLD for disinfection.  FRC monitoring to be done to check for residual chlorine in the filtered water at the outlet of Clear Water Reservoir. sustainable solutions. for a better life. Page 57
  • 58. P097-T0002-001 VA TECH WABAG OVERHEAD BACKWASH WATER TANK  A fully covered overhead backwash water Tank of RCC is provided with adequate elevation.  The size of the tank is 45.0 m x 7.3 m x 2.3 m LD.  Two nos. overhead tank filling Pumps (1W+1S), which draw water from the Filer outlet channel, are provided for supplying water to the Overhead backwash water tank. Each pump is having capacity of 760 m3/ h.  The tank is provided with a level switch for High High & Low Low levels with alarms and for tripping of the supply pumps at High High levels.  The duty pump is automatically started when a medium level is detected by the level transmitter.  Wash water is delivered direct to the filters by gravity. A flow indicator and integrator for indicating the wash water flow rate is provided in the backwash water line. sustainable solutions. for a better life. Page 58
  • 59. P097-T0002-001 VA TECH WABAG DIRTY WASH WATER COLLECTION TANK  The dirty wash water from the backwashing of filters is received into the Dirty Wash water Collection Tank (with two compartments) by gravity. The wash water is recycled back to the Flash Mixer.  The overflow from the tank is conveyed to the site drainage.  The tank compartments are provided with inlet gates in the inlet chamber and also interconnected by a gate at the bottom floor level, to allow one to be taken out of service for maintenance, whilst other remaining operational.  Two nos. (1W +1S) submersible type Dirty Wash water Transfer Pumps, each of 350 m3/h capacity, are provided to pump wash water to the inlet works.  When the level in the tank compartment reaches medium level, the duty pump is started automatically with the help of level transmitter and the running pump is tripped at low level , sensed by the level switch provided in the compartments.  Filter backwash is inhibited when the level in the Dirty Wash water Collection Tank is High.  This tank also receives the filtrate of the Sludge Drying Beds. sustainable solutions. for a better life. Page 59
  • 60. P097-T0002-001 VA TECH WABAG SLUDGE SUMP  The settled sludge from the Clariflocculator is bled intermittently into the Sludge Sump.  The sludge from the Sludge Sump is pumped to eight nos. Sludge Drying Beds with the help of 2 nos. (1 W+1 S) Sludge pumps.  Each duty thickener feed pump is started automatically at medium level detected by level transmitter.  The running thickener feed pumps are tripped at low level sensed by level switch.  When the sludge level reaches high in the Sludge Sump, clariflocculator desludging schedule is inhibited.  When one bed is out of service for maintenance, isolate the bed with the gate provided. sustainable solutions. for a better life. Page 60
  • 61. P097-T0002-001 VA TECH WABAG ALUMINIUM SULPHATE DOSING SYSTEM  Aluminium Sulphate (Alum) is used for the coagulation of suspended solids in the raw water.  Two nos. (1 W+ 1 S) each of having size 3.6 m x 2.6 m LD, is provided on the basis of 23 hours dosing requirement.  To prepare required strength of Alum (10%) and for the complete dissolution of alum, dosing tank is equipped with alum mixing agitators.  The tanks are constructed in RCC with acid alkali proof tile lining on inside surface.  The tank is provided with a dissolving basket and the alum and service water is added into the dissolving tray.  3 nos. alum dosing pumps of 2600 LPH capacity (2W+1S) are provided to transfer to the dosing point at the upstream of the parshall flume. sustainable solutions. for a better life. Page 61
  • 62. P097-T0002-001 VA TECH WABAG ALUMINIUM SULPHATE DOSING SYSTEM (contd.)  The level indicator/ transmitter is provided in the respective tanks and is interlocked with 3 nos. alum dosing pumps.  The alum solution preparation and dosing is manually controlled from local control panel with the help of push button stations.  Each dosing tank is provided with a level switch for giving Low level alarms.  The running alum feed pump and respective agitator are tripped at low level with the help of level switch. sustainable solutions. for a better life. Page 62
  • 63. P097-T0002-001 VA TECH WABAG ALUMINIUM SULPHATE DOSING INTO RAW WATER CHANNEL sustainable solutions. for a better life. Page 63
  • 64. P097-T0002-001 VA TECH WABAG LIME DOSING SYSTEM  Lime is used to increase the alkalinity of the raw water.  Two nos. (1 W+ 1 S) each of having size 3.6 m x 2.6 m LD, is provided on the basis of 23 hours dosing requirement.  To prepare required strength of Lime (5%) and for the complete dissolution of lime, dosing tank is equipped with lime mixing agitators.  The tanks are constructed in RCC with epoxy coating on inside surface.  The tank is provided with a dissolving basket and the lime and service water is added into the dissolving tray.  3 nos. lime dosing pumps of 10 m3/h capacity (2W+1S) are provided to transfer to the dosing point at the upstream of the parshall flume. sustainable solutions. for a better life. Page 64
  • 65. P097-T0002-001 VA TECH WABAG LIME DOSING SYSTEM (contd.)  The level indicator/ transmitter is provided in the respective tanks and is interlocked with 3 nos. lime dosing pumps.  The lime solution preparation and dosing is manually controlled from local control panel with the help of push button stations.  Each dosing tank is provided with a level switch for giving Low level alarms.  The running lime feed pump and respective agitator are tripped at low level with the help of level switch. sustainable solutions. for a better life. Page 65
  • 66. P097-T0002-001 VA TECH WABAG CHLORINE PLANT  The Chlorine Plant and its equipments are located in a self contained separate building and consists of a) Drum Room b) Chlorinator and Ejector Room  Two no. chlorinator of capacity 56.25 kg/h is provided for pre-chlorination for dosing chlorine at 2mg/L and post chlorination for dosing chlorine at Chlorine 3 mg/L.  All the chlorinators are vacuum operated with remote operated ejector.  Clear water from clear water pump house is used as motive water to dose the chlorine using booster pumps (1W+1S) which has the capacity of 15 m3/h. sustainable solutions. for a better life. Page 66
  • 67. P097-T0002-001 VA TECH WABAG CHLORINE PLANT (contd.)  The chlorine gas is withdrawn from chlorine ton containers gets filtered through gas filter and reaches the chlorine ejector.  The motive water creates vacuum in the ejector and the chlorine gas gets mixed with the motive water to form a solution of chlorine. This chlorinated water is added after cascade aerator and at the clear water channel before the clear water sump.  An automatic changeover system is provided at the chlorine withdrawal system, such that when one ton container is empty, the other toner comes online automatically and hence the chlorine supply is continuous.  The two delivery pipe lines are interconnected and an arrangement of isolating valves is provided to permit the use of any two of the four chlorinators independently for pre-chlorination and/or post chlorination.  Chlorine leak detectors (3 nos.) are provided for monitoring the abnormal chlorine gas concentration and for indicating chlorine gas leakage. The chlorine room is built in such a way that it can store 93 nos. ton containers. sustainable solutions. for a better life. Page 67
  • 68. P097-T0002-001 VA TECH WABAG CHLORINE PLANT (contd.)  The chlorine-dosing rate for pre-chlorination is regulated by manually adjusting the chlorine gas control valve of the chlorinator.  For post-chlorination, select one motive water pump. Keep the inlet valve of the standby chlorinator and ejector closed.  The chlorine dose for post-chlorination is regulated w. r. t residual chlorine to be maintained in the treated water. sustainable solutions. for a better life. Page 68
  • 69. P097-T0002-001 VA TECH WABAG CHLORINE PLANT (contd.) sustainable solutions. for a better life. Page 69
  • 70. P097-T0002-001 VA TECH WABAG CHLORINE PLANT (contd.) sustainable solutions. for a better life. Page 70
  • 71. P097-T0002-001 VA TECH WABAG SECTION – 1 C Emergency Procedures sustainable solutions. for a better life. Page 71
  • 72. P097-T0002-001 VA TECH WABAG EMERGENCY PROCEDURES IN CASE OF POWER FAILURE  If raw water is still received in the plant, allow the water to pass through the entire plant. - Continue dosing the alum and lime solution from the available stock. - De-sludge the Clarifiers manually, as per the routine, using manual override facility of sludge bleed valves. - Let the filters be in service mode. sustainable solutions. for a better life. Page 72
  • 73. P097-T0002-001 VA TECH WABAG EMERGENCY PROCEDURES (Contd.)  If raw water has stopped - Stop the alum and lime dosing. - De-sludge the Clarifiers manually, as per the routine, using manual override facility of sludge bleed valves, to complete one cycle desludging operation. - Isolate the filters by closing the filtered water outlet valves, manually, to avoid the filters from running dry. Under power failure conditions, all the drives shall be isolated locally and restarted on resumption of power, ensuring no overload conditions. sustainable solutions. for a better life. Page 73
  • 74. P097-T0002-001 VA TECH WABAG EMERGENCY PROCEDURES (Contd.)  Backwashing during failure of auto operation of valve - When the motorized operation is non-functional and manual operation needs to be carried out for the backwashing of Filters, ensure the following: - Isolate the air supply and vent out the air from the actuator. -Position two operators, one at the control desk of the Filter (Operator 1) which is to be taken up for backwashing and the other (Operator 2), for backwash flow control. - Let the operator at the control desk initiate the backwash operation of the selected Filter, sequentially. - When the Conjunctive air plus water wash is to be commenced, Operator 1 will convey the message to the Operator 2. sustainable solutions. for a better life. Page 74
  • 75. P097-T0002-001 VA TECH WABAG EMERGENCY PROCEDURES (Contd.)  Backwashing during failure of auto operation (Contd.) - Operator 2 will close the backwash valve provided with the help of hand wheel. Operate the hand wheel manually. - The hand wheel needs to be operated to maintain the flow as necessary. -The manual operation of the valves at the pipe gallery for carrying out the backwashing operation shall be attended to, by the Operator 1. -When the duration of final wash step is over, close the B/W valve. - A close coordination is required between the two operators, to complete the backwashing operation, manually. sustainable solutions. for a better life. Page 75