SlideShare una empresa de Scribd logo
1 de 35
Lean Management, Lean Leadership, and
Leader Standard Work
A Webinar Hosted by AME
8 April 2016
© David Mann 2016
www.dmannlean.com
Webinar Topics
„ Introduction
„ Nature of lean and difficulty sustaining its gains
„ Overview: Lean Management System (LMS)
„ Interdependence of lean’s tools and LMS
„ Process focus: Leader standard work
„ Value proposition in LMS
„ Meaningfully engaging executives in lean
„ Summary, Q&A
© David Mann 2016
www.dmannlean.com
What’s the nature of lean?
According to Shigeo Shingo*:
„ Lean is fundamentally about finding waste
„ Lean thinkers search out problems where none are
thought to exist
* The sayings of Shigeo Shingo: Key strategies for plant improvement. Translated by Andrew P.
Dillon. Productivity Press, 1987. Original publication 1985, The Nikkan Kogyo Shimbun, Ltd
3
© David Mann 2016
www.dmannlean.com
This seems simple enough...
„ But highlighting problems can be difficult - and
risky – in a conventional organization
„ Highlighting problems goes against
•  Habits
•  What conventional bosses expect
•  Personal reinforcement contingencies – that is,
rewards and punishments
4
© David Mann 2016
www.dmannlean.com
Because of habit and convention...
Lean is harder than it seems!
„ Many organizations begin the lean journey
„ Few (~ 5%) see it through to sustained gains
„ Kaizen and 6 sigma successes equally fail to last
„ Why? Failure to recognize implications for
managers’ practices and behaviors
„ Lean management addresses behaviors, tools,
practices to sustain, extend lean production’s gains
5
© David Mann 2016
www.dmannlean.com
A lean ecosystem
„ For sustained lean success, experience suggests the
need for a lean ecosystem
„ The ecosystem has two main sub-systems:
1.  Lean production system: tools to improve process
stability and performance
2.  Lean management system: leaders’ behaviors,
practices and tools to focus on the process, sustain
initial lean gains, drive further improvement
6
© David Mann 2016
www.dmannlean.com
1.  Lean tools: Improve stability
2.  Lean Mgt: Sustain gains, capture problems, assign actions
3.  Lean tools: Improve stability
4.  Lean Mgt: Sustai gains, capture problems, assign actions
5.  Lean tools: Improve stability
6.  Lean Mgt: Sustain ...
7.  Lean tools: Improve ...
8.  Continue until perfection!
.
Process
Focus	
  
Lean tools
Findproblems!
Process
Focus	
  
Lean tools
Findproblems!
Process
Focus	
  
Lean tools
Start
here
Findproblems!
A lean production + lean management ecosystem:
Healthy, sustainable, beneficial
7
© David Mann 2016
www.dmannlean.com
Lean production and LMS: Interdependent
„ Well established:
•  Gains from lean production are rarely sustained
„ Less well known but equally true:
•  Lean management – without the gains from lean
production – is seen as meaningless
•  LSW particularly seen as bureaucratic “check the box”
exercise, does not produce improvement
8
© David Mann 2016
www.dmannlean.com
Lean management’s value proposition
„ For leaders, for front line workers:
1.  Did lean tools eliminate a chronic problem,
frustration?
2.  Would you like to see this benefit sustained?
3.  In the past, would you expect the benefit to last?
4.  If it lasted, would it make for a better day at work?
5.  What’s in it for you: LMS sustains the benefit
6.  LMS captures next opportunities for improvement
9
© David Mann 2016
www.dmannlean.com
Lean management’s focus on process 

sustains gains and drives improvement

3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
(Frequent focus on
process health)
1. Visual Controls
Process
Focus!	
  
10
© David Mann 2016
www.dmannlean.com
Lean management’s focus on process 

sustains gains and drives improvement

3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
(Frequent focus on
process health)
1. Visual Controls
Process
Focus!	
  
11
© David Mann 2016
www.dmannlean.com
Visual controls: Key elements
What did we
expect?
What did we
actually get?
If we didn’t get it,
What happened?
What are we
looking for?
12
© David Mann 2016
www.dmannlean.com
Visual controls inhigh speed automated processes:

OEE six big losses - Minutes lost & why
Hour mtl operat’r min stop maj stop defect speed describe
13
6
7
8
9
10
11
12
1
2
3
etc
17 Forklift down
9 Wrong plate staged
Impression cylinder misagaligned27
© David Mann 2016
www.dmannlean.com
Expected vs actual and description of misses in a
takt paced assembly process
Supervisor
initialed every
hour
14
© David Mann 2016
www.dmannlean.com
Capturing interruptions, delays in variable duration
cardiac procedures
15
© David Mann 2016
www.dmannlean.com
Lean	
  management	
  -­‐	
  A	
  closer	
  look	
  
3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
1. Visual controls
Process
Focus!	
  
(Frequent focus on
process health)
© David Mann Lean Consulting 2010 Reproduced with permission
16
© David Mann 2016
www.dmannlean.com
Daily accountability process
17
Ø  Brief, timed, stand up, on or near the floor
Ø  Standard agenda:
•  Yesterday’s visuals for needed follow-up
•  Tasks assigned for follow-up – cause or action
•  Written as verb, noun – action is the idea!
•  Review tasks due today
•  Completed? Green
•  Not completed? Red, reason why
•  Help needed? Expected completion?
© David Mann 2016
www.dmannlean.com
Daily accountability: Did you complete
assigned tasks on time?
Names 4/4 4/5 4/6 4/7 4/8 4/9
John
Jane
George
Phan
Marie
bring
donuts
verb
noun
verb
noun
verb
noun
verb
noun
Today
18
verb
noun
verb
noun
verb
noun
verb
noun
© David Mann 2016
www.dmannlean.com
Lean	
  management	
  -­‐	
  A	
  closer	
  look	
  
3. Leader Standard Work
2. Standard
(Visual)
Accountability
(Sustained behavior)
(Improvement)
1. Visual controls
Process
Focus!	
  
(Frequent focus on
process health)
© David Mann Lean Consulting 2010 Reproduced with permission
19
© David Mann 2016
www.dmannlean.com
20
Leader standard closes the loop on process
focus, and keeps it closed
Improvement
Lean
gains
Leader
standard
work
Courtesy Scott Simmons
© David Mann 2016
www.dmannlean.com
Intent of leader standard work
„ Guarantee the integrity of the standardized lean
production system by consistent focus on the
production processes as they cycle
•  Being in the production area “grasping reality”
•  Observing adherence to standardized work (10 cycles or
10 minutes) each person for team leaders, 1 person per
team leader for supervisors, and so on
•  Talking with operators about recent changes in standard
work, and their thinking on further improvement
•  Reinforcing your personal relationships with them
© David Mann 2016
www.dmannlean.com
Date:
Zone Leader Std. Work Zone Leader Std. Work
Time TASKS
5:15 Check for call-in
Review vacation log
5:30 Hold Daily Start-up Mtg.
Review manpower needs
Review shortages
Review Cross-training and zone training plans
Review schedule - mix and daily APS requirements
Assign EE to work areas
Check for employee issues
5:45 Attend Dept. Zone Leader Mtg.
Review manpower needs
Review shortages
6:00 Adjust Labor Planning Board
Review 3rd shift production log/notes with counterpart
Review Cross-training and zone training plans
Review schedule/mix for late changes
Adjust EE assignments as needed
6:30 Check Kanban Inventories
Review Minimum Levels
Review Maximum Levels
Review 5's organization
8:00 Gemba Walk with Supv. & ZL's
Note assignments
9:45 Attend Lean Board Meeting - Daily
10:30 Attend Division Zone Leader mtg - Daily
1:30 Next Day Planning
Review vacation log
Review Cross-training and zone training plans
Review schedule - mix and daily APS requirements
Assign EE to work areas
1:45 Set-up night shift priorities
Id work centers to be manned
Id part numbers & quantities to be ran
2:00 Establish personal plan for next days activities
Lean Tasks
Employee Training
Process Improvement
Time TASKS
Monitor 40 min. clock (before and after all breaks)
1st break 2nd break Lunch
7:45 9:45 12:00
Zone Walk through (5X per day)
1st 2nd 3rd 4th 5th
Verify hourly production tracking, post results,
note and act on any flow interupters.
6:30 11:30
7:30 12:30
8:30 1:30
9:30 2:30
10:30 3:30
All Monitor Std. Work
the Check for compliance
Time Reinforce & correct operator behavior
Update Std. Work as needed
When Provide Operator Training (as needed)
Needed Train & Certify new employees
Review Cross-training and zone training plans
Keep skill versatility matrix current
Front Back
© David Mann 2016
www.dmannlean.com
Leader Standard Work-VS Manager
Task pad coded
daily or as recurring
Standard weekly or
specific-today tasks
Emergent
items
Notes,
working diary
Note: Outlook and Groupwise both have trifold formats
© David Mann 2016
www.dmannlean.com
Person dependent or process dependent?
„ Lean systems seek to be process dependent
„ In human systems, at some level a person must
monitor and reinforce consistent adherence
„ Leader standard work defines this monitoring and
reinforcement
„ Overlapping content between levels of LSW help
guarantee the system’s integrity, but...
„ Ultimate integrity depends on support by execs
„ So, what about executive standard work???
24
© David Mann 2016
www.dmannlean.com
Problem statement: 

Operations VP, precision machining, 2014
“I have hosted hundreds of tours at [our
company] since we began to apply the lean
management system starting in 2008.
The majority of Lean Champions that came
through confided in me that "getting their executives
on board was very difficult", and that they were
concerned that all the hard work of their teams would
go to waste if they could not garner support from
leadership/ownership of their organizations.”
Emphasis added
25
© David Mann 2016
www.dmannlean.com
Gemba walking execs: 

A cautionary tale and a lesson learned
◆ Execs wanted to support lean
◆ But they didn’t know how
◆ We weren’t helping them
◆ They were cancelling the walks
◆ “David, you have a problem!”
Why are gembas being
cancelled just as we’re
having such success?
26
© David Mann 2016
www.dmannlean.com
Reflec3on:	
  Execs	
  are	
  our	
  customers!	
  
What	
  do	
  we	
  know	
  about	
  them?	
  
„ Bright
„ Quick studies
„ Competitive
„ Achievement oriented
„ Strive to ace every test
„ Action oriented
„ Thirsty for hands-on
„ Expect staff prep work,
avoid embarrassment
„ Want to drive
improvement
27
© David Mann 2016
www.dmannlean.com
Design spec: Improved exec gemba walk process
What we were providing
1.  Execs in passive role
a.  Yammering sensi-yawn!
2.  Unprepared to participate
3.  Low confidence in lean
knowledge
4.  Uncomfortable discussing lean
5.  Felt incompetent in gemba
6.  Not a meaningful exercise:
boring, embarassing, wasted of
time
A better customer value
1.  Exec-driven experience
a.  Get the answer, ace the test
2.  Good staff prep, execs ready to
participate and lead
3.  Confident observer in gemba
4.  Comfortable coaching lean
management in gemba
5.  Competent in lean management
system
6.  Valued, fun(!) investment of time
28
© David Mann 2016
www.dmannlean.com
Gemba worksheets and a new exec gemba design
1.  Process-dependent: Predictable, repeatable
2.  Structure put exec “student” in control
3.  Sufficient preparation (staff work)
4.  Agenda for clear content focus
5.  Test underscored learning, made experience
personally meaningful: Ace the test!
29
Worksheets provided value from customer perspective:
© David Mann 2016
www.dmannlean.com
Lean management system
Standardized
Lean Processes
Supervisor/Manager
Director/Value stream leader
Executives
Proposition: If the lean management system is healthy, 

then the lean production system is healthy
Team Leader
30
© David Mann 2016
www.dmannlean.com
Full set of 8 gemba
worksheets available
as free download
at dmannlean.com
© David Mann 2016
www.dmannlean.com
Put execs in active role…
„  Brief prep / gemba worksheet
„  Questions to ask
„  Things to look for
„  Let them drive the bus!
„  After, compare ratings:
•  Exec ”4.5”; Sensei “2.5”
•  Teachable moment!!
“This	
  3me,	
  it’s	
  gemba	
  
for	
  visual	
  controls.	
  You	
  	
  
might	
  want	
  to	
  look	
  for…	
  
and	
  ask	
  about…”	
  
You,	
  on	
  the	
  way	
  to	
  
gemba:	
  	
  
Hi,	
  how’s	
  it	
  going	
  
today?	
  What’s	
  the	
  
process	
  here?	
  
32
© David Mann 2016
www.dmannlean.com
Summary
„ Lean production and lean management are interdependent
•  Together, they create and sustain a better day at work,
sustained and ongoing improvement
„ Lean’s value proposition depends on timing: Lean gains
first, then lean management to sustain them
•  Leader standard work keeps the loop closed
„ Lean’s value proposition for executives is fundamentally
different, supporting their unique managerial responsibilities
•  Lean management empowers execs to judge first-hand
the integrity of the chain of command and the fidelity of
execution of their lean strategy
33
© David Mann 2016
www.dmannlean.com
For details on these topics, see:
34
Or email me at
dmann@dmannlean.com
For more about lean management and leadership, be sure to check out the 
2017 AME International Conference in Boston this fall! For more information, 
visit the #AMEBoston website, www.ame.org/boston.

Más contenido relacionado

La actualidad más candente

Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean ProjectsAnand Subramaniam
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleTKMG, Inc.
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Romains Bos, PMP, MBA
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Hedakrishnaheda
 
Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015CSoltero
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016W3 Group Canada Inc.
 
Plan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DivePlan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DiveTKMG, Inc.
 
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results TKMG, Inc.
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsTKMG, Inc.
 

La actualidad más candente (20)

Kaizen Events Blitz & Lean Projects
Kaizen Events   Blitz  & Lean ProjectsKaizen Events   Blitz  & Lean Projects
Kaizen Events Blitz & Lean Projects
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
We've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not peopleWe've Had it All Wrong: Manage Processes, Not people
We've Had it All Wrong: Manage Processes, Not people
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
Hourly Lean Introduction
Hourly Lean IntroductionHourly Lean Introduction
Hourly Lean Introduction
 
Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)Lean Daily Visual ManagementSystem(LDVMS)
Lean Daily Visual ManagementSystem(LDVMS)
 
Lean Office
Lean OfficeLean Office
Lean Office
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
Kaizen Poster
Kaizen PosterKaizen Poster
Kaizen Poster
 
Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015Lean Leadership _ ARMA 2015
Lean Leadership _ ARMA 2015
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016Elimination of 7 Types of  Waste (Muda) - Learning to See - December 2016
Elimination of 7 Types of Waste (Muda) - Learning to See - December 2016
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Plan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep DivePlan-Do-Study-Adjust: A Deep Dive
Plan-Do-Study-Adjust: A Deep Dive
 
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
Hoshin Kanri: Creating a Strategy Deployment Plan That Gets Results
 
Lean Daily Management System
Lean Daily Management SystemLean Daily Management System
Lean Daily Management System
 
Dmaic
DmaicDmaic
Dmaic
 
Lean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work EnviromentsLean Transformation in Office, Service, and Knowledge Work Enviroments
Lean Transformation in Office, Service, and Knowledge Work Enviroments
 

Destacado

Manufacturing excellence for future production perspective
Manufacturing excellence for future production perspectiveManufacturing excellence for future production perspective
Manufacturing excellence for future production perspectiveUniversiti Teknologi Malaysia
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comNareshChawla
 
Fisica 3 periodo fenomenos ondulatorios 2017
Fisica 3 periodo fenomenos ondulatorios 2017Fisica 3 periodo fenomenos ondulatorios 2017
Fisica 3 periodo fenomenos ondulatorios 2017Mario Bahamon
 
Νοτιοαντολική Ασία
Νοτιοαντολική ΑσίαΝοτιοαντολική Ασία
Νοτιοαντολική ΑσίαKaragkouni Maria
 
Apresentação spring and values
Apresentação spring and valuesApresentação spring and values
Apresentação spring and valuesAna Carreira
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
Juntando as idéias I
Juntando as idéias IJuntando as idéias I
Juntando as idéias ITestRock!
 
A vida sem empatia atividades
A vida sem empatia   atividadesA vida sem empatia   atividades
A vida sem empatia atividadesDoug Caesar
 
2017 Microsoft Hosting and Cloud study. By 451 Research.
2017 Microsoft Hosting and Cloud study. By 451 Research.2017 Microsoft Hosting and Cloud study. By 451 Research.
2017 Microsoft Hosting and Cloud study. By 451 Research.Hameed Mohammed
 
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesThe Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesAssociation for Manufacturing Excellence
 
Rowing boat presentation slides
Rowing boat presentation slidesRowing boat presentation slides
Rowing boat presentation slidesHerbert Liew
 
Standardizing and Managing Your Infrastructure - MOSC 2011
Standardizing and Managing Your Infrastructure - MOSC 2011Standardizing and Managing Your Infrastructure - MOSC 2011
Standardizing and Managing Your Infrastructure - MOSC 2011Brian Ritchie
 
Herding Cats: User Research Techniques for Standardizing an Organic Intranet
Herding Cats: User Research Techniques for Standardizing an Organic IntranetHerding Cats: User Research Techniques for Standardizing an Organic Intranet
Herding Cats: User Research Techniques for Standardizing an Organic IntranetGianna Pfister-LaPin
 
Efficient Rowing Boat Movement with Jimmy Joy
Efficient Rowing Boat Movement with Jimmy JoyEfficient Rowing Boat Movement with Jimmy Joy
Efficient Rowing Boat Movement with Jimmy Joyrowperfect
 

Destacado (20)

Slide share presentation - building a people-centric culture
Slide share presentation - building a people-centric cultureSlide share presentation - building a people-centric culture
Slide share presentation - building a people-centric culture
 
Manufacturing excellence for future production perspective
Manufacturing excellence for future production perspectiveManufacturing excellence for future production perspective
Manufacturing excellence for future production perspective
 
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.comLean Manufacturing : Concept & Overview nkchawla@gmail.com
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
Fisica 3 periodo fenomenos ondulatorios 2017
Fisica 3 periodo fenomenos ondulatorios 2017Fisica 3 periodo fenomenos ondulatorios 2017
Fisica 3 periodo fenomenos ondulatorios 2017
 
Algas
AlgasAlgas
Algas
 
Νοτιοαντολική Ασία
Νοτιοαντολική ΑσίαΝοτιοαντολική Ασία
Νοτιοαντολική Ασία
 
Apresentação spring and values
Apresentação spring and valuesApresentação spring and values
Apresentação spring and values
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Juntando as idéias I
Juntando as idéias IJuntando as idéias I
Juntando as idéias I
 
A vida sem empatia atividades
A vida sem empatia   atividadesA vida sem empatia   atividades
A vida sem empatia atividades
 
Value stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environmentsValue stream mapping for non manufacturing environments
Value stream mapping for non manufacturing environments
 
2017 Microsoft Hosting and Cloud study. By 451 Research.
2017 Microsoft Hosting and Cloud study. By 451 Research.2017 Microsoft Hosting and Cloud study. By 451 Research.
2017 Microsoft Hosting and Cloud study. By 451 Research.
 
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and ServicesThe Complete Lean Enterprise: Value Stream Mapping for Office and Services
The Complete Lean Enterprise: Value Stream Mapping for Office and Services
 
Rowing boat presentation slides
Rowing boat presentation slidesRowing boat presentation slides
Rowing boat presentation slides
 
Standardizing and Managing Your Infrastructure - MOSC 2011
Standardizing and Managing Your Infrastructure - MOSC 2011Standardizing and Managing Your Infrastructure - MOSC 2011
Standardizing and Managing Your Infrastructure - MOSC 2011
 
Regional project report
Regional project reportRegional project report
Regional project report
 
Herding Cats: User Research Techniques for Standardizing an Organic Intranet
Herding Cats: User Research Techniques for Standardizing an Organic IntranetHerding Cats: User Research Techniques for Standardizing an Organic Intranet
Herding Cats: User Research Techniques for Standardizing an Organic Intranet
 
Efficient Rowing Boat Movement with Jimmy Joy
Efficient Rowing Boat Movement with Jimmy JoyEfficient Rowing Boat Movement with Jimmy Joy
Efficient Rowing Boat Movement with Jimmy Joy
 
5s a lean Tool,
5s a lean Tool,5s a lean Tool,
5s a lean Tool,
 

Similar a Lean management, lean leadership and leader standard work (AME Webinar)

Honda's Supplier Conf Front Line Supervisor Standardized Work
Honda's Supplier Conf Front Line Supervisor Standardized WorkHonda's Supplier Conf Front Line Supervisor Standardized Work
Honda's Supplier Conf Front Line Supervisor Standardized WorkGE Aviation
 
ELEC2017 2.1 p. anhede - learning lean according to the view of the product...
ELEC2017   2.1 p. anhede - learning lean according to the view of the product...ELEC2017   2.1 p. anhede - learning lean according to the view of the product...
ELEC2017 2.1 p. anhede - learning lean according to the view of the product...HAN Lean-QRM Centrum / HAN Lectoraat Lean
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentTKMG, Inc.
 
Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)
Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)
Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)AgileNZ Conference
 
What it takes to Change
What it takes to ChangeWhat it takes to Change
What it takes to Changepahatem
 
WCM_World_Class_Manufacturing_Outline_v1
WCM_World_Class_Manufacturing_Outline_v1WCM_World_Class_Manufacturing_Outline_v1
WCM_World_Class_Manufacturing_Outline_v1Radmila Petrovic
 
Citizen Schools' Performance Management Process
Citizen Schools' Performance Management ProcessCitizen Schools' Performance Management Process
Citizen Schools' Performance Management ProcessAdam Maurer
 
Lean Six Sigma Black Belt Training Part 3
Lean Six Sigma Black Belt Training Part 3Lean Six Sigma Black Belt Training Part 3
Lean Six Sigma Black Belt Training Part 3Lean Insight
 
Building a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessBuilding a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessTKMG, Inc.
 
Avoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily ExecutionAvoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily ExecutionSafetyChain Software
 
Implementation of quality improvement program in hospitals
Implementation of quality improvement program in hospitalsImplementation of quality improvement program in hospitals
Implementation of quality improvement program in hospitalsLallu Joseph
 
AoIT 15 November Nationwide v.1
AoIT 15 November Nationwide v.1AoIT 15 November Nationwide v.1
AoIT 15 November Nationwide v.1agileoutsideIT
 
2016 Ohio State COE LSW Presentation
2016 Ohio State COE LSW Presentation2016 Ohio State COE LSW Presentation
2016 Ohio State COE LSW PresentationNikola Cica
 
Powerpoint created for Holland Management Consultant
Powerpoint created for Holland Management ConsultantPowerpoint created for Holland Management Consultant
Powerpoint created for Holland Management ConsultantBarbara Smith
 
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...LeanKanbanIndia
 

Similar a Lean management, lean leadership and leader standard work (AME Webinar) (20)

Honda's Supplier Conf Front Line Supervisor Standardized Work
Honda's Supplier Conf Front Line Supervisor Standardized WorkHonda's Supplier Conf Front Line Supervisor Standardized Work
Honda's Supplier Conf Front Line Supervisor Standardized Work
 
ELEC2017 2.1 p. anhede - learning lean according to the view of the product...
ELEC2017   2.1 p. anhede - learning lean according to the view of the product...ELEC2017   2.1 p. anhede - learning lean according to the view of the product...
ELEC2017 2.1 p. anhede - learning lean according to the view of the product...
 
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and AlignmentStrategy Deployment: Accelerating Improvement Through Focus and Alignment
Strategy Deployment: Accelerating Improvement Through Focus and Alignment
 
Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)
Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)
Lynn Davies (CDHB) & Joe Kearns (Assurity Consulting)
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
TPM CYCLE C
TPM CYCLE CTPM CYCLE C
TPM CYCLE C
 
What it takes to Change
What it takes to ChangeWhat it takes to Change
What it takes to Change
 
WCM_World_Class_Manufacturing_Outline_v1
WCM_World_Class_Manufacturing_Outline_v1WCM_World_Class_Manufacturing_Outline_v1
WCM_World_Class_Manufacturing_Outline_v1
 
Citizen Schools' Performance Management Process
Citizen Schools' Performance Management ProcessCitizen Schools' Performance Management Process
Citizen Schools' Performance Management Process
 
Lean Six Sigma Black Belt Training Part 3
Lean Six Sigma Black Belt Training Part 3Lean Six Sigma Black Belt Training Part 3
Lean Six Sigma Black Belt Training Part 3
 
Lean Management System
Lean Management SystemLean Management System
Lean Management System
 
PDCA Problem Solving Process & Tools
PDCA Problem Solving Process & ToolsPDCA Problem Solving Process & Tools
PDCA Problem Solving Process & Tools
 
Building a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to SuccessBuilding a Lean Enterprise: Navigating the Common Obstacles to Success
Building a Lean Enterprise: Navigating the Common Obstacles to Success
 
Avoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily ExecutionAvoiding Risk: Using a Tiered Management System to Improve Daily Execution
Avoiding Risk: Using a Tiered Management System to Improve Daily Execution
 
Implementation of quality improvement program in hospitals
Implementation of quality improvement program in hospitalsImplementation of quality improvement program in hospitals
Implementation of quality improvement program in hospitals
 
AoIT 15 November Nationwide v.1
AoIT 15 November Nationwide v.1AoIT 15 November Nationwide v.1
AoIT 15 November Nationwide v.1
 
2016 Ohio State COE LSW Presentation
2016 Ohio State COE LSW Presentation2016 Ohio State COE LSW Presentation
2016 Ohio State COE LSW Presentation
 
Lean Transformation
Lean TransformationLean Transformation
Lean Transformation
 
Powerpoint created for Holland Management Consultant
Powerpoint created for Holland Management ConsultantPowerpoint created for Holland Management Consultant
Powerpoint created for Holland Management Consultant
 
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
Lean Kanban India 2016 | Kanban – Common sense in a new light | Ashok Kumar M...
 

Más de Association for Manufacturing Excellence

How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInHow and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInAssociation for Manufacturing Excellence
 

Más de Association for Manufacturing Excellence (20)

AME Chicago 2019 Conference Preview
AME Chicago 2019 Conference PreviewAME Chicago 2019 Conference Preview
AME Chicago 2019 Conference Preview
 
Value Stream Mapping: Things We've Learned Since Learning to See
Value Stream Mapping: Things We've Learned Since Learning to SeeValue Stream Mapping: Things We've Learned Since Learning to See
Value Stream Mapping: Things We've Learned Since Learning to See
 
AME Lean Consortia
AME Lean ConsortiaAME Lean Consortia
AME Lean Consortia
 
AME San Diego 2018 Conference Preview
AME San Diego 2018 Conference PreviewAME San Diego 2018 Conference Preview
AME San Diego 2018 Conference Preview
 
Applying for the AME Excellence Award
Applying for the AME Excellence Award Applying for the AME Excellence Award
Applying for the AME Excellence Award
 
AME Boston International Conference Preview
AME Boston International Conference Preview AME Boston International Conference Preview
AME Boston International Conference Preview
 
Love and Lean
Love and Lean Love and Lean
Love and Lean
 
Interviewing for Success
Interviewing for SuccessInterviewing for Success
Interviewing for Success
 
Sorry: LinkedIn "Event" app no longer exists
 Sorry: LinkedIn "Event" app no longer exists Sorry: LinkedIn "Event" app no longer exists
Sorry: LinkedIn "Event" app no longer exists
 
Fundamentals of LinkedIn Groups
Fundamentals of LinkedIn GroupsFundamentals of LinkedIn Groups
Fundamentals of LinkedIn Groups
 
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedInHow and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
How and why to make your LinkedIn profile shine: AME Leaders Guide to LinkedIn
 
AME Leaders guide to LinkedIn: Networking & Connections
AME Leaders guide to LinkedIn: Networking & ConnectionsAME Leaders guide to LinkedIn: Networking & Connections
AME Leaders guide to LinkedIn: Networking & Connections
 
Retire the PDCA wedge
Retire the PDCA wedgeRetire the PDCA wedge
Retire the PDCA wedge
 
Advanced Social Networking
Advanced Social NetworkingAdvanced Social Networking
Advanced Social Networking
 
Getting started with social media
Getting started with social mediaGetting started with social media
Getting started with social media
 
Difficulties With Changing To A Lean Culture Part 03 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 03 By Mike ThelenDifficulties With Changing To A Lean Culture Part 03 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 03 By Mike Thelen
 
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 12 By Mike ThelenDifficulties With Changing To A Lean Culture Part 12 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 12 By Mike Thelen
 
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 06 By Mike ThelenDifficulties With Changing To A Lean Culture Part 06 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 06 By Mike Thelen
 
Difficulties With Changing To A Lean Culture Part 02 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 02 By Mike ThelenDifficulties With Changing To A Lean Culture Part 02 By Mike Thelen
Difficulties With Changing To A Lean Culture Part 02 By Mike Thelen
 
Lean Product Development by Ron Mascitelli
Lean Product Development by Ron Mascitelli Lean Product Development by Ron Mascitelli
Lean Product Development by Ron Mascitelli
 

Último

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfrs7054576148
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfEr. Suman Jyoti
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 

Último (20)

Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 

Lean management, lean leadership and leader standard work (AME Webinar)

  • 1. Lean Management, Lean Leadership, and Leader Standard Work A Webinar Hosted by AME 8 April 2016
  • 2. © David Mann 2016 www.dmannlean.com Webinar Topics „ Introduction „ Nature of lean and difficulty sustaining its gains „ Overview: Lean Management System (LMS) „ Interdependence of lean’s tools and LMS „ Process focus: Leader standard work „ Value proposition in LMS „ Meaningfully engaging executives in lean „ Summary, Q&A
  • 3. © David Mann 2016 www.dmannlean.com What’s the nature of lean? According to Shigeo Shingo*: „ Lean is fundamentally about finding waste „ Lean thinkers search out problems where none are thought to exist * The sayings of Shigeo Shingo: Key strategies for plant improvement. Translated by Andrew P. Dillon. Productivity Press, 1987. Original publication 1985, The Nikkan Kogyo Shimbun, Ltd 3
  • 4. © David Mann 2016 www.dmannlean.com This seems simple enough... „ But highlighting problems can be difficult - and risky – in a conventional organization „ Highlighting problems goes against •  Habits •  What conventional bosses expect •  Personal reinforcement contingencies – that is, rewards and punishments 4
  • 5. © David Mann 2016 www.dmannlean.com Because of habit and convention... Lean is harder than it seems! „ Many organizations begin the lean journey „ Few (~ 5%) see it through to sustained gains „ Kaizen and 6 sigma successes equally fail to last „ Why? Failure to recognize implications for managers’ practices and behaviors „ Lean management addresses behaviors, tools, practices to sustain, extend lean production’s gains 5
  • 6. © David Mann 2016 www.dmannlean.com A lean ecosystem „ For sustained lean success, experience suggests the need for a lean ecosystem „ The ecosystem has two main sub-systems: 1.  Lean production system: tools to improve process stability and performance 2.  Lean management system: leaders’ behaviors, practices and tools to focus on the process, sustain initial lean gains, drive further improvement 6
  • 7. © David Mann 2016 www.dmannlean.com 1.  Lean tools: Improve stability 2.  Lean Mgt: Sustain gains, capture problems, assign actions 3.  Lean tools: Improve stability 4.  Lean Mgt: Sustai gains, capture problems, assign actions 5.  Lean tools: Improve stability 6.  Lean Mgt: Sustain ... 7.  Lean tools: Improve ... 8.  Continue until perfection! . Process Focus   Lean tools Findproblems! Process Focus   Lean tools Findproblems! Process Focus   Lean tools Start here Findproblems! A lean production + lean management ecosystem: Healthy, sustainable, beneficial 7
  • 8. © David Mann 2016 www.dmannlean.com Lean production and LMS: Interdependent „ Well established: •  Gains from lean production are rarely sustained „ Less well known but equally true: •  Lean management – without the gains from lean production – is seen as meaningless •  LSW particularly seen as bureaucratic “check the box” exercise, does not produce improvement 8
  • 9. © David Mann 2016 www.dmannlean.com Lean management’s value proposition „ For leaders, for front line workers: 1.  Did lean tools eliminate a chronic problem, frustration? 2.  Would you like to see this benefit sustained? 3.  In the past, would you expect the benefit to last? 4.  If it lasted, would it make for a better day at work? 5.  What’s in it for you: LMS sustains the benefit 6.  LMS captures next opportunities for improvement 9
  • 10. © David Mann 2016 www.dmannlean.com Lean management’s focus on process 
 sustains gains and drives improvement
 3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) (Frequent focus on process health) 1. Visual Controls Process Focus!   10
  • 11. © David Mann 2016 www.dmannlean.com Lean management’s focus on process 
 sustains gains and drives improvement
 3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) (Frequent focus on process health) 1. Visual Controls Process Focus!   11
  • 12. © David Mann 2016 www.dmannlean.com Visual controls: Key elements What did we expect? What did we actually get? If we didn’t get it, What happened? What are we looking for? 12
  • 13. © David Mann 2016 www.dmannlean.com Visual controls inhigh speed automated processes:
 OEE six big losses - Minutes lost & why Hour mtl operat’r min stop maj stop defect speed describe 13 6 7 8 9 10 11 12 1 2 3 etc 17 Forklift down 9 Wrong plate staged Impression cylinder misagaligned27
  • 14. © David Mann 2016 www.dmannlean.com Expected vs actual and description of misses in a takt paced assembly process Supervisor initialed every hour 14
  • 15. © David Mann 2016 www.dmannlean.com Capturing interruptions, delays in variable duration cardiac procedures 15
  • 16. © David Mann 2016 www.dmannlean.com Lean  management  -­‐  A  closer  look   3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) 1. Visual controls Process Focus!   (Frequent focus on process health) © David Mann Lean Consulting 2010 Reproduced with permission 16
  • 17. © David Mann 2016 www.dmannlean.com Daily accountability process 17 Ø  Brief, timed, stand up, on or near the floor Ø  Standard agenda: •  Yesterday’s visuals for needed follow-up •  Tasks assigned for follow-up – cause or action •  Written as verb, noun – action is the idea! •  Review tasks due today •  Completed? Green •  Not completed? Red, reason why •  Help needed? Expected completion?
  • 18. © David Mann 2016 www.dmannlean.com Daily accountability: Did you complete assigned tasks on time? Names 4/4 4/5 4/6 4/7 4/8 4/9 John Jane George Phan Marie bring donuts verb noun verb noun verb noun verb noun Today 18 verb noun verb noun verb noun verb noun
  • 19. © David Mann 2016 www.dmannlean.com Lean  management  -­‐  A  closer  look   3. Leader Standard Work 2. Standard (Visual) Accountability (Sustained behavior) (Improvement) 1. Visual controls Process Focus!   (Frequent focus on process health) © David Mann Lean Consulting 2010 Reproduced with permission 19
  • 20. © David Mann 2016 www.dmannlean.com 20 Leader standard closes the loop on process focus, and keeps it closed Improvement Lean gains Leader standard work Courtesy Scott Simmons
  • 21. © David Mann 2016 www.dmannlean.com Intent of leader standard work „ Guarantee the integrity of the standardized lean production system by consistent focus on the production processes as they cycle •  Being in the production area “grasping reality” •  Observing adherence to standardized work (10 cycles or 10 minutes) each person for team leaders, 1 person per team leader for supervisors, and so on •  Talking with operators about recent changes in standard work, and their thinking on further improvement •  Reinforcing your personal relationships with them
  • 22. © David Mann 2016 www.dmannlean.com Date: Zone Leader Std. Work Zone Leader Std. Work Time TASKS 5:15 Check for call-in Review vacation log 5:30 Hold Daily Start-up Mtg. Review manpower needs Review shortages Review Cross-training and zone training plans Review schedule - mix and daily APS requirements Assign EE to work areas Check for employee issues 5:45 Attend Dept. Zone Leader Mtg. Review manpower needs Review shortages 6:00 Adjust Labor Planning Board Review 3rd shift production log/notes with counterpart Review Cross-training and zone training plans Review schedule/mix for late changes Adjust EE assignments as needed 6:30 Check Kanban Inventories Review Minimum Levels Review Maximum Levels Review 5's organization 8:00 Gemba Walk with Supv. & ZL's Note assignments 9:45 Attend Lean Board Meeting - Daily 10:30 Attend Division Zone Leader mtg - Daily 1:30 Next Day Planning Review vacation log Review Cross-training and zone training plans Review schedule - mix and daily APS requirements Assign EE to work areas 1:45 Set-up night shift priorities Id work centers to be manned Id part numbers & quantities to be ran 2:00 Establish personal plan for next days activities Lean Tasks Employee Training Process Improvement Time TASKS Monitor 40 min. clock (before and after all breaks) 1st break 2nd break Lunch 7:45 9:45 12:00 Zone Walk through (5X per day) 1st 2nd 3rd 4th 5th Verify hourly production tracking, post results, note and act on any flow interupters. 6:30 11:30 7:30 12:30 8:30 1:30 9:30 2:30 10:30 3:30 All Monitor Std. Work the Check for compliance Time Reinforce & correct operator behavior Update Std. Work as needed When Provide Operator Training (as needed) Needed Train & Certify new employees Review Cross-training and zone training plans Keep skill versatility matrix current Front Back
  • 23. © David Mann 2016 www.dmannlean.com Leader Standard Work-VS Manager Task pad coded daily or as recurring Standard weekly or specific-today tasks Emergent items Notes, working diary Note: Outlook and Groupwise both have trifold formats
  • 24. © David Mann 2016 www.dmannlean.com Person dependent or process dependent? „ Lean systems seek to be process dependent „ In human systems, at some level a person must monitor and reinforce consistent adherence „ Leader standard work defines this monitoring and reinforcement „ Overlapping content between levels of LSW help guarantee the system’s integrity, but... „ Ultimate integrity depends on support by execs „ So, what about executive standard work??? 24
  • 25. © David Mann 2016 www.dmannlean.com Problem statement: 
 Operations VP, precision machining, 2014 “I have hosted hundreds of tours at [our company] since we began to apply the lean management system starting in 2008. The majority of Lean Champions that came through confided in me that "getting their executives on board was very difficult", and that they were concerned that all the hard work of their teams would go to waste if they could not garner support from leadership/ownership of their organizations.” Emphasis added 25
  • 26. © David Mann 2016 www.dmannlean.com Gemba walking execs: 
 A cautionary tale and a lesson learned ◆ Execs wanted to support lean ◆ But they didn’t know how ◆ We weren’t helping them ◆ They were cancelling the walks ◆ “David, you have a problem!” Why are gembas being cancelled just as we’re having such success? 26
  • 27. © David Mann 2016 www.dmannlean.com Reflec3on:  Execs  are  our  customers!   What  do  we  know  about  them?   „ Bright „ Quick studies „ Competitive „ Achievement oriented „ Strive to ace every test „ Action oriented „ Thirsty for hands-on „ Expect staff prep work, avoid embarrassment „ Want to drive improvement 27
  • 28. © David Mann 2016 www.dmannlean.com Design spec: Improved exec gemba walk process What we were providing 1.  Execs in passive role a.  Yammering sensi-yawn! 2.  Unprepared to participate 3.  Low confidence in lean knowledge 4.  Uncomfortable discussing lean 5.  Felt incompetent in gemba 6.  Not a meaningful exercise: boring, embarassing, wasted of time A better customer value 1.  Exec-driven experience a.  Get the answer, ace the test 2.  Good staff prep, execs ready to participate and lead 3.  Confident observer in gemba 4.  Comfortable coaching lean management in gemba 5.  Competent in lean management system 6.  Valued, fun(!) investment of time 28
  • 29. © David Mann 2016 www.dmannlean.com Gemba worksheets and a new exec gemba design 1.  Process-dependent: Predictable, repeatable 2.  Structure put exec “student” in control 3.  Sufficient preparation (staff work) 4.  Agenda for clear content focus 5.  Test underscored learning, made experience personally meaningful: Ace the test! 29 Worksheets provided value from customer perspective:
  • 30. © David Mann 2016 www.dmannlean.com Lean management system Standardized Lean Processes Supervisor/Manager Director/Value stream leader Executives Proposition: If the lean management system is healthy, 
 then the lean production system is healthy Team Leader 30
  • 31. © David Mann 2016 www.dmannlean.com Full set of 8 gemba worksheets available as free download at dmannlean.com
  • 32. © David Mann 2016 www.dmannlean.com Put execs in active role… „  Brief prep / gemba worksheet „  Questions to ask „  Things to look for „  Let them drive the bus! „  After, compare ratings: •  Exec ”4.5”; Sensei “2.5” •  Teachable moment!! “This  3me,  it’s  gemba   for  visual  controls.  You     might  want  to  look  for…   and  ask  about…”   You,  on  the  way  to   gemba:     Hi,  how’s  it  going   today?  What’s  the   process  here?   32
  • 33. © David Mann 2016 www.dmannlean.com Summary „ Lean production and lean management are interdependent •  Together, they create and sustain a better day at work, sustained and ongoing improvement „ Lean’s value proposition depends on timing: Lean gains first, then lean management to sustain them •  Leader standard work keeps the loop closed „ Lean’s value proposition for executives is fundamentally different, supporting their unique managerial responsibilities •  Lean management empowers execs to judge first-hand the integrity of the chain of command and the fidelity of execution of their lean strategy 33
  • 34. © David Mann 2016 www.dmannlean.com For details on these topics, see: 34 Or email me at dmann@dmannlean.com