1. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
1 | P a g e
2. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
2 | P a g e
CONTENT PAGE
NO.
1.0
2.0
3.0
INTRODUCTION
PROJECTS
- 2.1 SAINT XAVIER HIGH SCHOOL MULTIPURPOSE HALL
- 2.2 THE PENTHOUSE
- 2.3 STRATA BUNGALOW
- 2.4 REFUSE CHAMBER AND RECYCLING
- 2.5 CENTRE POINT TIARA
- 2.6 BEST GRADE, BROWN ROAD
- 2.7 SALES GALLERY & SHOW UNIT
- 2.8 SUMMIT PERSPECTIVE
- 2.9 PERMATANG DASAR LAUT
- 2.10 SUMMIT 191
- 2.11 ROYAL THAI CONSULATE GENERAL
- 2.12 ROSE MANSION
CONCLUSION
2
4 – 8
9 – 14
15 – 18
19 – 20
21 – 28
29 – 37
38 – 44
45 – 50
51 – 53
54 – 55
56 – 65
64 – 68
69
3. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
3 | P a g e
1.0 INTRODUCTION
For a three-month period from January 2017 till March 2017, I did an internship at an architect’s
company in Penang, in which their projects cover large areas in Penang Island and parts of Kuala
Lumpur. K.H. TAN ARCHITECTS deals with various types of projects such as high-rise, factory,
hotel, gallery, residential projects et cetera, to multiple clients and also local developers. This
internship is part of my 3-year degree programme with Taylor’s Lakeside University, Kuala
Lumpur.
I worked on different types of assignments to create an awareness and understanding of the
application of the Uniform Building by-laws and similar Building Regulations existing nationally
and internationally. The main contents of the projects that have been passed to me are to learn
about the dealing with local authorities, procedures and requirements with regards to Planning
Submission and Building Submission processes, and learn to appreciate the complexity of the
processes to satisfy both Planning/Building Submissions and relevant by-laws.
4. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
4 | P a g e
2.0 PROJECTS
2.1 SAINT XAVIER HIGH SCHOOL MULTIPURPOSE HALL
Site Location: Lot 2335, Jalan Brother James,Sek.1,Bandar Georgetown,P.Pinang.
This project I was asked to build a 3D one block one storey multipurpose hall for Saint Xavier High
School besides the existing building, mainly for assembly or event purpose, and also for visual
presentation to the school board committee to start a charity donation for this project.
PROPOSED BUIDLING ARCHITECTURAL DRAWING
5. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
5 | P a g e
6. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
6 | P a g e
7. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
7 | P a g e
3D MODELLING
FINAL RENDER
8. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
8 | P a g e
INTERIOR RENDERING
9. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
9 | P a g e
2.2 THE PENTHOUSE
Site Location: Bandar Tanjung Tokong, D.T.L, Jalan Bunga Hinai, Pulau Pinang.
The Penthouse is located at the centre of Tanjung Tokong, Penang. The surrounding area is a
quiet and calm residential area, mostly the residents has been staying there for more than 10
years. This project is a luxury and contemporary residential designs, that mainly focusing on
middle age buyer. It is a place with every indulgent catered for, that suites presents a high-end-5-
star luxury urban living, comprising exclusive suites on every floor, including exclusive private lift
lobby for every unit, and also to be assured of a secure living environment that feature an
integrated system that provides the most comprehensive 24-hour security surveillance. This
project I was asked to go to site inspection and amendment the drawing based on the site
changes, and also prepares some tender drawing as well. I also participate with consultant
meeting at the site, checking the list for the Certificate Completion and Compliances for the project
to be submitted to the local authority.
WORKING PROGRESS
ARCHITECTURAL DRAWING
10. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
10 | P a g e
11. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
11 | P a g e
PREPARE A SET OF STANDARD ACHITECTURAL DRAWING
12. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
12 | P a g e
SITE INSPECTION
(20th JANUARY 2017))
13. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
13 | P a g e
PARTICIPATE WITH CONSULTANT MEETING (20th JANUARY 2017)
14. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
14 | P a g e
15. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
15 | P a g e
2.3 STRATA BUNGALOW
Site Location: Halaman Bukit Gambir, Sungai Dua, Pulau Pinang.
The Strata Bungalow it was passed to me to study on façade design of the building. It was a
modern bungalow design, by using plain white façade and simple form to present the modernism
of the building. This assignment also needed me to build a 3D model to further study for the
façade design of the building and also to show a visual presentation to the client.
WORKING PROGRESS
ARCHITECTURAL DRAWING
16. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
16 | P a g e
3D MODELLING
17. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
17 | P a g e
FINAL RENDER (STUDY ON FACADE DESIGN)
18. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
18 | P a g e
19. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
19 | P a g e
2.4 REFUSE CHAMBER AND RECYCLING
Site Location: Ramah Pavilion Teluk Kumbar, Pualu Pinang.
This project has passed it to me mainly wanted me to focus on plotting and annotating for the
tender drawing of the refuse chamber and recycling. Although is a small project, I have learned the
way of annotated and how to arrange the schedule for door and window.
WORKING PROGRESS
ARCHITECTURAL DRAWING
20. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
20 | P a g e
21. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
21 | P a g e
2.5 CENTRE POINT TIARA
Site Location: Bandar Tanjung Tokong, D.T.L, Jalan Bunga Mawar, Pulau Pinang.
Centre Point Tiara consists of a single row of terrace houses located on the side of a hill. What
makes the project unusual is that rather than having the houses following the natural contour, the
entire project is elevated off ground on a single platform supported by reinforced concrete stilts.
Each house is 3-storey gated from the entrance and got their own garage, also with lift access
especially for the elderly, separated the public and private space. I was asked to make a 3D
model of the project and also the site (including the height of the contour and existing building), the
purpose of this assignment is to focus on the buildability and also study on the site itself.
WORKING PROGRESS
ARCHITECTURAL DRAWING
22. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
22 | P a g e
3D MODELLING
23. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
23 | P a g e
FINAL RENDER
24. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
24 | P a g e
25. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
25 | P a g e
26. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
26 | P a g e
27. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
27 | P a g e
28. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
28 | P a g e
29. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
29 | P a g e
2.6 BEST GRADE, BROWN ROAD
Site Location: Brown Road, Seksyen 1,Georgetown, Pulau Pinang.
Best Grade has passed it to me to fully handle, after my colleague resigned. This is a 3-storey
bungalow residential project which is built on two lands, with a basement car park. Each bungalow
got lift access from basement to roof top, the roof will be design into a public space for gym,
Jacuzzi, also a place for children to have fun at the middle of the roof. For future planning there
will be a bridge connecting two bungalow from the roof. This bungalow is designed like a
condominium living style, each floor is one unit for one a family to stay, and basement is a parking
spot only for the residents. I have participated the consultant meeting, prepare architectural
drawings for the local authority, engineer and contractor, and also prepare tender documents. This
project I have done a lot of detailing of the façade and also did changes due to the client’s request.
Best Grade is one of the project that I have learned and experience a lot from the process, that
lead me to understand more about my major.
WORKING PROGRESS
ARCHITECTURAL DRAWING
CHANGES ON HEIGHT, OUTER FACADE AND DETAILING
30. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
30 | P a g e
AMENDMENT FLOOR PLAN
31. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
31 | P a g e
CHANGING INTERIOR LAYOUT / PLOT OUT PIPING SYSTEM & M&E
32. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
32 | P a g e
PARTICIPATE MEETING WITH CONSULTANTS (20th FEBRUARY 2017)
33. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
33 | P a g e
PARTICIPATE MEETING WITH CONSULTANTS (3rd MARCH 2017)
34. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
34 | P a g e
A SET OF CLIENT-CONSULTANT MEETING (CCM) MINUTES
35. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
35 | P a g e
36. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
36 | P a g e
37. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
37 | P a g e
38. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
38 | P a g e
2.7 SALES GALLERY & SHOW UNIT
Site Location: Lot 715, Jalan Sungai Rasau, Seksyen 16, Shah Alam, Selangor.
This sales gallery & show unit is located at Shah Alam, Selangor, it was already built. My
assignment for this project is to build a 3D model and show a visual presentation of the 3D
perspective with completed rendering of the existing show unit and the sales gallery at the side.
WORKING PROGRESS
ARCHITECTURAL DRAWING
39. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
39 | P a g e
3D MODELLING
40. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
40 | P a g e
APPLIED MATERIAL FOR RENDERING
41. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
41 | P a g e
FINAL RENDER
42. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
42 | P a g e
43. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
43 | P a g e
44. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
44 | P a g e
45. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
45 | P a g e
2.8 SUMMIT PERSPECTIVE
Site Location: New Lane, Sek.12, Georgetown, Pulau Pinang.
This project I was asked to build a 3D model of the existing site and also the proposed building to
show the connection between the site and the building design. Summit Perspective is a budget
hotel which is plan to build at heritage area in Georgetown. To build a high rise building at the site,
it is necessary to study the building height of the area and also approval from the local authority.
WORKING PROGRESS
ARCHITECTURAL DRAWING
46. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
46 | P a g e
3D MODELLING PROPOSED BUILDING
47. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
47 | P a g e
3D MODDELING SURROUNDING BUILDING ON SITE
48. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
48 | P a g e
FINAL RENDERING SHOW SURROUNDING AREA ON SITE
49. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
49 | P a g e
PROPOSED BUILDING ON SITE
50. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
50 | P a g e
SITE STUDY ON THE SURROUNDING BUILDING HEIGHT
51. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
51 | P a g e
2.9 PERMATANG DASAR LAUT
Site Location: Lorong Permatang Dasar Laut, Daerah Barat Daya, Pulau Pinang.
This project is still at a very early stage and I was asked to build a 3D model of the site in order to
study its slope. This is to determine the best spot to place the future structure and also to figure
out the access to the building.
WORKING PROGRESS
SITE PLAN (STUDY CONTOUR ON PROPOSED SITE)
52. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
52 | P a g e
IMPORTED TO SKETCHUP FOR VISUALIZING THE CONTOUR IN 3D
53. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
53 | P a g e
FINAL 3D MODEL TO STUDY THE BUILDABILITY ON PROPOSED SITE
54. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
54 | P a g e
2.10 SUMMIT 191
Site Location: Magazine Road, Georgetown, Pulau Pinang.
Summit 191 is a 23-storey steel structure comprised of exclusive luxury office hotel suites with
mechanical tower parking on one side because of the constraint of the site, I was asked to plan
out a concept for the back lane due to request from the developer, it is still at a conceptual stage
where it is still going on. I have also participated in the consultant meeting with each expert on the
field and also the developer to monitor the progress of the building as well as to estimate the time
frame required to complete the building.
SITE VISIT
(6th MARCH 2017)
PROPOSED BUILDING UNDER CONSTRUCTION
55. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
55 | P a g e
SURROUNDING BUIDLING ON SITE (TAKEN FROM INSIDE OF THE BUILDING)
PROPOSED BEAUTIFICATION OF THE BACK LANE FOR THE PUBLIC
56. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
56 | P a g e
2.11 ROYAL THAI CONSULATE GENERAL
Site Location: Jalan Nunn/Jalan Tunku Abdul Rahman,Seksyen 1,Georgetown.
Royal Thai Consulate General is constructing a new 3-storey consulate building in Penang as an
extension to its existing 2-storey building at Lot 1337, Jalan Tunku Abdul Rahman/Jalan Nunn,
Section Georgetown. The new extension building is expected to be completed by 2017. Royal
Thai Consulate General has been occupying the same premise for the last 50 years or so and the
current project is the first major construction activity undertaken since the construction of the
original building. The main purpose of this building extension is necessary to facilitate the ever
increasing staffs and diplomatic missions provided by the consulate. I have participated meeting
with consultants and have experience the process of cooperation of two countries.
SITE PHOTO
57. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
57 | P a g e
PARTICIPATE MEETING WITH CONSULTANTS (15th FEBRUARY 2017)
58. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
58 | P a g e
A SET OF CLIENT-CONSULTANT MEETING (CCM) MINUTES
59. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
59 | P a g e
60. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
60 | P a g e
61. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
61 | P a g e
62. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
62 | P a g e
63. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
63 | P a g e
64. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
64 | P a g e
65. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
65 | P a g e
66. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
66 | P a g e
2.12 ROSE MANSION
Site Location: Rose Avenue, Georgetown, Pulau Pinang.
This project I was asked to inspect the site condition throughout the constructing period and to
assure site condition tallies with the drawings. We have asked the contractor to touch up the paint
jobs where it differs from the 3D model.
SITE INSPECTION
(23th FEBRUARY 2017)
67. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
67 | P a g e
68. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
68 | P a g e
69. ARC 2625 INTERNSHIP REPORT
STUDENT NAME : YEOH XIANG AN
STUDENT ID : 0322691
69 | P a g e
3.0 CONCLUSION
This internship betters the understanding of my major and also brought me to a very new and
interesting area that I couldn’t learn in the university. Through the assignments, I gained a lot of
knowledge but more importantly, I also had a great chance to sharpen my skills in a real,
professional working environment. I have improved my communication through giving
presentations, discussing with supervisors, experts in the field and other staffs within and outside
the company. I appreciated Mr. Tan Kian Hio, my supervisor at K.H. TAN ARCHITECTS. Mr. Tan
and my colleagues gave me very practical, valuable instructions and put me in contact with
experts in the field.
Throughout the internship, I have also learnt many things about my future job scope, in which the
benefits are far beyond what I could learn in the university. In short, I would like to thank K.H.TAN
ARCHITECT and Taylor’s Lakeside University, for this great opportunity in which I have developed
myself both academically, professionally and socially.