SlideShare una empresa de Scribd logo
1 de 4
Ekansh Singhal
Contact No.: +91-9958506820
E-Mail: ekansh.singhal46@gmail.com
Topursueacareerinanesteemedorganizationholdingaresponsiblepositionwhichwouldenhancemyskillstoworkinacompetitive
environmentandservetheorganization
PROFILE SUMMARY
• Total Experience of 2.11 years the consumer electronic industry working as Production Engineer.
• Having 1.9 years of experience harness & power cord production with UKB Electronics Pvt. Ltd., Pune
as Production Engg.
• Presently associated with Lava International Ltd. Noida as a Production Sr. Engg. From May’2015.
• Expertise in handling the complete operations in production, resource utilization & manpower
management.
• Demonstrated excellence in planning, executing, managing and spearheading engineering activities.
• A strategist with expertise in planning and executing projects with a flair for adopting modern
methodologies in compliance with quality standards.
• Sound knowledge of Fixed Tact Time Implementation, Line design & layout modification, structure &
line design for power cord & harness manufacturing.
• An effective communicator with good analytical, interpersonal and organizational skills.
AREAS OF EXPERTISE
~Manpower Management
~Production Planning& Ccontrol
~Capacity Planning
~Inventory Management
~Quality Assurance
~Productivity Improvement
~5S Management
~IS694&1293
 Define roles & responsibilities of employees, Work Out manpower
requirement according to customer requirement, Organize available
Manpower in a systematic manner, Provide sufficient training &
technical support to utilize their skill, Manpower Multiskilling training activity planning.
 Work out daily production requirement, Prepare daily production plan. Ensure availability of manpower, raw
material, M/C, tooling & equipment to fulfill daily production plan. Hourly production follow up to monitoring
Plan Vs actual.
 Work out each machine capacity, Prepare machine loading plan for proper utilization of machine; define set up
time, cleaning time etc.
 Ensure minimum inventory on the shop floor, no mix-up material on the shop floor & workplace. Always
focusing on raw material storage & smooth material flow. Kanban implementation for single piece material
flow, Implement JIT system for production.
• Kaizen & Innovation –Motivate employees to implement Kaizen & Innovation on the shop floor, Guide
them for implementation & provide all kind of support for effective implementation.
• Productivity improvement achieved through comfortable Line Balancing. Identifies root causes of losses
by Time study, method study, motion study. Define Tack time for each line, Prepare work distribution
chart to balance all work station. Improve working method to avoid losses & down time.
• 5 S management –Provide training for 5 S management, prepare 5S check sheet for each process,
Taking 5S audit to analyze actual condition.
• Quality Management – Ensure production happening according to quality norms & customer
requirements. Ensure all documents, check sheets, skill matrix, and drawings etc available on the line.
All work instructions Defect matrix, acceptance criteria etc available on the work place. Reducing all
problems through applying 7 QC tools.
• IS 694/1293 – Good knowledge about IS 694(IS 8130, IS 5831) & IS 1293 etc.
• Leadership Quality & Communication -Having ability to lead production team successfully, motivate
them to achieving desired goals, ability to Delegating responsibilities, always Demand result, Good
decision making & disciplined work. Good communication & analytical approach with team & superiors.
WORK EXPERIENCE
May’15-Till Date Lava International Ltd., Noida as Sr. Engg. Production
Role:
• Working as Sr. Engg. Production in Assembly - Mobile department, controlling all the production actives. And
achieving the highest production and continue to do the same.
• Leading a team of 200 People.
• Line process study & improvement.
• Strategies to increase the line output.
• Responsible for corrective action & preventive action.
• Removing non value added processes & process improvements.
• Responsible for inventory control of all the material.
• Monitoring the production records like hourly production, line output sheet, line setup check sheet & daily
rejection data.
• Responsible for line rejection, customer complaints and take effective countermeasure.
• Manpower handling in the shop floor & training to all sub co-ordinates for meet production targets.
• Responsible for Daily target achievement.
• Identifying and implementing strategies for building team effectiveness by promoting a spirit of co-operation
between team members.
• Make skill matrix chart for all employees according to their capabilities.
• Skill training & time-to-time socialization activities in the organization.
• Working knowledge of 5S, 3R, SAP.
• Line balancing with the help of TACT TIME
• Checking to cycle time & tact time for new model
Highlights:
 Increase productivity ( Sets/Persons) : 1440
 Multi Skilling 0%8%
 Complete soldering O/Ps Requirement 160240 for feature phone line by leading Training Team Parallelism with
production.
 Starts awards Scheme to motivate soldering O/p with help of management.
 Got super star award (2 times) for highest production in Shift.
 Got Team awards (2 times) for my team for best productivity, Best SSI & 0 Lot rejection in OQA.
 MR for ISO implementation from Production Department.
July’13-May’15 UKB Electronics Pvt. Ltd., Pune as Production Engg.
Role:
 Working as a Production Engineer in Assembly Department, Manage 150 Employees in the Assembly shop including
line leaders & associates.
 Responsible for Production planning, Manpower planning , Interacting with operators for solving problems & there
motivation, Production report preparation, Send Daily production incidence report, Weekly production Vs rejection
discussion with supervisors, Calculate Efficiency & OEE. Weekly down time discussion with supervisors and
concerned dept. Raw material planning, Kaizen training & coaching, planning for new production
facilities/equipment’s, interacting with vendors, interacting with customers.
 Responsible for daily production targets & delivery, Manage all production activities in the Production Department
like - Coordinating with supporting departments, Conducting trials of new products, Monitor the Performance of
Production department, To ensure production activities in the shop as per prescribed standards & established
quality norms. To improve and sustain efficiency & productivity of employees by Team building and employee
motivation.
 Ensure single piece material flow is happening everywhere.
 To ensure reduction in rework and rejection, safety and discipline in the section. To identify and monitor
implementation of new systems and technologies for continuous improvement
 Responsible for 4M management, productivity improvement, proper utilization of all resources & reducing
rejection. On time Delivery & Product Quality as per customer requirement.
Highlights:
 Increase Productivity ( Sets / Man-Hr ) : 60  121
 Multi Skilling 5%  38%
 Attrition Reduction 35%  7%
 Cell Line Concept Implementation for LVHM Products.
 Started Employee Engagement  Innovation Scheme Through Suggestion Scheme.
 Got an Award of “Highest Innovative Shift”.
 Lead Trainer of West Reduction & 12 Principle Motion Economy.
GROWTH PATH:
July’13-Apr’14 Trainee Engineer
Apr’14-May’15 Engineer
May’15-Till Date Sr. Engineer
EDUCATION
2013 B.Tech (Electronics & Comm. Engg.) from Graphic Era University Dehradoon
(Uttrakhand) (2013) with 69%
2009 XIIth Sarasvati Vidhya Mandir Muzaffarnagar U.P Board with 67.6%
2007 Xth Janta Inter College Muzaffarnagar U.P Board with 67.5%.
IT SKILLS
• Well versed with MS Office and Internet Applications
PERSONAL DETAILS
Date of Birth: 6th
March, 1993
Languages Known: English and Hindi
Father’s Name: Shri Narendra Kumar Singhal
Permanent Address: H.No.-237A, Hasanpur luhari, Dist.- Shamli (U.P) PIN-247772

Más contenido relacionado

La actualidad más candente

La actualidad más candente (17)

anuragsaxena_Profile
anuragsaxena_Profileanuragsaxena_Profile
anuragsaxena_Profile
 
Alam_CV
Alam_CVAlam_CV
Alam_CV
 
CV
CVCV
CV
 
Carmen's Resume NA 10.7.15
Carmen's Resume NA 10.7.15Carmen's Resume NA 10.7.15
Carmen's Resume NA 10.7.15
 
Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2
 
Resume_Chiranjit Bhatt
Resume_Chiranjit BhattResume_Chiranjit Bhatt
Resume_Chiranjit Bhatt
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
latestResume_Sushant
latestResume_SushantlatestResume_Sushant
latestResume_Sushant
 
ARVINDER_SINGH
ARVINDER_SINGHARVINDER_SINGH
ARVINDER_SINGH
 
vivek Kurhade-Operations
vivek Kurhade-Operationsvivek Kurhade-Operations
vivek Kurhade-Operations
 
CV-2016
CV-2016CV-2016
CV-2016
 
sachin b.tech mech
sachin b.tech mechsachin b.tech mech
sachin b.tech mech
 
Resume new Yogesh
Resume new YogeshResume new Yogesh
Resume new Yogesh
 
Minh Pham - CV
Minh Pham - CVMinh Pham - CV
Minh Pham - CV
 
Resume 123
Resume 123Resume 123
Resume 123
 
Abdelhameed - Resume 2016
Abdelhameed - Resume 2016Abdelhameed - Resume 2016
Abdelhameed - Resume 2016
 
VIKAS CHINNA AUSULA
VIKAS CHINNA AUSULAVIKAS CHINNA AUSULA
VIKAS CHINNA AUSULA
 

Destacado

Formato 5-valoracic3b3n-de-productos
Formato 5-valoracic3b3n-de-productosFormato 5-valoracic3b3n-de-productos
Formato 5-valoracic3b3n-de-productosanaloa14
 
Evvnt investment deck gdp usd 2016-17
Evvnt investment deck gdp usd 2016-17Evvnt investment deck gdp usd 2016-17
Evvnt investment deck gdp usd 2016-17Richard Green
 
CC Play - das 20. Jahrhundert zum Puzzeln
CC Play - das 20. Jahrhundert zum PuzzelnCC Play - das 20. Jahrhundert zum Puzzeln
CC Play - das 20. Jahrhundert zum PuzzelnMarcus Bösch
 
Wedding dress list
Wedding dress listWedding dress list
Wedding dress listTing Zhou
 
Seminars and Presentations
Seminars and PresentationsSeminars and Presentations
Seminars and PresentationsUpul Atukorala
 
The Ideal Muslim
The Ideal MuslimThe Ideal Muslim
The Ideal Muslimzakir2012
 
Bridesmaiddress20160920
Bridesmaiddress20160920Bridesmaiddress20160920
Bridesmaiddress20160920Ting Zhou
 
Como elaborar um CV e respetiva carta de cobertura
Como elaborar um CV e respetiva carta de coberturaComo elaborar um CV e respetiva carta de cobertura
Como elaborar um CV e respetiva carta de coberturaSusana Correia da Silva
 
Bhutanese culture influence learning skill
Bhutanese culture influence learning skillBhutanese culture influence learning skill
Bhutanese culture influence learning skillSonam Dendup
 
Sintesis informativa 09 de marzo 2017
Sintesis informativa 09 de marzo 2017Sintesis informativa 09 de marzo 2017
Sintesis informativa 09 de marzo 2017megaradioexpress
 

Destacado (14)

Formato 5-valoracic3b3n-de-productos
Formato 5-valoracic3b3n-de-productosFormato 5-valoracic3b3n-de-productos
Formato 5-valoracic3b3n-de-productos
 
Evvnt investment deck gdp usd 2016-17
Evvnt investment deck gdp usd 2016-17Evvnt investment deck gdp usd 2016-17
Evvnt investment deck gdp usd 2016-17
 
CC Play - das 20. Jahrhundert zum Puzzeln
CC Play - das 20. Jahrhundert zum PuzzelnCC Play - das 20. Jahrhundert zum Puzzeln
CC Play - das 20. Jahrhundert zum Puzzeln
 
Wedding dress list
Wedding dress listWedding dress list
Wedding dress list
 
Seminars and Presentations
Seminars and PresentationsSeminars and Presentations
Seminars and Presentations
 
Aplicacion retazos
Aplicacion retazosAplicacion retazos
Aplicacion retazos
 
The Ideal Muslim
The Ideal MuslimThe Ideal Muslim
The Ideal Muslim
 
Sanciones aduaneras
Sanciones aduanerasSanciones aduaneras
Sanciones aduaneras
 
Bridesmaiddress20160920
Bridesmaiddress20160920Bridesmaiddress20160920
Bridesmaiddress20160920
 
Como elaborar um CV e respetiva carta de cobertura
Como elaborar um CV e respetiva carta de coberturaComo elaborar um CV e respetiva carta de cobertura
Como elaborar um CV e respetiva carta de cobertura
 
Nuestra historia capítulo 10
Nuestra historia capítulo 10Nuestra historia capítulo 10
Nuestra historia capítulo 10
 
Bhutanese culture influence learning skill
Bhutanese culture influence learning skillBhutanese culture influence learning skill
Bhutanese culture influence learning skill
 
Μέσα μετάδοσης
Μέσα μετάδοσηςΜέσα μετάδοσης
Μέσα μετάδοσης
 
Sintesis informativa 09 de marzo 2017
Sintesis informativa 09 de marzo 2017Sintesis informativa 09 de marzo 2017
Sintesis informativa 09 de marzo 2017
 

Similar a ekanshsinghal-3 (1) (1) (20)

Simon 2
Simon 2Simon 2
Simon 2
 
Resume for production Enng
Resume for production EnngResume for production Enng
Resume for production Enng
 
Deva resume march3032019
Deva resume march3032019Deva resume march3032019
Deva resume march3032019
 
Minh Pham - CV
Minh Pham - CVMinh Pham - CV
Minh Pham - CV
 
Minh Pham - CV
Minh Pham - CVMinh Pham - CV
Minh Pham - CV
 
Charinthorn_Resume file_
Charinthorn_Resume file_Charinthorn_Resume file_
Charinthorn_Resume file_
 
Plant head (operation)
Plant head (operation)Plant head (operation)
Plant head (operation)
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
Sudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-SSudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-S
 
Dusitsun Narkprasert CV6
Dusitsun Narkprasert CV6Dusitsun Narkprasert CV6
Dusitsun Narkprasert CV6
 
Sathishbabu
SathishbabuSathishbabu
Sathishbabu
 
Evens's cv
Evens's cvEvens's cv
Evens's cv
 
Rsume
RsumeRsume
Rsume
 
Operations managerjvb updatedcv
Operations managerjvb updatedcvOperations managerjvb updatedcv
Operations managerjvb updatedcv
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Resume Rodolfo 2011
Resume Rodolfo 2011Resume Rodolfo 2011
Resume Rodolfo 2011
 
Smruti Resume
Smruti ResumeSmruti Resume
Smruti Resume
 
AE in Manufacturing with 3.5 year Expe
AE in Manufacturing with 3.5 year ExpeAE in Manufacturing with 3.5 year Expe
AE in Manufacturing with 3.5 year Expe
 
NItya Resume ..
NItya Resume ..NItya Resume ..
NItya Resume ..
 

ekanshsinghal-3 (1) (1)

  • 1. Ekansh Singhal Contact No.: +91-9958506820 E-Mail: ekansh.singhal46@gmail.com Topursueacareerinanesteemedorganizationholdingaresponsiblepositionwhichwouldenhancemyskillstoworkinacompetitive environmentandservetheorganization PROFILE SUMMARY • Total Experience of 2.11 years the consumer electronic industry working as Production Engineer. • Having 1.9 years of experience harness & power cord production with UKB Electronics Pvt. Ltd., Pune as Production Engg. • Presently associated with Lava International Ltd. Noida as a Production Sr. Engg. From May’2015. • Expertise in handling the complete operations in production, resource utilization & manpower management. • Demonstrated excellence in planning, executing, managing and spearheading engineering activities. • A strategist with expertise in planning and executing projects with a flair for adopting modern methodologies in compliance with quality standards. • Sound knowledge of Fixed Tact Time Implementation, Line design & layout modification, structure & line design for power cord & harness manufacturing. • An effective communicator with good analytical, interpersonal and organizational skills. AREAS OF EXPERTISE ~Manpower Management ~Production Planning& Ccontrol ~Capacity Planning ~Inventory Management ~Quality Assurance ~Productivity Improvement ~5S Management ~IS694&1293  Define roles & responsibilities of employees, Work Out manpower requirement according to customer requirement, Organize available Manpower in a systematic manner, Provide sufficient training & technical support to utilize their skill, Manpower Multiskilling training activity planning.  Work out daily production requirement, Prepare daily production plan. Ensure availability of manpower, raw material, M/C, tooling & equipment to fulfill daily production plan. Hourly production follow up to monitoring Plan Vs actual.  Work out each machine capacity, Prepare machine loading plan for proper utilization of machine; define set up time, cleaning time etc.  Ensure minimum inventory on the shop floor, no mix-up material on the shop floor & workplace. Always focusing on raw material storage & smooth material flow. Kanban implementation for single piece material flow, Implement JIT system for production.
  • 2. • Kaizen & Innovation –Motivate employees to implement Kaizen & Innovation on the shop floor, Guide them for implementation & provide all kind of support for effective implementation. • Productivity improvement achieved through comfortable Line Balancing. Identifies root causes of losses by Time study, method study, motion study. Define Tack time for each line, Prepare work distribution chart to balance all work station. Improve working method to avoid losses & down time. • 5 S management –Provide training for 5 S management, prepare 5S check sheet for each process, Taking 5S audit to analyze actual condition. • Quality Management – Ensure production happening according to quality norms & customer requirements. Ensure all documents, check sheets, skill matrix, and drawings etc available on the line. All work instructions Defect matrix, acceptance criteria etc available on the work place. Reducing all problems through applying 7 QC tools. • IS 694/1293 – Good knowledge about IS 694(IS 8130, IS 5831) & IS 1293 etc. • Leadership Quality & Communication -Having ability to lead production team successfully, motivate them to achieving desired goals, ability to Delegating responsibilities, always Demand result, Good decision making & disciplined work. Good communication & analytical approach with team & superiors. WORK EXPERIENCE May’15-Till Date Lava International Ltd., Noida as Sr. Engg. Production Role: • Working as Sr. Engg. Production in Assembly - Mobile department, controlling all the production actives. And achieving the highest production and continue to do the same. • Leading a team of 200 People. • Line process study & improvement. • Strategies to increase the line output. • Responsible for corrective action & preventive action. • Removing non value added processes & process improvements. • Responsible for inventory control of all the material. • Monitoring the production records like hourly production, line output sheet, line setup check sheet & daily rejection data. • Responsible for line rejection, customer complaints and take effective countermeasure. • Manpower handling in the shop floor & training to all sub co-ordinates for meet production targets. • Responsible for Daily target achievement. • Identifying and implementing strategies for building team effectiveness by promoting a spirit of co-operation between team members. • Make skill matrix chart for all employees according to their capabilities. • Skill training & time-to-time socialization activities in the organization. • Working knowledge of 5S, 3R, SAP. • Line balancing with the help of TACT TIME
  • 3. • Checking to cycle time & tact time for new model Highlights:  Increase productivity ( Sets/Persons) : 1440  Multi Skilling 0%8%  Complete soldering O/Ps Requirement 160240 for feature phone line by leading Training Team Parallelism with production.  Starts awards Scheme to motivate soldering O/p with help of management.  Got super star award (2 times) for highest production in Shift.  Got Team awards (2 times) for my team for best productivity, Best SSI & 0 Lot rejection in OQA.  MR for ISO implementation from Production Department. July’13-May’15 UKB Electronics Pvt. Ltd., Pune as Production Engg. Role:  Working as a Production Engineer in Assembly Department, Manage 150 Employees in the Assembly shop including line leaders & associates.  Responsible for Production planning, Manpower planning , Interacting with operators for solving problems & there motivation, Production report preparation, Send Daily production incidence report, Weekly production Vs rejection discussion with supervisors, Calculate Efficiency & OEE. Weekly down time discussion with supervisors and concerned dept. Raw material planning, Kaizen training & coaching, planning for new production facilities/equipment’s, interacting with vendors, interacting with customers.  Responsible for daily production targets & delivery, Manage all production activities in the Production Department like - Coordinating with supporting departments, Conducting trials of new products, Monitor the Performance of Production department, To ensure production activities in the shop as per prescribed standards & established quality norms. To improve and sustain efficiency & productivity of employees by Team building and employee motivation.  Ensure single piece material flow is happening everywhere.  To ensure reduction in rework and rejection, safety and discipline in the section. To identify and monitor implementation of new systems and technologies for continuous improvement  Responsible for 4M management, productivity improvement, proper utilization of all resources & reducing rejection. On time Delivery & Product Quality as per customer requirement. Highlights:  Increase Productivity ( Sets / Man-Hr ) : 60  121  Multi Skilling 5%  38%  Attrition Reduction 35%  7%  Cell Line Concept Implementation for LVHM Products.  Started Employee Engagement  Innovation Scheme Through Suggestion Scheme.  Got an Award of “Highest Innovative Shift”.  Lead Trainer of West Reduction & 12 Principle Motion Economy. GROWTH PATH:
  • 4. July’13-Apr’14 Trainee Engineer Apr’14-May’15 Engineer May’15-Till Date Sr. Engineer EDUCATION 2013 B.Tech (Electronics & Comm. Engg.) from Graphic Era University Dehradoon (Uttrakhand) (2013) with 69% 2009 XIIth Sarasvati Vidhya Mandir Muzaffarnagar U.P Board with 67.6% 2007 Xth Janta Inter College Muzaffarnagar U.P Board with 67.5%. IT SKILLS • Well versed with MS Office and Internet Applications PERSONAL DETAILS Date of Birth: 6th March, 1993 Languages Known: English and Hindi Father’s Name: Shri Narendra Kumar Singhal Permanent Address: H.No.-237A, Hasanpur luhari, Dist.- Shamli (U.P) PIN-247772