SlideShare una empresa de Scribd logo
1 de 31
CAL MARINE - One Plant
Budget 2008 - 2013

FINANCIAL SUMMARY                                                  2008                2009                2010                2011                 2012                 2013
$US                                                            Annual Budget       Annual Budget       Annual Budget       Annual Budget        Annual Budget        Annual Budget

Machines Produced                                                                                                               105                  180                  180
Total Machines Installed                                                                                                        105                  285                  465

Cash at Beginning of Month                                                     -       614,316,371      372,498,100         369,445,400          (453,368,097)        (565,508,782)


Use of Cash
Development Costs                                                              -       135,800,000           -                   -                    -                    -
Site Costs, Foundations and Siting                                             -                -            -              126,000,000          216,000,000          216,000,000
Ex Factory Cost ($6m per unit)                                                 -                   -         -              828,514,050         1,420,309,800        1,420,309,800
Assembly Costs in Floating Dock                                                -                   -         -              207,548,670          355,797,720          355,797,720
Finishing Costs (Incl Labour/Transport)                                      -                  -            -              63,000,000           108,000,000          108,000,000
Plant and Equipment                                                  30,000,000         25,000,000           -                  -                     -                    -
Land and Building Factory ($5m plus $53m)                            58,000,000                 -            -                   -                    -                    -
Tooling Moulds ($24m)                                                        -          24,000,000           -                   -                    -                    -
Floating Docks x 2 ($150m)                                          150,000,000                  -           -                   -                    -                    -
Engineering ($15.15m)                                                10,821,429           4,328,571          -                   -                    -                    -
Technology Transfer - To CAL + HTF Royalties                         15,000,000                    -         -              49,710,843            85,218,588          85,218,588
Cost of Sales Water per m3 + Barges                                          -                     -         -              202,537,454          800,269,939         1,511,620,996
Cost of Sales Electricity                                                      -                   -         -              77,153,481           304,850,338          575,828,416
Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover                      -                   -         -              57,937,933           228,925,491          432,414,816
Tug Towage to Site Cost                                                        -                   -         -              15,750,000            27,000,000          27,000,000
Undersea Cable & Pipework to Shore - Placement and Anchoring                   -                   -         -              105,000,000          180,000,000          180,000,000
CAL Marine Tugs - Ex Factory Cost                                            -                  -            -              15,810,000           18,000,000           18,000,000
Tug Manufacturing Plant - Capital Cost                               50,000,000         50,000,000           -                  -                    -                    -
Total Asset Purchases                                               313,821,429        239,128,571           -             1,748,962,430        3,744,371,875        4,930,190,335



Cash Flow from Operating Activities                                            -                   -         -                   -                    -                    -
Loan Repayment at 6% interest                                                  -                   -         -                   -                    -                    -
Operating (Deficiency) / Surplus                                    (21,862,200)         (2,689,700)     (3,052,700)         (3,237,700)          (4,747,700)          (4,747,700)
Sale of Water - $US0.70 per m3                                                                   -           -              150,585,313          594,995,625         1,123,880,625
Sale of Electricity - $US50.00 per MWh (61,320MWh annually)                    -                   -         -              448,950,000         1,773,900,000        3,350,700,000
Water Power Generation (113,880MWh annually)                                   -                   -         -              291,817,500         1,153,035,000        2,177,955,000
Ex Factory Margin                                                              -                   -         -                  -                    -                    -
Add Back Tug Transport                                                         -                   -         -              15,750,000           27,000,000           27,000,000
Add Back 2.5% to CAL Marine                                                  -                   -           -              22,283,820           88,048,266           166,313,391
Total                                                               (21,862,200)         (2,689,700)     (3,052,700)        926,148,933         3,632,231,191        6,841,101,316
Net (Deficiency) / Surplus before Investing                        (335,683,629)       372,498,100      369,445,400         (453,368,097)        (565,508,782)       1,345,402,198




Cash Flow from Financing Activities                                 950,000,000                    -         -                   -                    -                    -

Invested Share Capital                                              950,000,000                    -         -                   -                    -                    -



Net - Surplus (Deficiency) - before Commissions                     614,316,371        372,498,100      369,445,400         (453,368,097)        (565,508,782)       1,345,402,198


Less: Funding Commissions                                             9,500,000                    -         -                   -                    -                    -

Net - Surplus (Deficiency) - after Commissions                      604,816,371        372,498,100      369,445,400         (453,368,097)        (565,508,782)       1,345,402,198

Cash at End of Month                                                604,816,371        372,498,100      369,445,400         (453,368,097)        (565,508,782)       1,345,402,198


Net Cash Flow Surplus (Deficit)                                     604,816,371        (241,818,271)         (3,052,700)        (822,813,497)        (112,140,685)       1,910,910,980
CAL MARINE - One Plant
Budget 2008 - 2013

USE OF CASH                                                            2008               2008            2008              2008            2008             2008             2008            2008            2008           2008             2008            2008           2008
$US                                                                Annual Budget          Jan             Feb               March           April            May              June            July            Aug            Sept             Oct             Nov            Dec

Machines Produced per Month
Total Machines Installed                                                 0                  0              0                  0              0                 0               0                0               0              0               0                0              0

Cash at Beginning of Month                                                           $-   $950,000,000    $933,178,150      $931,356,300    $897,370,164     $870,548,314    $832,728,845    $797,073,662    $759,254,193    $723,599,010    $703,279,540    $668,457,690    $640,304,887

Use of Cash
Development Costs                                                                 $-                 -                  -              -                -               -               -               -               -               -               -               -               -
Site Costs, Foundations and Siting                                                $-
Ex Factory Cost ($6m per unit)                                                    $-
Assembly Costs in Floating Dock                                                   $-
Finishing Costs (Incl. Labour & Transport)                                        $-
Plant and Equipment (for Floating Dock & Main Factory)                   $30,000,000                -               -                 -               -                -               -               -               -        7,500,000       7,500,000       7,500,000       7,500,000
Land and Building - Factory ($5m + $53m)                                 $58,000,000                -               -          5,000,000              -         8,833,333       8,833,333       8,833,333       8,833,333       8,833,333       8,833,333              -               -
Tooling Moulds ($24m)                                                             $-                -               -                 -               -                -               -               -               -               -               -               -               -
Floating Docks x 3 ($150m)                                              $150,000,000                -               -         25,000,000      25,000,000       25,000,000      25,000,000      25,000,000      25,000,000              -               -               -               -
Engineering ($15.15m)                                                    $10,821,429                -               -          2,164,286              -         2,164,286              -        2,164,286              -        2,164,286              -        2,164,286              -
Technology Transfer - To CAL + HTF Royalties                             $15,000,000        15,000,000              -                 -               -                -               -               -               -               -               -               -               -
Cost of Sales Water per m3 + Barges                                               $-
Cost of Sales Electricity                                                         $-
Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover                         $-
Tug Towage to Site Cost                                                           $-
Undersea Cable & Pipework to Shore - Placement and Anchoring   $
CAL Marine Tugs - Ex Factory Cost                                                 $-
Tug Manufacturing Plant - Capital Cost                                   $50,000,000                                                                                                                                                           16,666,667      16,666,667      16,666,666
Total Asset Purchases                                                   $313,821,429        15,000,000                  -     32,164,286      25,000,000       35,997,619      33,833,333      35,997,619      33,833,333      18,497,619      33,000,000      26,330,953      24,166,666
                                                                                  $-
                                                                                  $-
Cash Flow from Operating Activities
Loan Repayment at 6% interest                                                      $-
Operating (Deficiency) / Surplus                                         $(21,862,200)      (1,821,850)     (1,821,850)       (1,821,850)      (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)
Sale of Water - $US0.70 per m3                                                     $-
Sale of Electricity - $US50.00 per MWh (61,320MWh annually)                        $-
Water Power Generation (113,880MWh annually)                                       $-
Add Back Tug Transport                                                             $-
Add Back 2.5% to CAL Marine                                                        $-
Total                                                                    $(21,862,200)      (1,821,850)     (1,821,850)       (1,821,850)     (1,821,850)      (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)     (1,821,850)
Net (Deficiency) / Surplus before Investing                              (335,683,629)     933,178,150     931,356,300       897,370,164     870,548,314      832,728,845     797,073,662     759,254,193     723,599,010     703,279,540     668,457,690     640,304,887     614,316,371


                                                                        $(335,683,629)     933,178,150     931,356,300       897,370,164     870,548,314      832,728,845     797,073,662     759,254,193     723,599,010     703,279,540     668,457,690     640,304,887     614,316,371

Cash Flow from Financing Activities                                     $950,000,000

Invested Share Capital                                                  $950,000,000


Net - Surplus (Deficiency) - before Commissions                         $614,316,371       933,178,150     931,356,300       897,370,164     870,548,314      832,728,845     797,073,662     759,254,193     723,599,010     703,279,540     668,457,690     640,304,887     614,316,371

Less: Funding Commissions                                                    $9,500,000

Net - Surplus (Deficiency) - after Commissions                          $604,816,371       933,178,150     931,356,300       897,370,164     870,548,314      832,728,845     797,073,662     759,254,193     723,599,010     703,279,540     668,457,690     640,304,887     614,316,371

Cash at End of Month                                                    $604,816,371      $933,178,150    $931,356,300      $897,370,164    $870,548,314     $832,728,845    $797,073,662    $759,254,193    $723,599,010    $703,279,540    $668,457,690    $640,304,887    $614,316,371
CAL MARINE - One Plant
Budget 2008 - 2013
                                                                                                 22               23                 24               25                26                27                28               29               30               31                32                 33
USE OF CASH                                                        2009             2009               2009             2009              2009              2009              2009              2009              2009             2009             2009             2009              2009
$US                                                            Annual Budget        Jan                Feb              March             April             May               June              July              Aug              Sept             Oct              Nov               Dec

Machines Produced per Month
Total Machines Installed                                             0                0                 0                 0                 0                 0                 0                 0                0                0                0                 0                0

Cash at Beginning of Month                                          $614,316,371    $614,316,371      $585,011,277      $555,706,183      $513,476,486      $487,913,456      $468,600,425      $449,287,394      $433,974,364     $418,661,333     $403,348,303     $388,035,272      $372,722,242

Use of Cash
Development Costs                                                   $135,800,000                  -                -      15,088,889        15,088,889        15,088,889        15,088,889        15,088,889        15,088,889       15,088,889       15,088,889       15,088,889                    -
Site Costs, Foundations and Siting                                            $-
Ex Factory Cost ($6m per unit)                                                $-
Assembly Costs in Floating Dock                                               $-
Finishing Costs (Incl. Labour & Transport)                                    $-
Plant and Equipment (for Floating Dock & Main Factory)               $25,000,000          6,250,000      6,250,000            6,250,000      6,250,000                 -                 -                   -                -                -                -                 -                  -
Land and Building - Factory ($5m + $53m)                                      $-                  -              -                    -              -                 -                 -                   -                -                -                -                 -                  -
Tooling Moulds ($24m)                                                $24,000,000          4,000,000      4,000,000            4,000,000      4,000,000         4,000,000         4,000,000                   -                -                -                -                 -                  -
Floating Docks x 3 ($150m)                                                    $-                  -              -                    -              -                 -                 -                   -                -                -                -                 -                  -
Engineering ($15.15m)                                                 $4,328,571          2,164,286      2,164,286                    -              -                 -                 -                   -                -                -                -                 -                  -
Technology Transfer - To CAL + HTF Royalties                                  $-                  -              -                    -              -                 -                 -                   -                -                -                -                 -                  -
Cost of Sales Water per m3 + Barges                                           $-
Cost of Sales Electricity                                                     $-
Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover                     $-
Tug Towage to Site Cost                                                       $-
Undersea Cable & Pipework to Shore - Placement and Anchoring                  $-
CAL Marine Tugs - Ex Factory Cost                                             $-
Tug Manufacturing Plant - Capital Cost                               $50,000,000      16,666,667        16,666,667        16,666,666
Total Asset Purchases                                               $239,128,571      29,080,953        29,080,953        42,005,555        25,338,889        19,088,889        19,088,889        15,088,889        15,088,889       15,088,889       15,088,889       15,088,889                    -


Cash Flow from Operating Activities
Loan Repayment at 6% interest                                                 $-
Operating (Deficiency) / Surplus                                     $(2,689,700)         (224,142)         (224,142)         (224,142)         (224,142)         (224,142)         (224,142)         (224,142)        (224,142)        (224,142)        (224,142)         (224,142)          (224,142)
Sale of Water - $US0.70 per m3                                                $-
Sale of Electricity - $US50.00 per MWh (61,320MWh annually)                   $-
Water Power Generation (113,880MWh annually)                                  $-
Add Back Tug Transport                                                        $-
Add Back 2.5% to CAL Marine                                                   $-
Total                                                                $(2,689,700)       (224,142)         (224,142)         (224,142)         (224,142)         (224,142)         (224,142)         (224,142)         (224,142)        (224,142)        (224,142)        (224,142)         (224,142)
Net (Deficiency) / Surplus before Investing                          372,498,100     585,011,277       555,706,183       513,476,486       487,913,456       468,600,425       449,287,394       433,974,364       418,661,333      403,348,303      388,035,272      372,722,242       372,498,100


                                                                    $372,498,100     585,011,277       555,706,183       513,476,486       487,913,456       468,600,425       449,287,394       433,974,364       418,661,333      403,348,303      388,035,272      372,722,242       372,498,100

Cash Flow from Financing Activities                                            $-

Invested Share Capital                                                         $-


Net - Surplus (Deficiency) - before Commissions                     $372,498,100     585,011,277       555,706,183       513,476,486       487,913,456       468,600,425       449,287,394       433,974,364       418,661,333      403,348,303      388,035,272      372,722,242       372,498,100

Less: Funding Commissions

Net - Surplus (Deficiency) - after Commissions                      $372,498,100     585,011,277       555,706,183       513,476,486       487,913,456       468,600,425       449,287,394       433,974,364       418,661,333      403,348,303      388,035,272      372,722,242       372,498,100

Cash at End of Month                                                $372,498,100    $585,011,277      $555,706,183      $513,476,486      $487,913,456      $468,600,425      $449,287,394      $433,974,364      $418,661,333     $403,348,303     $388,035,272     $372,722,242      $372,498,100
CAL MARINE - One Plant
Budget 2008 - 2013

USE OF CASH                                                        2010             2010            2010            2010            2010            2010            2010            2010            2010            2010            2010            2010            2010
$US                                                            Annual Budget        Jan             Feb             March           April           May             June            July            Aug             Sept            Oct             Nov             Dec

Machines Produced per Month
Total Machines Installed                                             0                0               0               0              0               0                0               0               0               0               0               0              0

Cash at Beginning of Month                                         $372,498,100     $372,498,100    $372,243,708    $371,989,317    $371,734,925    $371,480,533    $371,226,142    $370,971,750    $370,717,358    $370,462,967    $370,208,575    $369,954,183    $369,699,792

Use of Cash
Development Costs                                                              $-
Site Costs, Foundations and Siting                                             $-
Ex Factory Cost ($6m per unit)                                                 $-
Assembly Costs in Floating Dock                                                $-
Finishing Costs (Incl. Labour & Transport)                                     $-
Plant and Equipment (for Floating Dock & Main Factory)                         $-              -               -               -               -               -               -               -               -               -               -               -               -
Land and Building - Factory ($5m + $53m)                                       $-              -               -               -               -               -               -               -               -               -               -               -               -
Tooling Moulds ($24m)                                                          $-              -               -               -               -               -               -               -               -               -               -               -               -
Floating Docks x 3 ($150m)                                                     $-              -               -               -               -               -               -               -               -               -               -               -               -
Engineering ($15.15m)                                                          $-              -               -               -               -               -               -               -               -               -               -               -               -
Technology Transfer - To CAL + HTF Royalties                                   $-              -               -               -               -               -               -               -               -               -               -               -               -
Cost of Sales Water per m3 + Barges                                            $-
Cost of Sales Electricity                                                      $-
Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover                      $-
Tug Towage to Site Cost                                                        $-
Undersea Cable & Pipework to Shore - Placement and Anchoring                   $-
CAL Marine Tugs - Ex Factory Cost                                              $-
Tug Manufacturing Plant - Capital Cost                                         $-
Total Asset Purchases                                                          $-              -               -               -               -               -               -               -               -               -               -               -               -


Cash Flow from Operating Activities
Loan Repayment at 6% interest                                                $-
Operating (Deficiency) / Surplus                                    $(3,052,700)        (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)
Sale of Water - $US0.70 per m3                                               $-                -               -               -               -               -               -               -               -               -               -               -               -
Sale of Electricity - $US50.00 per MWh (61,320MWh annually)                  $-                -               -               -               -               -               -               -               -               -               -               -               -
Water Power Generation (113,880MWh annually)                                 $-                -               -               -               -               -               -               -               -               -               -               -               -
Add Back Tug Transport                                                       $-                -               -               -               -               -               -               -               -               -               -               -               -
Add Back 2.5% to CAL Marine                                                  $-                -               -               -               -               -               -               -               -               -               -               -               -
Total                                                               $(3,052,700)        (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)       (254,392)
Net (Deficiency) / Surplus before Investing                         369,445,400      372,243,708     371,989,317     371,734,925     371,480,533     371,226,142     370,971,750     370,717,358     370,462,967     370,208,575     369,954,183     369,699,792     369,445,400


                                                                   $369,445,400      372,243,708     371,989,317     371,734,925     371,480,533     371,226,142     370,971,750     370,717,358     370,462,967     370,208,575     369,954,183     369,699,792     369,445,400

Cash Flow from Financing Activities                                            $-

Invested Share Capital                                                         $-


Net - Surplus (Deficiency) - before Commissions                    $369,445,400      372,243,708     371,989,317     371,734,925     371,480,533     371,226,142     370,971,750     370,717,358     370,462,967     370,208,575     369,954,183     369,699,792     369,445,400

Less: Funding Commissions

Net - Surplus (Deficiency) - after Commissions                     $369,445,400      372,243,708     371,989,317     371,734,925     371,480,533     371,226,142     370,971,750     370,717,358     370,462,967     370,208,575     369,954,183     369,699,792     369,445,400

Cash at End of Month                                               $369,445,400     $372,243,708    $371,989,317    $371,734,925    $371,480,533    $371,226,142    $370,971,750    $370,717,358    $370,462,967    $370,208,575    $369,954,183    $369,699,792    $369,445,400
CAL MARINE - One Plant
Budget 2008 - 2013

USE OF CASH                                                        2011             2011            2011            2011            2011            2011            2011              2011             2011            2011             2011              2011             2011
$US                                                            Annual Budget        Jan             Feb             March           April           May             June              July             Aug             Sept             Oct               Nov              Dec

Machines Produced per Month                                        105               5                5              5               10              10               10               10               10              10               10                10               10
Total Machines Installed                                                             5               10              15              25              35               45               55               65              75               85                95              105

Cash at Beginning of Month                                          $369,445,400    $369,445,400    $307,385,079    $250,007,747    $197,313,406    $87,551,541      $(12,844,343)   $(103,874,248)   $(185,538,173)   $(257,836,117)   $(320,768,082)   $(374,334,067)   $(418,534,072)

Use of Cash
Development Costs                                                             $-
Site Costs, Foundations and Siting                                  $126,000,000       6,000,000       6,000,000       6,000,000      12,000,000     12,000,000        12,000,000       12,000,000       12,000,000       12,000,000       12,000,000       12,000,000       12,000,000
Ex Factory Cost ($6m per unit)                                      $828,514,050      39,453,050      39,453,050      39,453,050      78,906,100     78,906,100        78,906,100       78,906,100       78,906,100       78,906,100       78,906,100       78,906,100       78,906,100
Assembly Costs in Floating Dock                                     $207,548,670       9,883,270       9,883,270       9,883,270      19,766,540     19,766,540        19,766,540       19,766,540       19,766,540       19,766,540       19,766,540       19,766,540       19,766,540
Finishing Costs (Incl. Labour & Transport)                           $63,000,000       3,000,000       3,000,000       3,000,000       6,000,000      6,000,000         6,000,000        6,000,000        6,000,000        6,000,000        6,000,000        6,000,000        6,000,000
Plant and Equipment (for Floating Dock & Main Factory)                        $-               -               -               -               -              -                 -                -                -                -                -                -                -
Land and Building - Factory ($5m + $53m)                                      $-               -               -               -               -              -                 -                -                -                -                -                -                -
Tooling Moulds ($24m)                                                         $-               -               -               -               -              -                 -                -                -                -                -                -                -
Floating Docks x 3 ($150m)                                                    $-               -               -               -               -              -                 -                -                -                -                -                -                -
Engineering ($15.15m)                                                         $-               -               -               -               -              -                 -                -                -                -                -                -                -
Technology Transfer - To CAL + HTF Royalties                         $49,710,843       2,367,183       2,367,183       2,367,183       4,734,366      4,734,366         4,734,366        4,734,366        4,734,366        4,734,366        4,734,366        4,734,366        4,734,366
Cost of Sales Water per m3 + Barges                                 $202,537,454       1,646,646       3,293,292       4,939,938       8,233,230     11,526,522        14,819,814       18,113,106       21,406,398       24,699,689       27,992,981       31,286,273       34,579,565
Cost of Sales Electricity                                            $77,153,481         627,264       1,254,528       1,881,792       3,136,320      4,390,848         5,645,377        6,899,905        8,154,433        9,408,961       10,663,489       11,918,017       13,172,545
Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover            $57,937,933         471,040         942,080       1,413,120       2,355,201      3,297,281         4,239,361        5,181,441        6,123,521        7,065,602        8,007,682        8,949,762        9,891,842
Tug Towage to Site Cost                                              $15,750,000         750,000         750,000         750,000       1,500,000      1,500,000         1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000
Undersea Cable & Pipework to Shore - Placement and Anchoring        $105,000,000       5,000,000       5,000,000       5,000,000      10,000,000     10,000,000        10,000,000       10,000,000       10,000,000       10,000,000       10,000,000       10,000,000       10,000,000
CAL Marine Tugs - Ex Factory Cost                                    $15,810,000         770,000         770,000         770,000       1,500,000      1,500,000         1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000
Tug Manufacturing Plant - Capital Cost                                        $-
Total Asset Purchases                                             $1,748,962,430      69,968,453      72,713,403      75,458,353     148,131,757    153,621,657      159,111,557      164,601,458      170,091,358      175,581,258      181,071,158      186,561,059      192,050,959


Cash Flow from Operating Activities
Loan Repayment at 6% interest                                                 $-
Operating (Deficiency) / Surplus                                     $(3,237,700)       (269,808)       (269,808)       (269,808)       (269,808)       (269,808)        (269,808)        (269,808)        (269,808)        (269,808)        (269,808)        (269,808)        (269,808)
Sale of Water - $US0.70 per m3                                      $150,585,313       1,224,271       2,448,542       3,672,813       6,121,354       8,569,896       11,018,438       13,466,979       15,915,521       18,364,063       20,812,604       23,261,146       25,709,688
Sale of Electricity - $US50.00 per MWh (61,320MWh annually)         $448,950,000       3,650,000       7,300,000      10,950,000      18,250,000      25,550,000       32,850,000       40,150,000       47,450,000       54,750,000       62,050,000       69,350,000       76,650,000
Water Power Generation (113,880MWh annually)                        $291,817,500       2,372,500       4,745,000       7,117,500      11,862,500      16,607,500       21,352,500       26,097,500       30,842,500       35,587,500       40,332,500       45,077,500       49,822,500
Add Back Tug Transport                                               $15,750,000         750,000         750,000         750,000       1,500,000       1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000
Add Back 2.5% to CAL Marine                                          $22,283,820         181,169         362,339         543,508         905,846       1,268,185        1,630,523        1,992,862        2,355,201        2,717,539        3,079,878        3,442,216        3,804,555
Total                                                               $926,148,933       7,908,132      15,336,072      22,764,012      38,369,892      53,225,772       68,081,653       82,937,533       97,793,413      112,649,293      127,505,173      142,361,054      157,216,934
Net (Deficiency) / Surplus before Investing                         (453,368,097)    307,385,079     250,007,747     197,313,406      87,551,541     (12,844,343)    (103,874,248)    (185,538,173)    (257,836,117)    (320,768,082)    (374,334,067)    (418,534,072)    (453,368,097)


                                                                   $(453,368,097)    307,385,079     250,007,747     197,313,406      87,551,541     (12,844,343)    (103,874,248)    (185,538,173)    (257,836,117)    (320,768,082)    (374,334,067)    (418,534,072)    (453,368,097)

Cash Flow from Financing Activities                                            $-

Invested Share Capital                                                         $-


Net - Surplus (Deficiency) - before Commissions                    $(453,368,097)    307,385,079     250,007,747     197,313,406      87,551,541     (12,844,343)    (103,874,248)    (185,538,173)    (257,836,117)    (320,768,082)    (374,334,067)    (418,534,072)    (453,368,097)

Less: Funding Commissions

Net - Surplus (Deficiency) - after Commissions                     $(453,368,097)    307,385,079     250,007,747     197,313,406      87,551,541     (12,844,343)    (103,874,248)    (185,538,173)    (257,836,117)    (320,768,082)    (374,334,067)    (418,534,072)    (453,368,097)

Cash at End of Month                                               $(453,368,097)   $307,385,079    $250,007,747    $197,313,406     $87,551,541    $(12,844,343)   $(103,874,248)   $(185,538,173)   $(257,836,117)   $(320,768,082)   $(374,334,067)   $(418,534,072)   $(453,368,097)
CAL MARINE - One Plant
Budget 2008 - 2013

USE OF CASH                                                        2012               2012            2012             2012             2012              2012             2012             2012             2012             2012            2012              2012             2012
$US                                                            Annual Budget          Jan             Feb              March            April             May              June             July             Aug              Sept            Oct               Nov              Dec

Machines Produced per Month                                        180                 15               15                15             15                15                15              15              15                15               15               15              15
Total Machines Installed                                                              120              135               150             165               180              195              210             225               240             255              270              285

Cash at Beginning of Month                                          $(453,368,097)   $(453,368,097)   $(539,982,489)   $(612,547,910)   $(671,064,362)   $(715,531,844)   $(745,950,356)   $(762,319,898)   $(764,640,470)   $(752,912,072)   $(727,134,704)   $(687,308,367)   $(633,433,059)

Use of Cash
Development Costs                                                              $-
Site Costs, Foundations and Siting                                   $216,000,000      18,000,000       18,000,000       18,000,000       18,000,000       18,000,000       18,000,000       18,000,000       18,000,000       18,000,000       18,000,000       18,000,000       18,000,000
Ex Factory Cost ($6m per unit)                                     $1,420,309,800     118,359,150      118,359,150      118,359,150      118,359,150      118,359,150      118,359,150      118,359,150      118,359,150      118,359,150      118,359,150      118,359,150      118,359,150
Assembly Costs in Floating Dock                                      $355,797,720      29,649,810       29,649,810       29,649,810       29,649,810       29,649,810       29,649,810       29,649,810       29,649,810       29,649,810       29,649,810       29,649,810       29,649,810
Finishing Costs (Incl. Labour & Transport)                           $108,000,000       9,000,000        9,000,000        9,000,000        9,000,000        9,000,000        9,000,000        9,000,000        9,000,000        9,000,000        9,000,000        9,000,000        9,000,000
Plant and Equipment (for Floating Dock & Main Factory)                         $-              -                -                -                -                -                -                -                -                -                -                -                -
Land and Building - Factory ($5m + $53m)                                       $-              -                -                -                -                -                -                -                -                -                -                -                -
Tooling Moulds ($24m)                                                          $-              -                -                -                -                -                -                -                -                -                -                -                -
Floating Docks x 3 ($150m)                                                     $-              -                -                -                -                -                -                -                -                -                -                -                -
Engineering ($15.15m)                                                          $-              -                -                -                -                -                -                -                -                -                -                -                -
Technology Transfer - To CAL + HTF Royalties                          $85,218,588       7,101,549        7,101,549        7,101,549        7,101,549        7,101,549        7,101,549        7,101,549        7,101,549        7,101,549        7,101,549        7,101,549        7,101,549
Cost of Sales Water per m3 + Barges                                  $800,269,939      39,519,503       44,459,441       49,399,379       54,339,317       59,279,255       64,219,193       69,159,131       74,099,068       79,039,006       83,978,944       88,918,882       93,858,820
Cost of Sales Electricity                                            $304,850,338      15,054,338       16,936,130       18,817,922       20,699,714       22,581,506       24,463,299       26,345,091       28,226,883       30,108,675       31,990,468       33,872,260       35,754,052
Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover            $228,925,491      11,304,963       12,718,083       14,131,203       15,544,323       16,957,444       18,370,564       19,783,684       21,196,805       22,609,925       24,023,045       25,436,166       26,849,286
Tug Towage to Site Cost                                               $27,000,000       2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000
Undersea Cable & Pipework to Shore - Placement and Anchoring         $180,000,000      15,000,000       15,000,000       15,000,000       15,000,000       15,000,000       15,000,000       15,000,000       15,000,000       15,000,000       15,000,000       15,000,000       15,000,000
CAL Marine Tugs - Ex Factory Cost                                     $18,000,000       1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000        1,500,000
Tug Manufacturing Plant - Capital Cost                                         $-
Total Asset Purchases                                              $3,744,371,875     266,739,312      274,974,163      283,209,013      291,443,864      299,678,714      307,913,564      316,148,415      324,383,265      332,618,116      340,852,966      349,087,816      357,322,667


Cash Flow from Operating Activities
Loan Repayment at 6% interest                                                  $-
Operating (Deficiency) / Surplus                                      $(4,747,700)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)        (395,642)
Sale of Water - $US0.70 per m3                                       $594,995,625       29,382,500       33,055,313       36,728,125       40,400,938       44,073,750       47,746,563       51,419,375       55,092,188       58,765,000       62,437,813       66,110,625       69,783,438    -
Sale of Electricity - $US50.00 per MWh (61,320MWh annually)        $1,773,900,000       87,600,000       98,550,000      109,500,000      120,450,000      131,400,000      142,350,000      153,300,000      164,250,000      175,200,000      186,150,000      197,100,000      208,050,000    -
Water Power Generation (113,880MWh annually)                       $1,153,035,000       56,940,000       64,057,500       71,175,000       78,292,500       85,410,000       92,527,500       99,645,000      106,762,500      113,880,000      120,997,500      128,115,000      135,232,500    -
Add Back Tug Transport                                                $27,000,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000        2,250,000    -
Add Back 2.5% to CAL Marine                                           $88,048,266        4,348,063        4,891,570        5,435,078        5,978,586        6,522,094        7,065,602        7,609,109        8,152,617        8,696,125        9,239,633        9,783,141       10,326,648    -
Total                                                              $3,632,231,191      180,124,921      202,408,741      224,692,561      246,976,382      269,260,202      291,544,022      313,827,843      336,111,663      358,395,483      380,679,304      402,963,124      425,246,944
Net (Deficiency) / Surplus before Investing                          (565,508,782)    (539,982,489)    (612,547,910)    (671,064,362)    (715,531,844)    (745,950,356)    (762,319,898)    (764,640,470)    (752,912,072)    (727,134,704)    (687,308,367)    (633,433,059)    (565,508,782)


                                                                    $(565,508,782)    (539,982,489)    (612,547,910)    (671,064,362)    (715,531,844)    (745,950,356)    (762,319,898)    (764,640,470)    (752,912,072)    (727,134,704)    (687,308,367)    (633,433,059)    (565,508,782)

Cash Flow from Financing Activities                                            $-

Invested Share Capital                                                         $-


Net - Surplus (Deficiency) - before Commissions                     $(565,508,782)    (539,982,489)    (612,547,910)    (671,064,362)    (715,531,844)    (745,950,356)    (762,319,898)    (764,640,470)    (752,912,072)    (727,134,704)    (687,308,367)    (633,433,059)    (565,508,782)

Less: Funding Commissions

Net - Surplus (Deficiency) - after Commissions                      $(565,508,782)    (539,982,489)    (612,547,910)    (671,064,362)    (715,531,844)    (745,950,356)    (762,319,898)    (764,640,470)    (752,912,072)    (727,134,704)    (687,308,367)    (633,433,059)    (565,508,782)

Cash at End of Month                                                $(565,508,782)   $(539,982,489)   $(612,547,910)   $(671,064,362)   $(715,531,844)   $(745,950,356)   $(762,319,898)   $(764,640,470)   $(752,912,072)   $(727,134,704)   $(687,308,367)   $(633,433,059)   $(565,508,782)
CAL MARINE - One Plant
Budget 2008 - 2013

Balance Sheet
CAPITAL BUDGET                                                 Totals    2008            2008
$US                                                                     Annual           Jan

ASSETS

Equipment

Development Costs                                        $135,800,000             $-
Plant and Equipment (for Floating Dock & Main Factory)    $55,000,000    $30,000,000
Land and Building - Factory ($5m + $53m)                  $58,000,000    $58,000,000
Tooling Moulds ($24m)                                     $24,000,000             $-
Floating Docks x 3 ($150m)                               $150,000,000   $150,000,000
Engineering ($15.15m)                                     $15,150,000    $10,821,429
Technology Transfer                                       $15,000,000    $15,000,000    15,000,000
Tug Manufacturing Plant - Capital Cost                   $100,000,000   $100,000,000

Total Asset Purchases                                    $552,950,000   $363,821,429   $15,000,000
2008         2008           2008         2008          2008         2008          2008
Feb          March          April        May           June         July          Aug




              5,000,000                   8,833,333     8,833,333     8,833,333     8,833,333

             25,000,000    25,000,000    25,000,000    25,000,000    25,000,000    25,000,000
              2,164,286                   2,164,286                   2,164,286

             16,666,667    16,666,667    16,666,667    16,666,667    16,666,667    16,666,667

       $-   $48,830,952   $41,666,667   $52,664,286   $50,500,000   $52,664,286   $50,500,000
2008          2008          2008          2008           2009
Sept           Oct          Nov           Dec           Annual




                                                        $135,800,000
  7,500,000     7,500,000     7,500,000     7,500,000    $25,000,000
  8,833,333     8,833,333                                         $-
                                                         $24,000,000
                                                                  $-
  2,164,286                   2,164,286                   $4,328,571
                                                                  $-
                                                                  $-

$18,497,619   $16,333,333    $9,664,286    $7,500,000   $189,128,571
2009          2009          2009          2009          2009          2009
Jan           Feb           March         April         May           June




                             15,088,889    15,088,889    15,088,889    15,088,889
  6,250,000     6,250,000     6,250,000     6,250,000

  4,000,000     4,000,000     4,000,000     4,000,000     4,000,000     4,000,000

  2,164,286     2,164,286



$12,414,286   $12,414,286   $25,338,889   $25,338,889   $19,088,889   $19,088,889
2009          2009          2009          2009          2009          2009
July          Aug           Sept           Oct          Nov           Dec




 15,088,889    15,088,889    15,088,889    15,088,889    15,088,889




$15,088,889   $15,088,889   $15,088,889   $15,088,889   $15,088,889          $-
2010         2010        2010        2010         2010
Annual        Jan         Feb         March        April




         $-
         $-
         $-
         $-
         $-
         $-
         $-


         $-          $-          $-           $-           $-
2010        2010        2010        2010        2010
May         June        July        Aug         Sept




       $-          $-          $-          $-          $-
2010        2010        2010         2011         2011
 Oct        Nov         Dec         Annual        Jan




                                             $-
                                             $-
                                             $-
                                             $-
                                             $-
                                             $-
                                             $-


       $-          $-          $-            $-          $-
2011        2011         2011         2011        2011
Feb         March        April        May         June




       $-           $-           $-          $-          $-
2011        2011        2011        2011        2011
July        Aug         Sept         Oct        Nov




       $-          $-          $-          $-          $-
2011         2012         2012        2012        2012
Dec         Annual        Jan         Feb         March




                     $-
                     $-
                     $-
                     $-
                     $-
                     $-
                     $-


       $-            $-          $-          $-           $-
2012         2012        2012        2012        2012
April        May         June        July        Aug




        $-          $-          $-          $-          $-
2012        2012        2012        2012
Sept         Oct        Nov         Dec




       $-          $-          $-          $-
2013         2013        2013        2013         2013
Annual        Jan         Feb         March        April




         $-
         $-
         $-
         $-
         $-
         $-
         $-


         $-          $-          $-           $-           $-
2013        2013        2013        2013        2013
May         June        July        Aug         Sept




       $-          $-          $-          $-          $-
2013        2013        2013
 Oct        Nov         Dec




       $-          $-          $-
EXECUTIVE OVERHEAD SUMMARY
$US


                                                                Pre-Production                                       Production
                                                        2008             2009        2010        2011        2012           2013       2014        2015
Personnel Costs:
President                                            160,000          160,000     200,000     200,000     350,000        350,000    350,000     350,000
VP Research & Dev                                     55,000          110,000     140,000     140,000     200,000        200,000    200,000     200,000
VP Turbines                                           55,000          110,000     140,000     140,000     200,000        200,000    200,000     200,000
VP Marine                                             55,000          110,000     140,000     140,000     200,000        200,000    200,000     200,000
VP Financial                                          55,000          110,000     140,000     140,000     200,000        200,000    200,000     200,000
VP Marketing                                          55,000          110,000     140,000     140,000     200,000        200,000    200,000     200,000
VP Manufacturing                                                      110,000     140,000     140,000     200,000        200,000    200,000     200,000
VP Electrical                                         55,000          110,000     140,000     140,000     200,000        200,000    200,000     200,000
Office Personal                                       30,000           60,000      70,000      80,000     100,000        100,000    100,000     100,000
Executive Directors & Staff                          200,000          400,000     450,000     600,000     700,000        700,000    700,000     700,000
Director of Project Management                       160,000          160,000     200,000     200,000     350,000        350,000    350,000     350,000
Consulting:
Consultants (incl $20m labour hireage allowance)   20,200,000         200,000     200,000     200,000     300,000        300,000    300,000     300,000
Total Personnel Costs                              21,080,000       1,750,000    2,100,000   2,260,000   3,200,000     3,200,000   3,200,000   3,200,000


Other Overheads:
Office Rent                                          150,000          300,000     300,000     300,000     600,000        600,000    600,000     600,000
Office Equip Rental                                   10,000           17,700      17,700      17,700      17,700         17,700     17,700      17,700
Printing &Stationary                                  20,000            2,000       5,000       5,000       5,000          5,000      5,000       5,000
Communications                                        10,000           10,000      20,000      20,000      30,000         30,000     30,000      30,000
Vehicle Running                                       39,000           50,000      50,000      50,000      50,000         50,000     50,000      50,000
Vehicle Leases                                        43,200           60,000      60,000      60,000      60,000         60,000     60,000      60,000
Legal                                                 80,000           20,000      20,000      30,000      40,000         40,000     40,000      40,000
Accounting/Audit                                      50,000           10,000      10,000      15,000      15,000         15,000     15,000      15,000
Local Travel                                          50,000           50,000      50,000      50,000      50,000         50,000     50,000      50,000
Overseas Travel                                      200,000          200,000     200,000     200,000     300,000        300,000    300,000     300,000
Private Accommodation                                110,000          200,000     200,000     200,000     300,000        300,000    300,000     300,000
Advertising/Web Site                                  20,000           20,000      20,000      30,000      80,000         80,000     80,000      80,000
Total Other Overheads                                782,200          939,700     952,700     977,700    1,547,700     1,547,700   1,547,700   1,547,700

Total Operating Costs                              21,862,200       2,689,700    3,052,700   3,237,700   4,747,700     4,747,700   4,747,700   4,747,700
Sheet Line
   No


   14

   15

   16

   17

   24


   25

   40




   37


   38




   39


   26

   29
Varaible Cost PER MACHINE



Site Costs, Foundations and Siting

Ex Factory Cost (HT Ferro Components of wind turbine)

Assembly Costs (in Floating Dock)

Finishing Costs IE Blades, and 3 Generators - Wind Generator, Solar Generation, Water Current generator
   Total Cost for Floating unit
Cost of Sales Water per m3 + Barges = $0.3692674/m3
4,197,500 m3 Annual Divided by Capital Cost per Machine = $15,000,000
plus $500,000 cost of Barge = $15,500,000 x 6 % + 2 % = 4,197,500 = 0.0285884 x 8% plus 2% Maintenance =
Cost of Electricity = $8,000,000 x 6 % + 2% = $0208741 KWh =

Ex Factory Margin Over Cost per Unit



Ex Factory Margin Over Cost per Unit
Cost ex Factory


Sale of Water per Unit = $2.55 x 4,179,500 m3 = $10,661,650 Annual divided by 12 = 888,470.83 Per Month x $2.54 + $2,256,715.90
m3

Sale of Electricity Per unit:
Ivory Coast = $70 per MWh x 2,555 MWh per Month
Europe = $90 per MWh x 2,555 MWh per Month

Solar and Water Generation - calculate it will take the Electricity up to 100% CAPACITY FACTOR = 4,745 MWh per month x either $90
per MWh or $70 per MWh

This figure will reduce as turnover is not as high as first shown it will be

Cal Marine Tugs ex Factory - allow for 2 tugs per month at the start-up level (each tug can tow up to 3 wind turbines at a time)

Unit Towage
Site Costs per unit
Unit assembly on floating dock
Finishing costs

Undersea Cable & Pipework to Shore - Placement and Anchoring

Tug Manufactured Cost


Desalination Plant
  Capital Cost per machine
   Water production (cubic meters per machine per annum)
   Cost of capital
   Maintenance cost
   Total cost
   Monthly cost

Electricity Generation
   Capital cost
   ROI & Maintenance
   Power generation capacity @ 20 MW per unit
   Capacity factor
   MWh per machine per annum

   Monthly cost
   Annual Cost
   Cost per MWh

Sale of Water per machine
Water production per annum (cubic metres)
  Selling price per cubic meter
  Revenue per annum

Electricity sales
   Selling price per MWh

Electricity selling price per machine
Electricity production per month (MWh)
Selling Price
Cost Figure



  $1,200,000

  $4,311,768

    $326,340

  $5,500,000 x 6% Funds Borrowed so unit cost is
 $10,138,108
  $0.3692674

 $0.00357355
  $0.2087410 per MWH

            $0 Power               $13,000,000
               Gereration
               Plants - Capital
               value
                                     $5,109,390
                                      7,890,610




    $178,850
    $229,950




        6.5% of Turnover per month

    $770,000 for 2 tugs

   $150,000
  $1,200,000
  $1,976,654
   $600,000

  $1,000,000

    $385,000




 $15,500,000
   4,197,500        349,791.67
          8%
          2%


 $329,329.19                0.94

  Wind              Water           Total
  $8,000,000        $5,000,000     $13,000,000
         10%              10%             10%
    175,200           175,200         175,200
         35%              65%            100%
      61,320          113,880         175,200

  $77,201.73         $48,251.08    $125,452.81
   $926,421           $579,013      $1,505,434
      $15.11              $5.08          $8.59

per annum         per month
4,197,500
     $0.70
$2,938,250     $244,854


   $50.00

Wind         Water        Total
    5,110         9,490      14,600
    $50.00       $50.00       $50.00
 $255,500     $474,500     $730,000
Budget For CAL MARINE in reference to the CashFlow
$US

ENGINEERING COSTS

  Completetion of Wind Tunnel testing                                                     100,000

  Wind Tunnel model including Instrumentation                                              50,000

  Engineering of Floating C86-10MW HT Ferro Attaractor, Centre
  Body, Centre-Body Supports, Column and Ballest Keel,
  Including Sea-Bed Anchoring                                                            1,500,000

  Engineering of Flotation and Sea-Tow, stationing on pre-set
  Cooridinates; power cable connection, fixture and layout; yaw control                   750,000

  Design/Engineering of Column Structure 25m dia x 70m length
  Anchoring fixture for sea-bed Foundation Pile tops and fixing
  Yaw capability, guidence of column base to foundation tops and
  fixing.                                                                                 750,000

  Engineering of Floating Dock: 450m x 200m                                               800,000

  Launching Technique, Craneage assembly on Floating Dock,
  Assembley Process                                                                       500,000

  Engineering/Design Variable Speed 10MW AC Generator
  Control System and Switchgear                                                           500,000

  Engineering/Design 10MW Direct Current Generator, Control
  System, Switchgear, DC/AC shore System with switching                                   750,000

  Design/Blueprint 80m x 20m Electrical Assembley Shed                                    650,000

  Design/Blueprint 80m x 20m Mechanical assembley shed                                    650,000

  Design/Blueprint Steel reinforcing assembley shed                                       650,000

  Design/Engineer Blade and Hub assembly; Drive train
  Brake, Hydraulics, assembly and fitting out centre-body and rotors                     1,500,000

  Design/Engineer Towing System; Tug Sizing, Launching
  from Floating Dock, Site Installation, Multiple unit connection
  and Precision placement                                                                1,000,000

  Design, build test, co-generator                                                       5,000,000

  Sub Total                                                                             15,150,000

CAPITAL COSTS

  Floating Docks x 3 off (Tender Allowance)                                            150,000,000

  Tug Plant alonside main Plant, Budget reqd for Design
  Technology Transfer, Engineering and Moulds, Tug Length
  77.7m beam 77m draught 7.1m with two 10,000 KW Supercharged Diesels                  100,000,000

  Purchase Waterfront Land - allow 100 Hectares
  x $50,000 per Hectare                                                                  5,000,000

  Production Plant 200m x 530m at $500/m2                                               53,000,000

  Exclusive Licence for HTFerro Plants                                                  15,000,000

  Plant and Equipment (Main Plant)                                                      25,000,000

  Plant and Equipment (Floating Dock)                                                   30,000,000

  Main Structure Moulds:
    Attractor                                                             13,500,000
    Column 25m dia x 70m                                                   3,500,000
Bell Flotation Unit                                                          2,500,000
     Keel Ballast Support Legs                                                    3,000,000
     Keel Ballast                                                                 1,500,000
                                                                                               24,000,000

  Sub Total                                                                                   402,000,000

DEVELOPMENT COSTS

  Wharf and Floating Dock Tethering 1000m                                                     100,000,000

  Dredge Foreshore to accomodateF/Docks and Towage path
  900,000 cubic metres x $70/m3                                                                 6,300,000

  Desalination Barge: 35m x 7m capable of transporting & housing
  42 x 20ft desalination container modules 3 high - design
  moulds, plant, and motive power                                                              20,000,000

  Brokerage Fees - allow 1% total budget                                                        9,500,000

  Sub Total                                                                                   135,800,000

TOTAL                                                                                         552,950,000

Plus Contingency Allowance of 10% (not included in cashflow) but allowed for in
Funding Application.                                                                          55,295,000

Más contenido relacionado

Destacado

Destacado (13)

Projeto Amigo da Criança 2011
Projeto  Amigo da Criança 2011Projeto  Amigo da Criança 2011
Projeto Amigo da Criança 2011
 
Oh no the cramp again ……
Oh no the cramp again ……Oh no the cramp again ……
Oh no the cramp again ……
 
akash
akashakash
akash
 
Dennis John Paul of NZ Struc
Dennis John Paul of NZ StrucDennis John Paul of NZ Struc
Dennis John Paul of NZ Struc
 
ADIB Time Schedule V4.0
ADIB Time Schedule V4.0ADIB Time Schedule V4.0
ADIB Time Schedule V4.0
 
Proyecto Final IAVA
Proyecto Final IAVAProyecto Final IAVA
Proyecto Final IAVA
 
Johana alma
Johana almaJohana alma
Johana alma
 
Tanques agitados
Tanques agitadosTanques agitados
Tanques agitados
 
Design and plan 2.5
Design and plan 2.5Design and plan 2.5
Design and plan 2.5
 
rotstekeningen
rotstekeningenrotstekeningen
rotstekeningen
 
автограф
автографавтограф
автограф
 
Cal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentationCal Marine Power & Water "straw" scam presentation
Cal Marine Power & Water "straw" scam presentation
 
Ficha de trabalho 10%c2%ba a
Ficha de trabalho 10%c2%ba aFicha de trabalho 10%c2%ba a
Ficha de trabalho 10%c2%ba a
 

Similar a 5 year cashflow Cal Marine SCAM????

Spark the rise Recycle e-waste
Spark the rise Recycle e-wasteSpark the rise Recycle e-waste
Spark the rise Recycle e-wasteShivin Tikoo
 
Drilling & Acquisition Fund, LLC
Drilling & Acquisition Fund, LLCDrilling & Acquisition Fund, LLC
Drilling & Acquisition Fund, LLCenhancedsol
 
.schering-plough Cash-Flow-Highlights
.schering-plough Cash-Flow-Highlights.schering-plough Cash-Flow-Highlights
.schering-plough Cash-Flow-Highlightsfinance22
 
21 10125魚貨供銷情形
21 10125魚貨供銷情形21 10125魚貨供銷情形
21 10125魚貨供銷情形Penlock Chen
 
Mayo%202010 presupuesto centro
Mayo%202010 presupuesto centroMayo%202010 presupuesto centro
Mayo%202010 presupuesto centrowinstonrivera
 
Mayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centroMayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centrowinstonrivera
 
COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$ 8
COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$   8COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$   8
COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$ 8AlleneMcclendon878
 
Proposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plantProposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plantDato Mat Isa
 
PLC Business Plan (01.09.2010)
PLC Business Plan (01.09.2010)PLC Business Plan (01.09.2010)
PLC Business Plan (01.09.2010)John Ceresa
 
Costing assignment.docx
Costing assignment.docxCosting assignment.docx
Costing assignment.docxssuserdcbf4e
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationAltera Infrastructure
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationAltera Infrastructure
 
Budget Vs Actual Variance Analysis PowerPoint Presentation Slides
Budget Vs Actual Variance Analysis PowerPoint Presentation SlidesBudget Vs Actual Variance Analysis PowerPoint Presentation Slides
Budget Vs Actual Variance Analysis PowerPoint Presentation SlidesSlideTeam
 
Actual Vs Budget Variance PowerPoint Presentation Slides
Actual Vs Budget Variance PowerPoint Presentation SlidesActual Vs Budget Variance PowerPoint Presentation Slides
Actual Vs Budget Variance PowerPoint Presentation SlidesSlideTeam
 
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27
Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27Rajendra Inani
 
Osx project update agosto_final_inglês
Osx project update agosto_final_inglêsOsx project update agosto_final_inglês
Osx project update agosto_final_inglêsosxri
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing conceptPaul Jacob
 

Similar a 5 year cashflow Cal Marine SCAM???? (20)

Spark the rise Recycle e-waste
Spark the rise Recycle e-wasteSpark the rise Recycle e-waste
Spark the rise Recycle e-waste
 
Drilling & Acquisition Fund, LLC
Drilling & Acquisition Fund, LLCDrilling & Acquisition Fund, LLC
Drilling & Acquisition Fund, LLC
 
.schering-plough Cash-Flow-Highlights
.schering-plough Cash-Flow-Highlights.schering-plough Cash-Flow-Highlights
.schering-plough Cash-Flow-Highlights
 
B'dAfrique newco biocarbon 1
B'dAfrique  newco biocarbon 1B'dAfrique  newco biocarbon 1
B'dAfrique newco biocarbon 1
 
21 10125魚貨供銷情形
21 10125魚貨供銷情形21 10125魚貨供銷情形
21 10125魚貨供銷情形
 
Mayo%202010 presupuesto centro
Mayo%202010 presupuesto centroMayo%202010 presupuesto centro
Mayo%202010 presupuesto centro
 
Mayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centroMayo de 2010 presupuesto centro
Mayo de 2010 presupuesto centro
 
COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$ 8
COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$   8COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$   8
COST BUDGETCONSTRUCTION COSTCostLand Loan To American Bank(2)$ 8
 
Proposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plantProposed Turbine Inlet Air Cooling for MLNG processing plant
Proposed Turbine Inlet Air Cooling for MLNG processing plant
 
PLC Business Plan (01.09.2010)
PLC Business Plan (01.09.2010)PLC Business Plan (01.09.2010)
PLC Business Plan (01.09.2010)
 
Costing assignment.docx
Costing assignment.docxCosting assignment.docx
Costing assignment.docx
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
 
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings PresentationTeekay Offshore Partners Second Quarter 2012 Earnings Presentation
Teekay Offshore Partners Second Quarter 2012 Earnings Presentation
 
Budget Vs Actual Variance Analysis PowerPoint Presentation Slides
Budget Vs Actual Variance Analysis PowerPoint Presentation SlidesBudget Vs Actual Variance Analysis PowerPoint Presentation Slides
Budget Vs Actual Variance Analysis PowerPoint Presentation Slides
 
Actual Vs Budget Variance PowerPoint Presentation Slides
Actual Vs Budget Variance PowerPoint Presentation SlidesActual Vs Budget Variance PowerPoint Presentation Slides
Actual Vs Budget Variance PowerPoint Presentation Slides
 
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27
Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27Epgp sm2  assignment_#6_03 april  10_ rajendra inani #27
Epgp sm2 assignment_#6_03 april 10_ rajendra inani #27
 
TMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZTMI MOTOR 3512 1GZ
TMI MOTOR 3512 1GZ
 
Osx project update agosto_final_inglês
Osx project update agosto_final_inglêsOsx project update agosto_final_inglês
Osx project update agosto_final_inglês
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 
Tower sharing concept
Tower sharing conceptTower sharing concept
Tower sharing concept
 

Último

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girladitipandeya
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024TeckResourcesLtd
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxindia IPO
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServicePooja Nehwal
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escortsindian call girls near you
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxMollyBrown86
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024TeckResourcesLtd
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsaronly4webmaster01
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccMollyBrown86
 

Último (20)

VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Miyapur high-profile Call Girl
 
Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024Sustainability Leadership, April 26 2024
Sustainability Leadership, April 26 2024
 
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
Sensual Moments: +91 9999965857 Independent Call Girls Noida Delhi {{ Monika}...
 
SME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptxSME IPO and sme ipo listing consultants .pptx
SME IPO and sme ipo listing consultants .pptx
 
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls ServiceMalad Escorts, (Pooja 09892124323), Malad Call Girls Service
Malad Escorts, (Pooja 09892124323), Malad Call Girls Service
 
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
(👉゚9999965857 ゚)👉 VIP Call Girls Friends Colony 👉 Delhi 👈 : 9999 Cash Payment...
 
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our EscortsCall Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
Call Girls in Friends Colony 9711199171 Delhi Enjoy Call Girls With Our Escorts
 
Editing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxxEditing progress 20th march.docxxxxxxxxx
Editing progress 20th march.docxxxxxxxxx
 
Call Girls 🫤 Mahipalpur ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
Call Girls 🫤 Mahipalpur ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOYCall Girls 🫤 Mahipalpur ➡️ 9999965857  ➡️ Delhi 🫦  Russian Escorts FULL ENJOY
Call Girls 🫤 Mahipalpur ➡️ 9999965857 ➡️ Delhi 🫦 Russian Escorts FULL ENJOY
 
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Karol Bagh 💓 High Profile Escorts Delhi 🫶
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024Teck Investor Presentation, April 24, 2024
Teck Investor Presentation, April 24, 2024
 
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
@9999965857 🫦 Sexy Desi Call Girls Vaishali 💓 High Profile Escorts Delhi 🫶
 
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In AmritsarCall Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
Call Girls In Amritsar 💯Call Us 🔝 76967 34778🔝 💃 Independent Escort In Amritsar
 
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Mahavir Nagar 🔝 9953056974 🔝 Delhi escort Service
 
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
Russian Call Girls Rohini Sector 22 💓 Delhi 9999965857 @Sabina Modi VVIP MODE...
 
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS LiveVip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
Vip Call Girls Vasant Kunj ➡️ Delhi ➡️ 9999965857 No Advance 24HRS Live
 
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort ServiceBDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
BDSM⚡Call Girls in Hari Nagar Delhi >༒8448380779 Escort Service
 
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 15 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
B2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxcccccccccccccccB2 Interpret the brief.docxccccccccccccccc
B2 Interpret the brief.docxccccccccccccccc
 

5 year cashflow Cal Marine SCAM????

  • 1. CAL MARINE - One Plant Budget 2008 - 2013 FINANCIAL SUMMARY 2008 2009 2010 2011 2012 2013 $US Annual Budget Annual Budget Annual Budget Annual Budget Annual Budget Annual Budget Machines Produced 105 180 180 Total Machines Installed 105 285 465 Cash at Beginning of Month - 614,316,371 372,498,100 369,445,400 (453,368,097) (565,508,782) Use of Cash Development Costs - 135,800,000 - - - - Site Costs, Foundations and Siting - - - 126,000,000 216,000,000 216,000,000 Ex Factory Cost ($6m per unit) - - - 828,514,050 1,420,309,800 1,420,309,800 Assembly Costs in Floating Dock - - - 207,548,670 355,797,720 355,797,720 Finishing Costs (Incl Labour/Transport) - - - 63,000,000 108,000,000 108,000,000 Plant and Equipment 30,000,000 25,000,000 - - - - Land and Building Factory ($5m plus $53m) 58,000,000 - - - - - Tooling Moulds ($24m) - 24,000,000 - - - - Floating Docks x 2 ($150m) 150,000,000 - - - - - Engineering ($15.15m) 10,821,429 4,328,571 - - - - Technology Transfer - To CAL + HTF Royalties 15,000,000 - - 49,710,843 85,218,588 85,218,588 Cost of Sales Water per m3 + Barges - - - 202,537,454 800,269,939 1,511,620,996 Cost of Sales Electricity - - - 77,153,481 304,850,338 575,828,416 Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover - - - 57,937,933 228,925,491 432,414,816 Tug Towage to Site Cost - - - 15,750,000 27,000,000 27,000,000 Undersea Cable & Pipework to Shore - Placement and Anchoring - - - 105,000,000 180,000,000 180,000,000 CAL Marine Tugs - Ex Factory Cost - - - 15,810,000 18,000,000 18,000,000 Tug Manufacturing Plant - Capital Cost 50,000,000 50,000,000 - - - - Total Asset Purchases 313,821,429 239,128,571 - 1,748,962,430 3,744,371,875 4,930,190,335 Cash Flow from Operating Activities - - - - - - Loan Repayment at 6% interest - - - - - - Operating (Deficiency) / Surplus (21,862,200) (2,689,700) (3,052,700) (3,237,700) (4,747,700) (4,747,700) Sale of Water - $US0.70 per m3 - - 150,585,313 594,995,625 1,123,880,625 Sale of Electricity - $US50.00 per MWh (61,320MWh annually) - - - 448,950,000 1,773,900,000 3,350,700,000 Water Power Generation (113,880MWh annually) - - - 291,817,500 1,153,035,000 2,177,955,000 Ex Factory Margin - - - - - - Add Back Tug Transport - - - 15,750,000 27,000,000 27,000,000 Add Back 2.5% to CAL Marine - - - 22,283,820 88,048,266 166,313,391 Total (21,862,200) (2,689,700) (3,052,700) 926,148,933 3,632,231,191 6,841,101,316 Net (Deficiency) / Surplus before Investing (335,683,629) 372,498,100 369,445,400 (453,368,097) (565,508,782) 1,345,402,198 Cash Flow from Financing Activities 950,000,000 - - - - - Invested Share Capital 950,000,000 - - - - - Net - Surplus (Deficiency) - before Commissions 614,316,371 372,498,100 369,445,400 (453,368,097) (565,508,782) 1,345,402,198 Less: Funding Commissions 9,500,000 - - - - - Net - Surplus (Deficiency) - after Commissions 604,816,371 372,498,100 369,445,400 (453,368,097) (565,508,782) 1,345,402,198 Cash at End of Month 604,816,371 372,498,100 369,445,400 (453,368,097) (565,508,782) 1,345,402,198 Net Cash Flow Surplus (Deficit) 604,816,371 (241,818,271) (3,052,700) (822,813,497) (112,140,685) 1,910,910,980
  • 2. CAL MARINE - One Plant Budget 2008 - 2013 USE OF CASH 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 2008 $US Annual Budget Jan Feb March April May June July Aug Sept Oct Nov Dec Machines Produced per Month Total Machines Installed 0 0 0 0 0 0 0 0 0 0 0 0 0 Cash at Beginning of Month $- $950,000,000 $933,178,150 $931,356,300 $897,370,164 $870,548,314 $832,728,845 $797,073,662 $759,254,193 $723,599,010 $703,279,540 $668,457,690 $640,304,887 Use of Cash Development Costs $- - - - - - - - - - - - - Site Costs, Foundations and Siting $- Ex Factory Cost ($6m per unit) $- Assembly Costs in Floating Dock $- Finishing Costs (Incl. Labour & Transport) $- Plant and Equipment (for Floating Dock & Main Factory) $30,000,000 - - - - - - - - 7,500,000 7,500,000 7,500,000 7,500,000 Land and Building - Factory ($5m + $53m) $58,000,000 - - 5,000,000 - 8,833,333 8,833,333 8,833,333 8,833,333 8,833,333 8,833,333 - - Tooling Moulds ($24m) $- - - - - - - - - - - - - Floating Docks x 3 ($150m) $150,000,000 - - 25,000,000 25,000,000 25,000,000 25,000,000 25,000,000 25,000,000 - - - - Engineering ($15.15m) $10,821,429 - - 2,164,286 - 2,164,286 - 2,164,286 - 2,164,286 - 2,164,286 - Technology Transfer - To CAL + HTF Royalties $15,000,000 15,000,000 - - - - - - - - - - - Cost of Sales Water per m3 + Barges $- Cost of Sales Electricity $- Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover $- Tug Towage to Site Cost $- Undersea Cable & Pipework to Shore - Placement and Anchoring $ CAL Marine Tugs - Ex Factory Cost $- Tug Manufacturing Plant - Capital Cost $50,000,000 16,666,667 16,666,667 16,666,666 Total Asset Purchases $313,821,429 15,000,000 - 32,164,286 25,000,000 35,997,619 33,833,333 35,997,619 33,833,333 18,497,619 33,000,000 26,330,953 24,166,666 $- $- Cash Flow from Operating Activities Loan Repayment at 6% interest $- Operating (Deficiency) / Surplus $(21,862,200) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) Sale of Water - $US0.70 per m3 $- Sale of Electricity - $US50.00 per MWh (61,320MWh annually) $- Water Power Generation (113,880MWh annually) $- Add Back Tug Transport $- Add Back 2.5% to CAL Marine $- Total $(21,862,200) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) (1,821,850) Net (Deficiency) / Surplus before Investing (335,683,629) 933,178,150 931,356,300 897,370,164 870,548,314 832,728,845 797,073,662 759,254,193 723,599,010 703,279,540 668,457,690 640,304,887 614,316,371 $(335,683,629) 933,178,150 931,356,300 897,370,164 870,548,314 832,728,845 797,073,662 759,254,193 723,599,010 703,279,540 668,457,690 640,304,887 614,316,371 Cash Flow from Financing Activities $950,000,000 Invested Share Capital $950,000,000 Net - Surplus (Deficiency) - before Commissions $614,316,371 933,178,150 931,356,300 897,370,164 870,548,314 832,728,845 797,073,662 759,254,193 723,599,010 703,279,540 668,457,690 640,304,887 614,316,371 Less: Funding Commissions $9,500,000 Net - Surplus (Deficiency) - after Commissions $604,816,371 933,178,150 931,356,300 897,370,164 870,548,314 832,728,845 797,073,662 759,254,193 723,599,010 703,279,540 668,457,690 640,304,887 614,316,371 Cash at End of Month $604,816,371 $933,178,150 $931,356,300 $897,370,164 $870,548,314 $832,728,845 $797,073,662 $759,254,193 $723,599,010 $703,279,540 $668,457,690 $640,304,887 $614,316,371
  • 3. CAL MARINE - One Plant Budget 2008 - 2013 22 23 24 25 26 27 28 29 30 31 32 33 USE OF CASH 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 2009 $US Annual Budget Jan Feb March April May June July Aug Sept Oct Nov Dec Machines Produced per Month Total Machines Installed 0 0 0 0 0 0 0 0 0 0 0 0 0 Cash at Beginning of Month $614,316,371 $614,316,371 $585,011,277 $555,706,183 $513,476,486 $487,913,456 $468,600,425 $449,287,394 $433,974,364 $418,661,333 $403,348,303 $388,035,272 $372,722,242 Use of Cash Development Costs $135,800,000 - - 15,088,889 15,088,889 15,088,889 15,088,889 15,088,889 15,088,889 15,088,889 15,088,889 15,088,889 - Site Costs, Foundations and Siting $- Ex Factory Cost ($6m per unit) $- Assembly Costs in Floating Dock $- Finishing Costs (Incl. Labour & Transport) $- Plant and Equipment (for Floating Dock & Main Factory) $25,000,000 6,250,000 6,250,000 6,250,000 6,250,000 - - - - - - - - Land and Building - Factory ($5m + $53m) $- - - - - - - - - - - - - Tooling Moulds ($24m) $24,000,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000 - - - - - - Floating Docks x 3 ($150m) $- - - - - - - - - - - - - Engineering ($15.15m) $4,328,571 2,164,286 2,164,286 - - - - - - - - - - Technology Transfer - To CAL + HTF Royalties $- - - - - - - - - - - - - Cost of Sales Water per m3 + Barges $- Cost of Sales Electricity $- Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover $- Tug Towage to Site Cost $- Undersea Cable & Pipework to Shore - Placement and Anchoring $- CAL Marine Tugs - Ex Factory Cost $- Tug Manufacturing Plant - Capital Cost $50,000,000 16,666,667 16,666,667 16,666,666 Total Asset Purchases $239,128,571 29,080,953 29,080,953 42,005,555 25,338,889 19,088,889 19,088,889 15,088,889 15,088,889 15,088,889 15,088,889 15,088,889 - Cash Flow from Operating Activities Loan Repayment at 6% interest $- Operating (Deficiency) / Surplus $(2,689,700) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) Sale of Water - $US0.70 per m3 $- Sale of Electricity - $US50.00 per MWh (61,320MWh annually) $- Water Power Generation (113,880MWh annually) $- Add Back Tug Transport $- Add Back 2.5% to CAL Marine $- Total $(2,689,700) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) (224,142) Net (Deficiency) / Surplus before Investing 372,498,100 585,011,277 555,706,183 513,476,486 487,913,456 468,600,425 449,287,394 433,974,364 418,661,333 403,348,303 388,035,272 372,722,242 372,498,100 $372,498,100 585,011,277 555,706,183 513,476,486 487,913,456 468,600,425 449,287,394 433,974,364 418,661,333 403,348,303 388,035,272 372,722,242 372,498,100 Cash Flow from Financing Activities $- Invested Share Capital $- Net - Surplus (Deficiency) - before Commissions $372,498,100 585,011,277 555,706,183 513,476,486 487,913,456 468,600,425 449,287,394 433,974,364 418,661,333 403,348,303 388,035,272 372,722,242 372,498,100 Less: Funding Commissions Net - Surplus (Deficiency) - after Commissions $372,498,100 585,011,277 555,706,183 513,476,486 487,913,456 468,600,425 449,287,394 433,974,364 418,661,333 403,348,303 388,035,272 372,722,242 372,498,100 Cash at End of Month $372,498,100 $585,011,277 $555,706,183 $513,476,486 $487,913,456 $468,600,425 $449,287,394 $433,974,364 $418,661,333 $403,348,303 $388,035,272 $372,722,242 $372,498,100
  • 4. CAL MARINE - One Plant Budget 2008 - 2013 USE OF CASH 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 $US Annual Budget Jan Feb March April May June July Aug Sept Oct Nov Dec Machines Produced per Month Total Machines Installed 0 0 0 0 0 0 0 0 0 0 0 0 0 Cash at Beginning of Month $372,498,100 $372,498,100 $372,243,708 $371,989,317 $371,734,925 $371,480,533 $371,226,142 $370,971,750 $370,717,358 $370,462,967 $370,208,575 $369,954,183 $369,699,792 Use of Cash Development Costs $- Site Costs, Foundations and Siting $- Ex Factory Cost ($6m per unit) $- Assembly Costs in Floating Dock $- Finishing Costs (Incl. Labour & Transport) $- Plant and Equipment (for Floating Dock & Main Factory) $- - - - - - - - - - - - - Land and Building - Factory ($5m + $53m) $- - - - - - - - - - - - - Tooling Moulds ($24m) $- - - - - - - - - - - - - Floating Docks x 3 ($150m) $- - - - - - - - - - - - - Engineering ($15.15m) $- - - - - - - - - - - - - Technology Transfer - To CAL + HTF Royalties $- - - - - - - - - - - - - Cost of Sales Water per m3 + Barges $- Cost of Sales Electricity $- Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover $- Tug Towage to Site Cost $- Undersea Cable & Pipework to Shore - Placement and Anchoring $- CAL Marine Tugs - Ex Factory Cost $- Tug Manufacturing Plant - Capital Cost $- Total Asset Purchases $- - - - - - - - - - - - - Cash Flow from Operating Activities Loan Repayment at 6% interest $- Operating (Deficiency) / Surplus $(3,052,700) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) Sale of Water - $US0.70 per m3 $- - - - - - - - - - - - - Sale of Electricity - $US50.00 per MWh (61,320MWh annually) $- - - - - - - - - - - - - Water Power Generation (113,880MWh annually) $- - - - - - - - - - - - - Add Back Tug Transport $- - - - - - - - - - - - - Add Back 2.5% to CAL Marine $- - - - - - - - - - - - - Total $(3,052,700) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) (254,392) Net (Deficiency) / Surplus before Investing 369,445,400 372,243,708 371,989,317 371,734,925 371,480,533 371,226,142 370,971,750 370,717,358 370,462,967 370,208,575 369,954,183 369,699,792 369,445,400 $369,445,400 372,243,708 371,989,317 371,734,925 371,480,533 371,226,142 370,971,750 370,717,358 370,462,967 370,208,575 369,954,183 369,699,792 369,445,400 Cash Flow from Financing Activities $- Invested Share Capital $- Net - Surplus (Deficiency) - before Commissions $369,445,400 372,243,708 371,989,317 371,734,925 371,480,533 371,226,142 370,971,750 370,717,358 370,462,967 370,208,575 369,954,183 369,699,792 369,445,400 Less: Funding Commissions Net - Surplus (Deficiency) - after Commissions $369,445,400 372,243,708 371,989,317 371,734,925 371,480,533 371,226,142 370,971,750 370,717,358 370,462,967 370,208,575 369,954,183 369,699,792 369,445,400 Cash at End of Month $369,445,400 $372,243,708 $371,989,317 $371,734,925 $371,480,533 $371,226,142 $370,971,750 $370,717,358 $370,462,967 $370,208,575 $369,954,183 $369,699,792 $369,445,400
  • 5. CAL MARINE - One Plant Budget 2008 - 2013 USE OF CASH 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 2011 $US Annual Budget Jan Feb March April May June July Aug Sept Oct Nov Dec Machines Produced per Month 105 5 5 5 10 10 10 10 10 10 10 10 10 Total Machines Installed 5 10 15 25 35 45 55 65 75 85 95 105 Cash at Beginning of Month $369,445,400 $369,445,400 $307,385,079 $250,007,747 $197,313,406 $87,551,541 $(12,844,343) $(103,874,248) $(185,538,173) $(257,836,117) $(320,768,082) $(374,334,067) $(418,534,072) Use of Cash Development Costs $- Site Costs, Foundations and Siting $126,000,000 6,000,000 6,000,000 6,000,000 12,000,000 12,000,000 12,000,000 12,000,000 12,000,000 12,000,000 12,000,000 12,000,000 12,000,000 Ex Factory Cost ($6m per unit) $828,514,050 39,453,050 39,453,050 39,453,050 78,906,100 78,906,100 78,906,100 78,906,100 78,906,100 78,906,100 78,906,100 78,906,100 78,906,100 Assembly Costs in Floating Dock $207,548,670 9,883,270 9,883,270 9,883,270 19,766,540 19,766,540 19,766,540 19,766,540 19,766,540 19,766,540 19,766,540 19,766,540 19,766,540 Finishing Costs (Incl. Labour & Transport) $63,000,000 3,000,000 3,000,000 3,000,000 6,000,000 6,000,000 6,000,000 6,000,000 6,000,000 6,000,000 6,000,000 6,000,000 6,000,000 Plant and Equipment (for Floating Dock & Main Factory) $- - - - - - - - - - - - - Land and Building - Factory ($5m + $53m) $- - - - - - - - - - - - - Tooling Moulds ($24m) $- - - - - - - - - - - - - Floating Docks x 3 ($150m) $- - - - - - - - - - - - - Engineering ($15.15m) $- - - - - - - - - - - - - Technology Transfer - To CAL + HTF Royalties $49,710,843 2,367,183 2,367,183 2,367,183 4,734,366 4,734,366 4,734,366 4,734,366 4,734,366 4,734,366 4,734,366 4,734,366 4,734,366 Cost of Sales Water per m3 + Barges $202,537,454 1,646,646 3,293,292 4,939,938 8,233,230 11,526,522 14,819,814 18,113,106 21,406,398 24,699,689 27,992,981 31,286,273 34,579,565 Cost of Sales Electricity $77,153,481 627,264 1,254,528 1,881,792 3,136,320 4,390,848 5,645,377 6,899,905 8,154,433 9,408,961 10,663,489 11,918,017 13,172,545 Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover $57,937,933 471,040 942,080 1,413,120 2,355,201 3,297,281 4,239,361 5,181,441 6,123,521 7,065,602 8,007,682 8,949,762 9,891,842 Tug Towage to Site Cost $15,750,000 750,000 750,000 750,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 Undersea Cable & Pipework to Shore - Placement and Anchoring $105,000,000 5,000,000 5,000,000 5,000,000 10,000,000 10,000,000 10,000,000 10,000,000 10,000,000 10,000,000 10,000,000 10,000,000 10,000,000 CAL Marine Tugs - Ex Factory Cost $15,810,000 770,000 770,000 770,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 Tug Manufacturing Plant - Capital Cost $- Total Asset Purchases $1,748,962,430 69,968,453 72,713,403 75,458,353 148,131,757 153,621,657 159,111,557 164,601,458 170,091,358 175,581,258 181,071,158 186,561,059 192,050,959 Cash Flow from Operating Activities Loan Repayment at 6% interest $- Operating (Deficiency) / Surplus $(3,237,700) (269,808) (269,808) (269,808) (269,808) (269,808) (269,808) (269,808) (269,808) (269,808) (269,808) (269,808) (269,808) Sale of Water - $US0.70 per m3 $150,585,313 1,224,271 2,448,542 3,672,813 6,121,354 8,569,896 11,018,438 13,466,979 15,915,521 18,364,063 20,812,604 23,261,146 25,709,688 Sale of Electricity - $US50.00 per MWh (61,320MWh annually) $448,950,000 3,650,000 7,300,000 10,950,000 18,250,000 25,550,000 32,850,000 40,150,000 47,450,000 54,750,000 62,050,000 69,350,000 76,650,000 Water Power Generation (113,880MWh annually) $291,817,500 2,372,500 4,745,000 7,117,500 11,862,500 16,607,500 21,352,500 26,097,500 30,842,500 35,587,500 40,332,500 45,077,500 49,822,500 Add Back Tug Transport $15,750,000 750,000 750,000 750,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 Add Back 2.5% to CAL Marine $22,283,820 181,169 362,339 543,508 905,846 1,268,185 1,630,523 1,992,862 2,355,201 2,717,539 3,079,878 3,442,216 3,804,555 Total $926,148,933 7,908,132 15,336,072 22,764,012 38,369,892 53,225,772 68,081,653 82,937,533 97,793,413 112,649,293 127,505,173 142,361,054 157,216,934 Net (Deficiency) / Surplus before Investing (453,368,097) 307,385,079 250,007,747 197,313,406 87,551,541 (12,844,343) (103,874,248) (185,538,173) (257,836,117) (320,768,082) (374,334,067) (418,534,072) (453,368,097) $(453,368,097) 307,385,079 250,007,747 197,313,406 87,551,541 (12,844,343) (103,874,248) (185,538,173) (257,836,117) (320,768,082) (374,334,067) (418,534,072) (453,368,097) Cash Flow from Financing Activities $- Invested Share Capital $- Net - Surplus (Deficiency) - before Commissions $(453,368,097) 307,385,079 250,007,747 197,313,406 87,551,541 (12,844,343) (103,874,248) (185,538,173) (257,836,117) (320,768,082) (374,334,067) (418,534,072) (453,368,097) Less: Funding Commissions Net - Surplus (Deficiency) - after Commissions $(453,368,097) 307,385,079 250,007,747 197,313,406 87,551,541 (12,844,343) (103,874,248) (185,538,173) (257,836,117) (320,768,082) (374,334,067) (418,534,072) (453,368,097) Cash at End of Month $(453,368,097) $307,385,079 $250,007,747 $197,313,406 $87,551,541 $(12,844,343) $(103,874,248) $(185,538,173) $(257,836,117) $(320,768,082) $(374,334,067) $(418,534,072) $(453,368,097)
  • 6. CAL MARINE - One Plant Budget 2008 - 2013 USE OF CASH 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 2012 $US Annual Budget Jan Feb March April May June July Aug Sept Oct Nov Dec Machines Produced per Month 180 15 15 15 15 15 15 15 15 15 15 15 15 Total Machines Installed 120 135 150 165 180 195 210 225 240 255 270 285 Cash at Beginning of Month $(453,368,097) $(453,368,097) $(539,982,489) $(612,547,910) $(671,064,362) $(715,531,844) $(745,950,356) $(762,319,898) $(764,640,470) $(752,912,072) $(727,134,704) $(687,308,367) $(633,433,059) Use of Cash Development Costs $- Site Costs, Foundations and Siting $216,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 18,000,000 Ex Factory Cost ($6m per unit) $1,420,309,800 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 118,359,150 Assembly Costs in Floating Dock $355,797,720 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 29,649,810 Finishing Costs (Incl. Labour & Transport) $108,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 9,000,000 Plant and Equipment (for Floating Dock & Main Factory) $- - - - - - - - - - - - - Land and Building - Factory ($5m + $53m) $- - - - - - - - - - - - - Tooling Moulds ($24m) $- - - - - - - - - - - - - Floating Docks x 3 ($150m) $- - - - - - - - - - - - - Engineering ($15.15m) $- - - - - - - - - - - - - Technology Transfer - To CAL + HTF Royalties $85,218,588 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 7,101,549 Cost of Sales Water per m3 + Barges $800,269,939 39,519,503 44,459,441 49,399,379 54,339,317 59,279,255 64,219,193 69,159,131 74,099,068 79,039,006 83,978,944 88,918,882 93,858,820 Cost of Sales Electricity $304,850,338 15,054,338 16,936,130 18,817,922 20,699,714 22,581,506 24,463,299 26,345,091 28,226,883 30,108,675 31,990,468 33,872,260 35,754,052 Government fee 4% + 2.5% to CAL Marine = 6.5% of Turnover $228,925,491 11,304,963 12,718,083 14,131,203 15,544,323 16,957,444 18,370,564 19,783,684 21,196,805 22,609,925 24,023,045 25,436,166 26,849,286 Tug Towage to Site Cost $27,000,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 Undersea Cable & Pipework to Shore - Placement and Anchoring $180,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 15,000,000 CAL Marine Tugs - Ex Factory Cost $18,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 Tug Manufacturing Plant - Capital Cost $- Total Asset Purchases $3,744,371,875 266,739,312 274,974,163 283,209,013 291,443,864 299,678,714 307,913,564 316,148,415 324,383,265 332,618,116 340,852,966 349,087,816 357,322,667 Cash Flow from Operating Activities Loan Repayment at 6% interest $- Operating (Deficiency) / Surplus $(4,747,700) (395,642) (395,642) (395,642) (395,642) (395,642) (395,642) (395,642) (395,642) (395,642) (395,642) (395,642) (395,642) Sale of Water - $US0.70 per m3 $594,995,625 29,382,500 33,055,313 36,728,125 40,400,938 44,073,750 47,746,563 51,419,375 55,092,188 58,765,000 62,437,813 66,110,625 69,783,438 - Sale of Electricity - $US50.00 per MWh (61,320MWh annually) $1,773,900,000 87,600,000 98,550,000 109,500,000 120,450,000 131,400,000 142,350,000 153,300,000 164,250,000 175,200,000 186,150,000 197,100,000 208,050,000 - Water Power Generation (113,880MWh annually) $1,153,035,000 56,940,000 64,057,500 71,175,000 78,292,500 85,410,000 92,527,500 99,645,000 106,762,500 113,880,000 120,997,500 128,115,000 135,232,500 - Add Back Tug Transport $27,000,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 2,250,000 - Add Back 2.5% to CAL Marine $88,048,266 4,348,063 4,891,570 5,435,078 5,978,586 6,522,094 7,065,602 7,609,109 8,152,617 8,696,125 9,239,633 9,783,141 10,326,648 - Total $3,632,231,191 180,124,921 202,408,741 224,692,561 246,976,382 269,260,202 291,544,022 313,827,843 336,111,663 358,395,483 380,679,304 402,963,124 425,246,944 Net (Deficiency) / Surplus before Investing (565,508,782) (539,982,489) (612,547,910) (671,064,362) (715,531,844) (745,950,356) (762,319,898) (764,640,470) (752,912,072) (727,134,704) (687,308,367) (633,433,059) (565,508,782) $(565,508,782) (539,982,489) (612,547,910) (671,064,362) (715,531,844) (745,950,356) (762,319,898) (764,640,470) (752,912,072) (727,134,704) (687,308,367) (633,433,059) (565,508,782) Cash Flow from Financing Activities $- Invested Share Capital $- Net - Surplus (Deficiency) - before Commissions $(565,508,782) (539,982,489) (612,547,910) (671,064,362) (715,531,844) (745,950,356) (762,319,898) (764,640,470) (752,912,072) (727,134,704) (687,308,367) (633,433,059) (565,508,782) Less: Funding Commissions Net - Surplus (Deficiency) - after Commissions $(565,508,782) (539,982,489) (612,547,910) (671,064,362) (715,531,844) (745,950,356) (762,319,898) (764,640,470) (752,912,072) (727,134,704) (687,308,367) (633,433,059) (565,508,782) Cash at End of Month $(565,508,782) $(539,982,489) $(612,547,910) $(671,064,362) $(715,531,844) $(745,950,356) $(762,319,898) $(764,640,470) $(752,912,072) $(727,134,704) $(687,308,367) $(633,433,059) $(565,508,782)
  • 7. CAL MARINE - One Plant Budget 2008 - 2013 Balance Sheet CAPITAL BUDGET Totals 2008 2008 $US Annual Jan ASSETS Equipment Development Costs $135,800,000 $- Plant and Equipment (for Floating Dock & Main Factory) $55,000,000 $30,000,000 Land and Building - Factory ($5m + $53m) $58,000,000 $58,000,000 Tooling Moulds ($24m) $24,000,000 $- Floating Docks x 3 ($150m) $150,000,000 $150,000,000 Engineering ($15.15m) $15,150,000 $10,821,429 Technology Transfer $15,000,000 $15,000,000 15,000,000 Tug Manufacturing Plant - Capital Cost $100,000,000 $100,000,000 Total Asset Purchases $552,950,000 $363,821,429 $15,000,000
  • 8. 2008 2008 2008 2008 2008 2008 2008 Feb March April May June July Aug 5,000,000 8,833,333 8,833,333 8,833,333 8,833,333 25,000,000 25,000,000 25,000,000 25,000,000 25,000,000 25,000,000 2,164,286 2,164,286 2,164,286 16,666,667 16,666,667 16,666,667 16,666,667 16,666,667 16,666,667 $- $48,830,952 $41,666,667 $52,664,286 $50,500,000 $52,664,286 $50,500,000
  • 9. 2008 2008 2008 2008 2009 Sept Oct Nov Dec Annual $135,800,000 7,500,000 7,500,000 7,500,000 7,500,000 $25,000,000 8,833,333 8,833,333 $- $24,000,000 $- 2,164,286 2,164,286 $4,328,571 $- $- $18,497,619 $16,333,333 $9,664,286 $7,500,000 $189,128,571
  • 10. 2009 2009 2009 2009 2009 2009 Jan Feb March April May June 15,088,889 15,088,889 15,088,889 15,088,889 6,250,000 6,250,000 6,250,000 6,250,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000 4,000,000 2,164,286 2,164,286 $12,414,286 $12,414,286 $25,338,889 $25,338,889 $19,088,889 $19,088,889
  • 11. 2009 2009 2009 2009 2009 2009 July Aug Sept Oct Nov Dec 15,088,889 15,088,889 15,088,889 15,088,889 15,088,889 $15,088,889 $15,088,889 $15,088,889 $15,088,889 $15,088,889 $-
  • 12. 2010 2010 2010 2010 2010 Annual Jan Feb March April $- $- $- $- $- $- $- $- $- $- $- $-
  • 13. 2010 2010 2010 2010 2010 May June July Aug Sept $- $- $- $- $-
  • 14. 2010 2010 2010 2011 2011 Oct Nov Dec Annual Jan $- $- $- $- $- $- $- $- $- $- $- $-
  • 15. 2011 2011 2011 2011 2011 Feb March April May June $- $- $- $- $-
  • 16. 2011 2011 2011 2011 2011 July Aug Sept Oct Nov $- $- $- $- $-
  • 17. 2011 2012 2012 2012 2012 Dec Annual Jan Feb March $- $- $- $- $- $- $- $- $- $- $- $-
  • 18. 2012 2012 2012 2012 2012 April May June July Aug $- $- $- $- $-
  • 19. 2012 2012 2012 2012 Sept Oct Nov Dec $- $- $- $-
  • 20. 2013 2013 2013 2013 2013 Annual Jan Feb March April $- $- $- $- $- $- $- $- $- $- $- $-
  • 21. 2013 2013 2013 2013 2013 May June July Aug Sept $- $- $- $- $-
  • 22. 2013 2013 2013 Oct Nov Dec $- $- $-
  • 23. EXECUTIVE OVERHEAD SUMMARY $US Pre-Production Production 2008 2009 2010 2011 2012 2013 2014 2015 Personnel Costs: President 160,000 160,000 200,000 200,000 350,000 350,000 350,000 350,000 VP Research & Dev 55,000 110,000 140,000 140,000 200,000 200,000 200,000 200,000 VP Turbines 55,000 110,000 140,000 140,000 200,000 200,000 200,000 200,000 VP Marine 55,000 110,000 140,000 140,000 200,000 200,000 200,000 200,000 VP Financial 55,000 110,000 140,000 140,000 200,000 200,000 200,000 200,000 VP Marketing 55,000 110,000 140,000 140,000 200,000 200,000 200,000 200,000 VP Manufacturing 110,000 140,000 140,000 200,000 200,000 200,000 200,000 VP Electrical 55,000 110,000 140,000 140,000 200,000 200,000 200,000 200,000 Office Personal 30,000 60,000 70,000 80,000 100,000 100,000 100,000 100,000 Executive Directors & Staff 200,000 400,000 450,000 600,000 700,000 700,000 700,000 700,000 Director of Project Management 160,000 160,000 200,000 200,000 350,000 350,000 350,000 350,000 Consulting: Consultants (incl $20m labour hireage allowance) 20,200,000 200,000 200,000 200,000 300,000 300,000 300,000 300,000 Total Personnel Costs 21,080,000 1,750,000 2,100,000 2,260,000 3,200,000 3,200,000 3,200,000 3,200,000 Other Overheads: Office Rent 150,000 300,000 300,000 300,000 600,000 600,000 600,000 600,000 Office Equip Rental 10,000 17,700 17,700 17,700 17,700 17,700 17,700 17,700 Printing &Stationary 20,000 2,000 5,000 5,000 5,000 5,000 5,000 5,000 Communications 10,000 10,000 20,000 20,000 30,000 30,000 30,000 30,000 Vehicle Running 39,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 Vehicle Leases 43,200 60,000 60,000 60,000 60,000 60,000 60,000 60,000 Legal 80,000 20,000 20,000 30,000 40,000 40,000 40,000 40,000 Accounting/Audit 50,000 10,000 10,000 15,000 15,000 15,000 15,000 15,000 Local Travel 50,000 50,000 50,000 50,000 50,000 50,000 50,000 50,000 Overseas Travel 200,000 200,000 200,000 200,000 300,000 300,000 300,000 300,000 Private Accommodation 110,000 200,000 200,000 200,000 300,000 300,000 300,000 300,000 Advertising/Web Site 20,000 20,000 20,000 30,000 80,000 80,000 80,000 80,000 Total Other Overheads 782,200 939,700 952,700 977,700 1,547,700 1,547,700 1,547,700 1,547,700 Total Operating Costs 21,862,200 2,689,700 3,052,700 3,237,700 4,747,700 4,747,700 4,747,700 4,747,700
  • 24. Sheet Line No 14 15 16 17 24 25 40 37 38 39 26 29
  • 25.
  • 26. Varaible Cost PER MACHINE Site Costs, Foundations and Siting Ex Factory Cost (HT Ferro Components of wind turbine) Assembly Costs (in Floating Dock) Finishing Costs IE Blades, and 3 Generators - Wind Generator, Solar Generation, Water Current generator Total Cost for Floating unit Cost of Sales Water per m3 + Barges = $0.3692674/m3 4,197,500 m3 Annual Divided by Capital Cost per Machine = $15,000,000 plus $500,000 cost of Barge = $15,500,000 x 6 % + 2 % = 4,197,500 = 0.0285884 x 8% plus 2% Maintenance = Cost of Electricity = $8,000,000 x 6 % + 2% = $0208741 KWh = Ex Factory Margin Over Cost per Unit Ex Factory Margin Over Cost per Unit Cost ex Factory Sale of Water per Unit = $2.55 x 4,179,500 m3 = $10,661,650 Annual divided by 12 = 888,470.83 Per Month x $2.54 + $2,256,715.90 m3 Sale of Electricity Per unit: Ivory Coast = $70 per MWh x 2,555 MWh per Month Europe = $90 per MWh x 2,555 MWh per Month Solar and Water Generation - calculate it will take the Electricity up to 100% CAPACITY FACTOR = 4,745 MWh per month x either $90 per MWh or $70 per MWh This figure will reduce as turnover is not as high as first shown it will be Cal Marine Tugs ex Factory - allow for 2 tugs per month at the start-up level (each tug can tow up to 3 wind turbines at a time) Unit Towage Site Costs per unit Unit assembly on floating dock Finishing costs Undersea Cable & Pipework to Shore - Placement and Anchoring Tug Manufactured Cost Desalination Plant Capital Cost per machine Water production (cubic meters per machine per annum) Cost of capital Maintenance cost Total cost Monthly cost Electricity Generation Capital cost ROI & Maintenance Power generation capacity @ 20 MW per unit Capacity factor MWh per machine per annum Monthly cost Annual Cost Cost per MWh Sale of Water per machine
  • 27. Water production per annum (cubic metres) Selling price per cubic meter Revenue per annum Electricity sales Selling price per MWh Electricity selling price per machine Electricity production per month (MWh) Selling Price
  • 28. Cost Figure $1,200,000 $4,311,768 $326,340 $5,500,000 x 6% Funds Borrowed so unit cost is $10,138,108 $0.3692674 $0.00357355 $0.2087410 per MWH $0 Power $13,000,000 Gereration Plants - Capital value $5,109,390 7,890,610 $178,850 $229,950 6.5% of Turnover per month $770,000 for 2 tugs $150,000 $1,200,000 $1,976,654 $600,000 $1,000,000 $385,000 $15,500,000 4,197,500 349,791.67 8% 2% $329,329.19 0.94 Wind Water Total $8,000,000 $5,000,000 $13,000,000 10% 10% 10% 175,200 175,200 175,200 35% 65% 100% 61,320 113,880 175,200 $77,201.73 $48,251.08 $125,452.81 $926,421 $579,013 $1,505,434 $15.11 $5.08 $8.59 per annum per month
  • 29. 4,197,500 $0.70 $2,938,250 $244,854 $50.00 Wind Water Total 5,110 9,490 14,600 $50.00 $50.00 $50.00 $255,500 $474,500 $730,000
  • 30. Budget For CAL MARINE in reference to the CashFlow $US ENGINEERING COSTS Completetion of Wind Tunnel testing 100,000 Wind Tunnel model including Instrumentation 50,000 Engineering of Floating C86-10MW HT Ferro Attaractor, Centre Body, Centre-Body Supports, Column and Ballest Keel, Including Sea-Bed Anchoring 1,500,000 Engineering of Flotation and Sea-Tow, stationing on pre-set Cooridinates; power cable connection, fixture and layout; yaw control 750,000 Design/Engineering of Column Structure 25m dia x 70m length Anchoring fixture for sea-bed Foundation Pile tops and fixing Yaw capability, guidence of column base to foundation tops and fixing. 750,000 Engineering of Floating Dock: 450m x 200m 800,000 Launching Technique, Craneage assembly on Floating Dock, Assembley Process 500,000 Engineering/Design Variable Speed 10MW AC Generator Control System and Switchgear 500,000 Engineering/Design 10MW Direct Current Generator, Control System, Switchgear, DC/AC shore System with switching 750,000 Design/Blueprint 80m x 20m Electrical Assembley Shed 650,000 Design/Blueprint 80m x 20m Mechanical assembley shed 650,000 Design/Blueprint Steel reinforcing assembley shed 650,000 Design/Engineer Blade and Hub assembly; Drive train Brake, Hydraulics, assembly and fitting out centre-body and rotors 1,500,000 Design/Engineer Towing System; Tug Sizing, Launching from Floating Dock, Site Installation, Multiple unit connection and Precision placement 1,000,000 Design, build test, co-generator 5,000,000 Sub Total 15,150,000 CAPITAL COSTS Floating Docks x 3 off (Tender Allowance) 150,000,000 Tug Plant alonside main Plant, Budget reqd for Design Technology Transfer, Engineering and Moulds, Tug Length 77.7m beam 77m draught 7.1m with two 10,000 KW Supercharged Diesels 100,000,000 Purchase Waterfront Land - allow 100 Hectares x $50,000 per Hectare 5,000,000 Production Plant 200m x 530m at $500/m2 53,000,000 Exclusive Licence for HTFerro Plants 15,000,000 Plant and Equipment (Main Plant) 25,000,000 Plant and Equipment (Floating Dock) 30,000,000 Main Structure Moulds: Attractor 13,500,000 Column 25m dia x 70m 3,500,000
  • 31. Bell Flotation Unit 2,500,000 Keel Ballast Support Legs 3,000,000 Keel Ballast 1,500,000 24,000,000 Sub Total 402,000,000 DEVELOPMENT COSTS Wharf and Floating Dock Tethering 1000m 100,000,000 Dredge Foreshore to accomodateF/Docks and Towage path 900,000 cubic metres x $70/m3 6,300,000 Desalination Barge: 35m x 7m capable of transporting & housing 42 x 20ft desalination container modules 3 high - design moulds, plant, and motive power 20,000,000 Brokerage Fees - allow 1% total budget 9,500,000 Sub Total 135,800,000 TOTAL 552,950,000 Plus Contingency Allowance of 10% (not included in cashflow) but allowed for in Funding Application. 55,295,000