Using IT to Strengthen
Supply Chain Planning 

Tuesday, 10th
May’2016
Harish Bawari
External - General e-Material Flow
• The world’s largest two wheeler
manufacturer
• Presence in 30+ countries outside India
• 6500+ Customer Touch points in India
• 4 Manufacturing Plants in India
• One in Columbia
• Overseas Assembly operations:
Kenya, Uganda, Tanzania, Bangladesh
Hero MotoCorp Ltd.
External - General e-Material Flow
Supply Chain is about…
Flow of products and services from
–Raw materials manufacturers
–Component and intermediate manufacturers
–Final product manufacturers
–Wholesalers and distributors and Retailers
–Finally to Customer
External - General e-Material Flow
And Supply Chain Management is
about…
Design and management of seamless,
value-added processes across
organizational boundaries to meet
the real needs of the end customer
External - General e-Material Flow
Key Focus Areas in Supply Chain
Management
–Improving Service Levels and
efficiency
–Cost reduction
–Continuous Improvement
through automation
External - General e-Material Flow
Today we want to Share a
Project we have done in IT to
Strengthen Supply Chain at
Hero MotoCorp
External - General e-Material Flow
Business Scenario
• We have grown tremendously in our operations, resulting in
complex Operations and Supply Chain
• The flow of materials is a key factor in making sure that
production is smooth and streamlined
• The material and information at the right place and right
time is very important
• It flows through various points in the operations chain
• The cycle of transfer of information ends up being too
complex owing to the scale of operations and the Bill of
Materials
External - General e-Material Flow
So, we implemented a System

External - General e-Material Flow
The system was conceptualized and
designed to make sure that the
supply chain becomes more
efficient, cost effective and
information is easily available
9
External - General e-Material Flow
e-Material Flow
Business Objectives
External - General e-Material Flow
To have smooth material flow at optimum costs
across the Supply Chain based on JIT principles
– Inventory management
– Production Sequencing and scheduling
– Uniform communication to all vendors and
the Shop floor
– Enhance quality and productivity -
removing NVAs
External - General e-Material Flow
• To streamline the Supply Chain by making
available the right information at the right time
to the right stakeholders
• Enabling real time visibility of production status
to the vendors as well as shop floor to enable
the right people to act in time
• Proactively get alerted in case of any
abnormality in Operations
External - General e-Material Flow
e-Material Flow
What was done…
External - General e-Material Flow
• The project entailed using the SAP ERP system and
integrating it with various other systems to achieve
the objectives
• The solution was designed in SAP system for making
the delivery schedule available to the vendors online
based on the production
• Automation in assembly lines with initiatives like
scanning of SKU, hanger and VIN number at different
stages
14
External - General e-Material Flow
• Scanning at the time of Gate entry and goods
receipt, etc. were done which added to the overall
automation of the chain
• To streamline SC, the delivery schedule is made
available online to the vendors based on production
forecast and detailed planning
• Further automation has been done through this
system in the related processes such as Gate entry
and GR to create synergy in the entire material flow
15
External - General e-Material Flow
EMF System is integrated with multiple systems :
– SAP EP – for delivery schedules publishing and bar
coded tags printing
– SAP BI – for analytics to improve the abnormalities
– Extensive integration with the barcode system so
that the processes are automated across the
Supply Chain
– Gmail for communication of exceptions/alerts
– SMS system for sending alerts
– Empty Return system to reduce efforts of
duplication
– Truck Turn Around Time system
External - General e-Material Flow
External - General e-Material Flow
Enhanced HMCL-Vendor Interface Portal
• Information flow through the portal
• All schedules uploaded in the portal which vendor can access-no
emails
• Vendor prints all tags (Vehicle Tag, Receipt Tag, Bin Tag) from
portal
• Only those material for which schedule is given can be printed
• All acknowledgements & discrepancy note, if any, generated
through the same portal & can be seen on real time basis
• The vehicle entry time and exit time can also be viewed by
vendor on real time basis from the portal
18
External - General e-Material Flow
e-Material Flow
How the Way of Working has
Changed
External - General e-Material Flow
PPC
20
# Before emf system After emf system
1 Plan is issued monthly and inconsistently
Plan is being issued fortnightly and on
time
2 Colour wise plan is issued very late after
the start of month
Production plan is being released at
SKU level
4 All work is done manually/in excel and
then loaded in SAP
System generates the plan
5 Frequent changes in production plan, no
rules are set for the changes
Minimum changes in the production
plan as per set rules and due approval
6 Plan if not completed by month end is
treated as cancelled
Plan once issued will not be cancelled
but shifted
External - General e-Material Flow 21
# Before emf system After emf system
1 Monthly schedules are sent indicating
total requirement
Fortnightly day wise/line wise schedules are
sent
2 Day wise schedules are not sent Daily day wise schedules indicating time &
unloading location
3 Vendor usually supply material in the
beginning of the month
Vendor can supply day wise required material
only
4 Plan is issued to vendors. Vendors do
their own manual calculations
Daily System generated part wise schedule
are released.
5 Daily meetings & constant follow up to
ensure supplies
Time wise schedule will take care,
monitoring screens are available. Auto alerts
available in case of deviation.
Supply Chain
External - General e-Material Flow
Supply Chain
22
# Before emf system After emf system
06 Inventory adjustments are possible
only at month end
Inventory adjustments are done on daily
basis based on actual production
07 Due to uncertainty vendors keep
inventory of all items for all models
As schedules are fixed therefore vendors to
keep inventory of required items only
08 Inventory norms are fixed for all items No Inventory norms. Material will be
available as per advance time
09 Line stoppages due to component
shortages
Minimum Line stoppages due to component
shortages
10 Segregation inside the plant No Segregation inside the plant
External - General e-Material Flow
Stores
23
# Before emf system After emf system
1 Exact time of receipt, unloading
location & consumption point is
not known
Time of receipt, unloading location &
consumption point is mentioned on tags
2 Manual punching at gate, Manual
counting of trolley/bins & GRN
creation etc.
No manual punching. Every entry, counting of
trolley/bins, GRN creation is through the reading
of the bar-coded documents
3 Any material in any quantity is
sent by the vendor
Material can be sent only as per the daily
schedule
4 Vendor persons inside the plant to
take physical stock etc
No need of vendor persons inside the plant
5 Real time information of dispatch
of material, GE and GR not
available
Real time information is available
External - General e-Material Flow
e-Material Flow
Key Benefits Achieved
External - General e-Material Flow
The project benefited the organization in multiple
ways. The key benefits that we realized post
implementation
• Inventory carrying cost reduction - parts and engines
• Lesser instances of line stoppages, helped in
increased production and lot of savings in the labour
cost
• Manpower savings which resulted from automation
across the supply chain, store and planning
departments
25
External - General e-Material Flow
• Truck Turn Around Time reduction and in turn,
increase in the logistics efficiency
• We also realized a lot of other benefits as a
result of streamlining of the Supply Chain and
the automation at various levels
• Benefits which we reaped from this project -
way surpassed the cost of the project
• RoI within 6 months of the launch owing to the
scale and the effectiveness of implementation
26
External - General e-Material Flow
Benefits to Suppliers
• To the minute firm scheduling system helped Suppliers
-Optimise human resources
-Inventory optimization
-Reduction in manufacturing losses
-No requirement calculation from rolling plan
-Simpler material reconciliation at both locations
-Standardize production lot size and economise on logistics
costs
• Real time information of truck entry, acknowledgement,
discrepancy if any, return of empties and truck exit etc.
• Reverse logistics management is simpler and efficient
• The number trolleys/bins in circulation reduced
• Truck TAT improved
27
External - General e-Material Flow
e-Material Flow - Achievements
Particulars Before EMF @6600VPD After EMF@9100VPD
No. of filled trolleys 2200 nos. ~700 nos.
Avg. Inventory of
emf parts
15 Crore 9 Crore
Avg. engine inventory 3200 Nos. 2700 Nos.
Line stoppages Avg. 3073 Min/Mth Avg. 1350 Min/Mth
Production plan changes
Avg. 75 /Mth
(Unplanned)
Avg. 10/Mth
(Approved)
Manpower in Stores 184 148
3PL operators
(stores + vendors)
244 112
Manpower in PPC 231 201
No. of 3PL trucks 102 85
Truck turn-around time Avg. 130 Min Avg. 90 Min
External - General e-Material Flow
e-Material Flow - Achievements
Particulars Before EMF @6600VPD After EMF@9100VPD
Schedule adherence No day wise schedule Avg. 95% for daily schedules
On-time delivery NA 87% on time achieved
% Lot segregation 1.2% 0.04%
Accuracy-BOM 86% 100%
Minor injuries/Annum
(PPC + Stores)
50 16
Visuals/FIFO No Visuals/FIFO Day-wise colour tags and emf
layout ensures FIFO
Information flow Slow: combination of manual
and emails.
Fast: Combination of real time
reports and Auto alerts
Total 2.83 Crores/Annum recurring cost has been saved from one
plant.
External - General e-Material Flow
e-Material Flow
Key Business Challenges Faced
External - General e-Material Flow
The complexity of the project was huge.
There were so many areas which the project
touched and hence the challenges. Top 3
Challenges :
• Physical changes on shop floor ( stores
layout changes without stopping
production ) Overcome by Detailed planning
for contingency and top management drive
External - General e-Material Flow
• Cultural changes (Change Management)
Adherence to MRP (legacy System) –
Overcome by involvement of key
stakeholders in testing and suggestions
during the project
• Availability of business experts for sufficient
and quality time – Overcome by calendar
planning and top management involvement
External - General e-Material Flow
e-Material Flow
Key Technical Challenges Faced
External - General e-Material Flow
The system is unique. The challenge was high
risk on account of system failure. Top 2
Challenges:
• Since the system was evolving, the iterations
were more and to be done within stipulated
time frame. Overcome by Rigorous testing of
all scenarios and training to users before Go-
Live and building of robust fall back systems
for each and every process
External - General e-Material Flow
• Development and support capability of internal
and external (Consultants) teams. Overcome by
motivating both teams (Business & Technical)
and involving external process experts to
achieve a unique and effective integrated
solution/system for complete supply chain, to
work as single team and complement each other
External - General e-Material Flow
e-Material Flow
Next Steps
External - General e-Material Flow
The EMF Journey Continues
• Continue to implement e-Material Flow System in all
our manufacturing plants - existing and upcoming
• Our endeavour always is to make sure that
– Technology is used in the most optimal way
– Functional processes designed efficiently
– Proposed benefits reaped thoroughly
Thank You

Más contenido relacionado

La actualidad más candente

Bpcl erp casestudy by Vishal Khatokar
Bpcl erp casestudy by Vishal KhatokarBpcl erp casestudy by Vishal Khatokar
Bpcl erp casestudy by Vishal Khatokar
SCMHRD
 
Marketing Strategy of Hero cycles
Marketing Strategy of Hero cyclesMarketing Strategy of Hero cycles
Marketing Strategy of Hero cycles
Joshua Finny
 
Maruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENTMaruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENT
sanjay p
 

La actualidad más candente (20)

Eileen Fisher Case Analysis
Eileen Fisher Case AnalysisEileen Fisher Case Analysis
Eileen Fisher Case Analysis
 
Apple supply chain management
Apple supply chain managementApple supply chain management
Apple supply chain management
 
Reebok nfl
Reebok nflReebok nfl
Reebok nfl
 
Barilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain IntegrationBarilla Spa: A case on Supply Chain Integration
Barilla Spa: A case on Supply Chain Integration
 
Bpcl erp casestudy by Vishal Khatokar
Bpcl erp casestudy by Vishal KhatokarBpcl erp casestudy by Vishal Khatokar
Bpcl erp casestudy by Vishal Khatokar
 
Operation level strategy- Maruti Suzuki
Operation level strategy- Maruti Suzuki Operation level strategy- Maruti Suzuki
Operation level strategy- Maruti Suzuki
 
Mahindra and mahindra
Mahindra and mahindraMahindra and mahindra
Mahindra and mahindra
 
Markstrat Presentation
Markstrat PresentationMarkstrat Presentation
Markstrat Presentation
 
Mission hospital package pricing analysis
Mission hospital package pricing analysisMission hospital package pricing analysis
Mission hospital package pricing analysis
 
SUPPLY CHAIN MANAGEMENT OF LUXOTTICA
SUPPLY CHAIN MANAGEMENT OF LUXOTTICA SUPPLY CHAIN MANAGEMENT OF LUXOTTICA
SUPPLY CHAIN MANAGEMENT OF LUXOTTICA
 
Mahindra and Mahindra Case Study
Mahindra and Mahindra Case StudyMahindra and Mahindra Case Study
Mahindra and Mahindra Case Study
 
HP case- Implementation of operations research
HP case- Implementation of operations researchHP case- Implementation of operations research
HP case- Implementation of operations research
 
HP at Cultural Crossroads - Impact of Cultural Change - Organisational Behaviour
HP at Cultural Crossroads - Impact of Cultural Change - Organisational BehaviourHP at Cultural Crossroads - Impact of Cultural Change - Organisational Behaviour
HP at Cultural Crossroads - Impact of Cultural Change - Organisational Behaviour
 
Mahindra and Mahindra International Strategy
Mahindra and Mahindra International StrategyMahindra and Mahindra International Strategy
Mahindra and Mahindra International Strategy
 
Marketing Strategy of Hero cycles
Marketing Strategy of Hero cyclesMarketing Strategy of Hero cycles
Marketing Strategy of Hero cycles
 
Maruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENTMaruti suzuki STRATEGIC MANAGEMENT
Maruti suzuki STRATEGIC MANAGEMENT
 
Mrf tyres concept of management
Mrf tyres concept of managementMrf tyres concept of management
Mrf tyres concept of management
 
Reliance TUP 3.0 Case Competition PPT - Campus Finalist
Reliance TUP 3.0 Case Competition PPT - Campus FinalistReliance TUP 3.0 Case Competition PPT - Campus Finalist
Reliance TUP 3.0 Case Competition PPT - Campus Finalist
 
Scor model
Scor modelScor model
Scor model
 
Coda coffee case study
Coda coffee case studyCoda coffee case study
Coda coffee case study
 

Destacado

Strategic Management hero motocorp
Strategic Management hero motocorpStrategic Management hero motocorp
Strategic Management hero motocorp
Samidha Kashettiwar
 
ROLE OF MIS IN TOURISM
ROLE OF MIS IN TOURISMROLE OF MIS IN TOURISM
ROLE OF MIS IN TOURISM
DILNA VIJAYAN
 
Hero MotoCorp Financial Analysis Report
Hero MotoCorp Financial Analysis ReportHero MotoCorp Financial Analysis Report
Hero MotoCorp Financial Analysis Report
Prateek Singh Bapna
 
New project 3c hero
New project 3c heroNew project 3c hero
New project 3c hero
SUBHAPAUL7
 

Destacado (19)

A presentation on Hero MotoCorp
A presentation on Hero MotoCorpA presentation on Hero MotoCorp
A presentation on Hero MotoCorp
 
Hero motocorp ltd full PPT
Hero motocorp ltd full PPTHero motocorp ltd full PPT
Hero motocorp ltd full PPT
 
Hero motocorp
Hero motocorpHero motocorp
Hero motocorp
 
Strategic Management hero motocorp
Strategic Management hero motocorpStrategic Management hero motocorp
Strategic Management hero motocorp
 
"Finance accounting of hero motocorp" THESIS By Hitesh Patidar
"Finance accounting of hero motocorp" THESIS By Hitesh Patidar"Finance accounting of hero motocorp" THESIS By Hitesh Patidar
"Finance accounting of hero motocorp" THESIS By Hitesh Patidar
 
Role and Scope of MIS in Monitoring and Surveillance Systems of HPNSDP
Role and Scope of MIS in Monitoring and Surveillance Systems of HPNSDPRole and Scope of MIS in Monitoring and Surveillance Systems of HPNSDP
Role and Scope of MIS in Monitoring and Surveillance Systems of HPNSDP
 
32645044 supply-chain
32645044 supply-chain32645044 supply-chain
32645044 supply-chain
 
HERO MOTOCORP
HERO MOTOCORPHERO MOTOCORP
HERO MOTOCORP
 
Presentation on Hero Motocorp CSR Activities
Presentation on Hero Motocorp CSR ActivitiesPresentation on Hero Motocorp CSR Activities
Presentation on Hero Motocorp CSR Activities
 
Management Information System
Management Information SystemManagement Information System
Management Information System
 
Supply Chain Benchmarking Study
Supply Chain Benchmarking StudySupply Chain Benchmarking Study
Supply Chain Benchmarking Study
 
Role of MIS in Business Management (Supermarket Case Study)
Role of MIS in Business Management  (Supermarket Case Study)Role of MIS in Business Management  (Supermarket Case Study)
Role of MIS in Business Management (Supermarket Case Study)
 
ROLE OF MIS IN TOURISM
ROLE OF MIS IN TOURISMROLE OF MIS IN TOURISM
ROLE OF MIS IN TOURISM
 
Ppt on hero moto corp.
Ppt on hero moto corp.Ppt on hero moto corp.
Ppt on hero moto corp.
 
Hero MotoCorp Financial Analysis Report
Hero MotoCorp Financial Analysis ReportHero MotoCorp Financial Analysis Report
Hero MotoCorp Financial Analysis Report
 
Emerging trends in management [compatibility mode]
Emerging trends in management [compatibility mode]Emerging trends in management [compatibility mode]
Emerging trends in management [compatibility mode]
 
Application Of Mis In Service Sector
Application Of Mis In Service SectorApplication Of Mis In Service Sector
Application Of Mis In Service Sector
 
New project 3c hero
New project 3c heroNew project 3c hero
New project 3c hero
 
hero csr activities
hero csr activitieshero csr activities
hero csr activities
 

Similar a Transforming supply chain Harish Bawari - Hero MotoCorp May 2016

April 20 Briefing With Team
April 20 Briefing With TeamApril 20 Briefing With Team
April 20 Briefing With Team
William Francis
 
Business Intelligence in Upstream-Downstream
Business Intelligence in Upstream-DownstreamBusiness Intelligence in Upstream-Downstream
Business Intelligence in Upstream-Downstream
Nirav Modh
 
M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316
sabbir456
 

Similar a Transforming supply chain Harish Bawari - Hero MotoCorp May 2016 (20)

Optimization of internal Supply Chain (Transfer Prices and Good Flows) for Mu...
Optimization of internal Supply Chain (Transfer Prices and Good Flows) for Mu...Optimization of internal Supply Chain (Transfer Prices and Good Flows) for Mu...
Optimization of internal Supply Chain (Transfer Prices and Good Flows) for Mu...
 
Case study material ledger implementation lessons learned
Case study  material ledger implementation lessons learnedCase study  material ledger implementation lessons learned
Case study material ledger implementation lessons learned
 
Case Study_SAP Material Ledger
Case Study_SAP Material LedgerCase Study_SAP Material Ledger
Case Study_SAP Material Ledger
 
Case study in implementing sap material ledger
Case study in implementing sap material ledgerCase study in implementing sap material ledger
Case study in implementing sap material ledger
 
Advanced Planning And Optimization
Advanced Planning And OptimizationAdvanced Planning And Optimization
Advanced Planning And Optimization
 
Services & Products of Optimal Management
Services & Products of Optimal ManagementServices & Products of Optimal Management
Services & Products of Optimal Management
 
ERP Must Have Features For Manufacturers
ERP Must Have Features For ManufacturersERP Must Have Features For Manufacturers
ERP Must Have Features For Manufacturers
 
SCM Project Objectives
SCM Project ObjectivesSCM Project Objectives
SCM Project Objectives
 
April 20 Briefing With Team
April 20 Briefing With TeamApril 20 Briefing With Team
April 20 Briefing With Team
 
BQ-RTPT 2012
BQ-RTPT 2012BQ-RTPT 2012
BQ-RTPT 2012
 
Business Intelligence in Upstream-Downstream
Business Intelligence in Upstream-DownstreamBusiness Intelligence in Upstream-Downstream
Business Intelligence in Upstream-Downstream
 
An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...
 
Session 4
Session 4Session 4
Session 4
 
OM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptxOM II_Group 9_MRF.pptx
OM II_Group 9_MRF.pptx
 
COLLABORATE 18 Presentation: Implementing WMS for 30+ Warehouses in 12 Months
COLLABORATE 18 Presentation: Implementing WMS for 30+ Warehouses in 12 MonthsCOLLABORATE 18 Presentation: Implementing WMS for 30+ Warehouses in 12 Months
COLLABORATE 18 Presentation: Implementing WMS for 30+ Warehouses in 12 Months
 
Access MRP - Material Requirements Planning
Access MRP - Material Requirements PlanningAccess MRP - Material Requirements Planning
Access MRP - Material Requirements Planning
 
CBN SALES PRESENTATION
CBN SALES PRESENTATIONCBN SALES PRESENTATION
CBN SALES PRESENTATION
 
Expert WP ERP Based Automated Workflows
Expert WP ERP Based Automated WorkflowsExpert WP ERP Based Automated Workflows
Expert WP ERP Based Automated Workflows
 
SAP Business One for Automotive Industry
SAP Business One for Automotive IndustrySAP Business One for Automotive Industry
SAP Business One for Automotive Industry
 
M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316M-Reporting introduction and faq pharma 20140316
M-Reporting introduction and faq pharma 20140316
 

Más de INDUSCommunity

Más de INDUSCommunity (20)

INDUS GST Session | 1st March,2017
INDUS GST Session | 1st March,2017INDUS GST Session | 1st March,2017
INDUS GST Session | 1st March,2017
 
Make In Digital India
Make In Digital IndiaMake In Digital India
Make In Digital India
 
Avnet Technology Solutions
Avnet Technology SolutionsAvnet Technology Solutions
Avnet Technology Solutions
 
Enabling A Digital India
Enabling A Digital IndiaEnabling A Digital India
Enabling A Digital India
 
Customer case study by ashutosh parida, dgm (c&it), sail
Customer case study by ashutosh parida, dgm (c&it), sailCustomer case study by ashutosh parida, dgm (c&it), sail
Customer case study by ashutosh parida, dgm (c&it), sail
 
IBM-SAP Partnership: Driving the Digital Transformation
IBM-SAP Partnership: Driving the Digital Transformation IBM-SAP Partnership: Driving the Digital Transformation
IBM-SAP Partnership: Driving the Digital Transformation
 
INDUS ES value maps
INDUS ES  value mapsINDUS ES  value maps
INDUS ES value maps
 
Services in detail
Services in detailServices in detail
Services in detail
 
Workshop - Building a Blueprint for Digital Transformation
Workshop - Building a Blueprint for Digital Transformation Workshop - Building a Blueprint for Digital Transformation
Workshop - Building a Blueprint for Digital Transformation
 
Update on GST, Arun Subramanian, SAP Labs India
Update on GST, Arun Subramanian, SAP Labs India Update on GST, Arun Subramanian, SAP Labs India
Update on GST, Arun Subramanian, SAP Labs India
 
IBM-SAP Partnership: Driving the Digital Transformation
IBM-SAP Partnership: Driving the Digital Transformation IBM-SAP Partnership: Driving the Digital Transformation
IBM-SAP Partnership: Driving the Digital Transformation
 
Delivering Digital Business Solutions, Raja Ukil, CIO, Wipro
Delivering Digital Business Solutions, Raja Ukil, CIO, WiproDelivering Digital Business Solutions, Raja Ukil, CIO, Wipro
Delivering Digital Business Solutions, Raja Ukil, CIO, Wipro
 
Sap Executive Keynote Dr. Wieland Schreiner, EVP - SAP AG
Sap Executive Keynote   Dr. Wieland Schreiner, EVP - SAP AGSap Executive Keynote   Dr. Wieland Schreiner, EVP - SAP AG
Sap Executive Keynote Dr. Wieland Schreiner, EVP - SAP AG
 
INDUS South Conference-INDUS Welcome Note
INDUS South Conference-INDUS Welcome NoteINDUS South Conference-INDUS Welcome Note
INDUS South Conference-INDUS Welcome Note
 
Indus spend analysis 2016
Indus spend analysis 2016  Indus spend analysis 2016
Indus spend analysis 2016
 
Connected platform the new normal to manage travel expense
Connected platform   the new normal to manage travel  expenseConnected platform   the new normal to manage travel  expense
Connected platform the new normal to manage travel expense
 
MRP Overview
MRP OverviewMRP Overview
MRP Overview
 
Instantly Deploy and Use SAP Solutions in The Cloud – within minutes
Instantly Deploy and Use SAP Solutions in The Cloud – within minutesInstantly Deploy and Use SAP Solutions in The Cloud – within minutes
Instantly Deploy and Use SAP Solutions in The Cloud – within minutes
 
Driving Digital Transformation Chandan Mehta Fujitsu May 2016
Driving Digital Transformation Chandan Mehta Fujitsu May 2016 Driving Digital Transformation Chandan Mehta Fujitsu May 2016
Driving Digital Transformation Chandan Mehta Fujitsu May 2016
 
HP Enterprises in Hana Pankaj Jain May 2016
HP Enterprises in Hana Pankaj Jain May 2016HP Enterprises in Hana Pankaj Jain May 2016
HP Enterprises in Hana Pankaj Jain May 2016
 

Último

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Último (20)

Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 

Transforming supply chain Harish Bawari - Hero MotoCorp May 2016

  • 1. Using IT to Strengthen Supply Chain Planning 
 Tuesday, 10th May’2016 Harish Bawari
  • 2. External - General e-Material Flow • The world’s largest two wheeler manufacturer • Presence in 30+ countries outside India • 6500+ Customer Touch points in India • 4 Manufacturing Plants in India • One in Columbia • Overseas Assembly operations: Kenya, Uganda, Tanzania, Bangladesh Hero MotoCorp Ltd.
  • 3. External - General e-Material Flow Supply Chain is about… Flow of products and services from –Raw materials manufacturers –Component and intermediate manufacturers –Final product manufacturers –Wholesalers and distributors and Retailers –Finally to Customer
  • 4. External - General e-Material Flow And Supply Chain Management is about… Design and management of seamless, value-added processes across organizational boundaries to meet the real needs of the end customer
  • 5. External - General e-Material Flow Key Focus Areas in Supply Chain Management –Improving Service Levels and efficiency –Cost reduction –Continuous Improvement through automation
  • 6. External - General e-Material Flow Today we want to Share a Project we have done in IT to Strengthen Supply Chain at Hero MotoCorp
  • 7. External - General e-Material Flow Business Scenario • We have grown tremendously in our operations, resulting in complex Operations and Supply Chain • The flow of materials is a key factor in making sure that production is smooth and streamlined • The material and information at the right place and right time is very important • It flows through various points in the operations chain • The cycle of transfer of information ends up being too complex owing to the scale of operations and the Bill of Materials
  • 8. External - General e-Material Flow So, we implemented a System

  • 9. External - General e-Material Flow The system was conceptualized and designed to make sure that the supply chain becomes more efficient, cost effective and information is easily available 9
  • 10. External - General e-Material Flow e-Material Flow Business Objectives
  • 11. External - General e-Material Flow To have smooth material flow at optimum costs across the Supply Chain based on JIT principles – Inventory management – Production Sequencing and scheduling – Uniform communication to all vendors and the Shop floor – Enhance quality and productivity - removing NVAs
  • 12. External - General e-Material Flow • To streamline the Supply Chain by making available the right information at the right time to the right stakeholders • Enabling real time visibility of production status to the vendors as well as shop floor to enable the right people to act in time • Proactively get alerted in case of any abnormality in Operations
  • 13. External - General e-Material Flow e-Material Flow What was done…
  • 14. External - General e-Material Flow • The project entailed using the SAP ERP system and integrating it with various other systems to achieve the objectives • The solution was designed in SAP system for making the delivery schedule available to the vendors online based on the production • Automation in assembly lines with initiatives like scanning of SKU, hanger and VIN number at different stages 14
  • 15. External - General e-Material Flow • Scanning at the time of Gate entry and goods receipt, etc. were done which added to the overall automation of the chain • To streamline SC, the delivery schedule is made available online to the vendors based on production forecast and detailed planning • Further automation has been done through this system in the related processes such as Gate entry and GR to create synergy in the entire material flow 15
  • 16. External - General e-Material Flow EMF System is integrated with multiple systems : – SAP EP – for delivery schedules publishing and bar coded tags printing – SAP BI – for analytics to improve the abnormalities – Extensive integration with the barcode system so that the processes are automated across the Supply Chain – Gmail for communication of exceptions/alerts – SMS system for sending alerts – Empty Return system to reduce efforts of duplication – Truck Turn Around Time system
  • 17. External - General e-Material Flow
  • 18. External - General e-Material Flow Enhanced HMCL-Vendor Interface Portal • Information flow through the portal • All schedules uploaded in the portal which vendor can access-no emails • Vendor prints all tags (Vehicle Tag, Receipt Tag, Bin Tag) from portal • Only those material for which schedule is given can be printed • All acknowledgements & discrepancy note, if any, generated through the same portal & can be seen on real time basis • The vehicle entry time and exit time can also be viewed by vendor on real time basis from the portal 18
  • 19. External - General e-Material Flow e-Material Flow How the Way of Working has Changed
  • 20. External - General e-Material Flow PPC 20 # Before emf system After emf system 1 Plan is issued monthly and inconsistently Plan is being issued fortnightly and on time 2 Colour wise plan is issued very late after the start of month Production plan is being released at SKU level 4 All work is done manually/in excel and then loaded in SAP System generates the plan 5 Frequent changes in production plan, no rules are set for the changes Minimum changes in the production plan as per set rules and due approval 6 Plan if not completed by month end is treated as cancelled Plan once issued will not be cancelled but shifted
  • 21. External - General e-Material Flow 21 # Before emf system After emf system 1 Monthly schedules are sent indicating total requirement Fortnightly day wise/line wise schedules are sent 2 Day wise schedules are not sent Daily day wise schedules indicating time & unloading location 3 Vendor usually supply material in the beginning of the month Vendor can supply day wise required material only 4 Plan is issued to vendors. Vendors do their own manual calculations Daily System generated part wise schedule are released. 5 Daily meetings & constant follow up to ensure supplies Time wise schedule will take care, monitoring screens are available. Auto alerts available in case of deviation. Supply Chain
  • 22. External - General e-Material Flow Supply Chain 22 # Before emf system After emf system 06 Inventory adjustments are possible only at month end Inventory adjustments are done on daily basis based on actual production 07 Due to uncertainty vendors keep inventory of all items for all models As schedules are fixed therefore vendors to keep inventory of required items only 08 Inventory norms are fixed for all items No Inventory norms. Material will be available as per advance time 09 Line stoppages due to component shortages Minimum Line stoppages due to component shortages 10 Segregation inside the plant No Segregation inside the plant
  • 23. External - General e-Material Flow Stores 23 # Before emf system After emf system 1 Exact time of receipt, unloading location & consumption point is not known Time of receipt, unloading location & consumption point is mentioned on tags 2 Manual punching at gate, Manual counting of trolley/bins & GRN creation etc. No manual punching. Every entry, counting of trolley/bins, GRN creation is through the reading of the bar-coded documents 3 Any material in any quantity is sent by the vendor Material can be sent only as per the daily schedule 4 Vendor persons inside the plant to take physical stock etc No need of vendor persons inside the plant 5 Real time information of dispatch of material, GE and GR not available Real time information is available
  • 24. External - General e-Material Flow e-Material Flow Key Benefits Achieved
  • 25. External - General e-Material Flow The project benefited the organization in multiple ways. The key benefits that we realized post implementation • Inventory carrying cost reduction - parts and engines • Lesser instances of line stoppages, helped in increased production and lot of savings in the labour cost • Manpower savings which resulted from automation across the supply chain, store and planning departments 25
  • 26. External - General e-Material Flow • Truck Turn Around Time reduction and in turn, increase in the logistics efficiency • We also realized a lot of other benefits as a result of streamlining of the Supply Chain and the automation at various levels • Benefits which we reaped from this project - way surpassed the cost of the project • RoI within 6 months of the launch owing to the scale and the effectiveness of implementation 26
  • 27. External - General e-Material Flow Benefits to Suppliers • To the minute firm scheduling system helped Suppliers -Optimise human resources -Inventory optimization -Reduction in manufacturing losses -No requirement calculation from rolling plan -Simpler material reconciliation at both locations -Standardize production lot size and economise on logistics costs • Real time information of truck entry, acknowledgement, discrepancy if any, return of empties and truck exit etc. • Reverse logistics management is simpler and efficient • The number trolleys/bins in circulation reduced • Truck TAT improved 27
  • 28. External - General e-Material Flow e-Material Flow - Achievements Particulars Before EMF @6600VPD After EMF@9100VPD No. of filled trolleys 2200 nos. ~700 nos. Avg. Inventory of emf parts 15 Crore 9 Crore Avg. engine inventory 3200 Nos. 2700 Nos. Line stoppages Avg. 3073 Min/Mth Avg. 1350 Min/Mth Production plan changes Avg. 75 /Mth (Unplanned) Avg. 10/Mth (Approved) Manpower in Stores 184 148 3PL operators (stores + vendors) 244 112 Manpower in PPC 231 201 No. of 3PL trucks 102 85 Truck turn-around time Avg. 130 Min Avg. 90 Min
  • 29. External - General e-Material Flow e-Material Flow - Achievements Particulars Before EMF @6600VPD After EMF@9100VPD Schedule adherence No day wise schedule Avg. 95% for daily schedules On-time delivery NA 87% on time achieved % Lot segregation 1.2% 0.04% Accuracy-BOM 86% 100% Minor injuries/Annum (PPC + Stores) 50 16 Visuals/FIFO No Visuals/FIFO Day-wise colour tags and emf layout ensures FIFO Information flow Slow: combination of manual and emails. Fast: Combination of real time reports and Auto alerts Total 2.83 Crores/Annum recurring cost has been saved from one plant.
  • 30. External - General e-Material Flow e-Material Flow Key Business Challenges Faced
  • 31. External - General e-Material Flow The complexity of the project was huge. There were so many areas which the project touched and hence the challenges. Top 3 Challenges : • Physical changes on shop floor ( stores layout changes without stopping production ) Overcome by Detailed planning for contingency and top management drive
  • 32. External - General e-Material Flow • Cultural changes (Change Management) Adherence to MRP (legacy System) – Overcome by involvement of key stakeholders in testing and suggestions during the project • Availability of business experts for sufficient and quality time – Overcome by calendar planning and top management involvement
  • 33. External - General e-Material Flow e-Material Flow Key Technical Challenges Faced
  • 34. External - General e-Material Flow The system is unique. The challenge was high risk on account of system failure. Top 2 Challenges: • Since the system was evolving, the iterations were more and to be done within stipulated time frame. Overcome by Rigorous testing of all scenarios and training to users before Go- Live and building of robust fall back systems for each and every process
  • 35. External - General e-Material Flow • Development and support capability of internal and external (Consultants) teams. Overcome by motivating both teams (Business & Technical) and involving external process experts to achieve a unique and effective integrated solution/system for complete supply chain, to work as single team and complement each other
  • 36. External - General e-Material Flow e-Material Flow Next Steps
  • 37. External - General e-Material Flow The EMF Journey Continues • Continue to implement e-Material Flow System in all our manufacturing plants - existing and upcoming • Our endeavour always is to make sure that – Technology is used in the most optimal way – Functional processes designed efficiently – Proposed benefits reaped thoroughly