5 S IN B-VENT AREA-BEFORE
3
BEFORE 5 S
4
B-VENT AFTER 5-S
5
B-VENT AFTER 5 S
6
Process/Material Flow
8
Source: Improve Phase 26jul07
Bottleneck Management
• Bottleneck
– The point which is currently reducing the
flow or slowing the entire process
– A managed buffer before a bottleneck is
necessary
– A bottleneck WILL exist in every process
– Bottlenecks move !
– High WIP can mask the bottleneck
– The people working at the bottleneck take
breaks, not the bottleneck
• Workers can do each others work, help out
when someone is sick, on holidays, quit
• Workers help improve bottleneck operations
by helping out each other
• Variety in work making it more full-filling
• Training new workers
Benefits of cross functionally
trained workers
QUESTION ON CYCLE TIME
40 min
20 min25 min
15 min
30 min
1
54
3
2
•What is the process cycle time?
•What is the process bottleneck?
HOW TO SET-UP 1-PC FLOW?
• GET ALL YOUR NEEDED MATERIAL BEFORE YOU
START!!
• Set-up equipment as close as possible together
so you can pass parts without using boxes
• Eliminate WIP BOXES
• Set-up a white board and record hourly PPMH
compared to target.
• List any issues you have during the run
• Run 1 order at a time in the cell until it’s
completed and then next order 12
13
10 min exercise on Batch
and 1 Pc flow
14
Next we set-up 1-pc flow
in components
15
| | 16

Más contenido relacionado

La actualidad más candente

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
Chris Cummins
 

La actualidad más candente (20)

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Standard Work
Standard WorkStandard Work
Standard Work
 
Lean basics
Lean basicsLean basics
Lean basics
 
Types of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna HedaTypes of waste - lean Concept Krishna Heda
Types of waste - lean Concept Krishna Heda
 
Cellular Manufacturing (Flexible Operations)
Cellular Manufacturing (Flexible Operations)Cellular Manufacturing (Flexible Operations)
Cellular Manufacturing (Flexible Operations)
 
Kaizen Seminar Presentation
Kaizen Seminar PresentationKaizen Seminar Presentation
Kaizen Seminar Presentation
 
Visual Controls - Mieruka
Visual Controls - MierukaVisual Controls - Mieruka
Visual Controls - Mieruka
 
Advanced Lean Strategies for Office & Service Environments
Advanced Lean Strategies for Office & Service Environments Advanced Lean Strategies for Office & Service Environments
Advanced Lean Strategies for Office & Service Environments
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
The 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation PosterThe 12 Steps of TPM Implementation Poster
The 12 Steps of TPM Implementation Poster
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group Activities
 
Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Kaizen bcic
Kaizen bcicKaizen bcic
Kaizen bcic
 
Introduction to Standardized Work
Introduction to Standardized WorkIntroduction to Standardized Work
Introduction to Standardized Work
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 

Destacado

Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flow
guest399e73
 
Ford VS Toyota New
Ford VS Toyota NewFord VS Toyota New
Ford VS Toyota New
Justin Doone
 
Lean DL Arsene
Lean DL ArseneLean DL Arsene
Lean DL Arsene
LuciArsene
 

Destacado (16)

Standard Work And One Piece Flow
Standard Work And One Piece FlowStandard Work And One Piece Flow
Standard Work And One Piece Flow
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Tw8
Tw8Tw8
Tw8
 
Flow Efficiency
Flow EfficiencyFlow Efficiency
Flow Efficiency
 
Continuous Improvement & Flow
Continuous Improvement & FlowContinuous Improvement & Flow
Continuous Improvement & Flow
 
Agile and the Lean Startup - E-nnovation conference
Agile and the Lean Startup - E-nnovation conferenceAgile and the Lean Startup - E-nnovation conference
Agile and the Lean Startup - E-nnovation conference
 
Micheal Kors Final Doc^
Micheal Kors Final Doc^Micheal Kors Final Doc^
Micheal Kors Final Doc^
 
Basics Of Lean
Basics Of LeanBasics Of Lean
Basics Of Lean
 
Ford VS Toyota New
Ford VS Toyota NewFord VS Toyota New
Ford VS Toyota New
 
Static Code Analysis
Static Code AnalysisStatic Code Analysis
Static Code Analysis
 
Lean DL Arsene
Lean DL ArseneLean DL Arsene
Lean DL Arsene
 
The quest of one-piece-flow in IT by Pierre Masai, Toyota Motor Europe
The quest of one-piece-flow in IT by Pierre Masai, Toyota Motor EuropeThe quest of one-piece-flow in IT by Pierre Masai, Toyota Motor Europe
The quest of one-piece-flow in IT by Pierre Masai, Toyota Motor Europe
 
Innovation training
Innovation trainingInnovation training
Innovation training
 
Error Proofing Manual Automotive Assembly by JULIAN KALAC
Error Proofing Manual Automotive Assembly by JULIAN KALACError Proofing Manual Automotive Assembly by JULIAN KALAC
Error Proofing Manual Automotive Assembly by JULIAN KALAC
 
Baby Frock
Baby FrockBaby Frock
Baby Frock
 

Similar a Batch v Lean 1 piece flow training

Agile lean workshop for teams, managers & exec leadership
Agile lean workshop for teams, managers & exec leadershipAgile lean workshop for teams, managers & exec leadership
Agile lean workshop for teams, managers & exec leadership
Ravi Tadwalkar
 
FCA Internship Presentation
FCA Internship PresentationFCA Internship Presentation
FCA Internship Presentation
Sarah Fox
 
Agile Scrum Introduction
Agile Scrum IntroductionAgile Scrum Introduction
Agile Scrum Introduction
Justin Whitling
 

Similar a Batch v Lean 1 piece flow training (20)

Presentation1
Presentation1Presentation1
Presentation1
 
PMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and MindsetPMI-ACP Domain 1 Agile Principles and Mindset
PMI-ACP Domain 1 Agile Principles and Mindset
 
Lean applied in Project Management
Lean applied in Project ManagementLean applied in Project Management
Lean applied in Project Management
 
Agile Software Development Workshop at Sote Hub
Agile Software Development Workshop at Sote HubAgile Software Development Workshop at Sote Hub
Agile Software Development Workshop at Sote Hub
 
Kanban for ODDS
Kanban for ODDSKanban for ODDS
Kanban for ODDS
 
Scrum
ScrumScrum
Scrum
 
Agile Workflow Process Everything You Need to Know
Agile Workflow Process Everything You Need to KnowAgile Workflow Process Everything You Need to Know
Agile Workflow Process Everything You Need to Know
 
Simple Lean Training
Simple  Lean TrainingSimple  Lean Training
Simple Lean Training
 
Kanban @ nine.ch
Kanban @ nine.chKanban @ nine.ch
Kanban @ nine.ch
 
Agile lean workshop for teams, managers & exec leadership
Agile lean workshop for teams, managers & exec leadershipAgile lean workshop for teams, managers & exec leadership
Agile lean workshop for teams, managers & exec leadership
 
Scrum
ScrumScrum
Scrum
 
FCA Internship Presentation
FCA Internship PresentationFCA Internship Presentation
FCA Internship Presentation
 
Agile Scrum Introduction
Agile Scrum IntroductionAgile Scrum Introduction
Agile Scrum Introduction
 
Kaizen event sample
Kaizen event sampleKaizen event sample
Kaizen event sample
 
CFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean TechniquesCFW - Continuous Improvement & Lean Techniques
CFW - Continuous Improvement & Lean Techniques
 
Running Rapid Improvement Events
Running Rapid Improvement EventsRunning Rapid Improvement Events
Running Rapid Improvement Events
 
Knowledge Management
Knowledge ManagementKnowledge Management
Knowledge Management
 
Vidas Vasiliauskas. Scrumban - mixing agile and lean for product manufacture ...
Vidas Vasiliauskas. Scrumban - mixing agile and lean for product manufacture ...Vidas Vasiliauskas. Scrumban - mixing agile and lean for product manufacture ...
Vidas Vasiliauskas. Scrumban - mixing agile and lean for product manufacture ...
 
Roadmap to Scrum Master ( CSM )
Roadmap to Scrum Master ( CSM ) Roadmap to Scrum Master ( CSM )
Roadmap to Scrum Master ( CSM )
 
Time management
Time managementTime management
Time management
 

Más de Julian Kalac P.Eng

FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
Julian Kalac P.Eng
 

Más de Julian Kalac P.Eng (20)

SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 

Último

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Último (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 

Batch v Lean 1 piece flow training

  • 1. Lean 1-Pc Flow vs Batch & Que Production August 12, 2012 Developed by Julian Kalac, P.Eng Lean Six Sigma Master Black Belt 1
  • 2.
  • 3. 5 S IN B-VENT AREA-BEFORE 3
  • 8. 8
  • 9. Source: Improve Phase 26jul07 Bottleneck Management • Bottleneck – The point which is currently reducing the flow or slowing the entire process – A managed buffer before a bottleneck is necessary – A bottleneck WILL exist in every process – Bottlenecks move ! – High WIP can mask the bottleneck – The people working at the bottleneck take breaks, not the bottleneck
  • 10. • Workers can do each others work, help out when someone is sick, on holidays, quit • Workers help improve bottleneck operations by helping out each other • Variety in work making it more full-filling • Training new workers Benefits of cross functionally trained workers
  • 11. QUESTION ON CYCLE TIME 40 min 20 min25 min 15 min 30 min 1 54 3 2 •What is the process cycle time? •What is the process bottleneck?
  • 12. HOW TO SET-UP 1-PC FLOW? • GET ALL YOUR NEEDED MATERIAL BEFORE YOU START!! • Set-up equipment as close as possible together so you can pass parts without using boxes • Eliminate WIP BOXES • Set-up a white board and record hourly PPMH compared to target. • List any issues you have during the run • Run 1 order at a time in the cell until it’s completed and then next order 12
  • 13. 13
  • 14. 10 min exercise on Batch and 1 Pc flow 14
  • 15. Next we set-up 1-pc flow in components 15