UNDERGROUND CAVERN
      PROJECT
           Compiled & Created By
           Manveer J Shetty-MBG-Marketing
           Ravi-MBG-CSE
Vision & Mission of Project
                 Underground
VISION
"People will make wise, informed, choices as they manage cave, karst
and groundwater resources to protect the underground ecosystems for
the health of current and future generations".

MISSION
"build the necessary awareness and responsible attitudes towards
cave, karst and groundwater resources and their management needs
among the general public through educational and interpretive
programs."
SCOPE OF WORK
The project involves engineering, procurement,
construction and commissioning of systems for crude
oil receipt, pumping out, metering, recirculation,
heating, waste water treatment, utilities production,
flaring and operation buildings.
INTRODUCTION
• cavern - a large cave or a large chamber in a cave
• a geological formation consisting of an underground enclosure
  with access from the surface of the ground or from the sea.
• Underground cavern project is for strategic storage of crude oil,
  required to provide supplies during emergencies/disruption of
  supplies .
• Underground rock caverns are considered the safest means of
  storing hydrocarbons
• It could store crude oil to meet the country's demand for 15 days in
  case of an emergency. It assumed significance because India would
  depend on oil imports for 92 per cent of its crude oil needs by
  2020, and because of the volatility in West Asia
Facts and Figures
• Total number of underground cavern projects in india are 4.
• GOI has decided to set up 5 MMT Strategic crude oil storages at Mangalore,
  Vishakapattanam and Padur.
• located to coasts so that they are readily accessible to the refining sector
  through marine distribution
• GOI has set up special purpose vehicle-INDIAN STRATEGIC PETROLEUM
  RESERVES LTD under OIDB to implement, maintain and operate strategic
  storage.
• India plans to store 136 Million Barrels till 2020.
      COMPANY       LOCATION    PROJECT CAPACITY     ESTIMATE          STATUS
     SKEC&KCT JV     PADDUR    9.25MILLION BARREL    375 CRORE   UNDER CONSTRUCTION
     SKEC&KCT JV   MANGALORE   10.25MILLION BARREL   400 CRORE   UNDER CONSTRUCTION
       HCC LTD       PADDUR    9.25MILLION BARREL    373 CRORE   UNDER CONSTRUCTION
       HCC LTD        VIZAG    7.30MILLION BARREL    380 CRORE       COMPLETED
What are the necessities to undertake
            these projects
• GOI proposes to construct underground rock cavern storage of
  imported crude oil on detailed feasibility report prepared by
  Engineers India Ltd in alliance with geostock Engineers
• GOI has set up special purpose vehicle-INDIAN STRATEGIC
  PETROLEUM RESERVES LTD under OIDB to implement, maintain
  and operate strategic storage.
• A company is appointed as the Project Management Consultants for
  the project.
• Subcontracting enterprise executes the project by providing all
  back up support in liasoning with local govt. bodies and for
  implementing preliminary setup of site and main cavern works.
What does happen to crude oil?
           A LIVE EXAMPLE
• Locatedamostly in Coastal region
• SKE&C, 60 Billion dollar Korean enterprise having a
• Crude Oil is transported fromconstruction cavern
  vast and rich experience in the port to the of such
  caverns has tied up with the Indian allies M/s Karma
  through pipelines for the execution of this project for
  Chand Taper (B) Ltd.
• Substations are set up in order to pump in to
  a worth of INR 403 Crores.
• caverns or back to refineries on demandProject
  Engineers India Limited is appointed as the
  Management Consultants for the project.
• Nag & Rich Infract are the subcontractors to the JV for
  the execution of this prestigious project of strategic
  importance to the country.
Features of Caverns

•Located mostly in Coastal region.
•Crude Oil is transported from port to the cavern through pipelines
•Substations are set up inorder to pump in to caverns or back to refineries on
demand
•All the 4 Caverns are of similar dimensions with an approx. length of
2800m(30m height and 20 m wide)
•Oval in shape.
•Capacity of oil storage cavern-2.3MMT
•Total cavern length-4(700)m equals to a TOTAL -2800M
•Cavern height-30m and width-20m
•Total length of access tunnel – 1400m(12&8M WIDTH)
•Total water curtain length-6.5m high and width-1140m
EQUIPMENTS USED IN CAVERN CONSTRUCTION

Jumbo Rig
Charging Car
Short Crete Machine
Hydraulic Excavators
DG Sets
Wheel Loaders
Dumpers
Transit Mixers
Cranes
Dozers
EQUIPMENTS USED IN CAVERN CONSTRUCTION


    Jumbo Rig
   Usage: To drill hole inside the tunnel
   Machine :Sandvick Mining ltd
   Model: DT820
   No. of machines reqd: 3 -4Nos
Charging Car


 Usage: To Charge the explosive
         inside the tunnel
 Machine :Normat International Ltd
 Model: HIMEC
 No. of machines reqd: 3 No's
Short Crete
        Machine

 Usage: To Concrete side walls
 Machine :Normat International Ltd
 Model: HIMEC
 No. of machines reqd: 3 Nos
Hydraulic
       Excavators
 Usage: To Excavate the stone after
         blasting and scaling is done
 Machine :Doosan Make
 Model: S-340,S-210
Capacity: 35 Ton and 20 Ton
 No. of machines reqd: 3 No's
    Gmmco’s opportunity
 Promote CAT Hydraulic excavators mapped to the tonnage requirement
 for the application
Machines Applicable:320D,329D,336
    Revenue generation
 Parts revenue: Rs.75000/excavator/month approx.
DG Sets
 Usage: To supply power to the plant
 Machine :Greaves
 Capacity: 400KVA
 No. of machines reqd: 8 Nos

  Gmmco’s opportunity
 Promote CAT DG sets mapped to the Power rating requirement
 for the application
 Engines Applicable:320KVA/365KVA/500KVA

   Revenue generation
  Parts revenue: Rs.2,43,500/engine/year approx
  Service revenue: Rs.14000/engine/year approx
Wheel Loaders


 Usage: To remove the material outside
 Machine :Caterpillar
 Model: 980H & 988F ,WA470(Komatsu)
 Capacity: 6.5Cu.m,4.5Cu.m,3.5Cu.m
 No. of machines : 5 Loaders

   Revenue generation
 Parts revenue: Rs.22,00,000/Loader/year
Dumpers


 Usage: To remove the material outside
 Machine :Volvo
 Model: 400
 Capacity: 31 Ton
 No. of machines reqd: 18 Nos
Transit Mixers


 Usage: To remove the material outside
 Machine :Volvo
 Model: 400
 Capacity: 31 Ton
 No. of machines reqd: 18 Nos
Hydra Cranes

 Usage: Material Handling application
 Machine :Hydra Crane
 Model: HY12
 Capacity: 12 Ton
 No. of machines reqd: 1 No's
Track Type
        Tractors
 Usage: To doze the material
 Machine :Caterpillar
 Model: D6G
 No. of machines reqd: 1 Nos




Revenue generation
 Parts revenue: Rs.50000/Dozer/year
Machineries utilized at the PADUR site
SL NO             EQUIPMENT DETAIL   MODEL       CAPACITY      TOTAL NO.S   UNIT PRICE      TOTAL PRICE
         1 DRILL JUMBO                  DT 820          2BOOM        3NOS     3.10 CRORE       9.30 Crores
         2 DRILL JUMBO                DT 1130         3 BOOM        2NOS      5.21 CRORE      15.63 Crores
         3 CHARGING CAR                9905BT    500KG/BASKET        2NOS      2.0CRORE           4 Crores
         4 SHORT CRETE MACHINE       7110WPC            30M/H        2NOS      3.0CRORE           6 Crores
         5 KOAMATSU LOADER               W470          3.5CUM        1NOS        1 CRORE       1.00 Crores
         6 CAT LOADER                    980H          4.5CUM        3NOS      1.5CRORE        4.50 Crores
         7 CAT LOADER                    988H          6.5CUM        1NOS        1CRORE        1.00 Crores
         8 EXCAVATORS                    S210          0.9CUM        1NOS         95LAKH          95 Lakhs
         9 EXCAVATORS                   CS340          1.5CUM        2NOS         78LAKH       1.56 Crores
        10 VOLVO DUMPERS                   400          31TON      16NOS          67 LAKH     10.72 Crores
        11 JCB BACKHOE LOADER             3DX          0.3CUM         1NO         19LAKH          19 Lakhs
        12 HYDRA CRANE                   HY12          12TON          1NO         10LAKH          10 Lakhs
        13 TRANS MIXER                  TM17             6CUM        3NOS         25LAKH          75Lakhs
        14 BATCHING PLANT                  SW     30CUM/HOUR          1NO         38LAKH          38 Lakhs
        15 COMPRESSOR                      280        600CFM          1NO         9.8LAKH        9.8 Lakhs
        16 TATA TRUCK                     1109           09TON        2NO          9LAKH          18 Lakhs
        17 GANTERY CRANE                   NA            15T0N        2N0          1.80 C       3.6 Crores
        18 DG SETS                         NA            500KV       8NOS         22LAKH       1.76 Crores
        19 DOZER                          D6G           17TON         1NO         65LAKH          65 Lakhs
        20 UNIROUT PUMP                 ATLAS           200L/M        2NO         30LAKH          60Lakhs


• Each such project requires machineries worth Rs.61.86 Cr
  approx.
• Mangalore received 3 UC projects necessitating 184 Cr worth
  machineries for the storage capacity of 28.75 Million Barrels
  (Total project cost for each project being 375 cr)
Future Scenario of Underground
             cavern projects?
• India plans to store 136 Million Barrels of Crude oil
  Storage.
• This storage will be used as strategic reserves for
  the country during emergencies/disruption of
  supplies
• India would depend on oil imports for 92 per cent of
  its crude oil needs by 2020, and because of the
  volatility in West Asia
SWOT Analysis For GMMCO
           Strengths                                        Weakness
 Gmmco’s strength of catering vast            Service support has to attain its
  product lines of caterpillar, supporting      Credibility
  variety of application makes it a unique     Quality of support has to match with
  dealer.                                       the premium nature of the product.
 RUN model which makes it a tailor made       Lead time needs to cope up with the
  supplier.                                     competition-Product delivery, parts
 Single last dealer makes it more credible     delivery and service support

          Opportunity                                         Threats
 Excavators will be manufactured              Competition is high
  indigenously in the near future.             Risk factor
 More Underground projects are in the         Demands to be matched with
  pipeline.                                     continuous support on service and
 Gmmco’s tie up with Mercedes Benz will        parts
  be a major Boost in the On highway           Higher prices of machines due to
  dumpers category                              imports leads to vulnerability.
SWOT Analysis for UCP

             Strengths                                       Weakness
 Development and utilization of                Shortage of domestic energy
  underground space                              resources
 Protection of ecological environment,         Crude oil supply instability
  resources utilization and sustainable         Security issues
  development


            Opportunity                                       Threats
 In the next 20 years,growth in demand           High capital costs
  for crude oil will be faster than domestic      Public access to this facility
  growth rate of crude oil.                       Product releases
 Providing cost effective and practical          Fires or explosions
  engineering solutions                           Cavern subsidence or collapse
                                                  Any other activity that endangers
                                                   public health, safety, or constitutes a
                                                   threat to the environment
Snap shots
Advantages
•   To ensure energy security in response to external supply disruptions
•   Safest means of storing hydrocarbons
•   Balance supply and demand
•   control oil and gas prices fluctuations
•   Withstand the emergency and safeguard the economic safety
•   Highly strategic and safe storage
•   Large storage capacity
•   Strong security
•   Less pollution
•   Small footprint
•   Short construction period
•   Low investment
Conclusion
Underground cavern is the right solution – both technically feasible and
commercially viable – for LPG, crude oil storages.
The construction of underground facility is a technically challenging job;
successful completion of such projects depends on the right kind of
equipment, preparedness in case of eventualities, and great teamwork.
Fixed establishment cost is high during the construction compared to
variable cost. Any savings in time will more than compensate the additional
cost involved for such crashing.
Many construction projects of this kind provide opportunities for the
construction contractors and also for the engineers.
The safe and mass storage system is possible in an underground which
offers strategy storage for the country demand and the supply to demand
can be managed during war, etc.
THANK YOU

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Training report of ONGC Ahmedabad
Training report of ONGC AhmedabadTraining report of ONGC Ahmedabad
Training report of ONGC Ahmedabad
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
 
Well logging notes
Well logging notesWell logging notes
Well logging notes
 
Casing of oil well
Casing of oil wellCasing of oil well
Casing of oil well
 
What is the different between the net pay and resrvoir thickness
What is the different between the net pay and resrvoir thicknessWhat is the different between the net pay and resrvoir thickness
What is the different between the net pay and resrvoir thickness
 
Mud logging
Mud loggingMud logging
Mud logging
 
Petroleum industry final
Petroleum industry finalPetroleum industry final
Petroleum industry final
 
Well completion
Well completionWell completion
Well completion
 
Well Control
Well ControlWell Control
Well Control
 
Flowsheet ONGC
Flowsheet ONGCFlowsheet ONGC
Flowsheet ONGC
 
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
Reserve Estimation of Initial Oil and Gas by using Volumetric Method in Mann ...
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Casing
CasingCasing
Casing
 
Drilling economics drilling engineering
Drilling economics drilling engineeringDrilling economics drilling engineering
Drilling economics drilling engineering
 
Basic of well drilling process
Basic of well drilling processBasic of well drilling process
Basic of well drilling process
 
Coring
CoringCoring
Coring
 
Neutron density and sonic logs
Neutron density and sonic logs Neutron density and sonic logs
Neutron density and sonic logs
 
Well control
Well controlWell control
Well control
 
Well completion workshop april-2018
Well completion workshop april-2018Well completion workshop april-2018
Well completion workshop april-2018
 
Estmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiibleEstmation of oil & gas proven probable posiible
Estmation of oil & gas proven probable posiible
 

Destacado

Strategic Petroleum Reserves India
Strategic Petroleum Reserves IndiaStrategic Petroleum Reserves India
Strategic Petroleum Reserves IndiaBHAGWAN PRASAD
 
Case Study--U.S. SPR Program and the Environment
Case Study--U.S. SPR Program and the Environment Case Study--U.S. SPR Program and the Environment
Case Study--U.S. SPR Program and the Environment The Ocean Foundation
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Cavern Technologies Underground Build To Suite Data Center
Cavern Technologies Underground Build To Suite Data CenterCavern Technologies Underground Build To Suite Data Center
Cavern Technologies Underground Build To Suite Data CenterCavern Technologies
 
CRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIA
CRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIACRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIA
CRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIASudan Wargantiwar
 

Destacado (10)

Strategic Petroleum Reserves India
Strategic Petroleum Reserves IndiaStrategic Petroleum Reserves India
Strategic Petroleum Reserves India
 
Case Study--U.S. SPR Program and the Environment
Case Study--U.S. SPR Program and the Environment Case Study--U.S. SPR Program and the Environment
Case Study--U.S. SPR Program and the Environment
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Basics for ugs
Basics for ugsBasics for ugs
Basics for ugs
 
Make in india
Make in indiaMake in india
Make in india
 
Cavern Technologies Underground Build To Suite Data Center
Cavern Technologies Underground Build To Suite Data CenterCavern Technologies Underground Build To Suite Data Center
Cavern Technologies Underground Build To Suite Data Center
 
R42460 SPR
R42460 SPRR42460 SPR
R42460 SPR
 
Naice 2010 SPE powerpoint
Naice 2010 SPE powerpointNaice 2010 SPE powerpoint
Naice 2010 SPE powerpoint
 
Oil & Gas Sectore Report - January 2017
Oil & Gas Sectore Report - January 2017Oil & Gas Sectore Report - January 2017
Oil & Gas Sectore Report - January 2017
 
CRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIA
CRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIACRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIA
CRUDE OIL PRICES:WHY ARE THEY FALLING AND ITS IMPACT ON WORLD ECONOMY AND INDIA
 

Similar a Underground cavern project

AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
RSMML training report
RSMML  training report RSMML  training report
RSMML training report ujjawalnagda
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandTransnet Port Terminals
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.pptDagmawiGenanaw
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.pptHARIDASSC0788
 
TATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEM
TATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEMTATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEM
TATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEMAvishek Ghosh
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Abdul Basith C
 
New Dan D Drilling Info Slide Share
New Dan D Drilling Info Slide ShareNew Dan D Drilling Info Slide Share
New Dan D Drilling Info Slide ShareRobert Waggoner
 
Introduccion ntf 1
Introduccion ntf 1Introduccion ntf 1
Introduccion ntf 1Jaime Troya
 
FTA Presentation.pptx for pawer plant flue gas treatment
FTA Presentation.pptx for pawer plant flue gas treatmentFTA Presentation.pptx for pawer plant flue gas treatment
FTA Presentation.pptx for pawer plant flue gas treatmentAnuj Saini
 
Site visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptxSite visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptxssuser9d0ede
 
Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011Mukesh Kumar Gupta
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
Trican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationTrican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationSistema FIEB
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specificationPrabhakar Tiwari
 
Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction  Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction Bethany Fan
 

Similar a Underground cavern project (20)

AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
RSMML training report
RSMML  training report RSMML  training report
RSMML training report
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 
The expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demandThe expansion of Saldanha Port to meet nternational growing iron ore demand
The expansion of Saldanha Port to meet nternational growing iron ore demand
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
TATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEM
TATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEMTATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEM
TATA MOTORS_BREAKDOWN ANALYSIS OF SHOT BLASTING SYSTEM
 
Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)Drillship(Dhirubhai Deep-water KG2)
Drillship(Dhirubhai Deep-water KG2)
 
New Dan D Drilling Info Slide Share
New Dan D Drilling Info Slide ShareNew Dan D Drilling Info Slide Share
New Dan D Drilling Info Slide Share
 
Nitin
NitinNitin
Nitin
 
Introduccion ntf 1
Introduccion ntf 1Introduccion ntf 1
Introduccion ntf 1
 
FTA Presentation.pptx for pawer plant flue gas treatment
FTA Presentation.pptx for pawer plant flue gas treatmentFTA Presentation.pptx for pawer plant flue gas treatment
FTA Presentation.pptx for pawer plant flue gas treatment
 
Site visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptxSite visit report of Raikela & Tantra Iron.pptx
Site visit report of Raikela & Tantra Iron.pptx
 
Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011Global Trend & Perspective on LNG - Lng World Summit Doha 2011
Global Trend & Perspective on LNG - Lng World Summit Doha 2011
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
Trican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources PresentationTrican Well Service - Unconventional Resources Presentation
Trican Well Service - Unconventional Resources Presentation
 
Ed1 r4 product specification
Ed1 r4 product specificationEd1 r4 product specification
Ed1 r4 product specification
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
Zeco Brochure
Zeco BrochureZeco Brochure
Zeco Brochure
 
Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction  Yutani magnetic pulverizer introduction
Yutani magnetic pulverizer introduction
 

Último

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 

Último (20)

BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 

Underground cavern project

  • 1. UNDERGROUND CAVERN PROJECT Compiled & Created By Manveer J Shetty-MBG-Marketing Ravi-MBG-CSE
  • 2. Vision & Mission of Project Underground VISION "People will make wise, informed, choices as they manage cave, karst and groundwater resources to protect the underground ecosystems for the health of current and future generations". MISSION "build the necessary awareness and responsible attitudes towards cave, karst and groundwater resources and their management needs among the general public through educational and interpretive programs."
  • 3. SCOPE OF WORK The project involves engineering, procurement, construction and commissioning of systems for crude oil receipt, pumping out, metering, recirculation, heating, waste water treatment, utilities production, flaring and operation buildings.
  • 4. INTRODUCTION • cavern - a large cave or a large chamber in a cave • a geological formation consisting of an underground enclosure with access from the surface of the ground or from the sea. • Underground cavern project is for strategic storage of crude oil, required to provide supplies during emergencies/disruption of supplies . • Underground rock caverns are considered the safest means of storing hydrocarbons • It could store crude oil to meet the country's demand for 15 days in case of an emergency. It assumed significance because India would depend on oil imports for 92 per cent of its crude oil needs by 2020, and because of the volatility in West Asia
  • 5. Facts and Figures • Total number of underground cavern projects in india are 4. • GOI has decided to set up 5 MMT Strategic crude oil storages at Mangalore, Vishakapattanam and Padur. • located to coasts so that they are readily accessible to the refining sector through marine distribution • GOI has set up special purpose vehicle-INDIAN STRATEGIC PETROLEUM RESERVES LTD under OIDB to implement, maintain and operate strategic storage. • India plans to store 136 Million Barrels till 2020. COMPANY LOCATION PROJECT CAPACITY ESTIMATE STATUS SKEC&KCT JV PADDUR 9.25MILLION BARREL 375 CRORE UNDER CONSTRUCTION SKEC&KCT JV MANGALORE 10.25MILLION BARREL 400 CRORE UNDER CONSTRUCTION HCC LTD PADDUR 9.25MILLION BARREL 373 CRORE UNDER CONSTRUCTION HCC LTD VIZAG 7.30MILLION BARREL 380 CRORE COMPLETED
  • 6. What are the necessities to undertake these projects • GOI proposes to construct underground rock cavern storage of imported crude oil on detailed feasibility report prepared by Engineers India Ltd in alliance with geostock Engineers • GOI has set up special purpose vehicle-INDIAN STRATEGIC PETROLEUM RESERVES LTD under OIDB to implement, maintain and operate strategic storage. • A company is appointed as the Project Management Consultants for the project. • Subcontracting enterprise executes the project by providing all back up support in liasoning with local govt. bodies and for implementing preliminary setup of site and main cavern works.
  • 7. What does happen to crude oil? A LIVE EXAMPLE • Locatedamostly in Coastal region • SKE&C, 60 Billion dollar Korean enterprise having a • Crude Oil is transported fromconstruction cavern vast and rich experience in the port to the of such caverns has tied up with the Indian allies M/s Karma through pipelines for the execution of this project for Chand Taper (B) Ltd. • Substations are set up in order to pump in to a worth of INR 403 Crores. • caverns or back to refineries on demandProject Engineers India Limited is appointed as the Management Consultants for the project. • Nag & Rich Infract are the subcontractors to the JV for the execution of this prestigious project of strategic importance to the country.
  • 8. Features of Caverns •Located mostly in Coastal region. •Crude Oil is transported from port to the cavern through pipelines •Substations are set up inorder to pump in to caverns or back to refineries on demand •All the 4 Caverns are of similar dimensions with an approx. length of 2800m(30m height and 20 m wide) •Oval in shape. •Capacity of oil storage cavern-2.3MMT •Total cavern length-4(700)m equals to a TOTAL -2800M •Cavern height-30m and width-20m •Total length of access tunnel – 1400m(12&8M WIDTH) •Total water curtain length-6.5m high and width-1140m
  • 9. EQUIPMENTS USED IN CAVERN CONSTRUCTION Jumbo Rig Charging Car Short Crete Machine Hydraulic Excavators DG Sets Wheel Loaders Dumpers Transit Mixers Cranes Dozers
  • 10. EQUIPMENTS USED IN CAVERN CONSTRUCTION Jumbo Rig  Usage: To drill hole inside the tunnel  Machine :Sandvick Mining ltd  Model: DT820  No. of machines reqd: 3 -4Nos
  • 11. Charging Car  Usage: To Charge the explosive inside the tunnel  Machine :Normat International Ltd  Model: HIMEC  No. of machines reqd: 3 No's
  • 12. Short Crete Machine  Usage: To Concrete side walls  Machine :Normat International Ltd  Model: HIMEC  No. of machines reqd: 3 Nos
  • 13. Hydraulic Excavators  Usage: To Excavate the stone after blasting and scaling is done  Machine :Doosan Make  Model: S-340,S-210 Capacity: 35 Ton and 20 Ton  No. of machines reqd: 3 No's Gmmco’s opportunity  Promote CAT Hydraulic excavators mapped to the tonnage requirement for the application Machines Applicable:320D,329D,336 Revenue generation  Parts revenue: Rs.75000/excavator/month approx.
  • 14. DG Sets  Usage: To supply power to the plant  Machine :Greaves  Capacity: 400KVA  No. of machines reqd: 8 Nos Gmmco’s opportunity  Promote CAT DG sets mapped to the Power rating requirement for the application  Engines Applicable:320KVA/365KVA/500KVA Revenue generation  Parts revenue: Rs.2,43,500/engine/year approx  Service revenue: Rs.14000/engine/year approx
  • 15. Wheel Loaders  Usage: To remove the material outside  Machine :Caterpillar  Model: 980H & 988F ,WA470(Komatsu)  Capacity: 6.5Cu.m,4.5Cu.m,3.5Cu.m  No. of machines : 5 Loaders Revenue generation  Parts revenue: Rs.22,00,000/Loader/year
  • 16. Dumpers  Usage: To remove the material outside  Machine :Volvo  Model: 400  Capacity: 31 Ton  No. of machines reqd: 18 Nos
  • 17. Transit Mixers  Usage: To remove the material outside  Machine :Volvo  Model: 400  Capacity: 31 Ton  No. of machines reqd: 18 Nos
  • 18. Hydra Cranes  Usage: Material Handling application  Machine :Hydra Crane  Model: HY12  Capacity: 12 Ton  No. of machines reqd: 1 No's
  • 19. Track Type Tractors  Usage: To doze the material  Machine :Caterpillar  Model: D6G  No. of machines reqd: 1 Nos Revenue generation  Parts revenue: Rs.50000/Dozer/year
  • 20. Machineries utilized at the PADUR site SL NO EQUIPMENT DETAIL MODEL CAPACITY TOTAL NO.S UNIT PRICE TOTAL PRICE 1 DRILL JUMBO DT 820 2BOOM 3NOS 3.10 CRORE 9.30 Crores 2 DRILL JUMBO DT 1130 3 BOOM 2NOS 5.21 CRORE 15.63 Crores 3 CHARGING CAR 9905BT 500KG/BASKET 2NOS 2.0CRORE 4 Crores 4 SHORT CRETE MACHINE 7110WPC 30M/H 2NOS 3.0CRORE 6 Crores 5 KOAMATSU LOADER W470 3.5CUM 1NOS 1 CRORE 1.00 Crores 6 CAT LOADER 980H 4.5CUM 3NOS 1.5CRORE 4.50 Crores 7 CAT LOADER 988H 6.5CUM 1NOS 1CRORE 1.00 Crores 8 EXCAVATORS S210 0.9CUM 1NOS 95LAKH 95 Lakhs 9 EXCAVATORS CS340 1.5CUM 2NOS 78LAKH 1.56 Crores 10 VOLVO DUMPERS 400 31TON 16NOS 67 LAKH 10.72 Crores 11 JCB BACKHOE LOADER 3DX 0.3CUM 1NO 19LAKH 19 Lakhs 12 HYDRA CRANE HY12 12TON 1NO 10LAKH 10 Lakhs 13 TRANS MIXER TM17 6CUM 3NOS 25LAKH 75Lakhs 14 BATCHING PLANT SW 30CUM/HOUR 1NO 38LAKH 38 Lakhs 15 COMPRESSOR 280 600CFM 1NO 9.8LAKH 9.8 Lakhs 16 TATA TRUCK 1109 09TON 2NO 9LAKH 18 Lakhs 17 GANTERY CRANE NA 15T0N 2N0 1.80 C 3.6 Crores 18 DG SETS NA 500KV 8NOS 22LAKH 1.76 Crores 19 DOZER D6G 17TON 1NO 65LAKH 65 Lakhs 20 UNIROUT PUMP ATLAS 200L/M 2NO 30LAKH 60Lakhs • Each such project requires machineries worth Rs.61.86 Cr approx. • Mangalore received 3 UC projects necessitating 184 Cr worth machineries for the storage capacity of 28.75 Million Barrels (Total project cost for each project being 375 cr)
  • 21. Future Scenario of Underground cavern projects? • India plans to store 136 Million Barrels of Crude oil Storage. • This storage will be used as strategic reserves for the country during emergencies/disruption of supplies • India would depend on oil imports for 92 per cent of its crude oil needs by 2020, and because of the volatility in West Asia
  • 22. SWOT Analysis For GMMCO Strengths Weakness  Gmmco’s strength of catering vast  Service support has to attain its product lines of caterpillar, supporting Credibility variety of application makes it a unique  Quality of support has to match with dealer. the premium nature of the product.  RUN model which makes it a tailor made  Lead time needs to cope up with the supplier. competition-Product delivery, parts  Single last dealer makes it more credible delivery and service support Opportunity Threats  Excavators will be manufactured  Competition is high indigenously in the near future.  Risk factor  More Underground projects are in the  Demands to be matched with pipeline. continuous support on service and  Gmmco’s tie up with Mercedes Benz will parts be a major Boost in the On highway  Higher prices of machines due to dumpers category imports leads to vulnerability.
  • 23. SWOT Analysis for UCP Strengths Weakness  Development and utilization of  Shortage of domestic energy underground space resources  Protection of ecological environment,  Crude oil supply instability resources utilization and sustainable  Security issues development Opportunity Threats  In the next 20 years,growth in demand  High capital costs for crude oil will be faster than domestic  Public access to this facility growth rate of crude oil.  Product releases  Providing cost effective and practical  Fires or explosions engineering solutions  Cavern subsidence or collapse  Any other activity that endangers public health, safety, or constitutes a threat to the environment
  • 25. Advantages • To ensure energy security in response to external supply disruptions • Safest means of storing hydrocarbons • Balance supply and demand • control oil and gas prices fluctuations • Withstand the emergency and safeguard the economic safety • Highly strategic and safe storage • Large storage capacity • Strong security • Less pollution • Small footprint • Short construction period • Low investment
  • 26. Conclusion Underground cavern is the right solution – both technically feasible and commercially viable – for LPG, crude oil storages. The construction of underground facility is a technically challenging job; successful completion of such projects depends on the right kind of equipment, preparedness in case of eventualities, and great teamwork. Fixed establishment cost is high during the construction compared to variable cost. Any savings in time will more than compensate the additional cost involved for such crashing. Many construction projects of this kind provide opportunities for the construction contractors and also for the engineers. The safe and mass storage system is possible in an underground which offers strategy storage for the country demand and the supply to demand can be managed during war, etc.