SlideShare una empresa de Scribd logo
1 de 16
PERFORMANCE ANALYSIS OF
GEOSYNTHETICS USED IN ASPHALT REHABILITATION
ON URBAN LOCAL HIERARCHY ROADS
Industry Project for Logan City Council (QLD)
Matthew W. Coleman
Queensland University of Technology
Student: Mr Matthew W. Coleman
Email: matthew.coleman@connect.qut.edu.au
matthewcoleman@logan.qld.gov.au
Assessment: Item No. 2 – Part A
BEng Degree Major: EN40 - Bachelor of Civil and Environmental Engineering
Academic Supervisor: Mr Bradley Cowan (Adjunct Professor, QUT)
Technical Supervisor: Mr Anthony Southon (Senior Engineer, Logan City Council)
Performing Organisation Name and Address:
Queensland University of Technology, 2 George Street, Brisbane QLD 4000
Sponsoring Organisation Name and Address:
Logan City Council, 150 Wembley Road, Logan Central QLD 4114
A thesis submitted in partial fulfilment of the requirements of the subject BEB801 Project 1 in the Bachelor of
Engineering Degree. School of Civil Engineering & Built Environment, Queensland University of Technology, June 2016.
The author holds the copyright on this thesis but permission has been granted for QUT Staff to photocopy this thesis
without reference to the author.
OBJECTIVE
• The objective of the project was to develop decision parameters for the use of geosynthetics in asphalt
rehabilitation works to prevent reflective cracking and related defects on urban local roads within
Logan City Council.
DELIVERABLES
Decisions Matrix for asphalt rehabilitation geosynthetics
• The decisions matrix will provide a listing of the available geosynthetics for asphalt applications to
South East Queensland and include selection criteria for different aspects of use, based off the
determined decision parameters. The matrix will look at variables including asphalt layer placement,
treatment types, road hierarchy limitations, constructability restrictions, usable base materials (e.g.
profiled surfaces), and manufacturers specifications, etcetera. The decisions matrix will be a live
document where future products can be added or removed to suit advancement in technologies, or
further performance findings.
Test Site for future testing and monitoring
• A section of Moffatt Road, Waterford West will be set up as a test site for new geosynthetic(s) chosen
as part of the decision parameter refinement of the project. The site will be used for future studies to
determine the long-term benefits of the chosen geosynthetic product(s) with respect to performance
elements such as, reduction and prevention of reflective cracking, and associated pavement defects.
Project Objective, Scope and Deliverables
• Two primary areas of investigation included:
• Logan City Council
• History
• Topography
• Soil profiles
• Urban local road hierarchy
• Design treatment selection and analysis tools
• Asphalt Rehabilitation & Geosynthetics
• Asphalt rehabilitation
• Pavement surface failure mechanisms
• Typical asphalt rehabilitation treatments (overlays and deep-lift treatments)
• Asphalt geosynthetics
• Asphalt repair treatments with geosynthetics (interlayer and subgrade treatments)
• Polyester vs. Glass-fibre geosynthetics
• Extension of pavement service life with geosynthetics
• Geosynthetics previously used by LCC
• Geosynthetic products available to South East Queensland
• Industry use of geosynthetics
• Alternatives to geosynthetics
• Certification avenues for available geosynthetic products
Research – Literature Review
• Various improvements are needed to LCC’s PMS database to ensure that geosynthetics are
captured accurately.
• Additional testing measures for preliminary investigations will help with more accurate asphalt
rehabilitation designs.
• Asphalt Geosynthetics are to be used to mitigate the propagation of bottom-up reflective and
fatigue cracking. The geosynthetics will also assist in the reduction of rutting and shoving, while
stabilising asphalt pavement layers and extending the structural life of the asphalt pavement.
• Asphalt repair treatments will include asphalt interlayer and subgrade / base geosynthetics.
These treatments will form the initial decision parameter of the decision matrix.
• Interlayer geosynthetic treatments were proven to be the most beneficial, and therefore will be
the main focus of the decision matrix. Subgrade / base geosynthetic treatments have a number
of concerns and underlying issues which will require further investigation by LCC and suppliers.
Possible future study opportunity. Subgrade / base asphalt geosynthetics will not be discounted
from the decision parameter analysis, and will be included in the decision matrix.
• The test site will provide a good opportunity to test the performance of both glass-fibre and
polyester geosynthetics.
• The extension of asphalt rehabilitation service life with geosynthetics was not able to be
accurately determined. However, when in use, geosynthetics will be assumed to provide a 30-
50% increase in pavement life, under ideal conditions.
• Geosynthetic manufacturers may find it beneficial to have their available products certified using
Australian standards and testing methods.
Literature Review Preliminary Recommendations
Various stages of qualitative information collection and analysis were conducted, in relation
to project performance, operational and system overviews.
The experimental stages included:
• Review of LCC Asset Systems, used for asphalt rehabilitation works.
• Observations and recommendations from previous projects.
• Observations and recommendations (including constructability assessment) of current
projects.
• Test site observations and preliminary investigation results.
• Analysis of observations, recommendations and literature review material to determine
decision parameters and decision matrix.
• Analysis of test site investigation results, and determination of final asphalt and
geosynthetic treatment.
• Test site implementation measures.
Experimental Method & Analysis
Recommendations:
• The SMEC PMS coding should be updated so that defects detected on higher profile roads take a
greater priority than defects on lower profile roads, due to the associated political risks and larger
traffic volumes generally associated with higher profile roads.
• SMEC’s pre-determined asphalt treatments should be updated to incorporate asphalt treatments with
geosynthetics. In conjunction, the determination of SMEC’s strength and cost values (for new and old
asphalt treatment types) should be revised to reflect more accurate project pricings and asphalt
lifespan growth with geosynthetic use, where feasible.
• Modification to LCC’s Standard Specifications to reflect the new asphalt notations specified in MRTS30.
The MRTS 30 notations are industry wide and are now incorporated on all current asphalt plant mix
designs.
• Implementation of additional testing methods such as FWD/HWD, PAVEDEF, GPR and TSD etcetera to
help save costs by refining the asphalt rehabilitation designs in future years, and assistance with
assessing the impacts geosynthetics may have on constructed pavements.
• Cost-benefit investigation should be undertaken in the coming years, to determine the budgetary
effectiveness of additional pre-design testing.
• Implementation of new treatment types/designs (with revised asphalt thicknesses) to reflect the
updated requirements of MRTS30 and also the updated range of geosynthetics available to South East
Queensland (Explored further in Section 10, after determination of the decision matrix)
• LCC should endeavour to keep all asphalt and pavement analysis software up to date, while also
keeping current with industry software advancements.
• LCC should endeavour to keep up-to-date with road condition survey assessment.
Review of Council Asset Systems
Visual inspections were carried out on six previously completed asphalt rehabilitation projects that
incorporated geosynthetics.
Defects were observed on two streets:
Previous Project Observations
Sports Drive, Underwood
Third Avenue, Marsden
Visual conditions results summary table:
Previous Project Observations - Summary
Street Suburb
Asphalt
Treatment
Geosynthetic
Treatment
Road Type
Defects Observed
Since Installation
Approx. Age of
Treatment
EXISTING ASPHALT INTERLAYER GEOSYNTHETIC TREATMENTS
Compton Road (near
Railway Bridge)
Woodridge
150mm nom. DG
AC
HaTelit® C
(placed on fresh AC
– interlayer
treatment)
Arterial Nil 23 months
Sports Drive Underwood
50mm nom. DG14
Overlay
HaTelit® C (placed
on existing AC)
Collector
Yes (Detailed
below).
Worst defect
rectified 12 months
ago.
2 years
SUBGRADE TO ASPHALT GEOSYNTHETIC TREATEMENTS
Holmview Road Holmview
150 – 200mm DG
AC
Tensar® AR-G Collector Nil 2 years
Third Avenue Marsden 300mm DG AC Tensar® AR-G Local
Longitudinal
cracking at asphalt
joint.
2 years
Underwood Road
Rochedale
South
200mm DG AC
with MG Binder
(Structural Layers)
[Travel lanes
only]
Tensar® AR-G Local Nil 2 years
Barbaralla Drive Springwood
200mm DG AC
with MG Binder
(Structural Layers)
[Travel lanes
only]
Tensar® AR-G Collector Nil ~2 years
Recommendations:
• Further to the asset system review, limitations were found with the SMEC PMS and LCC’s exposure to available asphalt
geosynthetics, which were transferred onto the past projects. These shortcomings need further investigation and improvement.
• The observed premature defects primarily occurred due to errors in asphalt paving processes, which will need to be flagged with
contractors and monitored in future projects.
• The defects on Sports Drive confirmed that the minimum asphalt thicknesses over geosynthetics needs to adhere to
manufacturers specifications. Cost-saving by reduction of asphalt thickness is not viable for asphalt overlays.
From LCC’s 2015/16 Asphalt Rehabilitation Works Programme two primary projects which incorporated geosynthetics
were chosen to investigate aspects of constructability, product suitability and design improvements.
Projects:
• Loganlea Road, Loganlea
• Browns Plains Road, Browns Plains
Various issues were encountered with both GlasGrid® TF and AR-G products, as shown.
On Loganlea Road the GlasGrid® TF was removed and replaced with HaTelit® C.
Current Project Observations
Geosynthetics in use:
Tensar® AR-G
Saint-Gobain Adfors GlasGrid® TF
Huesker HaTelit® C
Loganlea Road, Loganlea
GlasGrid® TF Install Issues with milled asphalt surface
Browns Plains Road, Browns Plains
Tensar® AR-G Install
Bow waves present after first paver run.
Recommendations:
• Smooth-mill profilers (micro-milled surfaces) have been removed from the decision parameters
due to it being outside of the general scope of works for LCC asphalt rehabilitation. The
GlasGrid® products incorporated in the decision matrix will be flagged as ‘not suitable’ for
regular milled bituminous surfaces.
• For HaTelit® C, where contractors are inexperienced with the product C170 bitumen is to be
used to assist the asphalt crew with geosynthetic adhesion.
• Further investigation / monitoring of Tensar® AR-G as a subgrade asphalt geosynthetic will be
required (as the practice is outside manufacturer’s specifications).
• Additional testing / monitoring of the current projects is to be undertaken on a regular basis to
help assess the suitability and performance of the different geosynthetics. Where defects occur
prematurely, further investigation will be required by LCC pavement engineers.
• Although not listed previously, additional recommendations that congregate from the earlier
sections also include,
• Further training requirements are needed for asphalt crews in relation to the installation of
geosynthetics. This will help with mitigating installation issues encountered on site. However,
such requests are not entirely up to LCC to decide – though they could be considered for future
projects, and as part of building LCC’s contractor relationships.
• The addition of hold points (Administrator sign-off required) for tack coat applications and/or
geosynthetic roll-out may prove useful to ensure the correct amount or type of tack coat is
sprayed, etcetera.
• LCC pavement engineers to keep up to date with industry movements, products and paving
technologies. Where applicable, LCC may even choose to model parts of their updated pavement
rehabilitation model off other rehabilitation models.
Current Project Observations - Summary
Test Locations were established on Moffatt Road, Waterford West at two points where the wearing
course defects were worst.
Before a suitable asphalt treatment with geosynthetic(s) was able to be determined, LCC organised
pavement geotechnical testing to determine the appropriate asphalt treatment for Moffatt Road.
Test Site Observations
Test Location A Test Location B Test Location Map
The conclusions from the geotechnical test locations were summarised as:
• The subsurface conditions at the site generally comprised between 60mm to 65mm of asphalt. Below
the asphalt, roadbase gravel was encountered to 0.45m to 0.5m depth. The fill below the roadbase
comprise of either silty sand or a mixture of clayey sand and clay. The natural material encountered
below the fill comprised of high plasticity clay.
• The soaked CBR values were determined, where the lowest CBR value encountered was 1%.
Test Site Geotechnical Investigation/Testing Results
Test Location A – Visible Crack Test Location B – Visible Crack
Decision Parameters & Decision Matrix [Project Deliverable 1]
• Section A: GlasGrid® Compogrid (Glass-Fibre)
• Section B: No geosynthetic reinforcement [Control]
• Section C: GC50-II (Polyester)
Test Site Implementation – Moffatt Road, Waterford West [Project Deliverable 2]
Geotechnical testing results were incorporated into
CIRCLY analysis. The final treatment design was
determined as:
100mm AC14 (DG14) placed in two separate layers,
with asphalt geosynthetic to be placed at the
interlayer (mid-point) of the two layers.
The test site will allow the comparison of both PET and
Glass-fibre geosynthetics.
Post-construction, the test site will undergo various
testing including FWD & GPR to investigate pavement
properties and geosynthetic impacts over time.
LCC pavement engineers are to follow the testing
regime developed as part of the report.
Thank you.

Más contenido relacionado

La actualidad más candente

Standards on geosynthetics msv i
Standards on geosynthetics msv iStandards on geosynthetics msv i
Standards on geosynthetics msv i
Deepak Kumar
 
Reinforcement of Pavement Subgrade using Granular Fill and a Geosynthetic Layer
Reinforcement of Pavement Subgrade using Granular  Fill and a Geosynthetic LayerReinforcement of Pavement Subgrade using Granular  Fill and a Geosynthetic Layer
Reinforcement of Pavement Subgrade using Granular Fill and a Geosynthetic Layer
AM Publications
 
Geosynthetic
GeosyntheticGeosynthetic
Geosynthetic
hlksd
 
Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...
Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...
Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...
IJERA Editor
 

La actualidad más candente (20)

Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Standards on geosynthetics msv i
Standards on geosynthetics msv iStandards on geosynthetics msv i
Standards on geosynthetics msv i
 
Application of Geocell in Geotechnical Engineering
Application of Geocell in Geotechnical EngineeringApplication of Geocell in Geotechnical Engineering
Application of Geocell in Geotechnical Engineering
 
GEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETEGEOGRIDS IN CONCRETE
GEOGRIDS IN CONCRETE
 
IRJET - Experimental Study on Replacement of Fine Aggregate as Black Cotton S...
IRJET - Experimental Study on Replacement of Fine Aggregate as Black Cotton S...IRJET - Experimental Study on Replacement of Fine Aggregate as Black Cotton S...
IRJET - Experimental Study on Replacement of Fine Aggregate as Black Cotton S...
 
A STUDY ON EFFECTS OF GEOSYNTHETIC ENCASEMENT ON FLOATING STONE COLUMN
A STUDY ON EFFECTS OF GEOSYNTHETIC ENCASEMENT ON FLOATING STONE COLUMNA STUDY ON EFFECTS OF GEOSYNTHETIC ENCASEMENT ON FLOATING STONE COLUMN
A STUDY ON EFFECTS OF GEOSYNTHETIC ENCASEMENT ON FLOATING STONE COLUMN
 
GEOSYTHETICS AND ITS APPLICATION IN FOUNDATION ENGINEERING
GEOSYTHETICS AND ITS APPLICATION IN FOUNDATION ENGINEERINGGEOSYTHETICS AND ITS APPLICATION IN FOUNDATION ENGINEERING
GEOSYTHETICS AND ITS APPLICATION IN FOUNDATION ENGINEERING
 
Lecture 2
Lecture 2Lecture 2
Lecture 2
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
IRJET- Investigations of Granular Pile Anchors in Granulated Soil Subject...
IRJET-  	  Investigations of Granular Pile Anchors in Granulated Soil Subject...IRJET-  	  Investigations of Granular Pile Anchors in Granulated Soil Subject...
IRJET- Investigations of Granular Pile Anchors in Granulated Soil Subject...
 
Geosynthetic
GeosyntheticGeosynthetic
Geosynthetic
 
4 reasons the time is now for the Geocell market
4 reasons the time is now for the Geocell market4 reasons the time is now for the Geocell market
4 reasons the time is now for the Geocell market
 
Role of geosynthetics in civil Engineering
Role of geosynthetics in civil EngineeringRole of geosynthetics in civil Engineering
Role of geosynthetics in civil Engineering
 
Reinforcement of Pavement Subgrade using Granular Fill and a Geosynthetic Layer
Reinforcement of Pavement Subgrade using Granular  Fill and a Geosynthetic LayerReinforcement of Pavement Subgrade using Granular  Fill and a Geosynthetic Layer
Reinforcement of Pavement Subgrade using Granular Fill and a Geosynthetic Layer
 
EFFECT OF GROUTING ON STABILITY OF SLOPE AND UNSUPPORTED STEEP EXCAVATION
EFFECT OF GROUTING ON STABILITY OF SLOPE AND UNSUPPORTED STEEP EXCAVATIONEFFECT OF GROUTING ON STABILITY OF SLOPE AND UNSUPPORTED STEEP EXCAVATION
EFFECT OF GROUTING ON STABILITY OF SLOPE AND UNSUPPORTED STEEP EXCAVATION
 
Geo 101 detailed
Geo 101  detailedGeo 101  detailed
Geo 101 detailed
 
Typar Geotextile for Road
Typar Geotextile for RoadTypar Geotextile for Road
Typar Geotextile for Road
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Geosynthetic
GeosyntheticGeosynthetic
Geosynthetic
 
Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...
Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...
Effect of Bearing Capacity of Strip Footing on Reinforced Double Layer Soil S...
 

Destacado

Asphalt Road Systems presentation
Asphalt Road Systems presentationAsphalt Road Systems presentation
Asphalt Road Systems presentation
Ebru Gullik
 
Hydro engineering consultancy
Hydro engineering consultancyHydro engineering consultancy
Hydro engineering consultancy
Fatima Abu sadah
 
[Challenge:Future] IEDC's Green Bridge
[Challenge:Future] IEDC's Green Bridge[Challenge:Future] IEDC's Green Bridge
[Challenge:Future] IEDC's Green Bridge
Challenge:Future
 
Seismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devicesSeismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devices
Manish Mall
 

Destacado (20)

Ejemplo de una presentacion en Power Point
Ejemplo de una presentacion en Power PointEjemplo de una presentacion en Power Point
Ejemplo de una presentacion en Power Point
 
warm mix casselberry comp
warm mix casselberry compwarm mix casselberry comp
warm mix casselberry comp
 
Asphalt Rubber Blend, Interaction, Properties and Test Methods
Asphalt Rubber Blend, Interaction, Properties and Test MethodsAsphalt Rubber Blend, Interaction, Properties and Test Methods
Asphalt Rubber Blend, Interaction, Properties and Test Methods
 
Warm Mix Asphalt
Warm Mix AsphaltWarm Mix Asphalt
Warm Mix Asphalt
 
Warm Mix Asphalt Pavement Design
Warm Mix Asphalt Pavement DesignWarm Mix Asphalt Pavement Design
Warm Mix Asphalt Pavement Design
 
ZeeTex Texion
ZeeTex TexionZeeTex Texion
ZeeTex Texion
 
Asphalt Road Systems presentation
Asphalt Road Systems presentationAsphalt Road Systems presentation
Asphalt Road Systems presentation
 
Warm Mix Asphalt research and performance
Warm Mix Asphalt research and performanceWarm Mix Asphalt research and performance
Warm Mix Asphalt research and performance
 
Warm Mix Asphalt
Warm Mix AsphaltWarm Mix Asphalt
Warm Mix Asphalt
 
Hydro engineering consultancy
Hydro engineering consultancyHydro engineering consultancy
Hydro engineering consultancy
 
[Challenge:Future] IEDC's Green Bridge
[Challenge:Future] IEDC's Green Bridge[Challenge:Future] IEDC's Green Bridge
[Challenge:Future] IEDC's Green Bridge
 
Eco-Concrete : Opportunities and Challenges
Eco-Concrete : Opportunities and ChallengesEco-Concrete : Opportunities and Challenges
Eco-Concrete : Opportunities and Challenges
 
GEOSYNTHETICS
GEOSYNTHETICSGEOSYNTHETICS
GEOSYNTHETICS
 
Seismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devicesSeismic protection of cable stayed bridge using supplemental devices
Seismic protection of cable stayed bridge using supplemental devices
 
Gama Vladimir
Gama VladimirGama Vladimir
Gama Vladimir
 
Pavement Management System Presentation to Township of Langley Council, June ...
Pavement Management System Presentation to Township of Langley Council, June ...Pavement Management System Presentation to Township of Langley Council, June ...
Pavement Management System Presentation to Township of Langley Council, June ...
 
A Practical Reliability-Based Method for Assessing Soil Liquefaction Potential
A Practical Reliability-Based Method for Assessing Soil Liquefaction PotentialA Practical Reliability-Based Method for Assessing Soil Liquefaction Potential
A Practical Reliability-Based Method for Assessing Soil Liquefaction Potential
 
Liquefaction and liquefaction potential
Liquefaction and liquefaction potentialLiquefaction and liquefaction potential
Liquefaction and liquefaction potential
 
Geogrid-As a soil reinforcement
Geogrid-As a soil reinforcementGeogrid-As a soil reinforcement
Geogrid-As a soil reinforcement
 
Building a Sustainable Technology Ecosystem and Cluster Bindi Karia
Building a Sustainable Technology Ecosystem and Cluster  Bindi KariaBuilding a Sustainable Technology Ecosystem and Cluster  Bindi Karia
Building a Sustainable Technology Ecosystem and Cluster Bindi Karia
 

Similar a Performance analysis of geosynthetics used in asphalt rehabilitation on urban local hierarchy roads

Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...
eSAT Journals
 

Similar a Performance analysis of geosynthetics used in asphalt rehabilitation on urban local hierarchy roads (20)

IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete BridgeIRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
IRJET - Repair and Rehabilitation of Reinforced Concrete Bridge
 
IRJET - Review on Use of Precast Panels for the Improvement of Pavements
IRJET -  	  Review on Use of Precast Panels for the Improvement of PavementsIRJET -  	  Review on Use of Precast Panels for the Improvement of Pavements
IRJET - Review on Use of Precast Panels for the Improvement of Pavements
 
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic SolutionExperimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
 
Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...
 
I012215259
I012215259I012215259
I012215259
 
SDP Presentation.pptx
SDP Presentation.pptxSDP Presentation.pptx
SDP Presentation.pptx
 
IRJET - Design of Improved Drainage System using Pervious Concrete
IRJET  -  	  Design of Improved Drainage System using Pervious ConcreteIRJET  -  	  Design of Improved Drainage System using Pervious Concrete
IRJET - Design of Improved Drainage System using Pervious Concrete
 
Final Project Presentation
Final Project PresentationFinal Project Presentation
Final Project Presentation
 
Structural design and economic evaluation of roller compacted concrete pavement
Structural design and economic evaluation of roller compacted concrete pavementStructural design and economic evaluation of roller compacted concrete pavement
Structural design and economic evaluation of roller compacted concrete pavement
 
FIRST REVIEW 1.pptx
FIRST REVIEW 1.pptxFIRST REVIEW 1.pptx
FIRST REVIEW 1.pptx
 
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible PavementIRJET-  	  A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
 
CIVIL_PROJECT_PPT_RECYCLED_AGGREGATE_CON.pptx
CIVIL_PROJECT_PPT_RECYCLED_AGGREGATE_CON.pptxCIVIL_PROJECT_PPT_RECYCLED_AGGREGATE_CON.pptx
CIVIL_PROJECT_PPT_RECYCLED_AGGREGATE_CON.pptx
 
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
EXPERIMENTAL INVESTIGATION ON PERFORMANCE OF WHITE TOPPING OVER FLEXIBLE PAVE...
 
Polymer road technology
Polymer road technologyPolymer road technology
Polymer road technology
 
Pipeline repair techniques
Pipeline repair techniquesPipeline repair techniques
Pipeline repair techniques
 
Latest CV of Gangadhar
Latest CV of GangadharLatest CV of Gangadhar
Latest CV of Gangadhar
 
A comparative study between traditional method and mix design with industrial...
A comparative study between traditional method and mix design with industrial...A comparative study between traditional method and mix design with industrial...
A comparative study between traditional method and mix design with industrial...
 
Minor project ppt1.pdf
Minor project ppt1.pdfMinor project ppt1.pdf
Minor project ppt1.pdf
 
The permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructureThe permitting advantages and challenges of green infrastructure
The permitting advantages and challenges of green infrastructure
 
Tools for Pavement Preservation
Tools for Pavement PreservationTools for Pavement Preservation
Tools for Pavement Preservation
 

Último

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Último (20)

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Performance analysis of geosynthetics used in asphalt rehabilitation on urban local hierarchy roads

  • 1. PERFORMANCE ANALYSIS OF GEOSYNTHETICS USED IN ASPHALT REHABILITATION ON URBAN LOCAL HIERARCHY ROADS Industry Project for Logan City Council (QLD) Matthew W. Coleman Queensland University of Technology
  • 2. Student: Mr Matthew W. Coleman Email: matthew.coleman@connect.qut.edu.au matthewcoleman@logan.qld.gov.au Assessment: Item No. 2 – Part A BEng Degree Major: EN40 - Bachelor of Civil and Environmental Engineering Academic Supervisor: Mr Bradley Cowan (Adjunct Professor, QUT) Technical Supervisor: Mr Anthony Southon (Senior Engineer, Logan City Council) Performing Organisation Name and Address: Queensland University of Technology, 2 George Street, Brisbane QLD 4000 Sponsoring Organisation Name and Address: Logan City Council, 150 Wembley Road, Logan Central QLD 4114 A thesis submitted in partial fulfilment of the requirements of the subject BEB801 Project 1 in the Bachelor of Engineering Degree. School of Civil Engineering & Built Environment, Queensland University of Technology, June 2016. The author holds the copyright on this thesis but permission has been granted for QUT Staff to photocopy this thesis without reference to the author.
  • 3. OBJECTIVE • The objective of the project was to develop decision parameters for the use of geosynthetics in asphalt rehabilitation works to prevent reflective cracking and related defects on urban local roads within Logan City Council. DELIVERABLES Decisions Matrix for asphalt rehabilitation geosynthetics • The decisions matrix will provide a listing of the available geosynthetics for asphalt applications to South East Queensland and include selection criteria for different aspects of use, based off the determined decision parameters. The matrix will look at variables including asphalt layer placement, treatment types, road hierarchy limitations, constructability restrictions, usable base materials (e.g. profiled surfaces), and manufacturers specifications, etcetera. The decisions matrix will be a live document where future products can be added or removed to suit advancement in technologies, or further performance findings. Test Site for future testing and monitoring • A section of Moffatt Road, Waterford West will be set up as a test site for new geosynthetic(s) chosen as part of the decision parameter refinement of the project. The site will be used for future studies to determine the long-term benefits of the chosen geosynthetic product(s) with respect to performance elements such as, reduction and prevention of reflective cracking, and associated pavement defects. Project Objective, Scope and Deliverables
  • 4. • Two primary areas of investigation included: • Logan City Council • History • Topography • Soil profiles • Urban local road hierarchy • Design treatment selection and analysis tools • Asphalt Rehabilitation & Geosynthetics • Asphalt rehabilitation • Pavement surface failure mechanisms • Typical asphalt rehabilitation treatments (overlays and deep-lift treatments) • Asphalt geosynthetics • Asphalt repair treatments with geosynthetics (interlayer and subgrade treatments) • Polyester vs. Glass-fibre geosynthetics • Extension of pavement service life with geosynthetics • Geosynthetics previously used by LCC • Geosynthetic products available to South East Queensland • Industry use of geosynthetics • Alternatives to geosynthetics • Certification avenues for available geosynthetic products Research – Literature Review
  • 5. • Various improvements are needed to LCC’s PMS database to ensure that geosynthetics are captured accurately. • Additional testing measures for preliminary investigations will help with more accurate asphalt rehabilitation designs. • Asphalt Geosynthetics are to be used to mitigate the propagation of bottom-up reflective and fatigue cracking. The geosynthetics will also assist in the reduction of rutting and shoving, while stabilising asphalt pavement layers and extending the structural life of the asphalt pavement. • Asphalt repair treatments will include asphalt interlayer and subgrade / base geosynthetics. These treatments will form the initial decision parameter of the decision matrix. • Interlayer geosynthetic treatments were proven to be the most beneficial, and therefore will be the main focus of the decision matrix. Subgrade / base geosynthetic treatments have a number of concerns and underlying issues which will require further investigation by LCC and suppliers. Possible future study opportunity. Subgrade / base asphalt geosynthetics will not be discounted from the decision parameter analysis, and will be included in the decision matrix. • The test site will provide a good opportunity to test the performance of both glass-fibre and polyester geosynthetics. • The extension of asphalt rehabilitation service life with geosynthetics was not able to be accurately determined. However, when in use, geosynthetics will be assumed to provide a 30- 50% increase in pavement life, under ideal conditions. • Geosynthetic manufacturers may find it beneficial to have their available products certified using Australian standards and testing methods. Literature Review Preliminary Recommendations
  • 6. Various stages of qualitative information collection and analysis were conducted, in relation to project performance, operational and system overviews. The experimental stages included: • Review of LCC Asset Systems, used for asphalt rehabilitation works. • Observations and recommendations from previous projects. • Observations and recommendations (including constructability assessment) of current projects. • Test site observations and preliminary investigation results. • Analysis of observations, recommendations and literature review material to determine decision parameters and decision matrix. • Analysis of test site investigation results, and determination of final asphalt and geosynthetic treatment. • Test site implementation measures. Experimental Method & Analysis
  • 7. Recommendations: • The SMEC PMS coding should be updated so that defects detected on higher profile roads take a greater priority than defects on lower profile roads, due to the associated political risks and larger traffic volumes generally associated with higher profile roads. • SMEC’s pre-determined asphalt treatments should be updated to incorporate asphalt treatments with geosynthetics. In conjunction, the determination of SMEC’s strength and cost values (for new and old asphalt treatment types) should be revised to reflect more accurate project pricings and asphalt lifespan growth with geosynthetic use, where feasible. • Modification to LCC’s Standard Specifications to reflect the new asphalt notations specified in MRTS30. The MRTS 30 notations are industry wide and are now incorporated on all current asphalt plant mix designs. • Implementation of additional testing methods such as FWD/HWD, PAVEDEF, GPR and TSD etcetera to help save costs by refining the asphalt rehabilitation designs in future years, and assistance with assessing the impacts geosynthetics may have on constructed pavements. • Cost-benefit investigation should be undertaken in the coming years, to determine the budgetary effectiveness of additional pre-design testing. • Implementation of new treatment types/designs (with revised asphalt thicknesses) to reflect the updated requirements of MRTS30 and also the updated range of geosynthetics available to South East Queensland (Explored further in Section 10, after determination of the decision matrix) • LCC should endeavour to keep all asphalt and pavement analysis software up to date, while also keeping current with industry software advancements. • LCC should endeavour to keep up-to-date with road condition survey assessment. Review of Council Asset Systems
  • 8. Visual inspections were carried out on six previously completed asphalt rehabilitation projects that incorporated geosynthetics. Defects were observed on two streets: Previous Project Observations Sports Drive, Underwood Third Avenue, Marsden
  • 9. Visual conditions results summary table: Previous Project Observations - Summary Street Suburb Asphalt Treatment Geosynthetic Treatment Road Type Defects Observed Since Installation Approx. Age of Treatment EXISTING ASPHALT INTERLAYER GEOSYNTHETIC TREATMENTS Compton Road (near Railway Bridge) Woodridge 150mm nom. DG AC HaTelit® C (placed on fresh AC – interlayer treatment) Arterial Nil 23 months Sports Drive Underwood 50mm nom. DG14 Overlay HaTelit® C (placed on existing AC) Collector Yes (Detailed below). Worst defect rectified 12 months ago. 2 years SUBGRADE TO ASPHALT GEOSYNTHETIC TREATEMENTS Holmview Road Holmview 150 – 200mm DG AC Tensar® AR-G Collector Nil 2 years Third Avenue Marsden 300mm DG AC Tensar® AR-G Local Longitudinal cracking at asphalt joint. 2 years Underwood Road Rochedale South 200mm DG AC with MG Binder (Structural Layers) [Travel lanes only] Tensar® AR-G Local Nil 2 years Barbaralla Drive Springwood 200mm DG AC with MG Binder (Structural Layers) [Travel lanes only] Tensar® AR-G Collector Nil ~2 years Recommendations: • Further to the asset system review, limitations were found with the SMEC PMS and LCC’s exposure to available asphalt geosynthetics, which were transferred onto the past projects. These shortcomings need further investigation and improvement. • The observed premature defects primarily occurred due to errors in asphalt paving processes, which will need to be flagged with contractors and monitored in future projects. • The defects on Sports Drive confirmed that the minimum asphalt thicknesses over geosynthetics needs to adhere to manufacturers specifications. Cost-saving by reduction of asphalt thickness is not viable for asphalt overlays.
  • 10. From LCC’s 2015/16 Asphalt Rehabilitation Works Programme two primary projects which incorporated geosynthetics were chosen to investigate aspects of constructability, product suitability and design improvements. Projects: • Loganlea Road, Loganlea • Browns Plains Road, Browns Plains Various issues were encountered with both GlasGrid® TF and AR-G products, as shown. On Loganlea Road the GlasGrid® TF was removed and replaced with HaTelit® C. Current Project Observations Geosynthetics in use: Tensar® AR-G Saint-Gobain Adfors GlasGrid® TF Huesker HaTelit® C Loganlea Road, Loganlea GlasGrid® TF Install Issues with milled asphalt surface Browns Plains Road, Browns Plains Tensar® AR-G Install Bow waves present after first paver run.
  • 11. Recommendations: • Smooth-mill profilers (micro-milled surfaces) have been removed from the decision parameters due to it being outside of the general scope of works for LCC asphalt rehabilitation. The GlasGrid® products incorporated in the decision matrix will be flagged as ‘not suitable’ for regular milled bituminous surfaces. • For HaTelit® C, where contractors are inexperienced with the product C170 bitumen is to be used to assist the asphalt crew with geosynthetic adhesion. • Further investigation / monitoring of Tensar® AR-G as a subgrade asphalt geosynthetic will be required (as the practice is outside manufacturer’s specifications). • Additional testing / monitoring of the current projects is to be undertaken on a regular basis to help assess the suitability and performance of the different geosynthetics. Where defects occur prematurely, further investigation will be required by LCC pavement engineers. • Although not listed previously, additional recommendations that congregate from the earlier sections also include, • Further training requirements are needed for asphalt crews in relation to the installation of geosynthetics. This will help with mitigating installation issues encountered on site. However, such requests are not entirely up to LCC to decide – though they could be considered for future projects, and as part of building LCC’s contractor relationships. • The addition of hold points (Administrator sign-off required) for tack coat applications and/or geosynthetic roll-out may prove useful to ensure the correct amount or type of tack coat is sprayed, etcetera. • LCC pavement engineers to keep up to date with industry movements, products and paving technologies. Where applicable, LCC may even choose to model parts of their updated pavement rehabilitation model off other rehabilitation models. Current Project Observations - Summary
  • 12. Test Locations were established on Moffatt Road, Waterford West at two points where the wearing course defects were worst. Before a suitable asphalt treatment with geosynthetic(s) was able to be determined, LCC organised pavement geotechnical testing to determine the appropriate asphalt treatment for Moffatt Road. Test Site Observations Test Location A Test Location B Test Location Map
  • 13. The conclusions from the geotechnical test locations were summarised as: • The subsurface conditions at the site generally comprised between 60mm to 65mm of asphalt. Below the asphalt, roadbase gravel was encountered to 0.45m to 0.5m depth. The fill below the roadbase comprise of either silty sand or a mixture of clayey sand and clay. The natural material encountered below the fill comprised of high plasticity clay. • The soaked CBR values were determined, where the lowest CBR value encountered was 1%. Test Site Geotechnical Investigation/Testing Results Test Location A – Visible Crack Test Location B – Visible Crack
  • 14. Decision Parameters & Decision Matrix [Project Deliverable 1]
  • 15. • Section A: GlasGrid® Compogrid (Glass-Fibre) • Section B: No geosynthetic reinforcement [Control] • Section C: GC50-II (Polyester) Test Site Implementation – Moffatt Road, Waterford West [Project Deliverable 2] Geotechnical testing results were incorporated into CIRCLY analysis. The final treatment design was determined as: 100mm AC14 (DG14) placed in two separate layers, with asphalt geosynthetic to be placed at the interlayer (mid-point) of the two layers. The test site will allow the comparison of both PET and Glass-fibre geosynthetics. Post-construction, the test site will undergo various testing including FWD & GPR to investigate pavement properties and geosynthetic impacts over time. LCC pavement engineers are to follow the testing regime developed as part of the report.