What are the advantages and disadvantages of membrane structures.pptx
Bertam Field Development Project Major HUC Campaign
1. Major HUC Campaign
PROVISION OF HOOK UP AND COMMISSIONING (HUC) SERVICES FOR
BLOCK PM307 BERTAM FIELD DEVELOPMENT PROJECT
STRUCTURAL / MECHANICAL / SAFETY
Prepared by
MOHD SYAFIQ BIN SHAWALUDIN (PROJECT ENGINEER)
4. STRUCTURAL - 1
Installation of IPE 220 Beams and 100x75x7 Angle Bar – the
offshore installed members are as indicated in reference
drawing title Cellar Deck Framing Plan at T.O.S EL (+) 13500
8. STRUCTURAL - 2
35x5 Serrated Galvanized Grating – Offshore Installed
members are as indicated in reference drawing title ‘Flooring &
Handrail Layout Plan at T.O. GRTG EL (+) 13535 / T.O.PLT. EL.(+)
13510’