1. Natasha Harding-Baxter MCIOBMACostEMISPAL ACIarB
Mobile: 00971 52 6006576 natasha.gail@hotmail.co.uk
Personal Profile:
An MCIOB qualified Senior Estimator with extensive experience of firstprinciplemeasurement and
pricing.Having performed 500+estimates for leadingconstruction industry providers,key skillsinclude:
20 years’experience in particular with reinforced concrete frames and largetowers from inception to
completion; strong clientnegotiation skillspre& post tender; a track record within largeconstruction
projects (up to AED 500 Million per project); and a deep knowledge across all sectors.Havingworked in
the MiddleEast sinceDecember 2008 (with the exception of March 2012 – August 2013 when I worked in
London, UK for a reputable RC London Main Contractor).
After 7 years in the MiddleEastI am seeking a Bid Manager/ Managing Estimator roleto broaden my
experience and knowledge internationally.
Career History:
Employer: Murray & Roberts Contractors (Middle East) LLC, Dubai, U.A.E
Position: Senior Estimator
Dates: October 2013 – To date
Murray & Roberts are South African’s leading Construction company and have a large presence in UAE
with offices in Dubai and Abu Dhabi specialising in iconic and complex projects such as Burj Al Arab, Dubai
and Dubai International Airport Terminal. Sectors include Commercial, Residential, Offices, Education and
Health Facilities.
Employed as Senior Estimator in Dubai responsiblefor reviewing and analysingbids,measuring
from firstprinciples and creatingBills of Quantities on Candy estimatingsoftware as well as using
Autodesk Design Review software to measure the main BoQ works as check to the ClientBoQ. This
is to ascertain any areas of risk thecompany may be exposed to be over or under measure in the
BoQ and submittingthe bid as Lump PriceFixed Sum for the term (usually 2 years).
Manage the complete process of a Tender Bid from receivingthe documents through to the
Tender submission.
Organisingand Chairingmeetings relevant to the tender includingKick Off meeting highlightingthe
tender / risks / opportunities/ key points / bulk quantities etc to the Pre-Contract team.
Whilstresponsiblefor the Bid submission I amalso responsibleto ensure the quantities provided in
the ClientBoQ arecorrect and not havingthe company at risk to money loss if project was secured.
To satisfy this,I managea team of Quantity Surveyors in-house; instructingand guidingthem on
the measure to be completed (RC Frame, Internal Finishes,Landscaping,Sundry items etc), provide
assistancewhere required, review their work prior to accepting this as partof the company’s
measure risk contingency of the Client BoQ.
Exposure to residential and commercial projects,as complex and iconic structures with limited
companies in the same expertise and professionalismlevel.
Working under very tight timescales and much pressureto provide the information for the
submission date,includinghavingtheinformation presented in a certain way for the planners to
use (i.e. the measure and BoQ) within the Contract Programme.
Preparing,sendingout, receivingand analysingsub-contractand supplier quotations in linewith
the contractbrief. Also then inputting the quotations into CCS and allocatingthe correctquotation
into the Bill rates,and supplementingwith any in house/direct works pri cingas required.
Chairingmeetings with sub-contractors in theanalysisof their quotations for the bid for example
FacadeSpecialists,MEP, FitOut, FF&E, Joinery, and Specialistworks etc.
Responsiblefor the Tender QA and Submission Document (inc.all relevantinformation and
ensuringthat the BoQ arein exactly the same format as the ClientSupplied BOQ).
Compiled the estimatingdatabase,as a pointof information,for the local Sub-contractors (all of
2. different work packages),Suppliers,Labour Agencies, day work rates etc
Reviewing bid documents and raisingany queries/clarificationsneeded to the Client.
Attending pre, mid bid and posttender meetings with the Client/Structural Engineer/Architect and
the likeand havinga full understandingof the tender I have complete responsibility for and
answeringcomplex technical queries as to how we proposeto constructthe building
Negotiations with the Clientthroughout the tender period to answer their queries and get
clarification on any tender queries, includingposttender negotiations to securethe project.
Reviewing all projectdocumentation for completeness and if any queries to raiseto the Client
usingthe RFI procedure.
A separatepart of my roleincludes preparingand compilingall thecorporate and job specific
information for Pre-Qualification’sto various Clients / Consultants / Project Management
Companies,as required. Since startinghere I have completed over 40 Pre-Qualification documents
for future projects / general PQ; of which several have resulted in receivingthe tender documents
from the Client/ Consultants.I have formed a niche rolecompleting these Pre-Qualifications and I
am the only one completing them as the company receives them. These are very detailed and
complex and usually has a contentof over 100 pages includingthefollowing – Financial accounts
on CD, Financial Summary of the company over the last5 years,HSE Information,QA Information,
Project Portfolio,Current Projects,Accreditations and Certifications,Green BuildingInformation,
Completing detailed Clientquestionnaires usually over 30 pages, Company resources and relevant
CV’s etc. This also involves managingthea team of Document Controllers/Administrativeassistants
to compilethe document and ensure all the information i request in the document is correct; this
then gets reviewed by Management prior to submittingexternally.
Employer: Byrne Bros (Formwork) Ltd
Position: Senior Estimator
Dates: March 2012 to August 2013
Byrne Bros (Formwork) Ltd specialises in construction of Reinforced Concrete frame towers in London (as
one of the market leaders) to the residential, commercial, public and private sectors with strong support
from the parent Group.
Employed as Senior Estimator in West London responsiblefor reviewingand analysingbids,
measuringfrom firstprinciples and creatingBillsof Quantities on estimatingsoftware.
Exposure to residential and commercial projects in London,as complex structures and only a few
companies ableto compete with includingthe use of slip formconstruction to the lift/stair cores,
as the market leader.
Key deliverables focus on:accurate“firstprinciples”SMM7 manual measuring/ pricingfromClient
drawings/specifications,understandingthecontractconditions,using Autodesk Design Review and
Conquest (total career experience 9 years on Conquest) to create the measured quantities and a
full BoQ, reviewing the bid with Directors,and ensuringthe tender submission packageis as the
Clientbrief with all relevantinformation supplied in the correct format.
Workingunder very tight timescales and much pressureto provide the information for the
submission date,includinghavingtheinformation presented in a certain way for the planners to
use (i.e. the measure and BoQ) within the Contract Programme.
Preparing,sendingout, receivingand analysingsub-contractand supplier quotations in linewith
the contractbrief.
Chairingmeetings with sub-contractors in theanalysisof their quotations for the bid.
Responsiblefor the Tender QA and Submission Document (inc.all relevantinformation and
ensuringthat the BoQ arein exactly the same format as the ClientSupplied BOQ).
Compiled the estimatingdatabase,as points of information,for the local Sub-contractors (all of
different work packages),Suppliers,Labour Agencies, Preliminary items i.e. soil/aggregatetesting,
Site Cabins and Labour Camps.
Responsiblefor assessingthelevel of ProjectManagement required and allocatingthecorrect
monies within the Contract Superintendent items.
Allocatingthe preliminary items (i.e. siteset up, ProjectManagement and Materials testing)
throughout the whole BOQ and spreadingmonies as is required.
3. Employer: Galliford Try Qatar LLC
Position: Senior Estimator
Dates: February 2010 to January 2012
Galliford Try Qatar LLC specialises in construction of infrastructure and building to the residential,
commercial, public and private sectors with strong support from the headquarters in UK, as a leading multi
billion £ UK Contractor.
Employed as Senior Estimator in Doha, Qatar responsiblefor reviewing and analysingbids,
measuringfrom firstprinciples and creatingBillsof Quantities on estimatingsoftware.
Exposure to residential and commercial projects with particularly theLocal Authorities
/Government Agencies in Qatar.
Key deliverables focus on:accurate“firstprinciples”SMM7/CESSM manual measuring/ pricing
from Client drawings/specifications,understandingthe contractconditions,usingCADMeasure and
Causeway to create the measured quantities and a full BoQ, reviewing the bid with Directors
Workingunder very tight timescales and much pressureto provide the information for the
submission date,includinghavingtheinformation presented in a certain way for the planners to
use (i.e. the measure and BoQ) within the Contract Programme.
Preparing,sendingout, receivingand analysingsub-contractand supplier quotations in linewith
the contractbrief.
Chairingmeetings with sub-contractors in theanalysisof their quotations for the bid.
Responsiblefor the Tender QA and Submission Document (inc.all relevantinformation and
ensuringthat the BoQ arein exactly the same format as the ClientSupplied BOQ).
Compiled the estimatingdatabase,as points of information,for the local Sub-contractors (all of
different work packages),Suppliers,Labour Agencies, Preliminary items i.e. soil/aggregatetesting,
Site Cabins and Labour Camps.
Responsiblefor assessingthelevel of ProjectManagement required and allocatingthecorrect
monies within the Contract Superintendent items.
Allocatingthe preliminary items (i.e. siteset up, ProjectManagement and Materials testing)
throughout the whole BOQ and spreadingmonies as is required.
Chairingweekly progress meetings to ensure the Bid is being monitored and the progress of the
team working on particularitems.
Reviewing bid documents and raisingany queries/clarificationsneeded to the Client.
Employer: WS Atkins & Partners Overseas, Dubai, UAE
Position: Site Commercial Administration Manager
Dates: December 2008 to August 2009
WS Atkins & Partners Overseas specialises in Design, Cost & Supervision Consultancy to the major
developers throughout the world (employed at the Dubai office specialising in Dubai & Abu Dhabi). With
a client base that includes many of the major developers and Local Government Municipalities WS
Atkins employs over 17,000 employees worldwide and over 2500 employees within the Middle East and
India.
Employed as Site Commercial Administration Manager in Dubai (Bid/Tender Manager)
responsiblefor reviewing bids (average bid is 25 million AED for Technical Supervisory Staff) to
multi storey tower blocks in Dubai and Abu Dhabi.
Exposure to both residential and commercial projects.
Key deliverables focus on:accurately pricing;securingcontracts through effective tender
management; compilingprogrammes and spreadsheet for supervision staff to projects,and
ensuringpricingallowcontracts to be delivered on time, within budget and to specification.
Employer: Frankis Solutions Ltd
Position: Senior Estimator
Dates: March 2008 to August 2008
Frankis Solutions Ltd (FSL) specialises in groundwork’s, reclamation, remediation, earthworks, demolition
and recycling. With a client base that includes many of the UK’s leading homebuilders and construction
4. companies, FSL has 150 employees and a £15million turnover.
Employed as Senior Estimator, responsiblefor reviewing, measuringand pricing£multi -million
tenders (up to £4m), specialisingin soil remediation,groundwork’s and RC frames.
Extensive exposure to residential,commercial and industrial tenders.
Key deliverables focus on:accurately pricing/ measuringtenders; securingcontracts through
effective tender management; and ensuringmeasurements / pricingallowcontracts to be delivered
on time, within budget and to specification.
Responsiblefor estimatingfrom firstprinciples,usingdrawings and specifications to createBoQ.
Extensive use of Conquest and Valesco estimatingsoftware.
The role involves engagingwith clients pre-tender to assess requirements and post tender to
negotiate contractterms prior to hand over to internal contractteam.
Liaisewith Contract Managers to ensure measurements arealigned with construction plans
Also involved in Marketing the Company and Business Development to Clients/Consultants
Employer: O’ Keefe Construction Ltd
Position: Estimator
Dates: June 2007 to March 2008
O’ Keefe Construction specialises in enabling works, groundwork’s, sub structures, super structures,
structural alterations, and soil remediation & stabilisation. The company has 100 employees and an £26m
turnover.
Employed as Estimator,responsiblefor reviewing, measuringand pricing£multi -million tenders (up to
£4m), specialisingin soil remediation,groundwork’s and RC frames.
Extensive exposure to residential,commercial and industrial tenders,specialisingin Groundwork’s and
RC works to city basements and commercial warehouses.
Average tender submission was approximately £5 million which included basement excavation,
temporary works,pilingand concrete box to create basement and ground floor includingall horizontal
and vertical members within in situ reinforced concrete.
Key deliverables focus on:accurately pricing/ measuringtenders; securingcontracts through effective
tender management; and ensuringmeasurements / pricing allowcontracts to be delivered on time,
within budget and to specification.
Responsiblefor estimatingfrom firstprinciples,usingdrawings and specifications to createBill of
Quantities.Extensive use of Conquest estimatingsoftware.
The role involves engagingwith clients pre-tender to assess requirements and post tender to
negotiate contractterms prior to hand over to internal contractteam.
Liaisewith Contract Managers to ensure measurements arealigned with construction plans /
methodology and personally selectall sub contractors through formal tender process.
Responsiblefor managingall tender QA and administration.
Employer: Anderson Construction Ltd
Position: Estimator
Dates: December 2003 to May 2007
Anderson Construction specialises in enabling works, demolition, groundwork’s, sub structures, reinforced
concrete super structures, and soil remediation. The company has 450 employees and a £50m turnover.
Employed as TraineeEstimator with progression to Estimator within two years, responsiblefor
reviewing, measuringand pricing£multi-million tenders,specialisingin soil remediation,
groundwork’s and Reinforced concrete frames.
Extensive exposure to residential,commercial and industrial tenders,specialisingin Groundwork’s and
RC works to multiplehouse developments (average 200 dwellings per development) and RC
residential tower blocks (average8-10 storeys high).
Average tender submission was approximately £5 million which included basement excavation,
temporary works,pilingand reinforced concrete frame or alternatively the groundwork’s to individual
houses includingpiling,earthworks,foundations,ground floor,drainage,external works,
infrastructureto the development and all services to the dwellings.
Key deliverables focus on:accurately pricing/ measuringtenders; securingcontracts through effective
tender management; ensuringmeasurements / pricingallowcontracts to be delivered on time, within
5. budget and to specification.
Responsiblefor estimatingfrom firstprinciples,usingdrawings and specifications to createBill of
Quantities.Extensive use of Conquest estimatingsoftware.
The role involves engagingwith clients pretender to assess requirements and post tender to
negotiate contractterms prior to hand over to internal contractteam.
Liaisewith Contract Managers to ensure measurements arealigned with construction plans /
methodology and personally selectall sub contractors through formal tender process.
Responsiblefor managingall tender QA and administration.
Employer: John Doyle Construction Ltd
Position: Section Site Engineer/Manager
Dates: September 1998 to July 2001
John Doyle Construction specialises in enabling works, piling, groundwork’s, sub structures, reinforced
concrete super structures, external works, and internal fit out to large developments.
Employed as Section Site Engineer/Manager at the Royal Albert Hall Development. This roleinvolved
me havingapproximately 20 skilled and unskilled workers to directtheir work. I was doing the setting
out (usinglaser,EDM and Theodolites) to accurately set the work out, and when needed I helped out
the Chief Engineer on the main site works with the setting out.
Responsiblefor compilingthe shortand longterm programmes, method statements, tool box talks,
siteinductions and generally ensuringthe work got completed to the required dates and to the
required specification.
To learn effectively I was a hands-on Engineer and if concrete needed pouring I would help out, if
reinforcingsteel needed fixingI would tie it – in order to get the job done when needed.
I also was the Health and Safety Officer for the whole siteand would undertake routine inspections of
the scaffoldingand excavations,etc. I would facilitatethe tool box talks to approx.50 men at a time
and ensure the workers were aware of the method statements.
Due to the works being beneath the stage of the Royal Albert Hall I had a largeamount of liaison with
the Structural Engineer and Architect to ensure the integrity of the Hall was notaffected.
I also attended collegeon a day releasebasis to attain a HNC in BuildingStudies.
Employer: Ashe Construction Ltd
Position: Assistant Estimator
Dates: September 1996 to September 1998
Ashe Construction specialises in earthworks, groundwork’s, sub structures, traditional construction super
structures, and internal finishes. The company has 200 employees and a £20m turnover.
Employed as AssistantEstimator,responsiblefor reviewing, and measuring£multi -million tenders,
specialisingin groundwork’s and traditional build super structureframes and the internal finishes.
Tasked with checkingnumerical accuracy figures on the BoQ pages i.e. ensuringthat the columns
added up correctly and the subtotals were accurateafter addingup the bill items.
After six months’in the estimating dept the Director wanted me to have direct siteexperience to
understand construction techniques/processes.I learnta great deal through shadowingthe site
manager and undertook material/labour/plantreturns,was hands on with the work happening on site
i.e. brick laying,foundation works,assistingwith settingout the main datums for followingtrades
Duringthis time I attended collegeon a day releasebasis startingand completingmy ONC in Building
Studies, of which I secured a Merit grade.
Responsiblefor analysingsubcontractquotes, checkingBOQ sums, and assistingsitemanager where
needed, ensuringweekly paperwork went to head office for accounts.
6. Qualifications:
Post Graduate Certificatein ProjectManagement, October 2013 with College of Estate Management,
Reading (onlinelearning)
AssociateMember of Chartered Arbitrators (ACIArb) January 2010.
Member of ACostEE (Cost Engineers)
Full Member of Chartered Institute of Building (MCIOB) June 2009
HNC in BuildingStudies:(achieved Distinction)1998 to 2000
ONC in BuildingStudies (achieved Merit): 1996 to 1998
10 GCSEs (Grades A to C): 1994 to 1996
Professional Development:
Candy Estimating2 day training coursecompleted October 2013 and used daily sincethen, alongside
various refresher/ trainingcourses as required
Causeway estimating software and DrawingMeasure trainingcoursecompleted Feb 2010.
Conquest 5 day trainingcourseand refresher courses in UK from January 2004
Asta Powerproject (attended ½ day course)
CSCS Accreditation (Estimator)
Site Manager’s CITB coursein Health & Safety on Construction Sites
Construction techniques seminars i.e. waterproofing basements, post tensioningto concrete slabs,
storm water storagetanks, earthworks and remediation etc
CIOB ContractAwareness seminar
Commercial & Presentation Skills(2 week course)
Many Seminars for CPD and industry awareness since2007
IT Proficiency: Good to very good
CCS Candy, Autodesk Design Review, Causeway, CADMeasure, Conquest, Valesco,Excel, Word,
PowerPoint, and Outlook.
Personal Details:
Address: Veneto Villa 10,Dubai Waterfront, Jebel Ali, Dubai,UAE
Email:natasha.gail@hotmail.co.uk
DrivingLicence: Full UK (clean),Full UAE (clean),Full Qatar (Clean).
MarriageStatus: Married.
Health: Good, non-smoker.
References: Availableupon request.
Client Testimonial:
“Natasha is enthusiastic and passionateabouther work and always willingto providethe clientwith what
is asked for in the tender documentation and does her utmost at all times in exceeding the client’s
expectations. She is someone I would recommend as a studious,competent, enthusiastic and reliable
Estimator. Natasha would providewhoever she engages a career with, the motivation,vitality and
determination to do her utmost for the company and secure new work for them in what is a tight
market.”
Mark Tomlinson,ManagingDirector,Explore Living(Client)
Client Testimonial:
Natasha is a competent estimator and is particularly skilled in beingableto produce accurateand detailed
billsof quantities.Natasha is well versed in the method of analytical estimatingand has shown that she is
ableto work out rates from firstprincipals.Natasha understandssub-contractor analysisand comparisons
and looks for the risks associated with competitive sub-contractor bids.WhilstatByrne Natasha made
time to visita number of our current construction sites to gain an insightinto the “real world” of
construction.I wish Natasha good luck in her next venture.
Phil Petz Chief Estimator Byrne Bros (Formwork) Ltd (July 22, 2013,Phil managed Natasha atByrne Bros
(Formwork)
7. Bid Experience
Murray & Roberts Contractors (Middle East) LLC
Refurbishment to 7 year old 5* hotel in Dubai;involvingthe logistics of refurbishmentin a live
busy Dubai hotel with average occupancy of 80% daily.The works included strippingback all the
hotel rooms, floor by floor,to get back to the shell of the room and then complete new fit
out/tiling/joinery/FF&E/Ceilings/Wallsetc.There has been waterproofing issues so itwas to
rectify this.As well as refurbishment to all the main restaurants and lobby areas to the hotel. The
project was awarded to another company after post tender negotiations and getting to 2nd place,
narrowly missingouton the award.
Bid Submission Total AED 130 Million
Brand new 5 star luxury hotel on SaadiyatIsland,Abu Dhabi includingearthworks,complete build
to hotel and resort with 340 rooms; all basement and structural concrete works, facadeworks,
BMU, wet trades, tiling,joinery,wall and ceilingworks,MEP, specialised trades,fitout, FF&E,
Kitchen Equipment, Restaurant fit outs, external works and landscaping,swimmingpools and
water features etc. This projectwas awarded to another contractor after 3 rounds of post tender
negotiations where M & R were close2nd.
Bid Submission Total AED 675 Million
Construction of 30 storey towers linked by a 5 storey basement parkingand podium levels
includingpiling,earthworks,all concreteworks, MEP, fit out, joinery,specialisttrades,masonry,
facadeworks, BMU, wet trades, tiling,wall and ceilingworks,FF&E, Kitchen Equipments,
Restaurantfit out, external works and landscaping,swimmingpools and water features,
irrigation works.This projectwas awarded to another contractor after 4 rounds of posttender
negotiations with M & R 2nd.
Bid Submission Total AED 525 Million
Maternity Leave for 5 months
Construction of a 13 storey tower linked to an existinga shoppingmall in Deira,Dubai including
connections to existingshoppingmall and removing/replacingtheexistingfacadeto
accommodate link bridgefrom hotel, earthworks, piling,shoring,RC Frame, Internal Finishes,
MEP, Specialisttrades,Fitout of 4* Hotel, landscaping,swimmingpool and water features. This
project was awarded to another contractor after 4 rounds of post tender negotiations where M
& R were a close2nd.
Bid Submission Total AED 280 Million
Construction of a 6 storey office block in DIP,Dubai includingearthworks,piling,shoring,RC
Frame, Internal Finishes,MEP,Specialisttrades,Fitout of offices, landscaping.Awaitingto hear
for post tender negotiations,submission was 17th December 2015
Bid Submission Total AED 220 Million
Byrne Bros Ltd, London, UK
22 storey reinforced concrete frame (floors,walls,columns and stairs) consistingof all levels with
complex rakinginclined columns,usingslip formmethod to progress the core ahead of the
floors,useof GRP riser grills for safety as the core is progressing,and stability problems to solve.
This projectwas awarded after negotiation meetings, and valueengineering the project to be
more economical and costeffective.
8. Awarded valueis equivalentto AED 50 Million
21 storey concrete frame and basement with a complicated core(as above the major elements).
Also basement construction,encased concrete columns and beams to fire regulations,capping
beam and pilingworks.This was awarded after negotiation meetings and valueengineered
savings to the project.
Awarded valueis equivalentto AED 60 Million
Galliford Try LLC, Qatar
30km of infrastructurefor Ashghal - includingbreakingup existingroad,beingsensitiveto the
many existingutility services within theroad, excavatingand layingpipes for drainagewhere
depth is up to 8m deep and with 20nr manholes that went to 30m deep (involvinga serious
consideration and costingfor temporary works to excavate and constructthese manholes),
backfillingthe excavation,micro-tunnellingfor 15kmto depths of 8m deep using1200mm
diameter pipes,Horizontal Directional Drilling,traffic management
Bid Submission total AED 380 Million
15km of infrastructurefor Kahrama,as extension to existingnetwork - includingbreakingup
existingroad,being sensitiveto the many existingutility services within theroad, excavatingand
layingpipes for drainagewhere depth is up to 4m deep, backfillingtheexcavation,Horizontal
Directional Drilling,traffic management
Bid Submission Total AED 200 Million
12km of new pipes within existingroads and 5 nr new pumping stations for Qatar Petroleum –
involvingexcavatingall by hand-dig,(due to massiveamounts of liveservices in the road),
Horizontal Directional Drillingatroad crossings,beingconcerned with a Client who is very
difficultto work with regardingpermits/approvals/times etc,interfacingwith kahrama (local
electricity and water authority)for the new pumping stations,construction of the 5 nr new
pumping stations,connection to 5nr existingsub-stationsapproximately 1kmaway from each
new pumping station,so includingall thenew pipelines and connections for this,and all
associated works.
Bid Submission Total AED 120 Million
New Duty Free Warehousefor Qatar Airways atNew Doha International Airport(Project
Manager being Mace) – Construction of new Duty Free Warehouse Store and In flightstore
which consists of full excavation,external works,soft and hard landscaping,structural steel
portal frame, external cladding,complete fit out which includes very high tech and modern
computer warehouse management system, all MEP and specialized Works (i.eTETRA, Structured
CablingSystem, CCTV, PA/VA, Access Control System etc)- all of which the new systems must
interface with the airportwidesystem in placealready.The Warehouse has a specialised racking
system and ASRS (Retrieval system) so the clientknows exactly how many items of duty free
items are in each palletatany given time. The rackingsystems are14m high and 120m long (4nr
of each) and are very specialized systems requiringfull understandingof the system and the
interfaces with sprinkler systems/MEP/fireprevention etc involvingcommunicationswith named
sub-contractors fromthe tender documents.
Bid Submission Total AED 350 Million
9. WS Atkins & Partners Overseas, Dubai, UAE
New Development for the Crown Prince – Al Fadah Development, which comprised of a whole
new area/city justoutsideof Abu Dhabi includingall groundwork’s,shell,coreand fit out,
infrastructure,drainageand external works for approximately 3000 houses,
schools/mosques/shops/parksto serve the new community.
Bid Submission Total AED 400 Million
New Headquarters for Gulf News in Dubai – involvingthe full construction and fitout of the new
warehouse for the newspaper processingfacility and all modern computer facilitiesto control
this process.
Bid Submission Total AED 65 Million
Numerous new office tower blocks in Dubai and Abu Dhabi – comprisingof earthworks, piling,
retainingsystems i.e. sheet piles,dewatering, foundations,structural shell,architectural ornate
cladding,fitout, infrastructure,drainage,external works, MEP works and specialized systems and
all associated projectmanagement and costs associated.
Bid Submission Total Rangingfrom AED 50 Million to 150 Million per tower
Frankis Solutions, Kent, UK
Residential developments in various areas i.e.Essex,Kent, Surrey, Herts usually for
approximately 150 dwellings (2 storey housing) includingsoil remediation,demolition,piling,
groundwork’s, foundations and ground floor slab,external works,infrastructure – for Clients like
Crest Nicholson,BarrattHomes, David Wilson Homes,ExploreLiving (partof Laing O’Rourke
Group).
Bid Submission Total rangingfrom equivalentof AED 10 Million to AED 30 Million
Anderson Construction Ltd,Essex, UK
Residential developments in various areas i.e.Essex,Kent, Surrey, Herts usually for
approximately 250-300 dwellings (2 storey housing) includingsoil remediation,demolition,piling,
groundwork’s, foundations and ground floor slab,external works,infrastructure – for Clients like
Crest Nicholson,BarrattHomes, David Wilson Homes,ExploreLiving (partof Laing O’Rourke
Group), Charles Church,Galliford Try.
Bid Submission totals rangingfromequivalentof AED 10 Million to AED 90 Million
Also I was involved in the Reinforced Concrete Frame company within the Group, measuringand
pricingfor apartment blocks comprisingof two levels of basements (car parking),ground floor
and podium levels (retail use) and extending to approximately 12 storeys (residential use)- for
the shell and core.
Bid Submission totals rangingfromequivalentof AED 10 Million to AED 60 Million
Thames Gateway Development , Dartford, Kent– providingfull measureand costs (from 1 A3
conceptual drawing) for residential and commercial use(approx 2000 houses in 4 phases)-piling,
foundations and ground floor slab,drainage,external works, infrastructure,structural shell,fit-
out.