CC603
PROJECT MANAGEMENT

SITE SUPERVISION
AND
ORGANISATION
A Gantt chart is
a type of bar
chart.

Developed
by Henry
Gantt, that
illustrates a
project schedule.

Illustrate the start
and finish dates of
the terminal
elements and
summary elements
of a project.

Bar Chart
or Gantt
Chart
Henry Laurence Gantt, A.B., M.E. (1861 – 23
November 1919) was an American mechanical
engineer and management consultant who is
best known for developing the Gantt chart in
the 1910s.
When scheduling
and monitoring
tasks within a
project.
When it’s not
necessary to show
which tasks
depend on
completion of
previous tasks.

USAGE OF BAR
CHART AND
GANTT CHART

When the steps of the project
or process, their sequence
and their duration are
known.

When
communicating
plans or status of
a project.
It is used for
scheduling
activities in a
project plan.

Is a network
diagramming
technique in which
activities are
represented by
arrows.

The precedence
relation between
activities is
represented by circles
connecting to one or
more arrows. The
length of the arrow
represents the
duration of the
relevant activity.

Arrow Method in Site
Planning
Be presented in the
form of a network
diagram that shows
the first and last
events and the
critical path.

Performed on a
time scale or
calendar in the form
of a bar chart

For larger projects and are
considered
complex, computer analyses.
Require the planner to think
logically.

Benefit of CPM

Activities that contractors
must focus its efforts during
the implementation of
projects identified during the
planning process.

Non-critical activities, were
identified and facilitate the
adjustment of resources.
Record, record activities of the
project every day in site diary
Arrange joinery or construction
worker

Regulate supervise work on site

Control and check work quality

Monitor work from building method
aspect, installation way, finish
Assistant
Engineer

Technician

Engineers tend to go to
work applying the
science and mathematics
knowledge to solve
problems and design
processes and products.

Technicians tend to start
their careers performing
tests, collecting
data, and assisting
engineers.

Engineers with NDT
backgrounds work on
developing new
inspection equipment
and procedures.

Technician becomes more
knowledgeable about the
work he or she is doing.
Materials
delivered to the
site, the quantity
used and retained

Items of plant on
site, working or
idling, including
reasons for being
idle.
Any work carried
out in connection
with the utility
service.

The number of
workers in various
trades

The date and
weather
conditions

This
document
usually
includes

Instructions
issued to the
contractor.
Minimizes
liability by
providing
accurate records
and valuable
evidence in the
event of a
dispute.

A comprehensive
tool for Site
Managers to
fulfill statuary
obligations.

Quality and
integrity of
information is
assured and
accurate.

Full transparency
of site activities.
3.1 the usage of bar chart

Más contenido relacionado

La actualidad más candente

Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
Aravind Samala
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
Kabilan Kabi
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
Adib Ramli
 

La actualidad más candente (20)

OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGSOPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
OPTIMAL PLANNING AND SCHEDULING OF HIGH RISE BUILDINGS
 
Construction Planning
Construction PlanningConstruction Planning
Construction Planning
 
9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Construction difficulties
Construction difficultiesConstruction difficulties
Construction difficulties
 
Construction planning & management
Construction planning & managementConstruction planning & management
Construction planning & management
 
Construction Equipment Management
Construction Equipment ManagementConstruction Equipment Management
Construction Equipment Management
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
 
5 principles of construction project management
5 principles of construction project management5 principles of construction project management
5 principles of construction project management
 
Traditional procurement method
Traditional procurement methodTraditional procurement method
Traditional procurement method
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
Cube test report
Cube test reportCube test report
Cube test report
 
Building condition survey whats more
Building condition survey whats moreBuilding condition survey whats more
Building condition survey whats more
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 

Similar a 3.1 the usage of bar chart

CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
pisal3
 
Work scheduling(2)
Work scheduling(2)Work scheduling(2)
Work scheduling(2)
ngiyari
 

Similar a 3.1 the usage of bar chart (20)

project management -04.ppt
project management -04.pptproject management -04.ppt
project management -04.ppt
 
09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Network Analysis- CPM ppt..pptx
Network Analysis- CPM  ppt..pptxNetwork Analysis- CPM  ppt..pptx
Network Analysis- CPM ppt..pptx
 
ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
QSS
QSSQSS
QSS
 
Qs(ici&itd) (1)
Qs(ici&itd) (1)Qs(ici&itd) (1)
Qs(ici&itd) (1)
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
PMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptxPMNM101 Lesson 2 2022.pptx
PMNM101 Lesson 2 2022.pptx
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
Work scheduling(2)
Work scheduling(2)Work scheduling(2)
Work scheduling(2)
 
Qsx
QsxQsx
Qsx
 
Qs(ici&itd)
Qs(ici&itd)Qs(ici&itd)
Qs(ici&itd)
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdf
 
GANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursingGANTT CHART nursing Management for Msc nursing
GANTT CHART nursing Management for Msc nursing
 
Nce603 mod unit1
Nce603 mod unit1Nce603 mod unit1
Nce603 mod unit1
 
Construction management
Construction managementConstruction management
Construction management
 
Traditional Management System.ppt
Traditional Management System.pptTraditional Management System.ppt
Traditional Management System.ppt
 

Más de Natalie Ulza

PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
Natalie Ulza
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policies
Natalie Ulza
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking strutting
Natalie Ulza
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak
Natalie Ulza
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
Natalie Ulza
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of management
Natalie Ulza
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1
Natalie Ulza
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
Natalie Ulza
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
Natalie Ulza
 

Más de Natalie Ulza (20)

miraculous discovery
miraculous discoverymiraculous discovery
miraculous discovery
 
PENEMUAN AJAIB
PENEMUAN AJAIBPENEMUAN AJAIB
PENEMUAN AJAIB
 
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
PANDUAN LAPORAN AKHIR LATIHAN INDUSTRI 2014 (PMM)
 
amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5amalan Bismillah 20,9,6,5
amalan Bismillah 20,9,6,5
 
3.6 understand of construction policies
3.6 understand of construction policies3.6 understand of construction policies
3.6 understand of construction policies
 
3.4 scaffolding
3.4 scaffolding3.4 scaffolding
3.4 scaffolding
 
3.3.1 planking strutting
3.3.1 planking strutting3.3.1 planking strutting
3.3.1 planking strutting
 
3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak3.2.3 site diary dan lawatan tapak
3.2.3 site diary dan lawatan tapak
 
2.2 resources of project management
2.2 resources of project management2.2 resources of project management
2.2 resources of project management
 
1.1 concepr of management
1.1 concepr of management1.1 concepr of management
1.1 concepr of management
 
Microsoft project 1
Microsoft project 1Microsoft project 1
Microsoft project 1
 
Hydrostatic force
Hydrostatic forceHydrostatic force
Hydrostatic force
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
Center of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body revCenter of pressure and hydrostatic force on a submerged body rev
Center of pressure and hydrostatic force on a submerged body rev
 
BOD TEST
BOD TESTBOD TEST
BOD TEST
 
TURBIDITY TEST
TURBIDITY TESTTURBIDITY TEST
TURBIDITY TEST
 
Mangan test
Mangan testMangan test
Mangan test
 
JET JAR TEST
JET JAR TESTJET JAR TEST
JET JAR TEST
 
FERUM TEST
FERUM TESTFERUM TEST
FERUM TEST
 
environment pollution topic 2-water pollution 2
environment pollution topic 2-water pollution 2environment pollution topic 2-water pollution 2
environment pollution topic 2-water pollution 2
 

Último

Último (20)

Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 

3.1 the usage of bar chart

  • 2. A Gantt chart is a type of bar chart. Developed by Henry Gantt, that illustrates a project schedule. Illustrate the start and finish dates of the terminal elements and summary elements of a project. Bar Chart or Gantt Chart Henry Laurence Gantt, A.B., M.E. (1861 – 23 November 1919) was an American mechanical engineer and management consultant who is best known for developing the Gantt chart in the 1910s.
  • 3.
  • 4. When scheduling and monitoring tasks within a project. When it’s not necessary to show which tasks depend on completion of previous tasks. USAGE OF BAR CHART AND GANTT CHART When the steps of the project or process, their sequence and their duration are known. When communicating plans or status of a project.
  • 5.
  • 6.
  • 7. It is used for scheduling activities in a project plan. Is a network diagramming technique in which activities are represented by arrows. The precedence relation between activities is represented by circles connecting to one or more arrows. The length of the arrow represents the duration of the relevant activity. Arrow Method in Site Planning
  • 8.
  • 9. Be presented in the form of a network diagram that shows the first and last events and the critical path. Performed on a time scale or calendar in the form of a bar chart For larger projects and are considered complex, computer analyses.
  • 10.
  • 11. Require the planner to think logically. Benefit of CPM Activities that contractors must focus its efforts during the implementation of projects identified during the planning process. Non-critical activities, were identified and facilitate the adjustment of resources.
  • 12.
  • 13. Record, record activities of the project every day in site diary Arrange joinery or construction worker Regulate supervise work on site Control and check work quality Monitor work from building method aspect, installation way, finish
  • 14.
  • 15. Assistant Engineer Technician Engineers tend to go to work applying the science and mathematics knowledge to solve problems and design processes and products. Technicians tend to start their careers performing tests, collecting data, and assisting engineers. Engineers with NDT backgrounds work on developing new inspection equipment and procedures. Technician becomes more knowledgeable about the work he or she is doing.
  • 16.
  • 17. Materials delivered to the site, the quantity used and retained Items of plant on site, working or idling, including reasons for being idle. Any work carried out in connection with the utility service. The number of workers in various trades The date and weather conditions This document usually includes Instructions issued to the contractor.
  • 18. Minimizes liability by providing accurate records and valuable evidence in the event of a dispute. A comprehensive tool for Site Managers to fulfill statuary obligations. Quality and integrity of information is assured and accurate. Full transparency of site activities.