SlideShare una empresa de Scribd logo
1 de 24
Descargar para leer sin conexión
BROWNFIELDS UPDATE
 THE AMENDMENTS TO O. REG. 153

              John Willms

      Specialist in Environmental Law

Certified by the Law Society of Upper Canada


 Willms & Shier Environmental Lawyers LLP

           www.willmsshier.com
Outline


• Soil, ground water and
 sediment standards
• Standards for Phase I and II
 ESAs
• Soil Movement
• Regulatory and Civil Liability
• Transition
Standards – New Tables


• Old Table 6 is gone and is
 replaced by
  • Tables 6 and 7 – for shallow soil
    sites
  • Tables 8 and 9 – for sites near
    water bodies
• Table 1 represents
 background conditions and is
 still used for sites that are
 areas of natural significance
Standards Added and Revised


• New standards for four VOCs and
  uranium
• “Science based” on the most
  sensitive combination of
  pathway and receptor – based
  on 10-6 for human health
• A few e.g. Vinyl chloride are less
  stringent
• For the contaminants that we
  most frequently encounter,
  between 1 to 3 orders more
  stringent
Changed Standards


• BTEX, benzene – significantly
 more stringent
• PHCs – numerical standards in
 all tables
• For PHC, no evidence of free
 product
• For potable ground water “no
 indication of objectionable
 petroleum hydrocarbon odour
 and taste”
Risk Assessment

• New and more detailed rules for
 traditional RA
• New type of RA added in attempt
 to streamline review and
 ameliorate concerns
• Modified generic uses “approved
 model”, MOE template and risk
 management measures approved
 and published by MOE
• Practitioner concern – this does
 not provide much relief without
 risk management
Role of QP


• Less independence, more
 work
• Detailed rules for Phase I and
 II ESAs embedded in Reg. 153
• As of July 1 ?? there will be a
 new MOE “approval” process
 – acknowledge for filing
Phase I ESA Data


• All reasonable enquiries – all
 sources of “reasonably
 accessible information”
• Extensive lists of sources of
 “records”
• Includes access to
 information legislation (my
 take - municipal, provincial)
Conceptual Site Model


• Information about Phase I
 Study Area
• Property boundaries 250 m
 from Phase I property
 boundary or beyond if QP
 determines
• Potentially contaminating
 uses, water bodies,
 underground services
Source: Ministry of Ontario, Brownfields Redevelopment Amendments to O. Reg. 153/04,
Brownfields Stakeholder Group Meeting, May 23, 2010
Potentially Contaminating Activities


 • Assess all within or beyond
   250 m
 • List of 70 activities
   encompasses most of the
   usual suspects
 • # 71 - Fill of unknown quality
Enhanced Phase I ESA


• Property had garage, dry
 cleaning or “bulk liquid
 dispensing”
• Permits and records, MSDS,
 inventories of chemicals,
 tanks, storage areas
• Waste management records
• Environmental audit reports
Phase II ESAs – Delineation


• How to draw the plume of
 contamination
• Keep sampling until areas of
 highest concentration found
• Edges of plume – vertical and
 horizontal extent to the next
 sampling location that is <
 standard – no interpolation
Phase II ESAs – Averaging


• Compliance to be determined
 at each sampling point
• Average where 2 or more
 samples at same location and
 depth (within 2 m radius)
• Composite samples not
 allowed for VOC analysis
Phase II ESAs Confirmatory Sampling


  • Two quarterly consecutive
   ground water samples needed
   where remediation done
  • Four if remediation in situ
Phase II ESAs - Contaminants


• CSM – Phase I and incorporate
 the results of the Phase II
 assessment
• Soil vapour survey for volatile
 contaminants including VOCs
• Measure and report on “free
 product” or “free flowing
 product”
Phase II ESAs - Hydrogeology


• Groundwater levels plus
 temporal variations – monitor
 or estimate
• Measure levels at every
 sampling event
• Flow direction using 3 or more
 monitoring wells
• Horizontal gradients
“Best By” Dates


• “Date of last work”
 researching for Phase I and II


• < 18 months before RSC
Movement and Treatment of Soil

– Reporting Quantities

• New MOE interest and
 emphasis on tracking
• QP must report on quantities
 and quality of soil
• Removed or imported
• Including characteristics
 (Phase I) of the source
 property
• Remediated on and off-site
Rules for Importation


• Rules apply to RSC properties
 ONLY
• General Rule - Table 1 soils
 fine for importation to any site
 including sites with RSC
∀ ∴ practice – import soil first,
 then do Phase II
Importing Clean Soil


• Know your source of backfill and
 bedding - no exemption for
 material from aggregate
 operation that has naturally
 occurring exceedance
• Many aggregate operations
 produce materials that exceed
 the new standards, usually
 metals, the exact contaminant
 depends on where in Ontario
Regulatory and Civil Liability


• Civil – no civil liability
  protection except for
  municipalities
• Municipalities – no liability for
  reliance on RSC by reason of
  inaccuracy in RSC
• Regulatory – RSC provides
  limited protection “reopeners”
  but not in the event of off-site
  migration
Transition


• Site Condition Standards –
 July 1, 2011
• New rules for Phase I and II
 ESAs – July 1, 2011 or earlier
 if and when RSC approval
 procedures proclaimed
• Ongoing risk assessment or
 remediation? Submit notice
 before January 1, 2011 and
 stay under the old rules up to
 January 1, 2013
Contact Information



             John Willms

         Phone: (416) 862-4821

        jwillms@willmsshier.com




Willms & Shier Environmental Lawyers LLP

         www.willmsshier.com

Más contenido relacionado

La actualidad más candente

CPAC Meeting 12-15-03
CPAC Meeting 12-15-03CPAC Meeting 12-15-03
CPAC Meeting 12-15-03
HartTWI
 
Maya Ganesan Final Paper
Maya Ganesan Final PaperMaya Ganesan Final Paper
Maya Ganesan Final Paper
Maya Ganesan
 

La actualidad más candente (20)

Environmental Clearance
Environmental ClearanceEnvironmental Clearance
Environmental Clearance
 
2011HSTS contractor meeting (Van Wert)
2011HSTS contractor meeting (Van Wert)2011HSTS contractor meeting (Van Wert)
2011HSTS contractor meeting (Van Wert)
 
Ambient Air Quality Monitoring in Southern Alberta
Ambient Air Quality Monitoring in Southern AlbertaAmbient Air Quality Monitoring in Southern Alberta
Ambient Air Quality Monitoring in Southern Alberta
 
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion UpdateMoffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
Moffett RAB: EPA Regional Groundwater and Vapor Intrusion Update
 
Importance of Background Samples - CLRA Conference 2012
Importance of Background Samples - CLRA Conference 2012Importance of Background Samples - CLRA Conference 2012
Importance of Background Samples - CLRA Conference 2012
 
Urban Hydrology Work In Guangdong Province
Urban Hydrology Work In Guangdong ProvinceUrban Hydrology Work In Guangdong Province
Urban Hydrology Work In Guangdong Province
 
CCW Conference: Cost effective practices for clean water
CCW Conference: Cost effective practices for clean waterCCW Conference: Cost effective practices for clean water
CCW Conference: Cost effective practices for clean water
 
Air Quality
Air QualityAir Quality
Air Quality
 
Naaqs oct 15
Naaqs oct 15Naaqs oct 15
Naaqs oct 15
 
DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...
DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...
DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...
 
Advocating Water Quality Improvement in Detroit
Advocating Water Quality Improvement in DetroitAdvocating Water Quality Improvement in Detroit
Advocating Water Quality Improvement in Detroit
 
Stormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityStormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste Facility
 
Lake Michigan Diversion - William Espey
Lake Michigan Diversion - William EspeyLake Michigan Diversion - William Espey
Lake Michigan Diversion - William Espey
 
AIR QUALITY INDEX MEASUREMENT
AIR QUALITY INDEX MEASUREMENT AIR QUALITY INDEX MEASUREMENT
AIR QUALITY INDEX MEASUREMENT
 
Dubbs, PE, CM, Kasi, Trinity Consultants, PM2.5 Regulatory Guidance Overview ...
Dubbs, PE, CM, Kasi, Trinity Consultants, PM2.5 Regulatory Guidance Overview ...Dubbs, PE, CM, Kasi, Trinity Consultants, PM2.5 Regulatory Guidance Overview ...
Dubbs, PE, CM, Kasi, Trinity Consultants, PM2.5 Regulatory Guidance Overview ...
 
CPAC Meeting 12-15-03
CPAC Meeting 12-15-03CPAC Meeting 12-15-03
CPAC Meeting 12-15-03
 
Maya Ganesan Final Paper
Maya Ganesan Final PaperMaya Ganesan Final Paper
Maya Ganesan Final Paper
 
ICOS ATC Labeling Process
ICOS ATC Labeling ProcessICOS ATC Labeling Process
ICOS ATC Labeling Process
 
Improving oregon's agricultural water quality
Improving oregon's agricultural water qualityImproving oregon's agricultural water quality
Improving oregon's agricultural water quality
 
Proposed Rule Changes - Jim Baumann
Proposed Rule Changes - Jim BaumannProposed Rule Changes - Jim Baumann
Proposed Rule Changes - Jim Baumann
 

Similar a ONEIA- John Willms Presentation

TH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICETH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICE
Charles Ice
 
Update on proposed quarry
Update on proposed quarryUpdate on proposed quarry
Update on proposed quarry
Greg_C_French
 
2014 Real Estate Inst (Otte Roek).PPTX
2014 Real Estate Inst (Otte Roek).PPTX2014 Real Estate Inst (Otte Roek).PPTX
2014 Real Estate Inst (Otte Roek).PPTX
Katie Roek
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due Diligence
Allen Matkins
 

Similar a ONEIA- John Willms Presentation (20)

Stormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in MarylandStormwater and Wetland Issues in Maryland
Stormwater and Wetland Issues in Maryland
 
Stormwater Regulation
Stormwater RegulationStormwater Regulation
Stormwater Regulation
 
Current Issues in Stormwater Management
Current Issues in Stormwater ManagementCurrent Issues in Stormwater Management
Current Issues in Stormwater Management
 
TH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICETH-F2 Dealing With Residual Contamination- ICE
TH-F2 Dealing With Residual Contamination- ICE
 
Environmental Issues Related to Construction Projects
Environmental Issues Related to Construction ProjectsEnvironmental Issues Related to Construction Projects
Environmental Issues Related to Construction Projects
 
Update on proposed quarry
Update on proposed quarryUpdate on proposed quarry
Update on proposed quarry
 
The Clean Water Act
The Clean Water ActThe Clean Water Act
The Clean Water Act
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-India
 
Gravel pits sept_2010
Gravel pits sept_2010Gravel pits sept_2010
Gravel pits sept_2010
 
ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due Diligence
 
Epa ord aehs 2015 v8 jhz rst cl
Epa ord  aehs 2015 v8 jhz rst clEpa ord  aehs 2015 v8 jhz rst cl
Epa ord aehs 2015 v8 jhz rst cl
 
Stormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 FinalStormwater Webinar 11 14 12 Final
Stormwater Webinar 11 14 12 Final
 
2014 Real Estate Inst (Otte Roek).PPTX
2014 Real Estate Inst (Otte Roek).PPTX2014 Real Estate Inst (Otte Roek).PPTX
2014 Real Estate Inst (Otte Roek).PPTX
 
Area 38 pic 1 final presentation
Area 38 pic 1   final presentationArea 38 pic 1   final presentation
Area 38 pic 1 final presentation
 
Groundwater Management
Groundwater ManagementGroundwater Management
Groundwater Management
 
Compliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit RequirementsCompliance With MPCA Industrial Stormwater Permit Requirements
Compliance With MPCA Industrial Stormwater Permit Requirements
 
Tighe&Bond - EHS Seminar - Middletown CT
Tighe&Bond - EHS Seminar - Middletown CTTighe&Bond - EHS Seminar - Middletown CT
Tighe&Bond - EHS Seminar - Middletown CT
 
Clearing Up the Confusion About the ASTM E 1527-13 Phase I ESA Standard
Clearing Up the Confusion About the ASTM E 1527-13 Phase I ESA StandardClearing Up the Confusion About the ASTM E 1527-13 Phase I ESA Standard
Clearing Up the Confusion About the ASTM E 1527-13 Phase I ESA Standard
 
Recent Developments in Environmental Due Diligence
Recent Developments in Environmental Due DiligenceRecent Developments in Environmental Due Diligence
Recent Developments in Environmental Due Diligence
 

Más de ONEIA

2013 10-09 oneia what’s next with sr&ed
2013 10-09 oneia what’s next with sr&ed2013 10-09 oneia what’s next with sr&ed
2013 10-09 oneia what’s next with sr&ed
ONEIA
 
C wardlaw irap oneia oct10 2013
C wardlaw irap oneia oct10 2013C wardlaw irap oneia oct10 2013
C wardlaw irap oneia oct10 2013
ONEIA
 
Oneia eid&ct conference 2013, May 16, 2013
Oneia eid&ct conference 2013, May 16, 2013Oneia eid&ct conference 2013, May 16, 2013
Oneia eid&ct conference 2013, May 16, 2013
ONEIA
 
Endetec-Veolia presentation, May 16, 2013
Endetec-Veolia presentation, May 16, 2013Endetec-Veolia presentation, May 16, 2013
Endetec-Veolia presentation, May 16, 2013
ONEIA
 
Enbridge presentation, May 16, 2013
Enbridge presentation, May 16, 2013Enbridge presentation, May 16, 2013
Enbridge presentation, May 16, 2013
ONEIA
 
Clairvest presentation, May 16, 2013
Clairvest presentation, May 16, 2013Clairvest presentation, May 16, 2013
Clairvest presentation, May 16, 2013
ONEIA
 

Más de ONEIA (20)

Darren fry walker environmental group
Darren fry   walker environmental groupDarren fry   walker environmental group
Darren fry walker environmental group
 
6 storm fisher pecha kucha v6 20160516
6   storm fisher pecha kucha v6 201605166   storm fisher pecha kucha v6 20160516
6 storm fisher pecha kucha v6 20160516
 
Oneia excess soils session, September 9, 2014
Oneia excess soils session, September 9, 2014Oneia excess soils session, September 9, 2014
Oneia excess soils session, September 9, 2014
 
Waste management division region of waterloo copy
Waste management division region of waterloo copyWaste management division region of waterloo copy
Waste management division region of waterloo copy
 
Cbn sep8 brownfields workshop final
Cbn sep8 brownfields workshop final Cbn sep8 brownfields workshop final
Cbn sep8 brownfields workshop final
 
Soil management at metrolinx
Soil management at metrolinx Soil management at metrolinx
Soil management at metrolinx
 
ONEIA Excess Soil Session September 9, 2014 - Panel presentation Janet Bobechko
ONEIA Excess Soil Session September 9, 2014 - Panel presentation Janet BobechkoONEIA Excess Soil Session September 9, 2014 - Panel presentation Janet Bobechko
ONEIA Excess Soil Session September 9, 2014 - Panel presentation Janet Bobechko
 
ONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECC
ONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECCONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECC
ONEIA Excess Soil Session, September 9, 2014 - Presentation by MOECC
 
2013 10-09 oneia what’s next with sr&ed
2013 10-09 oneia what’s next with sr&ed2013 10-09 oneia what’s next with sr&ed
2013 10-09 oneia what’s next with sr&ed
 
C wardlaw irap oneia oct10 2013
C wardlaw irap oneia oct10 2013C wardlaw irap oneia oct10 2013
C wardlaw irap oneia oct10 2013
 
TMX presentation, May 16, 2013
TMX presentation, May 16, 2013TMX presentation, May 16, 2013
TMX presentation, May 16, 2013
 
Oneia eid&ct conference 2013, May 16, 2013
Oneia eid&ct conference 2013, May 16, 2013Oneia eid&ct conference 2013, May 16, 2013
Oneia eid&ct conference 2013, May 16, 2013
 
Endetec-Veolia presentation, May 16, 2013
Endetec-Veolia presentation, May 16, 2013Endetec-Veolia presentation, May 16, 2013
Endetec-Veolia presentation, May 16, 2013
 
Enbridge presentation, May 16, 2013
Enbridge presentation, May 16, 2013Enbridge presentation, May 16, 2013
Enbridge presentation, May 16, 2013
 
Clairvest presentation, May 16, 2013
Clairvest presentation, May 16, 2013Clairvest presentation, May 16, 2013
Clairvest presentation, May 16, 2013
 
Losing our touch 2013 ec presentation to oneia mar 27
Losing our touch 2013 ec presentation to oneia mar 27Losing our touch 2013 ec presentation to oneia mar 27
Losing our touch 2013 ec presentation to oneia mar 27
 
Presentation Ontario Environment Commissioner-February 28, 2012
Presentation Ontario Environment Commissioner-February 28, 2012Presentation Ontario Environment Commissioner-February 28, 2012
Presentation Ontario Environment Commissioner-February 28, 2012
 
Presentation Craig Laudrum, OCE - ONEIA EBOB January 26, 2012
Presentation Craig Laudrum, OCE  - ONEIA EBOB January 26, 2012Presentation Craig Laudrum, OCE  - ONEIA EBOB January 26, 2012
Presentation Craig Laudrum, OCE - ONEIA EBOB January 26, 2012
 
DCC Presentation, Dennis Katic - ONEIA EBOB January 26, 2012terial_jan-26-201...
DCC Presentation, Dennis Katic - ONEIA EBOB January 26, 2012terial_jan-26-201...DCC Presentation, Dennis Katic - ONEIA EBOB January 26, 2012terial_jan-26-201...
DCC Presentation, Dennis Katic - ONEIA EBOB January 26, 2012terial_jan-26-201...
 
IRAP Presentation, Craig Wardlaw - ONEIA EBOB January 26, 2012
IRAP Presentation, Craig Wardlaw - ONEIA EBOB January 26, 2012IRAP Presentation, Craig Wardlaw - ONEIA EBOB January 26, 2012
IRAP Presentation, Craig Wardlaw - ONEIA EBOB January 26, 2012
 

Último

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
Vector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptxVector Search -An Introduction in Oracle Database 23ai.pptx
Vector Search -An Introduction in Oracle Database 23ai.pptx
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 

ONEIA- John Willms Presentation

  • 1. BROWNFIELDS UPDATE THE AMENDMENTS TO O. REG. 153 John Willms Specialist in Environmental Law Certified by the Law Society of Upper Canada Willms & Shier Environmental Lawyers LLP www.willmsshier.com
  • 2. Outline • Soil, ground water and sediment standards • Standards for Phase I and II ESAs • Soil Movement • Regulatory and Civil Liability • Transition
  • 3. Standards – New Tables • Old Table 6 is gone and is replaced by • Tables 6 and 7 – for shallow soil sites • Tables 8 and 9 – for sites near water bodies • Table 1 represents background conditions and is still used for sites that are areas of natural significance
  • 4. Standards Added and Revised • New standards for four VOCs and uranium • “Science based” on the most sensitive combination of pathway and receptor – based on 10-6 for human health • A few e.g. Vinyl chloride are less stringent • For the contaminants that we most frequently encounter, between 1 to 3 orders more stringent
  • 5. Changed Standards • BTEX, benzene – significantly more stringent • PHCs – numerical standards in all tables • For PHC, no evidence of free product • For potable ground water “no indication of objectionable petroleum hydrocarbon odour and taste”
  • 6. Risk Assessment • New and more detailed rules for traditional RA • New type of RA added in attempt to streamline review and ameliorate concerns • Modified generic uses “approved model”, MOE template and risk management measures approved and published by MOE • Practitioner concern – this does not provide much relief without risk management
  • 7. Role of QP • Less independence, more work • Detailed rules for Phase I and II ESAs embedded in Reg. 153 • As of July 1 ?? there will be a new MOE “approval” process – acknowledge for filing
  • 8. Phase I ESA Data • All reasonable enquiries – all sources of “reasonably accessible information” • Extensive lists of sources of “records” • Includes access to information legislation (my take - municipal, provincial)
  • 9. Conceptual Site Model • Information about Phase I Study Area • Property boundaries 250 m from Phase I property boundary or beyond if QP determines • Potentially contaminating uses, water bodies, underground services
  • 10. Source: Ministry of Ontario, Brownfields Redevelopment Amendments to O. Reg. 153/04, Brownfields Stakeholder Group Meeting, May 23, 2010
  • 11. Potentially Contaminating Activities • Assess all within or beyond 250 m • List of 70 activities encompasses most of the usual suspects • # 71 - Fill of unknown quality
  • 12. Enhanced Phase I ESA • Property had garage, dry cleaning or “bulk liquid dispensing” • Permits and records, MSDS, inventories of chemicals, tanks, storage areas • Waste management records • Environmental audit reports
  • 13. Phase II ESAs – Delineation • How to draw the plume of contamination • Keep sampling until areas of highest concentration found • Edges of plume – vertical and horizontal extent to the next sampling location that is < standard – no interpolation
  • 14. Phase II ESAs – Averaging • Compliance to be determined at each sampling point • Average where 2 or more samples at same location and depth (within 2 m radius) • Composite samples not allowed for VOC analysis
  • 15. Phase II ESAs Confirmatory Sampling • Two quarterly consecutive ground water samples needed where remediation done • Four if remediation in situ
  • 16. Phase II ESAs - Contaminants • CSM – Phase I and incorporate the results of the Phase II assessment • Soil vapour survey for volatile contaminants including VOCs • Measure and report on “free product” or “free flowing product”
  • 17. Phase II ESAs - Hydrogeology • Groundwater levels plus temporal variations – monitor or estimate • Measure levels at every sampling event • Flow direction using 3 or more monitoring wells • Horizontal gradients
  • 18. “Best By” Dates • “Date of last work” researching for Phase I and II • < 18 months before RSC
  • 19. Movement and Treatment of Soil – Reporting Quantities • New MOE interest and emphasis on tracking • QP must report on quantities and quality of soil • Removed or imported • Including characteristics (Phase I) of the source property • Remediated on and off-site
  • 20. Rules for Importation • Rules apply to RSC properties ONLY • General Rule - Table 1 soils fine for importation to any site including sites with RSC ∀ ∴ practice – import soil first, then do Phase II
  • 21. Importing Clean Soil • Know your source of backfill and bedding - no exemption for material from aggregate operation that has naturally occurring exceedance • Many aggregate operations produce materials that exceed the new standards, usually metals, the exact contaminant depends on where in Ontario
  • 22. Regulatory and Civil Liability • Civil – no civil liability protection except for municipalities • Municipalities – no liability for reliance on RSC by reason of inaccuracy in RSC • Regulatory – RSC provides limited protection “reopeners” but not in the event of off-site migration
  • 23. Transition • Site Condition Standards – July 1, 2011 • New rules for Phase I and II ESAs – July 1, 2011 or earlier if and when RSC approval procedures proclaimed • Ongoing risk assessment or remediation? Submit notice before January 1, 2011 and stay under the old rules up to January 1, 2013
  • 24. Contact Information John Willms Phone: (416) 862-4821 jwillms@willmsshier.com Willms & Shier Environmental Lawyers LLP www.willmsshier.com