Characteristics …
❑ Speediness & Correctness
 Capability of dealing with 1500 ~ 2000 ISO. drawings in a day.
 Capability of delivering Welding Map Drawings(Erection & Fabrication drawings) & reports
from 5000 ISO. Drawings in a week.
 Guarantee of Client’s Maximum Design Time for proven Piping Quality.
 Any type of Piping ISO. Drawings can be developed into successful Welding Map
Drawings for speedy Piping Construction Planning.
❑ Color-Style Drawings in Pdf Format
 2D Drawing Editor like AutoCAD is not necessary.
 Delivery of color-style Welding Map Drawings to supply Client’s easy identification of
Piping components and welds.
 Fabrication components(for Shop) are represented in Dark Green color.
 Erection components(for Field) are represented in Dark Magenta color.
 Fabrication welds(for Shop) are represented in Blue color.
 Erection welds(for Field) are represented in Dark Magenta color.
 Piping Supports are represented in Red color.
❑ Grouping of All Connected Drawings
 All connected Welding Map Drawings are delivered in a same folder named as a
sequential number.
ISO. MATRIX
Supply of Client Data…
❑ IDF, PDF files
 Idf, pcf files from 3D System like PDS, PDMS, SP3D and etc.
 Idf, Pcf files are required to be supplied as much as possible for complete connection
group.
❑ Line Index Data(Excel format – Excel 97-2003)
 Excel file should include all data to be printed out on Welding Map Drawings.
 Data include design temperature, design pressure, operating temperature, operating
pressure, revision number, ISO. Drawing number, etc…
❑ ISO. Border file(AutoCAD dwg – Ver. 2014 & lower)
 Project Name, Job Number, Client Logo, Contractor Logo, etc.
❑ Schedule Data(Excel format – Excel 97-2003)
 Tabulated Schedule data according to Piping Class, Size, EndType
❑ Random Length Data(Excel format – Excel 97-2003)
 Tabulated Pipe Random Length according to Piping Class
❑ Ectra Requirement
 Any Spool Requirement to be applied. / Any type of customized Reports
< Inch Bore > < mm Bore >
1
Preliminary Work
❑ All Joint Numbering
 All weld joints are sequentially numbered with balloon(Shop Weld) or double diamond(Field Weld)
 All thread joints are sequentially numbered with balloon (prefix : SC-7)
 All bolt joints are sequentially numbered with balloon (prefix : BT-8)
 All support joints are sequentially numbered with balloon (prefix : part number-9)
❑ Marking of Field Welds
 Long pipes are split by field welds according to random length.
 All external weld joints connected to other pipelines are marked as Field Welds.
 Change welds on both ends of pipe running through platform
❑ Marking of Spool Numbers
 All piping spools are sequentially numbered with pointed double box.
❑ Coloring of WM Drawings
 Fabrication components(for Shop) are represented in Dark Green color.
 Erection components(for Field) are represented in Dark Magenta color.
 Fabrication welds(for Shop) are represented in Blue color.
 Erection welds(for Field) are represented in Dark Magenta color.
❑ Generation of Full WM Drawing List
 Connected Group Name / WM Drawing number(ERECTION) / Spool Count / WM Drawing
number(FABRICATION) are listed up.
2
Preliminary Deliverables from
❑ Welding Map Drawing files(Adobe pdf format)
 Zipped file containing
- Erection & Fabrication WM Drawings grouped by Piping connection
- Full WM Drawing List
❑ Welding Map Report(Excel format) for Client Feed Back
 Weld List Report file Containing
- All Weld Data matching issued Preliminary WM Drawings
- All Material Data matching issued Preliminary WM Drawings
ISO. MATRIX3
Preliminary Deliverables from
Weld Joint List
Material List
ISO. MATRIX3
Check Preliminary Deliverables by Client
❑ Check & Assign Field Weld by Construction SI
 For bulky Spools
- Assign New Field Weld and mark in the issued Weld List(Weld Type Modification)
4
Spool numbered as SP-001 is too bulky.
If shop weld numbered as 3 needs to be
marked as field weld, make a comment in the
Weld List like following.
Supply of Client Feed Back Data
❑ Weld Type Modification Report
 Assign New Field Welds for convenient construction & mark them in the issued Weld List.
- Change the Construction Category(FABRICATION  ERECTION).
- Change the color in Red. Utilize Weld number for weld identification.
❑ Material Modification Report
 Change the Construction Category of Piping Components(FABRICATION  ERECTION).
- Check the mistakenly assigned Construction Category & mark them in the issued Material List.
- Change the color in Red. Utilize Part Number data for material identification.
5
Final Work
❑ Modify the WM Drawing according to Client Feed Back & Re-generate Drawings/Reports.
 Change the Construction Category of Welds or Piping Components
6
Shop weld numbered as 3 is changed into field
weld and new spool number is created. Weld
List will be output as following.
Final Deliverables from
❑ Welding Map Drawing files(Adobe pdf format)
 Zipped file containing
- Erection & Fabrication WM Drawings grouped by Piping connection
- Full WM Drawing List
❑ PCF files for 3D Piping Model(Split by Spool)
 These PCF files can be converted into 3D Piping Model(.vue) via SmartPlant InterOp Publisher.
- Users can review 3D Piping Model by Spool unit using SmartPlant Review.
ISO. MATRIX7
Final Deliverables from
❑ Welding Map Drawing Report(Excel format)
 Excel Report file containing
- Bolt Joint List / Thread Joint List / Weld Joint List / Cut Pipe List / Material List / Spool List
/ Support List
Thread Joint List
Weld Joint List
ISO. MATRIX
Cut Pipe List
7
Bolt Joint Report
Final Deliverables from
Support Joint List
Spool List
ISO. MATRIX7
Material List
Welding Map Drawing (Erection)
 Shop welds are colored in Blue.
 Shop weld numbers are shown in Circle
shapes.
 Field welds are colored in Magenta.
 Field weld numbers are shown in double
diamond shapes.
 Fabrication materials are colored in Green.
 Erection materials are colored in Magenta.
 All piping materials are separated properly
according to their Construction Category.
 Spool numbers are shown in
 Bolt joints are shown in circle shapes.
- Default Prefix is BT-8
 Thread joints are shown in circle shapes.
- Default Prefix is SC-7
 Support joints are shown in circle shapes.
- Default Prefix is (support part number – 9)
 Weld list is tabulated on the right-bottom side
of WM drawing.
 Cut pipe list is tabulated on the bottom side of
the WM drawing.
 Barcode 128 can be applied on the WM
drawing according to designated naming
convention.
Welding Map Drawing (Fabrication)
 Shop welds are colored in Blue.
 Shop weld numbers are shown in Circle
shapes.
 No Field weld is shown.
 No Field weld number is shown.
 Fabrication materials are colored in Green.
 No Erection material is shown.
 Spool number is shown on the right bottom
side of the WM drawing.
 No Bolt joint is shown.
 No Thread joint is shown.
 Support joints are shown in circle shapes.
- Default Prefix is (support part number – 9)
 Weld list is tabulated on the right-bottom side
of WM drawing.
 Cut pipe list is tabulated on the bottom side of
the WM drawing.
 All markings including(weld number, support
number, part number, cut pipe number, spool
number, etc.) are conform to those shown on
WM Drawing(Erection).
 Barcode 128 can be applied on the WM
drawing according to designated naming
convention.
Welding Map Drawing vs. SmartPlant Review Model
Welding Map Drawing vs. SmartPlant Review Model
Welding Map Drawing vs. SmartPlant Review Model
Welding Map Drawing vs. SmartPlant Review Model
Welding Map Drawing vs. SmartPlant Review Model

Más contenido relacionado

La actualidad más candente

Cálculos e recomendações para correias de transmissão de potência em v good...
Cálculos e recomendações para correias de transmissão de potência em v   good...Cálculos e recomendações para correias de transmissão de potência em v   good...
Cálculos e recomendações para correias de transmissão de potência em v good...
Diogo Bellé
 
Curso de tubulações industriais aula6
Curso de tubulações industriais aula6Curso de tubulações industriais aula6
Curso de tubulações industriais aula6
Antonio Gomes
 
Introdução à ciência dos materiais callister - capítulo 06 - propriedades m...
Introdução à ciência dos materiais   callister - capítulo 06 - propriedades m...Introdução à ciência dos materiais   callister - capítulo 06 - propriedades m...
Introdução à ciência dos materiais callister - capítulo 06 - propriedades m...
Tarcisio Lopes
 
Laporan kerosakan radio if fm
Laporan kerosakan radio if fmLaporan kerosakan radio if fm
Laporan kerosakan radio if fm
HINDONASPAR
 
KSKV Teknologi Kimpalan SEM1 -4
KSKV Teknologi Kimpalan SEM1 -4KSKV Teknologi Kimpalan SEM1 -4
KSKV Teknologi Kimpalan SEM1 -4
Abdul Karim Jaafar
 
Aula7 materiais
Aula7 materiaisAula7 materiais
Aula7 materiais
Tiago Cruz
 
3. memotong tiub kuprum(penghawa dingin)
3. memotong tiub kuprum(penghawa dingin)3. memotong tiub kuprum(penghawa dingin)
3. memotong tiub kuprum(penghawa dingin)
Amit Preve
 

La actualidad más candente (20)

Cálculos e recomendações para correias de transmissão de potência em v good...
Cálculos e recomendações para correias de transmissão de potência em v   good...Cálculos e recomendações para correias de transmissão de potência em v   good...
Cálculos e recomendações para correias de transmissão de potência em v good...
 
Python Programming ADP VTU CSE 18CS55 Module 4 Chapter 1
Python Programming ADP VTU CSE 18CS55 Module 4 Chapter 1Python Programming ADP VTU CSE 18CS55 Module 4 Chapter 1
Python Programming ADP VTU CSE 18CS55 Module 4 Chapter 1
 
Alatan menukul
Alatan menukulAlatan menukul
Alatan menukul
 
Curso de tubulações industriais aula6
Curso de tubulações industriais aula6Curso de tubulações industriais aula6
Curso de tubulações industriais aula6
 
MPI 1012 - APLIKASI PERALATAN PENGUKURAN
MPI 1012 - APLIKASI PERALATAN PENGUKURAN MPI 1012 - APLIKASI PERALATAN PENGUKURAN
MPI 1012 - APLIKASI PERALATAN PENGUKURAN
 
Gabarito ..
Gabarito ..Gabarito ..
Gabarito ..
 
Gd&t
Gd&tGd&t
Gd&t
 
Introdução à ciência dos materiais callister - capítulo 06 - propriedades m...
Introdução à ciência dos materiais   callister - capítulo 06 - propriedades m...Introdução à ciência dos materiais   callister - capítulo 06 - propriedades m...
Introdução à ciência dos materiais callister - capítulo 06 - propriedades m...
 
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIKPENGENALAN KEPADA  KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
PENGENALAN KEPADA KECEKAPAN TENAGA UNTUK PENGGUNA TENAGA DOMESTIK
 
Laporan kerosakan radio if fm
Laporan kerosakan radio if fmLaporan kerosakan radio if fm
Laporan kerosakan radio if fm
 
Nbr 5422
Nbr 5422Nbr 5422
Nbr 5422
 
Degree Certificate
Degree CertificateDegree Certificate
Degree Certificate
 
Apostila metrologia senai pe
Apostila metrologia senai peApostila metrologia senai pe
Apostila metrologia senai pe
 
Peralatan tangan
Peralatan tanganPeralatan tangan
Peralatan tangan
 
KSKV Teknologi Kimpalan SEM1 -4
KSKV Teknologi Kimpalan SEM1 -4KSKV Teknologi Kimpalan SEM1 -4
KSKV Teknologi Kimpalan SEM1 -4
 
Aula7 materiais
Aula7 materiaisAula7 materiais
Aula7 materiais
 
3. memotong tiub kuprum(penghawa dingin)
3. memotong tiub kuprum(penghawa dingin)3. memotong tiub kuprum(penghawa dingin)
3. memotong tiub kuprum(penghawa dingin)
 
pemberian ppe form.docx
pemberian ppe form.docxpemberian ppe form.docx
pemberian ppe form.docx
 
IS - CU 2 (3).pdf
IS - CU 2 (3).pdfIS - CU 2 (3).pdf
IS - CU 2 (3).pdf
 
03 torneamento
03 torneamento03 torneamento
03 torneamento
 

Destacado (8)

Steel Making: Ingot casting
Steel Making: Ingot casting Steel Making: Ingot casting
Steel Making: Ingot casting
 
Structural engineer drawings
Structural engineer drawingsStructural engineer drawings
Structural engineer drawings
 
Mohd Imran CV
Mohd Imran CVMohd Imran CV
Mohd Imran CV
 
ITD: Project #01: Structural Engineering Drawings
ITD: Project #01: Structural Engineering DrawingsITD: Project #01: Structural Engineering Drawings
ITD: Project #01: Structural Engineering Drawings
 
Bhilai Steel Plant Training Presentation
Bhilai Steel Plant Training PresentationBhilai Steel Plant Training Presentation
Bhilai Steel Plant Training Presentation
 
Engineering drawing (introduction of engineering drawing) lesson 1
Engineering drawing (introduction of engineering drawing) lesson 1Engineering drawing (introduction of engineering drawing) lesson 1
Engineering drawing (introduction of engineering drawing) lesson 1
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Construction equipments - Introduction and Classification
Construction equipments - Introduction and ClassificationConstruction equipments - Introduction and Classification
Construction equipments - Introduction and Classification
 

Similar a 1_Brochure

Similar a 1_Brochure (20)

PipeFab For Revit_AU_LasVegas_2018
PipeFab For Revit_AU_LasVegas_2018PipeFab For Revit_AU_LasVegas_2018
PipeFab For Revit_AU_LasVegas_2018
 
Nc dstv-interface
Nc dstv-interfaceNc dstv-interface
Nc dstv-interface
 
Engineering drawing 1 UniKL LDD 10303
Engineering drawing  1 UniKL LDD 10303Engineering drawing  1 UniKL LDD 10303
Engineering drawing 1 UniKL LDD 10303
 
AUTOSTEEL_STEEL CONNECTION DESIGN-BROCHURE
AUTOSTEEL_STEEL CONNECTION DESIGN-BROCHUREAUTOSTEEL_STEEL CONNECTION DESIGN-BROCHURE
AUTOSTEEL_STEEL CONNECTION DESIGN-BROCHURE
 
WL 141 Unit 03
WL 141 Unit 03WL 141 Unit 03
WL 141 Unit 03
 
Lantek nesting software for tube fiber laser cutting machine
Lantek nesting software for tube fiber laser cutting machine Lantek nesting software for tube fiber laser cutting machine
Lantek nesting software for tube fiber laser cutting machine
 
SOLID WORK DRAWING
SOLID WORK DRAWINGSOLID WORK DRAWING
SOLID WORK DRAWING
 
Dfm impeller 9 blades
Dfm impeller 9 blades Dfm impeller 9 blades
Dfm impeller 9 blades
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
Faztek T-Slotted Aluminum Extrusion Overview
Faztek T-Slotted Aluminum Extrusion OverviewFaztek T-Slotted Aluminum Extrusion Overview
Faztek T-Slotted Aluminum Extrusion Overview
 
DC MACHINE
DC MACHINEDC MACHINE
DC MACHINE
 
COMPUTER AIDED MACHINE DRAWING LAB MANUAL
COMPUTER AIDED MACHINE DRAWING LAB MANUALCOMPUTER AIDED MACHINE DRAWING LAB MANUAL
COMPUTER AIDED MACHINE DRAWING LAB MANUAL
 
Slide using and communicating technical information
Slide using and communicating technical informationSlide using and communicating technical information
Slide using and communicating technical information
 
IRJET- CFD Simulation and Analysis of Fluid Flow through Concentric Reducer P...
IRJET- CFD Simulation and Analysis of Fluid Flow through Concentric Reducer P...IRJET- CFD Simulation and Analysis of Fluid Flow through Concentric Reducer P...
IRJET- CFD Simulation and Analysis of Fluid Flow through Concentric Reducer P...
 
Internship Report (MEchanical Engg) by kalpesh pawar
Internship Report (MEchanical Engg) by kalpesh pawarInternship Report (MEchanical Engg) by kalpesh pawar
Internship Report (MEchanical Engg) by kalpesh pawar
 
JSW Summer Internship Report 2017
JSW Summer Internship Report  2017JSW Summer Internship Report  2017
JSW Summer Internship Report 2017
 
Barzan PJ Assignment
Barzan PJ AssignmentBarzan PJ Assignment
Barzan PJ Assignment
 
EC3 MANUAL FOR SAP2000
EC3 MANUAL FOR SAP2000EC3 MANUAL FOR SAP2000
EC3 MANUAL FOR SAP2000
 
industrial training report on composite girder and aggregate testing
industrial  training report on composite girder and aggregate testingindustrial  training report on composite girder and aggregate testing
industrial training report on composite girder and aggregate testing
 
Rishabh Engineering Services
Rishabh Engineering ServicesRishabh Engineering Services
Rishabh Engineering Services
 

1_Brochure

  • 1. Characteristics … ❑ Speediness & Correctness  Capability of dealing with 1500 ~ 2000 ISO. drawings in a day.  Capability of delivering Welding Map Drawings(Erection & Fabrication drawings) & reports from 5000 ISO. Drawings in a week.  Guarantee of Client’s Maximum Design Time for proven Piping Quality.  Any type of Piping ISO. Drawings can be developed into successful Welding Map Drawings for speedy Piping Construction Planning. ❑ Color-Style Drawings in Pdf Format  2D Drawing Editor like AutoCAD is not necessary.  Delivery of color-style Welding Map Drawings to supply Client’s easy identification of Piping components and welds.  Fabrication components(for Shop) are represented in Dark Green color.  Erection components(for Field) are represented in Dark Magenta color.  Fabrication welds(for Shop) are represented in Blue color.  Erection welds(for Field) are represented in Dark Magenta color.  Piping Supports are represented in Red color. ❑ Grouping of All Connected Drawings  All connected Welding Map Drawings are delivered in a same folder named as a sequential number. ISO. MATRIX
  • 2.
  • 3. Supply of Client Data… ❑ IDF, PDF files  Idf, pcf files from 3D System like PDS, PDMS, SP3D and etc.  Idf, Pcf files are required to be supplied as much as possible for complete connection group. ❑ Line Index Data(Excel format – Excel 97-2003)  Excel file should include all data to be printed out on Welding Map Drawings.  Data include design temperature, design pressure, operating temperature, operating pressure, revision number, ISO. Drawing number, etc… ❑ ISO. Border file(AutoCAD dwg – Ver. 2014 & lower)  Project Name, Job Number, Client Logo, Contractor Logo, etc. ❑ Schedule Data(Excel format – Excel 97-2003)  Tabulated Schedule data according to Piping Class, Size, EndType ❑ Random Length Data(Excel format – Excel 97-2003)  Tabulated Pipe Random Length according to Piping Class ❑ Ectra Requirement  Any Spool Requirement to be applied. / Any type of customized Reports < Inch Bore > < mm Bore > 1
  • 4. Preliminary Work ❑ All Joint Numbering  All weld joints are sequentially numbered with balloon(Shop Weld) or double diamond(Field Weld)  All thread joints are sequentially numbered with balloon (prefix : SC-7)  All bolt joints are sequentially numbered with balloon (prefix : BT-8)  All support joints are sequentially numbered with balloon (prefix : part number-9) ❑ Marking of Field Welds  Long pipes are split by field welds according to random length.  All external weld joints connected to other pipelines are marked as Field Welds.  Change welds on both ends of pipe running through platform ❑ Marking of Spool Numbers  All piping spools are sequentially numbered with pointed double box. ❑ Coloring of WM Drawings  Fabrication components(for Shop) are represented in Dark Green color.  Erection components(for Field) are represented in Dark Magenta color.  Fabrication welds(for Shop) are represented in Blue color.  Erection welds(for Field) are represented in Dark Magenta color. ❑ Generation of Full WM Drawing List  Connected Group Name / WM Drawing number(ERECTION) / Spool Count / WM Drawing number(FABRICATION) are listed up. 2
  • 5. Preliminary Deliverables from ❑ Welding Map Drawing files(Adobe pdf format)  Zipped file containing - Erection & Fabrication WM Drawings grouped by Piping connection - Full WM Drawing List ❑ Welding Map Report(Excel format) for Client Feed Back  Weld List Report file Containing - All Weld Data matching issued Preliminary WM Drawings - All Material Data matching issued Preliminary WM Drawings ISO. MATRIX3
  • 6. Preliminary Deliverables from Weld Joint List Material List ISO. MATRIX3
  • 7. Check Preliminary Deliverables by Client ❑ Check & Assign Field Weld by Construction SI  For bulky Spools - Assign New Field Weld and mark in the issued Weld List(Weld Type Modification) 4 Spool numbered as SP-001 is too bulky. If shop weld numbered as 3 needs to be marked as field weld, make a comment in the Weld List like following.
  • 8. Supply of Client Feed Back Data ❑ Weld Type Modification Report  Assign New Field Welds for convenient construction & mark them in the issued Weld List. - Change the Construction Category(FABRICATION  ERECTION). - Change the color in Red. Utilize Weld number for weld identification. ❑ Material Modification Report  Change the Construction Category of Piping Components(FABRICATION  ERECTION). - Check the mistakenly assigned Construction Category & mark them in the issued Material List. - Change the color in Red. Utilize Part Number data for material identification. 5
  • 9. Final Work ❑ Modify the WM Drawing according to Client Feed Back & Re-generate Drawings/Reports.  Change the Construction Category of Welds or Piping Components 6 Shop weld numbered as 3 is changed into field weld and new spool number is created. Weld List will be output as following.
  • 10. Final Deliverables from ❑ Welding Map Drawing files(Adobe pdf format)  Zipped file containing - Erection & Fabrication WM Drawings grouped by Piping connection - Full WM Drawing List ❑ PCF files for 3D Piping Model(Split by Spool)  These PCF files can be converted into 3D Piping Model(.vue) via SmartPlant InterOp Publisher. - Users can review 3D Piping Model by Spool unit using SmartPlant Review. ISO. MATRIX7
  • 11. Final Deliverables from ❑ Welding Map Drawing Report(Excel format)  Excel Report file containing - Bolt Joint List / Thread Joint List / Weld Joint List / Cut Pipe List / Material List / Spool List / Support List Thread Joint List Weld Joint List ISO. MATRIX Cut Pipe List 7 Bolt Joint Report
  • 12. Final Deliverables from Support Joint List Spool List ISO. MATRIX7 Material List
  • 13. Welding Map Drawing (Erection)  Shop welds are colored in Blue.  Shop weld numbers are shown in Circle shapes.  Field welds are colored in Magenta.  Field weld numbers are shown in double diamond shapes.  Fabrication materials are colored in Green.  Erection materials are colored in Magenta.  All piping materials are separated properly according to their Construction Category.  Spool numbers are shown in  Bolt joints are shown in circle shapes. - Default Prefix is BT-8  Thread joints are shown in circle shapes. - Default Prefix is SC-7  Support joints are shown in circle shapes. - Default Prefix is (support part number – 9)  Weld list is tabulated on the right-bottom side of WM drawing.  Cut pipe list is tabulated on the bottom side of the WM drawing.  Barcode 128 can be applied on the WM drawing according to designated naming convention.
  • 14. Welding Map Drawing (Fabrication)  Shop welds are colored in Blue.  Shop weld numbers are shown in Circle shapes.  No Field weld is shown.  No Field weld number is shown.  Fabrication materials are colored in Green.  No Erection material is shown.  Spool number is shown on the right bottom side of the WM drawing.  No Bolt joint is shown.  No Thread joint is shown.  Support joints are shown in circle shapes. - Default Prefix is (support part number – 9)  Weld list is tabulated on the right-bottom side of WM drawing.  Cut pipe list is tabulated on the bottom side of the WM drawing.  All markings including(weld number, support number, part number, cut pipe number, spool number, etc.) are conform to those shown on WM Drawing(Erection).  Barcode 128 can be applied on the WM drawing according to designated naming convention.
  • 15. Welding Map Drawing vs. SmartPlant Review Model
  • 16. Welding Map Drawing vs. SmartPlant Review Model
  • 17. Welding Map Drawing vs. SmartPlant Review Model
  • 18. Welding Map Drawing vs. SmartPlant Review Model
  • 19. Welding Map Drawing vs. SmartPlant Review Model