WALT DISNEY CONCERT HALL
FRANK GEHRY.
C
A
S
E
S
T
U
D
Y
SITE
Viewed from satellite
Location 111 South Grand Avenue
Los Angeles, California
U.S.A.
Coordinates 34°03′19″N 118°15′00″W
Coordinates: 34°03′19″N 1
18°15′00″W
Public transit
Civic Center/Grand Park
(Regional
Connector future)
Owner Los Angeles Music Center
Type Concert hall
Seating type Reserved
Capacity 2,265
Construction
Built 1999–2003
Opened October 24, 2003
Construction cost $130 million (plus $110
million for parking
garage)
INTRODUCTION
 The Walt Disney Concert Hall project is being designed as world class concert hall with a
seating capacity of 2265 seats.
 The project will be constructed on top of the existing Los Angeles
 The project has a total floor area of approximately 270,000 sq. ft. above grade and consists
of eight elements as follows:
1. The Concert Hall including the “wrappers” and East and West Stair Towers;
2. West Atrium
3. Pre-concert Area;
4. East Lobby and Foyers;
5. East Atrium;
6. Conductor’s Suite;
7. Building Base and Los Angeles Philharmonic Office Building
8. The Founders’ Room.
CONCEPT
 The extravagance of its forms seems to defy any rules of harmony and
symmetry.
 The forms are external inspired by a boat with sails drenched.
 The building consists of a series of interconnected volumes, some form of
orthogonal coated stone and other forms of organic and surfaces covered with
a corrugated metal skin of steel.
 The centerpiece of the interior of the building was designed to represent the
hull of a boat.
 The idea of the architect was to design a room with an evocative sculptural
forms of music, achieving an intimate connection between the orchestra and
audience.
INTERIOR
 The idea behind the interior of the Walt Disney Concert Hall is that there is “a
box and on either side of the box you have toilets and stairs with a foyer” .
 The interior of the auditorium and rooms, is lined with fir wood.
 To make up these spaces there are a variety of shapes that Gehry cleverly
crammed together.
 The circular spaces run into the rectangular wooden pieces to create interest
no matter where a person looks.
 All of this is covered in natural Los Anglos light that Gehry took advantage of
by adding skylights to the building.
• View of the stage and organ before a concert.
A view of the auditorium , as seen from A view of the auditorium looking towards
the balcony section. the stage and pipe organ.
Interior view of the lobby where Douglas fir
panel columns resemble tree.
Interior view of the lobby staircase looking toward
the upper levels.
EXTERIOR
 The iconic shapes known to the Walt Disney Concert Hall display Gehry’s use
of metaphor in this building.
 The metal peaks are reconstructed sail like shapes that are put together to
form an entirely new shape.
 The new shape is chaotic and calm at the same time.
 To coat the outer surfaces were used corrugated 12,500 pieces of steel
together on the outside.
Panoramic view of Frank Gehry's Walt Disney Concert
Hall, Los Angeles.
The processional main entrance
Detail near entrance
Viewed at night Viewed looking north
SITTING ARRANGEMENTS
FRAGMENTATION
 Construction began in 1987 and lasted 16 years until its grand opening on
October 24, 2003.
 In contrast to modernism that uses composition of spaces Frank Gehry uses a
technique refereed to as “assemblage”
 Assemblage gives his buildings a design language of “...angles and tilted
volumes introduced visual tension and ambiguities.”
 “Inside of the hall follows the acoustical requirements and it started to
become sail like he wanted to make the outside look the same.”
USE OF METAPHOR
 Gehry’s work is commonly known for having a fish metaphor but this is not the
metaphor for Walt Disney Concert Hall.
 Gehry’s colleagues began to look back to the Greek temples for inspiration
but was not acceptable.
 Gehry said “if you’re gonna go back, why not go back to fish?” and the idea
stuck.
 In the museum in Spain, the metal sheets on the exterior are put together in
a way that look like titanium fish scales.
 The ceiling tiles are layered together to look like the actual scales on a fish.
Reflection problems
 The building's exterior was designed with stainless steel given a matte finish, the
Founders Room and Children's Amphitheater were designed with highly polished
mirror-like panels.
 The reflective qualities of the surface were amplified by the concave sections of
the Founders Room walls.
 residents of the neighboring condominiums suffered glare caused by sunlight that
was reflected off these surfaces and concentrated in a manner similar to
a parabolic mirror.
 The resulting heat made some rooms of nearby condominiums unbearably warm,
caused the air-conditioning costs of these residents to skyrocket and created hot
spots on adjacent sidewalks of as much as 140 °F (60 °C).
The exterior of Founders room after panels were
re-surfaced.
SUMMERY
 Through the use of deconstruction, fragmentation, and metaphors he
assembled an inviting space that would serve the community for years to
come. The post modern look appealed to the younger generation while still
keeping some elements very classic and elegant to continue to attract an
older generation as well. “Assemblage” works very well in this building to
create interest that the older idea of composition could not achieve.
THANK YOU
 SUBMITTED BY :
SAYAN SARKAR
SUVRANILL SAHA
SOUPORNO MUKHERJEE
PRATIBHA RANI
SUPRIYA BHARATI

Más contenido relacionado

La actualidad más candente

Kauffman centre for performing arts
Kauffman centre for performing artsKauffman centre for performing arts
Kauffman centre for performing artsYash Kotgirwar
 
Auditorium Acoustics
Auditorium Acoustics Auditorium Acoustics
Auditorium Acoustics mominzaki
 
A Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTHA Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTHArvinth GM
 
Frank Owen Gehry (HOA)
Frank Owen Gehry (HOA)Frank Owen Gehry (HOA)
Frank Owen Gehry (HOA)Mehul Hotwani
 
Case Study of Triveni Kala Sangam
Case Study of Triveni Kala SangamCase Study of Triveni Kala Sangam
Case Study of Triveni Kala SangamAnubhav Arora
 
Auditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design PresentationAuditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design Presentationjisunfoo
 
THE ACOUSTIC DESIGN OF CONNEXION@NEXUS
THE ACOUSTIC DESIGN OF CONNEXION@NEXUSTHE ACOUSTIC DESIGN OF CONNEXION@NEXUS
THE ACOUSTIC DESIGN OF CONNEXION@NEXUSYen Min Khor
 
Design of amphitheatre
Design of amphitheatreDesign of amphitheatre
Design of amphitheatreDinesh Kannan
 
Frank Gehry: Study & Research
Frank Gehry: Study & ResearchFrank Gehry: Study & Research
Frank Gehry: Study & ResearchNicholas Socrates
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)Mansi Pushpakar
 
architect Frank gehry disney concert hall and residence
architect Frank gehry disney concert hall and residencearchitect Frank gehry disney concert hall and residence
architect Frank gehry disney concert hall and residencesanju priya
 
Cover Sheet _ACTIVITY#-2 (2).docx
Cover Sheet _ACTIVITY#-2 (2).docxCover Sheet _ACTIVITY#-2 (2).docx
Cover Sheet _ACTIVITY#-2 (2).docxChelseyDayrit
 
Frank o. gehry
Frank o. gehryFrank o. gehry
Frank o. gehryRaman Kant
 
Denver art museum_ Daniel Libeskind
Denver art museum_ Daniel LibeskindDenver art museum_ Daniel Libeskind
Denver art museum_ Daniel LibeskindComposicio 3 Tarda
 
Auditorium Architecture planning
Auditorium Architecture planningAuditorium Architecture planning
Auditorium Architecture planningDanishPathan7
 

La actualidad más candente (20)

Kauffman centre for performing arts
Kauffman centre for performing artsKauffman centre for performing arts
Kauffman centre for performing arts
 
Auditorium Acoustics
Auditorium Acoustics Auditorium Acoustics
Auditorium Acoustics
 
A Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTHA Case Study on cultural center in saint german , France by G.M.ARVINTH
A Case Study on cultural center in saint german , France by G.M.ARVINTH
 
Frank Owen Gehry (HOA)
Frank Owen Gehry (HOA)Frank Owen Gehry (HOA)
Frank Owen Gehry (HOA)
 
Case Study of Triveni Kala Sangam
Case Study of Triveni Kala SangamCase Study of Triveni Kala Sangam
Case Study of Triveni Kala Sangam
 
Auditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design PresentationAuditorium: A Case Study on Acoustic Design Presentation
Auditorium: A Case Study on Acoustic Design Presentation
 
THE ACOUSTIC DESIGN OF CONNEXION@NEXUS
THE ACOUSTIC DESIGN OF CONNEXION@NEXUSTHE ACOUSTIC DESIGN OF CONNEXION@NEXUS
THE ACOUSTIC DESIGN OF CONNEXION@NEXUS
 
Design of amphitheatre
Design of amphitheatreDesign of amphitheatre
Design of amphitheatre
 
Frank Gehry: Study & Research
Frank Gehry: Study & ResearchFrank Gehry: Study & Research
Frank Gehry: Study & Research
 
Auditorium Design (Case Study)
Auditorium Design (Case Study)Auditorium Design (Case Study)
Auditorium Design (Case Study)
 
architect Frank gehry disney concert hall and residence
architect Frank gehry disney concert hall and residencearchitect Frank gehry disney concert hall and residence
architect Frank gehry disney concert hall and residence
 
Daniel libeskind
Daniel libeskindDaniel libeskind
Daniel libeskind
 
Auditorium case study kamani auditorium (new delhi
Auditorium case study kamani auditorium (new delhiAuditorium case study kamani auditorium (new delhi
Auditorium case study kamani auditorium (new delhi
 
Cover Sheet _ACTIVITY#-2 (2).docx
Cover Sheet _ACTIVITY#-2 (2).docxCover Sheet _ACTIVITY#-2 (2).docx
Cover Sheet _ACTIVITY#-2 (2).docx
 
Calatrava audi
Calatrava audiCalatrava audi
Calatrava audi
 
_CONCERT HALL ACOUSTICS.pdf
_CONCERT HALL ACOUSTICS.pdf_CONCERT HALL ACOUSTICS.pdf
_CONCERT HALL ACOUSTICS.pdf
 
Frank o. gehry
Frank o. gehryFrank o. gehry
Frank o. gehry
 
Denver art museum_ Daniel Libeskind
Denver art museum_ Daniel LibeskindDenver art museum_ Daniel Libeskind
Denver art museum_ Daniel Libeskind
 
Auditorium Architecture planning
Auditorium Architecture planningAuditorium Architecture planning
Auditorium Architecture planning
 
Theatre acoustics
Theatre acousticsTheatre acoustics
Theatre acoustics
 

Destacado

Disney Concert Hall art 157
Disney Concert Hall art 157Disney Concert Hall art 157
Disney Concert Hall art 157madrigal191
 
Frank Owen Gehry
Frank Owen GehryFrank Owen Gehry
Frank Owen GehryAbhilash Ks
 
2013 Study Tour of Contemporary Architecture of the USA
2013 Study Tour of Contemporary Architecture of the USA2013 Study Tour of Contemporary Architecture of the USA
2013 Study Tour of Contemporary Architecture of the USABaldassoCortese
 
Presentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her workPresentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her workrenu rajbahak
 
Jamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAI
Jamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAIJamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAI
Jamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAIDijo Mathews
 
Zaha hadid (two projects)
Zaha hadid (two projects)Zaha hadid (two projects)
Zaha hadid (two projects)soodkartik
 
LSA Bootcamp Portland: Building a Successful Digital Marketing Strategy
LSA Bootcamp Portland: Building a Successful Digital Marketing StrategyLSA Bootcamp Portland: Building a Successful Digital Marketing Strategy
LSA Bootcamp Portland: Building a Successful Digital Marketing StrategyLocalogy
 
London 2012 - Aquatics Centre
London 2012 - Aquatics CentreLondon 2012 - Aquatics Centre
London 2012 - Aquatics CentreIcon
 
Postmodernism
PostmodernismPostmodernism
Postmodernismgable95
 
Zig Ziglar Quotes
Zig Ziglar QuotesZig Ziglar Quotes
Zig Ziglar QuotesDANNAH
 

Destacado (20)

Frank o gehry
Frank o gehryFrank o gehry
Frank o gehry
 
Frank Gehry
Frank GehryFrank Gehry
Frank Gehry
 
Disney Concert Hall art 157
Disney Concert Hall art 157Disney Concert Hall art 157
Disney Concert Hall art 157
 
Frank Owen Gehry
Frank Owen GehryFrank Owen Gehry
Frank Owen Gehry
 
Ppt concerthallbradbury
Ppt concerthallbradburyPpt concerthallbradbury
Ppt concerthallbradbury
 
2013 Study Tour of Contemporary Architecture of the USA
2013 Study Tour of Contemporary Architecture of the USA2013 Study Tour of Contemporary Architecture of the USA
2013 Study Tour of Contemporary Architecture of the USA
 
Caso De Estudio Walt Disney Concert Hall
Caso De Estudio Walt Disney Concert HallCaso De Estudio Walt Disney Concert Hall
Caso De Estudio Walt Disney Concert Hall
 
Concert hall proposal pdf
Concert hall proposal pdfConcert hall proposal pdf
Concert hall proposal pdf
 
Presentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her workPresentation on architect zaha hadid and her work
Presentation on architect zaha hadid and her work
 
Zaha hadid
Zaha hadidZaha hadid
Zaha hadid
 
Jamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAI
Jamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAIJamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAI
Jamshed bhabha theatre, ncpa, nariman point - ACOUSTICS - AUDITORIUM - MUMBAI
 
Zaha hadid (two projects)
Zaha hadid (two projects)Zaha hadid (two projects)
Zaha hadid (two projects)
 
Zaha Hadid
Zaha HadidZaha Hadid
Zaha Hadid
 
Deconstructivism
DeconstructivismDeconstructivism
Deconstructivism
 
LSA Bootcamp Portland: Building a Successful Digital Marketing Strategy
LSA Bootcamp Portland: Building a Successful Digital Marketing StrategyLSA Bootcamp Portland: Building a Successful Digital Marketing Strategy
LSA Bootcamp Portland: Building a Successful Digital Marketing Strategy
 
Frank owen gehry
Frank owen gehryFrank owen gehry
Frank owen gehry
 
London 2012 - Aquatics Centre
London 2012 - Aquatics CentreLondon 2012 - Aquatics Centre
London 2012 - Aquatics Centre
 
Postmodernism
PostmodernismPostmodernism
Postmodernism
 
Frank gehry
Frank gehryFrank gehry
Frank gehry
 
Zig Ziglar Quotes
Zig Ziglar QuotesZig Ziglar Quotes
Zig Ziglar Quotes
 

Similar a Net case study

WALT DISNEY CONCERT HALL architecture engineering...pdf
WALT DISNEY CONCERT HALL architecture engineering...pdfWALT DISNEY CONCERT HALL architecture engineering...pdf
WALT DISNEY CONCERT HALL architecture engineering...pdfmennamohamed200y
 
Avery Fisher Hall (David Geffen Hall) - Max Abromovitz
Avery Fisher Hall (David Geffen Hall) - Max AbromovitzAvery Fisher Hall (David Geffen Hall) - Max Abromovitz
Avery Fisher Hall (David Geffen Hall) - Max AbromovitzCityLabSarasota
 
Ar. frank owen gehry
Ar. frank owen gehryAr. frank owen gehry
Ar. frank owen gehryRANDA WH
 
WALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALLWALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALLA04AnkitSharma
 
F.L. Wright - Architecture
F.L. Wright - ArchitectureF.L. Wright - Architecture
F.L. Wright - ArchitectureMansi Pushpakar
 
Unit-3-international architecture_part-02.pdf
Unit-3-international architecture_part-02.pdfUnit-3-international architecture_part-02.pdf
Unit-3-international architecture_part-02.pdfnawin12
 
740130_Group8_Deconstructivism_Frank o GEHRY.pdf
740130_Group8_Deconstructivism_Frank o GEHRY.pdf740130_Group8_Deconstructivism_Frank o GEHRY.pdf
740130_Group8_Deconstructivism_Frank o GEHRY.pdfRishnaThapa1
 
WALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdf
WALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdfWALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdf
WALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdfpamohammedadil
 
Sydney opera house acoustical features
Sydney opera house acoustical featuresSydney opera house acoustical features
Sydney opera house acoustical featuresRohit Bhatt
 
Organic design
Organic designOrganic design
Organic designSenistr0
 
LSA-Apr_2014_Bing_Concert_Hall_original
LSA-Apr_2014_Bing_Concert_Hall_originalLSA-Apr_2014_Bing_Concert_Hall_original
LSA-Apr_2014_Bing_Concert_Hall_originalBrett Cooper, PMP
 
Architect Louis i kahn
Architect Louis i kahnArchitect Louis i kahn
Architect Louis i kahnOnal Kothari
 
14 Norman Foster-Renzo Piano
14 Norman Foster-Renzo Piano14 Norman Foster-Renzo Piano
14 Norman Foster-Renzo PianoDouglas Vail
 
A Brief case study about the famous GuggenheimMuseum.pdf
A Brief case study about the famous GuggenheimMuseum.pdfA Brief case study about the famous GuggenheimMuseum.pdf
A Brief case study about the famous GuggenheimMuseum.pdfmeygnanasivan
 
Ar. Alvar alto and his works
Ar. Alvar alto and his worksAr. Alvar alto and his works
Ar. Alvar alto and his worksHarjinder Grewal
 
Design Philosophy Through 'Planes'- Architect Louis I. Kahn
Design Philosophy Through 'Planes'- Architect Louis I. KahnDesign Philosophy Through 'Planes'- Architect Louis I. Kahn
Design Philosophy Through 'Planes'- Architect Louis I. KahnMd. Asfaquzzaman Rahad
 
Berliner Philharmonie - Hans Scharoun
Berliner Philharmonie - Hans ScharounBerliner Philharmonie - Hans Scharoun
Berliner Philharmonie - Hans ScharounCityLabSarasota
 

Similar a Net case study (20)

WALT DISNEY CONCERT HALL architecture engineering...pdf
WALT DISNEY CONCERT HALL architecture engineering...pdfWALT DISNEY CONCERT HALL architecture engineering...pdf
WALT DISNEY CONCERT HALL architecture engineering...pdf
 
Avery Fisher Hall (David Geffen Hall) - Max Abromovitz
Avery Fisher Hall (David Geffen Hall) - Max AbromovitzAvery Fisher Hall (David Geffen Hall) - Max Abromovitz
Avery Fisher Hall (David Geffen Hall) - Max Abromovitz
 
Ar. frank owen gehry
Ar. frank owen gehryAr. frank owen gehry
Ar. frank owen gehry
 
WALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALLWALT DISNEY CONCERT HALL
WALT DISNEY CONCERT HALL
 
F.L. Wright - Architecture
F.L. Wright - ArchitectureF.L. Wright - Architecture
F.L. Wright - Architecture
 
Unit-3-international architecture_part-02.pdf
Unit-3-international architecture_part-02.pdfUnit-3-international architecture_part-02.pdf
Unit-3-international architecture_part-02.pdf
 
740130_Group8_Deconstructivism_Frank o GEHRY.pdf
740130_Group8_Deconstructivism_Frank o GEHRY.pdf740130_Group8_Deconstructivism_Frank o GEHRY.pdf
740130_Group8_Deconstructivism_Frank o GEHRY.pdf
 
WALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdf
WALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdfWALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdf
WALT DISNEY concert hall acoustics P.A ADIL RN 19 .pdf
 
Sydney opera house acoustical features
Sydney opera house acoustical featuresSydney opera house acoustical features
Sydney opera house acoustical features
 
Organic design
Organic designOrganic design
Organic design
 
LSA-Apr_2014_Bing_Concert_Hall_original
LSA-Apr_2014_Bing_Concert_Hall_originalLSA-Apr_2014_Bing_Concert_Hall_original
LSA-Apr_2014_Bing_Concert_Hall_original
 
Architect Louis i kahn
Architect Louis i kahnArchitect Louis i kahn
Architect Louis i kahn
 
PROM copy
PROM copyPROM copy
PROM copy
 
14 Norman Foster-Renzo Piano
14 Norman Foster-Renzo Piano14 Norman Foster-Renzo Piano
14 Norman Foster-Renzo Piano
 
Hearst tower, NYC
Hearst tower, NYCHearst tower, NYC
Hearst tower, NYC
 
A Brief case study about the famous GuggenheimMuseum.pdf
A Brief case study about the famous GuggenheimMuseum.pdfA Brief case study about the famous GuggenheimMuseum.pdf
A Brief case study about the famous GuggenheimMuseum.pdf
 
5mb
5mb5mb
5mb
 
Ar. Alvar alto and his works
Ar. Alvar alto and his worksAr. Alvar alto and his works
Ar. Alvar alto and his works
 
Design Philosophy Through 'Planes'- Architect Louis I. Kahn
Design Philosophy Through 'Planes'- Architect Louis I. KahnDesign Philosophy Through 'Planes'- Architect Louis I. Kahn
Design Philosophy Through 'Planes'- Architect Louis I. Kahn
 
Berliner Philharmonie - Hans Scharoun
Berliner Philharmonie - Hans ScharounBerliner Philharmonie - Hans Scharoun
Berliner Philharmonie - Hans Scharoun
 

Último

TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Último (20)

Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 

Net case study

  • 1. WALT DISNEY CONCERT HALL FRANK GEHRY. C A S E S T U D Y
  • 2. SITE Viewed from satellite Location 111 South Grand Avenue Los Angeles, California U.S.A. Coordinates 34°03′19″N 118°15′00″W Coordinates: 34°03′19″N 1 18°15′00″W Public transit Civic Center/Grand Park (Regional Connector future) Owner Los Angeles Music Center Type Concert hall Seating type Reserved Capacity 2,265 Construction Built 1999–2003 Opened October 24, 2003 Construction cost $130 million (plus $110 million for parking garage)
  • 3. INTRODUCTION  The Walt Disney Concert Hall project is being designed as world class concert hall with a seating capacity of 2265 seats.  The project will be constructed on top of the existing Los Angeles  The project has a total floor area of approximately 270,000 sq. ft. above grade and consists of eight elements as follows: 1. The Concert Hall including the “wrappers” and East and West Stair Towers; 2. West Atrium 3. Pre-concert Area; 4. East Lobby and Foyers; 5. East Atrium; 6. Conductor’s Suite; 7. Building Base and Los Angeles Philharmonic Office Building 8. The Founders’ Room.
  • 4. CONCEPT  The extravagance of its forms seems to defy any rules of harmony and symmetry.  The forms are external inspired by a boat with sails drenched.  The building consists of a series of interconnected volumes, some form of orthogonal coated stone and other forms of organic and surfaces covered with a corrugated metal skin of steel.  The centerpiece of the interior of the building was designed to represent the hull of a boat.  The idea of the architect was to design a room with an evocative sculptural forms of music, achieving an intimate connection between the orchestra and audience.
  • 5. INTERIOR  The idea behind the interior of the Walt Disney Concert Hall is that there is “a box and on either side of the box you have toilets and stairs with a foyer” .  The interior of the auditorium and rooms, is lined with fir wood.  To make up these spaces there are a variety of shapes that Gehry cleverly crammed together.  The circular spaces run into the rectangular wooden pieces to create interest no matter where a person looks.  All of this is covered in natural Los Anglos light that Gehry took advantage of by adding skylights to the building. • View of the stage and organ before a concert.
  • 6. A view of the auditorium , as seen from A view of the auditorium looking towards the balcony section. the stage and pipe organ. Interior view of the lobby where Douglas fir panel columns resemble tree. Interior view of the lobby staircase looking toward the upper levels.
  • 7. EXTERIOR  The iconic shapes known to the Walt Disney Concert Hall display Gehry’s use of metaphor in this building.  The metal peaks are reconstructed sail like shapes that are put together to form an entirely new shape.  The new shape is chaotic and calm at the same time.  To coat the outer surfaces were used corrugated 12,500 pieces of steel together on the outside. Panoramic view of Frank Gehry's Walt Disney Concert Hall, Los Angeles.
  • 8. The processional main entrance Detail near entrance Viewed at night Viewed looking north
  • 10. FRAGMENTATION  Construction began in 1987 and lasted 16 years until its grand opening on October 24, 2003.  In contrast to modernism that uses composition of spaces Frank Gehry uses a technique refereed to as “assemblage”  Assemblage gives his buildings a design language of “...angles and tilted volumes introduced visual tension and ambiguities.”  “Inside of the hall follows the acoustical requirements and it started to become sail like he wanted to make the outside look the same.”
  • 11. USE OF METAPHOR  Gehry’s work is commonly known for having a fish metaphor but this is not the metaphor for Walt Disney Concert Hall.  Gehry’s colleagues began to look back to the Greek temples for inspiration but was not acceptable.  Gehry said “if you’re gonna go back, why not go back to fish?” and the idea stuck.  In the museum in Spain, the metal sheets on the exterior are put together in a way that look like titanium fish scales.  The ceiling tiles are layered together to look like the actual scales on a fish.
  • 12. Reflection problems  The building's exterior was designed with stainless steel given a matte finish, the Founders Room and Children's Amphitheater were designed with highly polished mirror-like panels.  The reflective qualities of the surface were amplified by the concave sections of the Founders Room walls.  residents of the neighboring condominiums suffered glare caused by sunlight that was reflected off these surfaces and concentrated in a manner similar to a parabolic mirror.  The resulting heat made some rooms of nearby condominiums unbearably warm, caused the air-conditioning costs of these residents to skyrocket and created hot spots on adjacent sidewalks of as much as 140 °F (60 °C). The exterior of Founders room after panels were re-surfaced.
  • 13. SUMMERY  Through the use of deconstruction, fragmentation, and metaphors he assembled an inviting space that would serve the community for years to come. The post modern look appealed to the younger generation while still keeping some elements very classic and elegant to continue to attract an older generation as well. “Assemblage” works very well in this building to create interest that the older idea of composition could not achieve.