SlideShare una empresa de Scribd logo
1 de 6
Designing a
Fuel
Purification
System
By Steven Brady,
Project Manager
1st Stage: Proposal
• Regulations
• Engines
• Purifiers
• Costs
• System
Designs
• Metallurgy
Research
• Mind Map
• Written
Documents
• Technical
Drawings
Software
• Objectives
• Gantt
Chart
• Mind Map
Plan
Stage 2: Technical Specification
•Main Components
•Operating Environment
•Fire Regulations
•Means of Escape
•Maintenance
Stage 3: Design Stage
Final Design Report
System
Drawings
Calculations
Research
• Purifiers
• System Diagram
• Room Layouts
• Piping
• Ventilation
• Sludge Tank
• Electrics
• Maintenance
• Fire Safety
• Verification Strategy
• Novel Features
Stage 4: Evaluation
Knowledge and Skills
Gained
Self Evaluation
Stage 5: Presentation
• The End of the project
• Any Questions?

Más contenido relacionado

Destacado (7)

1 numeroscomplejos
1 numeroscomplejos1 numeroscomplejos
1 numeroscomplejos
 
AMBC Presentation 3
AMBC Presentation 3AMBC Presentation 3
AMBC Presentation 3
 
Manejo del internet
Manejo del internetManejo del internet
Manejo del internet
 
Conocete a ti mismo y conoceras el universo.
Conocete a ti mismo y conoceras el universo.Conocete a ti mismo y conoceras el universo.
Conocete a ti mismo y conoceras el universo.
 
Mod7 tema1 5sc
Mod7 tema1 5scMod7 tema1 5sc
Mod7 tema1 5sc
 
Countable and uncountable nouns
Countable and uncountable nounsCountable and uncountable nouns
Countable and uncountable nouns
 
Waffle time
Waffle timeWaffle time
Waffle time
 

Designing a Fuel Purification System

  • 2. 1st Stage: Proposal • Regulations • Engines • Purifiers • Costs • System Designs • Metallurgy Research • Mind Map • Written Documents • Technical Drawings Software • Objectives • Gantt Chart • Mind Map Plan
  • 3. Stage 2: Technical Specification •Main Components •Operating Environment •Fire Regulations •Means of Escape •Maintenance
  • 4. Stage 3: Design Stage Final Design Report System Drawings Calculations Research • Purifiers • System Diagram • Room Layouts • Piping • Ventilation • Sludge Tank • Electrics • Maintenance • Fire Safety • Verification Strategy • Novel Features
  • 5. Stage 4: Evaluation Knowledge and Skills Gained Self Evaluation
  • 6. Stage 5: Presentation • The End of the project • Any Questions?