SlideShare una empresa de Scribd logo
1 de 46
Descargar para leer sin conexión
POME + Biomass 
Utilization 
BIOGAS POWER PLANT 
BIOMASS GASIFICATION POWER PLANT 
PLUS BIOMASS BRIQUETTE EXPORT 
December 2014 
Tara F Khaira, MBA
BIOGAS 
Palm Oil Mill Effluent 
======= Renewable Energy
Losses of using ponds.. 
Environmental effects 
 Underground water contamination 
 Methane emission causing global 
warming 
 Waste of fertile land 
 Bad odor 
Few Countries have banned open 
lagoons for effluent treatment due to 
hazards 
Monetary Losses 
USD 2 mio Loss (in 10 years) 
Sludge oil losses from POME 
CARBON CREDIT losses 
Diesel consumption 
No savings of BIOMASS 
Non productive Sludge 
Cost Center – No ROI and additional 
annual expenses for maintenance of 
lagoons
ENVIRONMENTAL BENEFITS 
• No Under ground water 
pollution 
• Methane is captured at 
higher efficiency and used 
for productive use 
• Only 80 x 80m required for 
60 TPH mill, upto 5 hectares 
land is saved 
• No Bad odor 
• This technology takes care 
of any future change of govt 
regulations/environment 
laws
MONETARY ADVANTAGES : 
• Profit from electricity sales 
• Recovery of sludge oil 
• Profit from Carbon Credit 
• Profits from sale of BIOMASS 
(PKS & Fiber Briquette 
Revenue) saved by using 
biogas in boiler 
• Saving on Diesel cost 
• End Sludge available for 
fertilizer
BIOGAS – A Proven technology 
• Successfully completed 5 projects and another 
11 palm oil mill effluent treatment projects 
under construction 
• More than 85 to 90% of BOD and COD Removal 
• The final discharge meets the local 
environmental standards
Process Flow Diagram 
SCRUBBER 
GAS 
ENGINE 
or CNG
Simplified PFD
BIOGAS COMPOSITION 
Methane (CH4) : 60-73% 
Carbon dioxide (CO2) : 26-30% 
Nitrogen (N2) : 0-1 % 
Hydrogen Sulphide (H2S) : 0-0.3 % 
Hydrogen (H2) : 0-1 % 
Oxygen (O2) : 0-2 %
PROJECT #1
Project #1 
PT. MESKOM, Sarimas Group, Bengkalis 
• Capacity 45->75 Ton / hour 
• POME Volume : 900m3 / day 
• POME Parameters: COD 80,000 
Reactor Volume : 9170 m3 
• Construction started: Dec 2011 
• Project completion: Dec 2012 
• Full operation since Jan 2013
* During construction
* Operational
* Operational
* Biogas digunakan pada Boiler
* Performance 
• Eficiency >80% 
• Biogas/M 3 POME : 30-35 NM 3 
Biogas 
• Final Discharge 
• COD: <250 Mg/L 
• BOD: <100 Mg/L 
• TSS: <100 Mg/L 
• O&G: 0 Mg/L 
• Methane Content more than 70%!!!
1st in Indonesia & Asia Tenggara 
Biogas Project without any pond 
BENGKALIS, RIAU
PROJECT #2
Project #2 
PT. AGRO MUKO, Tolan Tiga Group (SIPEF) 
• Capacity: 60 Ton / hour 
• POME Volume : 720m3 / day 
• POME Parameters: COD 56,000 BOD 30,000 
• Reactor Volume : 6763 m3 
• Construction started: Sept 2012 
• Project completion: April 2013 
• Project inauguration : Mei 2013
* During Construction
* Inauguration
* Operational
PROJECT #3
Project #3 
PT. MAI, Poliplant Group, Indonesia 
• Capacity 55 Ton / hour 
• Volume POME : 726m3 / day 
• Parameter POME : COD 65,000 BOD 30,000 
• Reactor Volume : 7500m3 
• Construction started: Agustus 2012 
• Project completion: Juni 2013
* During construction
* Operational
Project #3
Other PROJECTS 
Lokasi: 
West New Britain, 
Papua New Guinea 
Tahap konstruksi 
Barema Ltd, Sipef Group, Papua New Guinea
Other PROJECTS 
Lokasi: 
Dusun Tanjung 
Mulia, Sumatera 
Utara 
Tahap konstruksi 
PT UMW, Sipef Group – 60 TPH Mill, Indonesia.
Other PROJECTS 
Lokasi: 
Tanjung Langsat, 
Malaysia 
Tahap Konstruksi 
EVYAP SABUN MALAYSIA SDN BHD (EVYAP Group of Turkey). 
Proyek terbesar di dunia Oleochemical. 
Greenfield project pada lahan 50 Acre 
dengan investasi sebesar USD 350 juta (One Million Ringgit Project) 
Volume limbah per hari adalah 1000 MT 
Standar Baku Mutu BOD <20 Mg/L & COD <80 Mg/L
Other PROJECTS 
Lokasi: 
Hulu Sungai Selatan, 
Kalimantan Timur 
Tahap Konstruksi 
Astra Agro Lestari Tbk – 60 TPH Mill, Indonesia.
BIOMASS 
BRIQUETTING 
Empty Fruit Bunches 
======= Renewable Energy
Feedstock Preparation 
Briquetting Station 
Biomass Pellet dari Tandan Kosong
BIOMASS 
GASIFICATION 
Palm Kernel Shell 
======= Renewable Energy
All solid organic waste can be utilised as feedstock
Biomass 
Gasification 
conversion of 
solid biomass 
into flammable 
gas, known as 
Producer Gas 
Drying  Pyrolysis  Combustion  Reduction
PLTBm Gasifikasi 
200kWe : 
Kovilpatti, India 
1.2MWe : Gujarat, India 
5MWe : Thailand
Gasifier
BIOGAS 
• Biogas from POME to 
electricity (sell to PLN/ or 
Community) 
BIOMASS 
BRIQUETTING 
• Export 
• Additional feedstock for 
gasification 
BIOMASS GASIFICATION 
• Biomass Gasification from 
PKS to electricity (sell to 
PLN/ or Community) 
ELECTRICITY 
GENERATION 
BIOGAS 
GENERATI 
NG 
BUFFERI 
NG 
STORAGE 
CHOP/ 
SHRED 
DRYING 
ELECTRICITY 
GENERATION 
GASIFI-CATION 
HEAT 
GENERATIN 
G 
Proposed Solution 
PLN 
EKSPOR 
Pupuk
“Thank You Very Much 
For Your Valuable Time & Attention” 
46

Más contenido relacionado

La actualidad más candente

Furnace oil vs LDO corrected Final
Furnace oil vs LDO corrected FinalFurnace oil vs LDO corrected Final
Furnace oil vs LDO corrected Final
Aditya Shinde
 

La actualidad más candente (20)

Sop of turbine lubrication oil system
Sop of turbine lubrication oil systemSop of turbine lubrication oil system
Sop of turbine lubrication oil system
 
Deh oil moisture management
Deh oil moisture managementDeh oil moisture management
Deh oil moisture management
 
Role of lubricants in THERMAL power sector
Role of lubricants in THERMAL power sectorRole of lubricants in THERMAL power sector
Role of lubricants in THERMAL power sector
 
Fuel system of HFO Plant
Fuel system of HFO PlantFuel system of HFO Plant
Fuel system of HFO Plant
 
coal pulveriser
coal pulveriser coal pulveriser
coal pulveriser
 
Ch 20102 coal
Ch 20102 coalCh 20102 coal
Ch 20102 coal
 
Gasification Process
Gasification  ProcessGasification  Process
Gasification Process
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Optimization of biodiesel production
Optimization of biodiesel productionOptimization of biodiesel production
Optimization of biodiesel production
 
Phosphoric acid by sulphuric acid
Phosphoric acid by sulphuric acidPhosphoric acid by sulphuric acid
Phosphoric acid by sulphuric acid
 
Biomass Briquetting Machine
Biomass Briquetting MachineBiomass Briquetting Machine
Biomass Briquetting Machine
 
Best ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plantBest ppt on Presentation on Coal handling plant
Best ppt on Presentation on Coal handling plant
 
Surface Coal Gasification
Surface Coal GasificationSurface Coal Gasification
Surface Coal Gasification
 
Urea granulation
Urea granulationUrea granulation
Urea granulation
 
Pptfbc
PptfbcPptfbc
Pptfbc
 
Transesterification and its mechanism, its application in dairy industry
Transesterification and its mechanism, its application in dairy industryTransesterification and its mechanism, its application in dairy industry
Transesterification and its mechanism, its application in dairy industry
 
Fertilizers technology book
Fertilizers technology bookFertilizers technology book
Fertilizers technology book
 
Furnace oil vs LDO corrected Final
Furnace oil vs LDO corrected FinalFurnace oil vs LDO corrected Final
Furnace oil vs LDO corrected Final
 
Visbreaking and Delayed coking
Visbreaking and Delayed cokingVisbreaking and Delayed coking
Visbreaking and Delayed coking
 
Guide to base oils Ver 2
Guide to base oils Ver 2Guide to base oils Ver 2
Guide to base oils Ver 2
 

Similar a Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)

PRESENTATION BIO BOOSTERS- ENGLISH
PRESENTATION BIO BOOSTERS- ENGLISHPRESENTATION BIO BOOSTERS- ENGLISH
PRESENTATION BIO BOOSTERS- ENGLISH
BTM3
 
Full Presentation (1).ppt---SAVE WATER !
Full Presentation (1).ppt---SAVE WATER !Full Presentation (1).ppt---SAVE WATER !
Full Presentation (1).ppt---SAVE WATER !
RaphLalo
 
Full Presentation.pptHOW 2 SAVE MONEY!
Full Presentation.pptHOW  2  SAVE MONEY!Full Presentation.pptHOW  2  SAVE MONEY!
Full Presentation.pptHOW 2 SAVE MONEY!
RaphLalo
 

Similar a Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification) (20)

Kis group
Kis group Kis group
Kis group
 
GE ADGT Application iGas
GE ADGT Application iGasGE ADGT Application iGas
GE ADGT Application iGas
 
Oil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative NotesOil Sands Water Management Initiative Notes
Oil Sands Water Management Initiative Notes
 
Solar projects
Solar projectsSolar projects
Solar projects
 
Solutions for decentralised waste water treatment
Solutions for decentralised waste water treatmentSolutions for decentralised waste water treatment
Solutions for decentralised waste water treatment
 
Reliance Refining Building Worlds Larges Coke Gasification Project
Reliance Refining Building Worlds Larges Coke Gasification ProjectReliance Refining Building Worlds Larges Coke Gasification Project
Reliance Refining Building Worlds Larges Coke Gasification Project
 
Business plan on fly ash (final)
Business plan on fly ash (final)Business plan on fly ash (final)
Business plan on fly ash (final)
 
22.02.2016 monpolyment group
22.02.2016 monpolyment group22.02.2016 monpolyment group
22.02.2016 monpolyment group
 
SDO Presentation Slide Latest
SDO Presentation Slide LatestSDO Presentation Slide Latest
SDO Presentation Slide Latest
 
PRESENTATION BIO BOOSTERS- ENGLISH
PRESENTATION BIO BOOSTERS- ENGLISHPRESENTATION BIO BOOSTERS- ENGLISH
PRESENTATION BIO BOOSTERS- ENGLISH
 
Recovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn productionRecovery of sale-able slag from jigging tailings in FeMn production
Recovery of sale-able slag from jigging tailings in FeMn production
 
BIOCNG PLANT.pdf
BIOCNG PLANT.pdfBIOCNG PLANT.pdf
BIOCNG PLANT.pdf
 
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
 
Features - GREEN STP AD+
Features - GREEN STP AD+Features - GREEN STP AD+
Features - GREEN STP AD+
 
Final PPT
Final PPTFinal PPT
Final PPT
 
Zero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industriesZero Liquid Discharge For Pulp and paper industries
Zero Liquid Discharge For Pulp and paper industries
 
Introducing Process Group
Introducing Process GroupIntroducing Process Group
Introducing Process Group
 
Full Presentation (1).ppt---SAVE WATER !
Full Presentation (1).ppt---SAVE WATER !Full Presentation (1).ppt---SAVE WATER !
Full Presentation (1).ppt---SAVE WATER !
 
Full Presentation.pptHOW 2 SAVE MONEY!
Full Presentation.pptHOW  2  SAVE MONEY!Full Presentation.pptHOW  2  SAVE MONEY!
Full Presentation.pptHOW 2 SAVE MONEY!
 
Implementable Recommendation of Cleaner Production Progress in Pakistan
Implementable Recommendation of Cleaner Production Progress in PakistanImplementable Recommendation of Cleaner Production Progress in Pakistan
Implementable Recommendation of Cleaner Production Progress in Pakistan
 

Más de Tara F Khaira

Más de Tara F Khaira (6)

Neditel msw english
Neditel msw englishNeditel msw english
Neditel msw english
 
Hauling road muara enim
Hauling road muara enimHauling road muara enim
Hauling road muara enim
 
Low budget apartment
Low budget apartmentLow budget apartment
Low budget apartment
 
Bulughul Maram Bab Puasa, kumpulan hadist tentang Puasa dan Itikaf
Bulughul Maram Bab Puasa, kumpulan hadist tentang Puasa dan ItikafBulughul Maram Bab Puasa, kumpulan hadist tentang Puasa dan Itikaf
Bulughul Maram Bab Puasa, kumpulan hadist tentang Puasa dan Itikaf
 
Pupuk organik
Pupuk organikPupuk organik
Pupuk organik
 
Paris agreement evaluation perspectives v2-18-12-15
Paris agreement evaluation perspectives v2-18-12-15Paris agreement evaluation perspectives v2-18-12-15
Paris agreement evaluation perspectives v2-18-12-15
 

Último

Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
Probe Gold
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
Terna SpA
 

Último (20)

The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings Results
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 

Palm Oil Mill Waste Utilization (biogas, biomass briquette, biomass gasification)

  • 1. POME + Biomass Utilization BIOGAS POWER PLANT BIOMASS GASIFICATION POWER PLANT PLUS BIOMASS BRIQUETTE EXPORT December 2014 Tara F Khaira, MBA
  • 2. BIOGAS Palm Oil Mill Effluent ======= Renewable Energy
  • 3. Losses of using ponds.. Environmental effects  Underground water contamination  Methane emission causing global warming  Waste of fertile land  Bad odor Few Countries have banned open lagoons for effluent treatment due to hazards Monetary Losses USD 2 mio Loss (in 10 years) Sludge oil losses from POME CARBON CREDIT losses Diesel consumption No savings of BIOMASS Non productive Sludge Cost Center – No ROI and additional annual expenses for maintenance of lagoons
  • 4. ENVIRONMENTAL BENEFITS • No Under ground water pollution • Methane is captured at higher efficiency and used for productive use • Only 80 x 80m required for 60 TPH mill, upto 5 hectares land is saved • No Bad odor • This technology takes care of any future change of govt regulations/environment laws
  • 5. MONETARY ADVANTAGES : • Profit from electricity sales • Recovery of sludge oil • Profit from Carbon Credit • Profits from sale of BIOMASS (PKS & Fiber Briquette Revenue) saved by using biogas in boiler • Saving on Diesel cost • End Sludge available for fertilizer
  • 6. BIOGAS – A Proven technology • Successfully completed 5 projects and another 11 palm oil mill effluent treatment projects under construction • More than 85 to 90% of BOD and COD Removal • The final discharge meets the local environmental standards
  • 7. Process Flow Diagram SCRUBBER GAS ENGINE or CNG
  • 9. BIOGAS COMPOSITION Methane (CH4) : 60-73% Carbon dioxide (CO2) : 26-30% Nitrogen (N2) : 0-1 % Hydrogen Sulphide (H2S) : 0-0.3 % Hydrogen (H2) : 0-1 % Oxygen (O2) : 0-2 %
  • 11. Project #1 PT. MESKOM, Sarimas Group, Bengkalis • Capacity 45->75 Ton / hour • POME Volume : 900m3 / day • POME Parameters: COD 80,000 Reactor Volume : 9170 m3 • Construction started: Dec 2011 • Project completion: Dec 2012 • Full operation since Jan 2013
  • 15. * Biogas digunakan pada Boiler
  • 16. * Performance • Eficiency >80% • Biogas/M 3 POME : 30-35 NM 3 Biogas • Final Discharge • COD: <250 Mg/L • BOD: <100 Mg/L • TSS: <100 Mg/L • O&G: 0 Mg/L • Methane Content more than 70%!!!
  • 17. 1st in Indonesia & Asia Tenggara Biogas Project without any pond BENGKALIS, RIAU
  • 19. Project #2 PT. AGRO MUKO, Tolan Tiga Group (SIPEF) • Capacity: 60 Ton / hour • POME Volume : 720m3 / day • POME Parameters: COD 56,000 BOD 30,000 • Reactor Volume : 6763 m3 • Construction started: Sept 2012 • Project completion: April 2013 • Project inauguration : Mei 2013
  • 24. Project #3 PT. MAI, Poliplant Group, Indonesia • Capacity 55 Ton / hour • Volume POME : 726m3 / day • Parameter POME : COD 65,000 BOD 30,000 • Reactor Volume : 7500m3 • Construction started: Agustus 2012 • Project completion: Juni 2013
  • 28. Other PROJECTS Lokasi: West New Britain, Papua New Guinea Tahap konstruksi Barema Ltd, Sipef Group, Papua New Guinea
  • 29. Other PROJECTS Lokasi: Dusun Tanjung Mulia, Sumatera Utara Tahap konstruksi PT UMW, Sipef Group – 60 TPH Mill, Indonesia.
  • 30. Other PROJECTS Lokasi: Tanjung Langsat, Malaysia Tahap Konstruksi EVYAP SABUN MALAYSIA SDN BHD (EVYAP Group of Turkey). Proyek terbesar di dunia Oleochemical. Greenfield project pada lahan 50 Acre dengan investasi sebesar USD 350 juta (One Million Ringgit Project) Volume limbah per hari adalah 1000 MT Standar Baku Mutu BOD <20 Mg/L & COD <80 Mg/L
  • 31. Other PROJECTS Lokasi: Hulu Sungai Selatan, Kalimantan Timur Tahap Konstruksi Astra Agro Lestari Tbk – 60 TPH Mill, Indonesia.
  • 32. BIOMASS BRIQUETTING Empty Fruit Bunches ======= Renewable Energy
  • 33. Feedstock Preparation Briquetting Station Biomass Pellet dari Tandan Kosong
  • 34.
  • 35.
  • 36.
  • 37.
  • 38. BIOMASS GASIFICATION Palm Kernel Shell ======= Renewable Energy
  • 39. All solid organic waste can be utilised as feedstock
  • 40. Biomass Gasification conversion of solid biomass into flammable gas, known as Producer Gas Drying  Pyrolysis  Combustion  Reduction
  • 41.
  • 42.
  • 43. PLTBm Gasifikasi 200kWe : Kovilpatti, India 1.2MWe : Gujarat, India 5MWe : Thailand
  • 45. BIOGAS • Biogas from POME to electricity (sell to PLN/ or Community) BIOMASS BRIQUETTING • Export • Additional feedstock for gasification BIOMASS GASIFICATION • Biomass Gasification from PKS to electricity (sell to PLN/ or Community) ELECTRICITY GENERATION BIOGAS GENERATI NG BUFFERI NG STORAGE CHOP/ SHRED DRYING ELECTRICITY GENERATION GASIFI-CATION HEAT GENERATIN G Proposed Solution PLN EKSPOR Pupuk
  • 46. “Thank You Very Much For Your Valuable Time & Attention” 46