SlideShare una empresa de Scribd logo
1 de 12
CONSTRUCTION TECHNOLOGY
TUTORIAL 4 PRESENTATION
BY :
NA YONG YI ( 0324458 )
CHAI JIA ERN ( 0324653 )
TEE WAN NEE ( 0325074 )
1
WHAT IS
FORMWORK ?
- Supports structure and molds to create structures out of concrete
- Made by using steel, wood, aluminum and prefabricated forms
- Cost of formwork is around 30-40% of the concrete cost
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
Good Formwork
Water Tight
reusablestrong
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
4
METAL
FORMWORKADVANTA
GESSTEEL ALUMINIUM
Stronger, durable and longer life than timber
formwork
Often used in pre-fabricated formwork
Can be reused many times Strong and light in weight
Can be installed and dismantled with greater ease
and speed
The lighter sections will deflect more
Quality of exposed concrete surface is good Can be recycled after smelting
Does not absorb moisture from concrete Highly precise in assembly
Does not shrink or warp Can be reused for many times
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
5
METAL
FORMWORKDISADVANTA
GESSTEEL ALUMINIUM
Limited size or shape Higher risk of theft
Excessive loss of heat Not field modifiable
Limited fixing Cheaper (depend on the usage)
A very smooth surface will be produced which would
give problems for finishing process
Lower transportation cost compared to steel
formwork
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
SUITABILITY
STEEL ALUMINIUM
- Widely used in large projects or in situation where
large number reuses of the shuttering is possible
- Suitable for low as well as high rise building
- For heavy concrete work - can be designed for any condition/component of
building such as bay windows, stairs
- Suitable for circular or curved shaped structures
- such as tanks,
columns, chimneys.
- Bridge construction / Airport construction
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
COST
$ 100 - $ 300 / square meter
RM 400 – RM 1200 / square meter
$ 99 - $ 145 / square meter
RM 396 – RM 580 / square meter
Aluminium formworkSteel formwork
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
CONSTRUCTION TECHNOLOGY
TUTORIAL 4(B) PRESENTATION
BY :
NA YONG YI ( 0324458 )
CHAI JIA ERN ( 0324653 )
TEE WAN NEE ( 0325074 )
8
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
RUBBER FLOOR FINISHES
ADVANTAGES Durability
Low maintenance
Slip-resistant
Weatherproof
Hard-wearing
DISADVANTAGES Expensive
Rubber smell
Difficult to clean
Hard to get
9
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
RUBBER FLOOR FINISHES
10
SUITABILITY
- Exercise rooms benefit from having flooring that absorbs noise
- In the kitchen, rubber flooring shrugs off most spills and drops
- Playground to prevent children from getting injured
- Bathrooms are good candidates for water-resistant sheet rubber flooring
NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
RUBBER FLOOR FINISHES
11
Basic Best
Material Prices $320.00 – $350.00 $415.00 – $455.00
Installation Cost $105.00 – $110.00 $165.00 – $175.00
Total $425.00 – $460.00 $580.00 – $630.00
Total Average cost per
foot square
$4.42 $6.05
12NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Más contenido relacionado

Destacado

A Field Trip to Our Partners
A Field Trip to Our PartnersA Field Trip to Our Partners
A Field Trip to Our Partners
Jonathon Welch
 
150918 From coal mines to Collins St AFR
150918 From coal mines to Collins St AFR150918 From coal mines to Collins St AFR
150918 From coal mines to Collins St AFR
Philip Edmands
 
Summary Judgment Brief - 42 § 1983 - Color of Law
Summary Judgment Brief - 42 § 1983 - Color of LawSummary Judgment Brief - 42 § 1983 - Color of Law
Summary Judgment Brief - 42 § 1983 - Color of Law
Mike Kodada
 
Handling of radical prostatectomy specimens
Handling of radical prostatectomy specimensHandling of radical prostatectomy specimens
Handling of radical prostatectomy specimens
imrana tanvir
 

Destacado (11)

CakeSP - Specta Platform: CakePHP, Flex, Fake
CakeSP - Specta Platform: CakePHP, Flex, FakeCakeSP - Specta Platform: CakePHP, Flex, Fake
CakeSP - Specta Platform: CakePHP, Flex, Fake
 
GMX Studie zu Datenschutz und Verschlüsselung
GMX Studie zu Datenschutz und VerschlüsselungGMX Studie zu Datenschutz und Verschlüsselung
GMX Studie zu Datenschutz und Verschlüsselung
 
A Field Trip to Our Partners
A Field Trip to Our PartnersA Field Trip to Our Partners
A Field Trip to Our Partners
 
150918 From coal mines to Collins St AFR
150918 From coal mines to Collins St AFR150918 From coal mines to Collins St AFR
150918 From coal mines to Collins St AFR
 
Summary Judgment Brief - 42 § 1983 - Color of Law
Summary Judgment Brief - 42 § 1983 - Color of LawSummary Judgment Brief - 42 § 1983 - Color of Law
Summary Judgment Brief - 42 § 1983 - Color of Law
 
Defensa Prof. Hilda
Defensa Prof. HildaDefensa Prof. Hilda
Defensa Prof. Hilda
 
Case Review #3: 53 year old male with severe spinal cord compression
Case Review #3: 53 year old male with severe spinal cord compressionCase Review #3: 53 year old male with severe spinal cord compression
Case Review #3: 53 year old male with severe spinal cord compression
 
WPS y PQR Conforme al código D1.4 Structural Welding Code - Reinforcing Steel
WPS y PQR Conforme al código D1.4 Structural Welding Code - Reinforcing SteelWPS y PQR Conforme al código D1.4 Structural Welding Code - Reinforcing Steel
WPS y PQR Conforme al código D1.4 Structural Welding Code - Reinforcing Steel
 
Case Review #7: 58 year old male with Lumbar Soliosis
Case Review #7: 58 year old male with Lumbar SoliosisCase Review #7: 58 year old male with Lumbar Soliosis
Case Review #7: 58 year old male with Lumbar Soliosis
 
EMV chip cards
EMV chip cardsEMV chip cards
EMV chip cards
 
Handling of radical prostatectomy specimens
Handling of radical prostatectomy specimensHandling of radical prostatectomy specimens
Handling of radical prostatectomy specimens
 

Similar a Ct 4 (2)

Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)
w ss
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
FaizanSolanki
 
CONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEET
CONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEETCONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEET
CONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEET
AL AMIN AZIZ
 
Ct4 presentation
Ct4 presentationCt4 presentation
Ct4 presentation
qayyum23
 

Similar a Ct 4 (2) (20)

Ct 6-2
Ct 6-2Ct 6-2
Ct 6-2
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Farmwork shuttering
Farmwork shutteringFarmwork shuttering
Farmwork shuttering
 
Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)Aluminium formwork(t 4 a)
Aluminium formwork(t 4 a)
 
Construction Technology Tutorial 3
Construction Technology Tutorial 3Construction Technology Tutorial 3
Construction Technology Tutorial 3
 
Types of Formwork & Materials.pptx
Types of Formwork & Materials.pptxTypes of Formwork & Materials.pptx
Types of Formwork & Materials.pptx
 
Introduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineeringIntroduction and types of Form Work in civil engineering
Introduction and types of Form Work in civil engineering
 
Ct pad-foundation
Ct pad-foundationCt pad-foundation
Ct pad-foundation
 
Form-work in construction
Form-work in construction Form-work in construction
Form-work in construction
 
Formwork Presentation for Construction Technology
Formwork Presentation for Construction TechnologyFormwork Presentation for Construction Technology
Formwork Presentation for Construction Technology
 
Formwork
FormworkFormwork
Formwork
 
formwork Bco (1) final.pdf
formwork Bco (1) final.pdfformwork Bco (1) final.pdf
formwork Bco (1) final.pdf
 
Formwork
FormworkFormwork
Formwork
 
Formwork
FormworkFormwork
Formwork
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
CONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEET
CONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEETCONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEET
CONCRETE FILLED STEEL TUBULAR COLUMNS USING GS SHEET
 
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
STRUCTURAL BEHAVIOUR OF SQUARE AND ELLIPTICAL CROSS SECTIONS OF STEEL TUBULAR...
 
Ct4 presentation
Ct4 presentationCt4 presentation
Ct4 presentation
 
formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid formwork centering and scaffolding by khalid
formwork centering and scaffolding by khalid
 

Más de Wan Nee

Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)
Wan Nee
 

Más de Wan Nee (20)

Presentation 7-pp-final
Presentation 7-pp-finalPresentation 7-pp-final
Presentation 7-pp-final
 
Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)Professional practice-1-1-1-autosaved (1)
Professional practice-1-1-1-autosaved (1)
 
Structures final 20th june
Structures final 20th juneStructures final 20th june
Structures final 20th june
 
Eca presentation slide (group a)
Eca presentation slide (group a)Eca presentation slide (group a)
Eca presentation slide (group a)
 
Estimating final
Estimating  final Estimating  final
Estimating final
 
Seminar question
Seminar questionSeminar question
Seminar question
 
Estimating presentation
Estimating presentation Estimating presentation
Estimating presentation
 
Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)Evaluation brief qsb2134 tender (1)
Evaluation brief qsb2134 tender (1)
 
Estimating Assignment Brief
Estimating Assignment BriefEstimating Assignment Brief
Estimating Assignment Brief
 
Estimating Assignment
Estimating AssignmentEstimating Assignment
Estimating Assignment
 
Supply Chain
Supply Chain Supply Chain
Supply Chain
 
Supply chain
Supply chain  Supply chain
Supply chain
 
Supply chain
Supply chainSupply chain
Supply chain
 
Management Science
Management Science Management Science
Management Science
 
Qsb 2413 group project august 2017
Qsb 2413 group project august 2017 Qsb 2413 group project august 2017
Qsb 2413 group project august 2017
 
BS 2 PRESENTATION
BS 2 PRESENTATION BS 2 PRESENTATION
BS 2 PRESENTATION
 
CT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation SlideCT 3 Group Assignment Presentation Slide
CT 3 Group Assignment Presentation Slide
 
CT3 Group Assignment Report
CT3 Group Assignment ReportCT3 Group Assignment Report
CT3 Group Assignment Report
 
Ct2 latest1-1 (3)
Ct2 latest1-1 (3)Ct2 latest1-1 (3)
Ct2 latest1-1 (3)
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 

Último

Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
MateoGardella
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 

Último (20)

Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 

Ct 4 (2)

  • 1. CONSTRUCTION TECHNOLOGY TUTORIAL 4 PRESENTATION BY : NA YONG YI ( 0324458 ) CHAI JIA ERN ( 0324653 ) TEE WAN NEE ( 0325074 ) 1
  • 2. WHAT IS FORMWORK ? - Supports structure and molds to create structures out of concrete - Made by using steel, wood, aluminum and prefabricated forms - Cost of formwork is around 30-40% of the concrete cost NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
  • 3. Good Formwork Water Tight reusablestrong NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
  • 4. 4 METAL FORMWORKADVANTA GESSTEEL ALUMINIUM Stronger, durable and longer life than timber formwork Often used in pre-fabricated formwork Can be reused many times Strong and light in weight Can be installed and dismantled with greater ease and speed The lighter sections will deflect more Quality of exposed concrete surface is good Can be recycled after smelting Does not absorb moisture from concrete Highly precise in assembly Does not shrink or warp Can be reused for many times NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
  • 5. 5 METAL FORMWORKDISADVANTA GESSTEEL ALUMINIUM Limited size or shape Higher risk of theft Excessive loss of heat Not field modifiable Limited fixing Cheaper (depend on the usage) A very smooth surface will be produced which would give problems for finishing process Lower transportation cost compared to steel formwork NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
  • 6. SUITABILITY STEEL ALUMINIUM - Widely used in large projects or in situation where large number reuses of the shuttering is possible - Suitable for low as well as high rise building - For heavy concrete work - can be designed for any condition/component of building such as bay windows, stairs - Suitable for circular or curved shaped structures - such as tanks, columns, chimneys. - Bridge construction / Airport construction NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
  • 7. COST $ 100 - $ 300 / square meter RM 400 – RM 1200 / square meter $ 99 - $ 145 / square meter RM 396 – RM 580 / square meter Aluminium formworkSteel formwork NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074
  • 8. CONSTRUCTION TECHNOLOGY TUTORIAL 4(B) PRESENTATION BY : NA YONG YI ( 0324458 ) CHAI JIA ERN ( 0324653 ) TEE WAN NEE ( 0325074 ) 8
  • 9. NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074 RUBBER FLOOR FINISHES ADVANTAGES Durability Low maintenance Slip-resistant Weatherproof Hard-wearing DISADVANTAGES Expensive Rubber smell Difficult to clean Hard to get 9
  • 10. NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074 RUBBER FLOOR FINISHES 10 SUITABILITY - Exercise rooms benefit from having flooring that absorbs noise - In the kitchen, rubber flooring shrugs off most spills and drops - Playground to prevent children from getting injured - Bathrooms are good candidates for water-resistant sheet rubber flooring
  • 11. NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074 RUBBER FLOOR FINISHES 11 Basic Best Material Prices $320.00 – $350.00 $415.00 – $455.00 Installation Cost $105.00 – $110.00 $165.00 – $175.00 Total $425.00 – $460.00 $580.00 – $630.00 Total Average cost per foot square $4.42 $6.05
  • 12. 12NA YONG YI 0324458 | CHAI JIA ERN 0324653 | TEE WAN NEE 0325074

Notas del editor

  1. Pad foundations are usually used in…. - - Does not require much excavation ( As contractor only need to excavate the size of the pad instead of excavating the whole trench around the construction site) - Bearing capacity of ground is sufficient at relatively low depths (This load is then spread by the pad to the bearing layer of soil or rock below. Pad foundations can also be used to support ground beams.) -Uniform thickness (Their thickness must be sufficient to distribute the load across the plan shape.) They can be used to….. (so that the loads of the walls and the buildings are transferred through ground beams that rest on pad foundations)