SlideShare una empresa de Scribd logo
1 de 4
WILFREDO DELA PENA GONZALES
Chico St. Monark Subdivision Tuyo Balanga city, Bataan, Philippines
Tel: +63-9399544481 / +63 479350083
Email personal add: wgonzales_1969@yahoo.com
WORKING EXPERIENCE
June 2012 to Dec 2016 Material Specialist for Facility Engineering
Turn Around for Chevron/ CABGOC under
Velosi
 Responsible for material operations
activities and ensuring relevant key
performance indicators are met
 Manage the development, review, and
execution of required forecast reporting
 Manage the identification, disposal or
redeployment of surplus material across the
engineering, procurement and construction
management teams'
 Review and continually improve all material
handling equipment and processes to
maintain safe and efficient operations
 Conducted inspection of Materials quality
and documentation required from work
packs and drawing
 Participate in engagement meetings with
Turn Around Team to ensure supply chain
alignment
 Chevron E-Procurement Access and
Chevron Ariba Acess
June 2005 - July 09 2011
Warehouse Supervisor / Site Logistic Supervisor
CBI Constructor, Cabinda Gas Plant Project,
Malongo ,Angola
 Meets warehouse operational standards
by contributing warehouse information
to strategic plans and reviews;
implementing production, productivity,
quality, and customer-service standards;
resolving problems; identifying
warehouse system improvements.
 Moves inventory by scheduling
materials to be moved to and from
warehouse; coordinating inventory
transfers with related departments
 Delivers supplies and equipment to
departments by receiving and
transferring items.
 Maintains storage area by organizing
floor space; adhering to storage design
principles; recommending
improvements.
 Keeps equipment operating by enforcing
operating instructions; troubleshooting
breakdowns; requiring preventive
maintenance; calling for repairs
 Facilitate the shipping of Materials from
one destination to another
 Arrange transportation, schedule staff,
and orchestrate deliveries to meet
customer demand with little to no delay
 Manages activities throughout the order
fulfilment and transportation cycle to
make sure established deadlines are
met
July 2003 – May 2005
CBI Philippines Warehouse Supervisor

Moves inventory by scheduling
materials to be moved to and from
warehouse; coordinating inventory
transfers with related departments
 Delivers supplies and equipment to
departments by receiving and
transferring items.
 Maintains storage area by organizing
floor space; adhering to storage design
principles; recommending
improvements.
Nov. 1996 – April 2003 PURCHASING SUPERVISOR / MATERIAL
COORDINATOR of Chicago BRIDGE & IRON
PHILIPPINES ( CBI PHIL )
 Perform research activities to determine
a list of possible vendors
 Contact each vendor and take
information regarding price, availability
and quality of Materials
 Preparation of bidding documents and
ensure that other documentation is in
order
 Make purchase orders and have them
signed from production managers
 Check shipments to ensure quality and
quantity of purchased items
 Monitor all purchase requisitions and
handle adjustments with vendors
TRAINING / SEMINAR
Aug. 1997 Purchasing Management
Manila Philippines
Aug. 1997 Inventory Management
Manila Philippines
Jan. 1998 Accident Prevention 1
CBI Batangas Facility Philippines
Feb 1998 Accident Prevention 2
CBI Batangas Facility Philippines
March 13, 1998 Crosby Rigging Seminar
CBI Batangas Facility, Philippines
August 08, 1998 Import & Export, SGS Procedure &
Practices
Century Park Hotel Manila Philippines
March – May 1999 J. D. Edward Purchasing / Tools &
Equipment
CBI Warehouse Jebel Ali, Dubai
Sept. – Nov. 1999 J. D. Edward Purchasing / Tools &
Equipment
Horton CBI Warehouse Fort
Saskatchewan Canada
Feb 2000 Procurement Management
Chicago Bridge & Iron Warehouse
Texas USA
Feb. 2002 Project Planning & Control
Chicago Bridge & Iron Warehouse
Texas USA
June 2009 HHSE Excellent Award
Chicago Bridge & Iron and Chevron –
Cabinda Gas Plant Project, Malongo
Angola
June 2009 Certificate of Safety Training
Chicago Bridge & Iron , Cabinda Gas
Plant Project , Malongo Angola
Jan 2011 Basic Rigging
Chicago Bridge & Iron, Cabinda Gas
Plant Project, Malongo Angola
May 2011 Workforce Safety Leader Cert II
Chicago Bridge & Iron – Major Capital
Project Chevron, Malongo Angola
EDUCATIONAL BACKGROUND
1987 – 1994 BACHELOR OF SCIECE IN
MECHANICAL ENGINEERING
FIATI UNIVERSITY MANILA
PHILIPPINES

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

AlvinBuhay - CV 2016
AlvinBuhay - CV 2016AlvinBuhay - CV 2016
AlvinBuhay - CV 2016
 
joe c.v
joe c.vjoe c.v
joe c.v
 
r.carino.resume.whsemgr.12.11.14
r.carino.resume.whsemgr.12.11.14r.carino.resume.whsemgr.12.11.14
r.carino.resume.whsemgr.12.11.14
 
Resume Allyson Odum 2016 (1) (1)
Resume Allyson Odum 2016 (1) (1)Resume Allyson Odum 2016 (1) (1)
Resume Allyson Odum 2016 (1) (1)
 
quartezburnett
quartezburnettquartezburnett
quartezburnett
 
Sosefo Resume_1 copy
Sosefo Resume_1 copySosefo Resume_1 copy
Sosefo Resume_1 copy
 
Gary Webster Resume 1
Gary Webster Resume 1Gary Webster Resume 1
Gary Webster Resume 1
 
Ralph Dunuan 2015
Ralph Dunuan 2015Ralph Dunuan 2015
Ralph Dunuan 2015
 
2015 REVISED
2015 REVISED2015 REVISED
2015 REVISED
 
BHickman Rev1 (1)
BHickman Rev1 (1)BHickman Rev1 (1)
BHickman Rev1 (1)
 
Barilla
BarillaBarilla
Barilla
 
SusanaVitaeResume
SusanaVitaeResumeSusanaVitaeResume
SusanaVitaeResume
 
Cipriano macasojot resume
Cipriano macasojot   resumeCipriano macasojot   resume
Cipriano macasojot resume
 
eugene.roberts resume-1
eugene.roberts resume-1eugene.roberts resume-1
eugene.roberts resume-1
 
patti resume manager
patti resume managerpatti resume manager
patti resume manager
 
curriculum_vitae.eman2
curriculum_vitae.eman2curriculum_vitae.eman2
curriculum_vitae.eman2
 
PMari2
PMari2PMari2
PMari2
 
christopher-d-rev1 (2)
christopher-d-rev1 (2)christopher-d-rev1 (2)
christopher-d-rev1 (2)
 
David Resume
David ResumeDavid Resume
David Resume
 
Danielle-Bruner
Danielle-BrunerDanielle-Bruner
Danielle-Bruner
 

Destacado

Act. 8 estrategias pedag+ôgicas que han permeado leidy
Act. 8 estrategias pedag+ôgicas que han permeado leidyAct. 8 estrategias pedag+ôgicas que han permeado leidy
Act. 8 estrategias pedag+ôgicas que han permeado leidylucia garcia
 
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...AVEVA Group plc
 
Clase 1 derecho adminsitrativo general 2016 diapositivas
Clase 1 derecho adminsitrativo general 2016 diapositivasClase 1 derecho adminsitrativo general 2016 diapositivas
Clase 1 derecho adminsitrativo general 2016 diapositivasJose Garzon
 
Importancia de el cuidado de tu piel
Importancia de el cuidado de tu pielImportancia de el cuidado de tu piel
Importancia de el cuidado de tu pielalejandram07
 
Packaging new
Packaging newPackaging new
Packaging newremya37
 
Portofolio_Leka Redha Putra
Portofolio_Leka Redha PutraPortofolio_Leka Redha Putra
Portofolio_Leka Redha PutraLeka Putra
 
Panamá: La Ruta por descubrir
Panamá: La Ruta por descubrirPanamá: La Ruta por descubrir
Panamá: La Ruta por descubrirkarladiaz290
 
The Nuts and Bolts of Nonprofit Mergers for Web Site
The Nuts and Bolts of Nonprofit Mergers for Web SiteThe Nuts and Bolts of Nonprofit Mergers for Web Site
The Nuts and Bolts of Nonprofit Mergers for Web SiteJan Glick
 

Destacado (18)

Contratos ii
Contratos iiContratos ii
Contratos ii
 
Act. 8 estrategias pedag+ôgicas que han permeado leidy
Act. 8 estrategias pedag+ôgicas que han permeado leidyAct. 8 estrategias pedag+ôgicas que han permeado leidy
Act. 8 estrategias pedag+ôgicas que han permeado leidy
 
raji
rajiraji
raji
 
Investigación: Uso de NTICs en la Universidad
Investigación: Uso de NTICs en la UniversidadInvestigación: Uso de NTICs en la Universidad
Investigación: Uso de NTICs en la Universidad
 
Focus Group Report
Focus Group ReportFocus Group Report
Focus Group Report
 
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
Energy Sector Insight: AVEVA BoCAD Integration by Patrick Reilly, Vista Pro...
 
Virus y antivirus
Virus y antivirusVirus y antivirus
Virus y antivirus
 
Clase 1 derecho adminsitrativo general 2016 diapositivas
Clase 1 derecho adminsitrativo general 2016 diapositivasClase 1 derecho adminsitrativo general 2016 diapositivas
Clase 1 derecho adminsitrativo general 2016 diapositivas
 
Importancia de el cuidado de tu piel
Importancia de el cuidado de tu pielImportancia de el cuidado de tu piel
Importancia de el cuidado de tu piel
 
CV
CVCV
CV
 
Packaging new
Packaging newPackaging new
Packaging new
 
Resume
ResumeResume
Resume
 
EMCCaseStudy
EMCCaseStudyEMCCaseStudy
EMCCaseStudy
 
Portofolio_Leka Redha Putra
Portofolio_Leka Redha PutraPortofolio_Leka Redha Putra
Portofolio_Leka Redha Putra
 
Panamá: La Ruta por descubrir
Panamá: La Ruta por descubrirPanamá: La Ruta por descubrir
Panamá: La Ruta por descubrir
 
Termodinamica 3ero
Termodinamica 3eroTermodinamica 3ero
Termodinamica 3ero
 
Deportes extremos
Deportes extremosDeportes extremos
Deportes extremos
 
The Nuts and Bolts of Nonprofit Mergers for Web Site
The Nuts and Bolts of Nonprofit Mergers for Web SiteThe Nuts and Bolts of Nonprofit Mergers for Web Site
The Nuts and Bolts of Nonprofit Mergers for Web Site
 

Similar a WILFREDO GONZALES CV

GRAHAM COLE RESUME
GRAHAM COLE RESUMEGRAHAM COLE RESUME
GRAHAM COLE RESUMEGraham Cole
 
Update CV - Arnel Acosta Sechong
Update CV - Arnel Acosta SechongUpdate CV - Arnel Acosta Sechong
Update CV - Arnel Acosta SechongArnel Sechong
 
Update CV - Arnel Acosta Sechong
Update CV - Arnel Acosta SechongUpdate CV - Arnel Acosta Sechong
Update CV - Arnel Acosta SechongAce Chong
 
sandy resume planning.doc
sandy resume planning.docsandy resume planning.doc
sandy resume planning.docSandeep Rane
 
Victor's resume 2015
Victor's resume 2015Victor's resume 2015
Victor's resume 2015Victor Rubio
 
Ulysses M.Estera_original CV
Ulysses M.Estera_original CVUlysses M.Estera_original CV
Ulysses M.Estera_original CVUlysses Estera
 
Resume Rohan patil
Resume Rohan patilResume Rohan patil
Resume Rohan patilRohan Patil
 
CV for Warehouse Supervisor (M..JAMIL)
CV for Warehouse Supervisor (M..JAMIL)CV for Warehouse Supervisor (M..JAMIL)
CV for Warehouse Supervisor (M..JAMIL)Muhammad Jamil
 
Resume.RaysonLascano PH
Resume.RaysonLascano PHResume.RaysonLascano PH
Resume.RaysonLascano PHRayson Lascano
 

Similar a WILFREDO GONZALES CV (20)

GRAHAM COLE RESUME
GRAHAM COLE RESUMEGRAHAM COLE RESUME
GRAHAM COLE RESUME
 
Update CV - Arnel Acosta Sechong
Update CV - Arnel Acosta SechongUpdate CV - Arnel Acosta Sechong
Update CV - Arnel Acosta Sechong
 
Update CV - Arnel Acosta Sechong
Update CV - Arnel Acosta SechongUpdate CV - Arnel Acosta Sechong
Update CV - Arnel Acosta Sechong
 
Resume_Christopher John S. Capulong
Resume_Christopher John S. CapulongResume_Christopher John S. Capulong
Resume_Christopher John S. Capulong
 
Paulo Fernandes - CV
Paulo Fernandes - CVPaulo Fernandes - CV
Paulo Fernandes - CV
 
Iftikhar Ahmed CV1
Iftikhar Ahmed CV1Iftikhar Ahmed CV1
Iftikhar Ahmed CV1
 
sandy resume planning.doc
sandy resume planning.docsandy resume planning.doc
sandy resume planning.doc
 
Mary Glynn Ryan CV
Mary Glynn Ryan CVMary Glynn Ryan CV
Mary Glynn Ryan CV
 
Victor's resume 2015
Victor's resume 2015Victor's resume 2015
Victor's resume 2015
 
Tyrone Ambrose Resume 2015 - Military
Tyrone Ambrose Resume 2015 - MilitaryTyrone Ambrose Resume 2015 - Military
Tyrone Ambrose Resume 2015 - Military
 
Tyrone ambrose resume 2015
Tyrone ambrose resume 2015   Tyrone ambrose resume 2015
Tyrone ambrose resume 2015
 
Sahjahan_CV (2)
Sahjahan_CV (2)Sahjahan_CV (2)
Sahjahan_CV (2)
 
Ulysses M.Estera_original CV
Ulysses M.Estera_original CVUlysses M.Estera_original CV
Ulysses M.Estera_original CV
 
Ivy - CV
Ivy - CVIvy - CV
Ivy - CV
 
Resume Rohan patil
Resume Rohan patilResume Rohan patil
Resume Rohan patil
 
CV for Warehouse Supervisor (M..JAMIL)
CV for Warehouse Supervisor (M..JAMIL)CV for Warehouse Supervisor (M..JAMIL)
CV for Warehouse Supervisor (M..JAMIL)
 
Someswara Rao, CV
Someswara Rao, CVSomeswara Rao, CV
Someswara Rao, CV
 
Resume.RaysonLascano PH
Resume.RaysonLascano PHResume.RaysonLascano PH
Resume.RaysonLascano PH
 
Cheryl Thurwanger Resume 1
Cheryl Thurwanger Resume 1Cheryl Thurwanger Resume 1
Cheryl Thurwanger Resume 1
 
TivnerR
TivnerRTivnerR
TivnerR
 

WILFREDO GONZALES CV

  • 1. WILFREDO DELA PENA GONZALES Chico St. Monark Subdivision Tuyo Balanga city, Bataan, Philippines Tel: +63-9399544481 / +63 479350083 Email personal add: wgonzales_1969@yahoo.com WORKING EXPERIENCE June 2012 to Dec 2016 Material Specialist for Facility Engineering Turn Around for Chevron/ CABGOC under Velosi  Responsible for material operations activities and ensuring relevant key performance indicators are met  Manage the development, review, and execution of required forecast reporting  Manage the identification, disposal or redeployment of surplus material across the engineering, procurement and construction management teams'  Review and continually improve all material handling equipment and processes to maintain safe and efficient operations  Conducted inspection of Materials quality and documentation required from work packs and drawing  Participate in engagement meetings with Turn Around Team to ensure supply chain alignment  Chevron E-Procurement Access and Chevron Ariba Acess June 2005 - July 09 2011 Warehouse Supervisor / Site Logistic Supervisor CBI Constructor, Cabinda Gas Plant Project, Malongo ,Angola  Meets warehouse operational standards by contributing warehouse information to strategic plans and reviews; implementing production, productivity, quality, and customer-service standards; resolving problems; identifying warehouse system improvements.  Moves inventory by scheduling materials to be moved to and from
  • 2. warehouse; coordinating inventory transfers with related departments  Delivers supplies and equipment to departments by receiving and transferring items.  Maintains storage area by organizing floor space; adhering to storage design principles; recommending improvements.  Keeps equipment operating by enforcing operating instructions; troubleshooting breakdowns; requiring preventive maintenance; calling for repairs  Facilitate the shipping of Materials from one destination to another  Arrange transportation, schedule staff, and orchestrate deliveries to meet customer demand with little to no delay  Manages activities throughout the order fulfilment and transportation cycle to make sure established deadlines are met July 2003 – May 2005 CBI Philippines Warehouse Supervisor  Moves inventory by scheduling materials to be moved to and from warehouse; coordinating inventory transfers with related departments  Delivers supplies and equipment to departments by receiving and transferring items.  Maintains storage area by organizing floor space; adhering to storage design principles; recommending improvements.
  • 3. Nov. 1996 – April 2003 PURCHASING SUPERVISOR / MATERIAL COORDINATOR of Chicago BRIDGE & IRON PHILIPPINES ( CBI PHIL )  Perform research activities to determine a list of possible vendors  Contact each vendor and take information regarding price, availability and quality of Materials  Preparation of bidding documents and ensure that other documentation is in order  Make purchase orders and have them signed from production managers  Check shipments to ensure quality and quantity of purchased items  Monitor all purchase requisitions and handle adjustments with vendors TRAINING / SEMINAR Aug. 1997 Purchasing Management Manila Philippines Aug. 1997 Inventory Management Manila Philippines Jan. 1998 Accident Prevention 1 CBI Batangas Facility Philippines Feb 1998 Accident Prevention 2 CBI Batangas Facility Philippines March 13, 1998 Crosby Rigging Seminar CBI Batangas Facility, Philippines August 08, 1998 Import & Export, SGS Procedure & Practices Century Park Hotel Manila Philippines March – May 1999 J. D. Edward Purchasing / Tools & Equipment CBI Warehouse Jebel Ali, Dubai Sept. – Nov. 1999 J. D. Edward Purchasing / Tools & Equipment Horton CBI Warehouse Fort
  • 4. Saskatchewan Canada Feb 2000 Procurement Management Chicago Bridge & Iron Warehouse Texas USA Feb. 2002 Project Planning & Control Chicago Bridge & Iron Warehouse Texas USA June 2009 HHSE Excellent Award Chicago Bridge & Iron and Chevron – Cabinda Gas Plant Project, Malongo Angola June 2009 Certificate of Safety Training Chicago Bridge & Iron , Cabinda Gas Plant Project , Malongo Angola Jan 2011 Basic Rigging Chicago Bridge & Iron, Cabinda Gas Plant Project, Malongo Angola May 2011 Workforce Safety Leader Cert II Chicago Bridge & Iron – Major Capital Project Chevron, Malongo Angola EDUCATIONAL BACKGROUND 1987 – 1994 BACHELOR OF SCIECE IN MECHANICAL ENGINEERING FIATI UNIVERSITY MANILA PHILIPPINES