FINAL PROJECT
PROJECT PROPOSAL ON THE ESTABLISHMENT OF
SKYBAR & SKYPARK AT BLOCK E LEVEL 2
CLEMENT CHEN- 0319574
LEE REN JET- 0319058
MS NORMA
FNBE 0414
APRIL INTAKE 2014
AUGUST 2014
TABLE OF CONTENTS
1. Project Proposal Details
1.1Project Summary
1.2Project description and
application
1.3Project quotation
2. Introduction to Site
2.1Location
2.2Site analysis
2.3Concept
3. Design
3.1Site master plan
3.2Details
4. Authority Procedures
5. Bill of Quantities
6. Conclusion
Project Proposal Details
1.1 Project summary
This project envisages the establishment of a SKYBAR
restaurant and SKYPARK recreation area in the Taylor’s
University Block E Level 2 area.
Since there is no bar and recreation parks in Taylor’s
University that can enhance the lives of students, the
demand for the service is very attractive
The total initial investment requirement is estimated at
RM 250,000.00 of which 95% is for building
construction.
The project will create employment opportunities for 10
persons
1.2 Project description and Application
SKYBAR and SKYPARK are facilities where food,
drinks, recreation and other services are provided in an
efficient, cordial and pleasant manner and style.
Operating restaurant and parks both integrated to a
learning institution enhances student life, giving them
a place to hangout, release stress and strengthen social
communication.
1.3 Project Quotation
Our proposal shall apply to the areas as indicated in our enclosed
summary. We have made several design assumptions which then
followed and accepted totally by the consulting engineer will make
this alternative pricing for the pre-construction works valid for use.
Quotation
Our quotation is subject to terms & conditions enclosed
herewith on the following assumed design parameters as
contained in the technical paper enclosed herewith.
Price
Our price, subject to terms & conditions stated herewith, for the
sub-contract works shall be as follows:
[1] Design, supply and install of post-tensioning works including
raw materials and necessary accessories and works to do the
following:
SKYBAR
[RM]
A. Design fees RM
50,000.00
B. Construction works RM
200,000.00
SKYPARK Recreation Area
[RM]
A. Design fees RM
3,000.00
B. Construction works RM
10,000.00
Introduction to Site
2.1 Location
- Location of SKYBAR & SKYPARK
Block E level 2 open
area
2.2 Site Analysis
Our site is located at block E besides the strategic
development & international relations office. It has a great
view towards the basketball court, lake and the
commercial block. Regarding about the weather. The sun
will rise from the east and is partly blocked by other
blocks. In the afternoon, one of our site will not get hot
easily since the sun is
located at the south. But
during the evening, our site
is the ideal choice for
recreational since the sun
will be blocked from the
west! The wind blows from the south east to north west
therefore our site is quite windy during the day.
Our 30x30 site
Direction of sunlight at
3pm
Lake view from our site at 3pm
Easy access from parking
Walking distance from new
residence block
View towards the East at 3pm
Entrance towards the site
(South Elevation)
View from site towards Block
E
(North Elevation)
2.3
Concept
Bar Area during the day
Bar Area during the night
Planting concept
- At night it provides a sense of atmosphere, vibrant
and a view for the customers
Example (Not to scale) :
Site Master Plan
ITEM NAME QUANTITY
1 DRINK BAR 4
2 WATER
FOUNTAIN
2
3 TABLES & CHAIR
SET
10
2 2
3
1
DETAILS
- Drink Bar (Elevation & Perspective)
ITEM DESCRIPTION IMAGE
1
2
1 VARISHIELD SELF-TINTING GLASS
http://www.ssg.com.sg/product-
catalogue/eco-
products/product/30-
varishield/2-eco-products
2 TEMPERED SAFETY GLASS
http://www.ssg.com.sg/product-
catalogue/core-
products/product/1-duraglas-
t/1-core-products
- Water Fountain
- Tables & Chair Set
DESCRIPTION UNIT/SIZE RATE(RM) RATE AMOUNT
TOTAL
AMOUNT
A
HARDSCAPE
WORK
1 AIRCONDITIONERS NOS 1288 3 3864
2 CLUBBING STOOLS NOS 220 30 6600
3
BARTENDER
TABLE NOS 2000 2 4000
4 METAL RAILLING M² 120 24 2880
5 PARK BENCHES NOS 300 3 900
6
WOODEN PLANK
FLOORING FT² 9 165 1485
7 FOUNTAIN NOS 6750 2 13500
8 DINING TABLES NOS 400 50 20000
9
SELF TINTING
PANELS NOS 1000 30 30000
HARDSCAPE TOTAL 83229
B
SOFTSCAPE
WORKS
10 SCRUB M² 55 15 825
11
ARTIFICIAL SMALL
TREES NOS 30 2 60
12 SHADE TREES NOS 400 2 800
13 FERTILIZERS KG 10.90 20 218
14 SAND KG 20 30 600
15
HYDRANGEA
PLANT NOS (POT) 42 50 2100
16 LAWN TURF M² 11 7.5 82.5
SOFTSCAPE TOTAL 4685.5 267
BILL OF QUANTITIES
MAINTAINANCE PLAN
ITE
M
DESCRI
PTION
UNIT/
SIZE
USA
GE
LIS
T
RATE
(RM)
QUAN
TITY AMOUNT
1
WATER
USAGE
MONT
H (M³)
0-
20 0.57 30 17.1
>20
-35 1.03 21 21.63
>35 2 5000 10000
2
ELECTR
IC
USAGE
MONT
H
0-
200 0.218 300 65.4
3
GARDE
NER
MONT
H 1000 2 2000
4
PLUMB
ER
MON
TH
2200
2 4400
22773.
0692
SUBTOTAL
16
50
4.1
3 2800
16504
SUB TOTAL 87914.5 5169
CORRECTION TOTAL RM 87915 517
CORRECTION TOTAL
Authority Procedures
1. Submit and obtain Development through OSC
• Planning plan
• Building plan
• Engineering plan (earthwork, road & drainage plan,
road excavation permit & street lighting plan)
• Landscape plan
• Water supply plan
• Sewerage plan
• Infrastructure communication plan
• Fire safety plan
Estimated Processing Costs
1. Planning plan = MYR 500.00
2. Building plan= MYR 1,300.
3. Engineering plan = MYR 100.00
4. Water supply plan = MYR 1,000.00
1. Submission to Local Authority through OSC
2. Obtain Development Order (DO) from Planning Department
3. Obtain Water Approval
4. Obtain Sewerage Approval
5. Obtain Fire Safety (Arch) Comment
6. Obtain Earthwork Approval
7. Obtain Road and Drainage Approval
8. Obtain Landscape Approval
9. Obtain Street Lighting Approval
10. Obtain MSMA and SPAH Approvals
11. Obtain Building Plan Approval
12. Obtain Fire Safety (M&E) Approval
2. Submit pre-construction notifications to OSC
All notifications are submitted via OSC. OSC will then
distribute notifications to the relevant agencies such as:
• Building Department (B Form - notification to start
building work)
• Engineering Department (B Form - notification to start
earthwork)
• Sewerage Certifying Agency (IWK) (PDC 6 Form -
notification to start sewerage work)
3. Request final utilities inspections through OSC
Under OSC 1Submission, the builder has to request for
inspections via OSC. OSC will arrange and coordinate
inspections and connections schedule with relevant
agencies
1. TELCO connection = MYR495.00
2. Water connection = MYR 30.00
3. Fire safety inspection = MYR 111.00
4. Receive Road and Drainage Final Inspection
Once the road and drainage works has been completed, the
builder will request the Road and Drainage clearance
letter from the Engineering Department of CHKL. The
builder has to submit a construction report notification
and by signing form G 17, the Engineer certifies that all
works were carried out according to regulations. Form G17
will be filed along with Form F (Certificate of Completion
and Compliance (CCC) via OSC to the Engineering
Department.
5. Obtain Road and Drainage Clearance Letter
A date for the inspection will be set-up prior to the
issuance of clearance letter for the road and drainage
work
Agency: Sewerage Certifying Agency (IWK)12 daysno
charge6
7. Receive Sewage Final Inspection
The Sewerage Certifying Agency (IWK) will carry out
an inspection of the sewerage system and issue to the
builder a clearance letter for sewerage.
8. Obtain Sewage Clearance Letter
Once the inspection has been carried out, a clearance
letter is issued to the Builder. This clearance letter
will allow the Engineer to issue the Certificate of
Completion and compliance (CCC).
9. Receive Fire Safety Final Inspection
Fire and Rescue Department will carry out fire safety
inspection
10. Obtain Fire Safety Final Letter
Fire and Rescue Department will issue to the builder
the clearance letter for fire safety
11. Receive Water Inspection
Water Authority SYABAS will conduct an onsite
inspection of the works and make the connection to
the public pipe.
12. Submit Water Test and Commissioning (T&C)
Report
Water Authority SYABAS will conduct an onsite
inspection of the works and make the connection to
the public pipe.
13. Obtain Water Clearance Letter
The Water Authority SYABAS will issue a clearance
letter to the builder and install the water meter at the
same time for water connection.
14. Builder’s Principal Submitting Person files the
Certificate of Completion and compliance (CCC)
The Builder’s Principal Submitting Person
(professional, architect) will issue Certificate of
Completion and compliance (Form F - CCC) to the
Builder/Owner and 2 copies of the CCC will be filed
at the OSC for the Building Department (JRBB) and
the Board of Architects/Engineers (LAM/LJM).
15. Obtain Water Connection
MPSJ.RK.KPT(OSC)-07
PINDAAN: 01
KERAJAAN MALAYSIA
JABATAN KERAJAAN TEMPATAN
KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN
SENARAI SEMAK DOKUMEN DAN
SENARAI
SEMAK TERPERINCI AGENSI TEKNIKAL
DALAMAN DAN LUARAN
TARIKH KUATKUASA : 01 MEI2014
(PELAN TAMBAHAN & UBAHSUAIAN)
47610 SUBANG JAYA,
SELANGOR DARUL EHSAN.
TEL : 03 – 8026 3131
FAX : 03 – 8026 3295 WEB :
www.mpsj.gov.my
FEBRUARI 2013
HAKCIPTA TERPELIHARA
No. Ruj. OSC : MPSJ /____ /_____
No. Ruj. OSC terdahulu (jika
ada)
:_____________________________
Tarikh Daftar :
_____________________________
Masa :
_____________________________
Jenis permohonan yang dikemukakan :-
PERSIARAN PERPADUAN USJ 5,
PUSATSETEMPAT( )OSC
MAJLIS PERBANDARAN SUBANG JAYA (MPSJ)
Persiaran Perpaduan USJ 5,
47610Subang Jaya,
Selangor Darul Ehsan.
Tel : 03–8026 3131
Fax : 03–8026 3295
Web : www.mpsj.gov.my
1) Permohonan Tambahan dan Ubahsuaian Bangunan bagi bangunan perusahaan /
Perniagaan/Kemudahan Awam
2) Permohonan Tambahan dan Ubahsuaian Bangunan dan Perubahan Material
Kegunaan Bangunan
3) Permohonan Tambahan Bilangan Tingkat Bangunan
SENARAI SEMAK PENERIMAAN DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN DAN
UBAHSUAIAN
Tajuk
Permohonan
: ...........................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
...................................................................................................................................................................
Pemilik /
Pemaju
: ............................................................................................................................................................
Alamat
Pemilik/Pemaju
: ............................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
Tel. & Fax : ............................................................................................................................................................
Perunding : ............................................................................................................................................................
Alamat
Perunding
: ............................................................................................................................................................
..................................................................................................................................................................
..................................................................................................................................................................
Tel. & Fax : ............................................................................................................................................................
Nama : ............................................................................................................................................................
Perakuan Pemohon/Perunding:
Saya bagi pihak Pemohon/Perunding dengan ini membuat perakuan bahawa semua dokumen-
dokumen yang disertakan adalah benar serta mematuhi keperluan permohonan pembangunan di
Majlis Perbandaran Subang Jaya (MPSJ)
.......................…………………………….
Nama, Tandatangan & Cop Pemohon /
Perunding
.......................…………………………….
Nama, Tandatangan &
Cop Pegawai OSC 1
.......................……………………………
Nama, Tandatangan &
Cop Pegawai OSC 2
Tarikh : …………………… Tarikh : ……………………… Tarikh : ……………………..
MAKLUMAN
Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5
Tahun 2009 (rujukan KPKT(02)799/6 Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai
Semak Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan Pemajuan Melalui Pusat
Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya mulai 1hb Mei
2011. Sebarang pertanyaan dan penjelasan lanjut berhubung pekeliling ini boleh dikemukakan kepada:
KETUA PENGARAH
Jabatan Kerajaan Tempatan
Kementerian Perumahan & Kerajaan Tempatan
Aras 4, Blok K, Pusat Bandara Damansara,
50782 Kuala Lumpur
(u.p.: Bahagian Penyelidikan dan Perundangan Teknikal)
No. Telefon : 03-20947033 / 2087 4501
No. Fax : 03-2095 5180 / 2095 3717
Sebarang pertanyaan dan penjelasan lanjut berhubung Senarai Semak dan perinciannya, sila hubungi
agensi / jabatan teknikal yang berkaitan.
SENARAI SEMAK DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN &
UBAHSUAIAN
1) JABATAN BANGUNAN
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1
Borang A;
(Di Peraku oleh
Arkitek/Jurutera/Pelukis Pelan
Berdaftar)- Dapatkan di Kaunter OSC.
( Jadual
Kedua UKBS 1984 )
1
2
Surat Permohonan yang
ditandatangani oleh pemilik atau
perunding berdaftar ( Cover letter )
2
3
Salinan geran atau surat hakmilik
tanah asal yang telah disahkan ATAU
‘S & P’ (Sale &
Purchase)
1
4
Salinan ‘Tenancy Agreement’ (Jika
Dipohon oleh penyewa) 1
5
Salinan resit semasa cukai pintu
Januari-Jun
Julai-Disember
1
JABATAN/AGENSI TEKNIKALDALAMAN
6
Salinan Sijil Layak Menduduki
(CFO)/”Certificate
Completion & Compliance” (CCC)-
Borang F
1
7
Dokumen sokongan bagi tambahan
dan ubahsuai yang melebihi 50%
kelulusan asal dan tambahan
bilangan tingkat.
Salinan surat kelulusan Kebenaran
Merancang Perubahan Matan
Bangunan daripada Jabatan
Perancangan Bandar, MPSJ.
1
8
Dokumen sokongan bagi permohonan
Pelan Tambahan/ubahsuaian
bangunan kedai pejabat kepada
Pusat Pembelajaran/Pusat Tuisyen/
Budget Hotel/Bangunan
Keagamaan/ Kareoke/Asrama.
Salinan surat kelulusan Kebenaran
Merancang Perubahan Matan
Bangunan daripada Jabatan
Perancangan Bandar, MPSJ
1
9
Salinan surat dari Kementerian
Pelancongan untuk ‘Rating Star’ bagi
tambahan dan ubahsuai kepada
Budget Hotel. (Jika Berkaitan)
1
10
Salinan surat kelulusan arah kiblat
dari MAIS untuk tambahan dan
ubahsuai yang mempunyai ruang baru
tambahan bagi surau. (Jika
Berkaitan)
1
11
Pengenalan seperti Nama,Jawatan,
(jika
berkenaan) alamat terkini,No.Kad
Pengenalan dan Nombor pendaftaran
Setiap Perunding
(Jurutera/Arkitek/Pelukis Pelan)
Pemilik dan Pemaju hendaklah ditulis
atas setiap helaian pelan.
12
Pelan Tapak ( mengandungi lokasi
tapak yang
ditandakan, tunjuk arah utara)
Penyediaan Pelan dalam skala metric
(Termasuk 1 set linen)
Pelan perlu ditandatangani oleh
Pemilik/ Pemaju &
Perunding/ Arkitek/Jurutera/
Pelukis Pelan Berdaftar Pelan
Dikemukakan dalam lipatan A4
Memanjang
Pelan-pelan perlu diwarnakan
5
13
Template perkiraan Fi yuran proses
mengikut
Jadual Pertama UKBS 1984
(Yang telah Di Sahkan oleh Jabatan
Bangunan)
1
14
Gambar Tapak bersaiz A4 – ‘Hard
Copy’
berwarna – jpeg (Pandangan
Hadapan/Belakang/Tepi)
1
15
Salinan surat permohonan daripada
Perunding
Jurutera (C & S)-Cover Letter. (Jika
Berkaitan)
1
16
Borang A Di Peraku Oleh Perunding
Jurutera
C&S- Dapatkan di Kaunter OSC.
( Jadual Kedua
UKBS 1984 )- (Jika Berkaitan)
1
17
Pelan Struktur lengkap
ditandatangani oleh
Pemilik/Pemaju & Perunding Jurutera
C & S/ Pelukis Pelan Berdaftar dan di
perakui oleh perunding Jurutera C &
S- (Jika Berkaitan)
1 (Linen)
18
Pelan Sanitary lengkap
ditandatangani oleh
Pemilik/Pemaju & Perunding Jurutera
C & S/ Pelukis Pelan Berdaftar dan di
perakui oleh perunding Jurutera C &
S- (Jika Berkaitan)
1(linen)
1) JABATAN BOMBA DAN PENYELAMAT
BIL DOKUMEN
BILANGAN
DOKUMEN
ADA(√) ATAU
TIADA(X)
CATATAN
SEMAKAN
PEMOHON
SEMAKAN
KAUNTER
1 Surat Permohonan Rasmi
(Cover Letter) 2
2 Pelan Bangunan dalam skala
Metric
2
3 Pelan Lantai 2
4 Pelan Keratan Rentas 2
5 Pelan Pandangan Sisi 2
6 Tajuk Cadangan Pemajuan
Dengan Tepat
7 Skala Pelan hendaklah 1:100 atau
1:200 ( skala lain dengan
kebenaran )
8 Perakuan Tanggungjawab ,
Tandatangan Dan Cop Rasmi
‘Orang Yang Berkelayakan’ di
setiap helaian pelan.
9 Mencatitkan Kehendak-Kehendak
Kelengkapan
Menentang Kebakaran Atau
Perpasangan
Keselamatan Kebakaran Di Muka
Hadapan
Setiap Perenggan Pelan
JABATAN/AGENSI TEKNIKAL LUARAN
* NOTA Dokumen Perlu Diasingkan Dan Diikat Mengikut Susunan
Setiap Jabatan Yang Di tetapkan.
Pengarah,
Jabatan Bomba & Penyelamat, Malaysia,
No. 3 Persiaran Tebar Layar,
Bukit Jelutung, Seksyen U8,
40150 Shah Alam, Selangor
Darul Ehsan.
Pejabat Zon Petaling,
Balai Bomba dan Penyelamat Puchong,
Jalan Bandar 2, Pusat Bandar Puchong
47100 Puchong Selangor D.E
SENARAI SEMAKAN PERMOHONAN UNTUK JABATAN BOMBA DAN
PENYELAMAT MALAYSIA
BIL DOKUMEN BILANGAN
SET
SEMAKAN
KAUNTER
SENARAI SEMAKAN PERMOHONAN UNTUK KELULUSAN PELAN ARKITEKTURAL
1 Surat Permohonan Rasmi 1
2 Pelan Arkitektural Lengkap 2
3 Pernyataan Tajuk Projek Dengan Jelas / Betul -
4 Pengiraan Beban Mengikut UBBL 1984 1
5 Skala Pelan Hendaklah 1:100 Atau 1:200( Skala Lain
Dengan Kebenaran)
-
6 Pengiraan Isipadu Bangunan Bagi Penentuan Akses
Perkakasan Bomba
1
7 Menunjukkan Dan Mengadakan Akses Perkakas Bomba
Mengikut UBBL 1984 (Diwarnakan Kuning)
-
8 Mencatatkan Kedudukan Pili Bomba Jarak Tidak Lebih
Daripada 91.5m (Antara Satu Pili Bomba Dengan Yang
Lain) Dan Diwarnakan Merah.
-
9 Mengemukakan Pengiraan Hitungan Had Yang Dibenarkan
Bagi Kawasan Tak Terlindung (Jadual Ke 6 UBBL 1984)
1
10 Pelan Arkitektural Perubahan/Tambahan Struktur Di
Warnakan Merah
-
11 Pelan Arkitektural Struktur Diruntuhkan (Jika Ada)
Diwarnakan Biru
-
12 Perakuan, Tanggungjawab Dan Cop Rasmi Orang
Berkelayakan Di Setiap Helaian Pelan Arkitektural
-
13 Mencatitkan “Senarai Syor-Syor Kebombaan” Di Muka
Hadapan Setiap Set Pelan Arkitektural.
-
14
Keperluan Kehendak-Kehendak Menentang Dan Mencegah
Kebakaran Aktif Dan Pasif Mengikut UBBL 1984 Hendaklah
Diwarnakan Merah
-
Tandatangan :
Nama Pemohon : ……………………………………………………
Nama Syarikat : ……………………………………………………
……………………………………………………
……………………………………………………
……………………………………………………
……………………………………………………
……………………………………………………
No Telefon : ……………………………………………………
SEMAKAN JBPM – DITERIMA / TOLAK *
COP JBPM
PEGAWAI PENERIMA : ……………………………………………………..
TARIKH : ………………………………………………………
* Potong Yang Tidak Berkaitan
CONCLUSION
In conclusion, our improved site is now much
better and multipurpose. Without the team, I don’t
think we could able to make it through! This site
here is known for its environment and especially
the weather, It would be an ideal place for all
people to enjoy/studying. During the process,we
learned how to reconstruct a blank site into a
multipurpose and useful bar + park for all the
students. We also learned how to write a report and
our master plan properly.
We hope that our sky bar & park will bring lots of
benefit to all the students and also our lecturers.
We also would hope that they would use it wisely
and enjoy their meal without walking all the way
to commercial block to have a good meal. We would
love to see all the students enjoy and have their
new way of studying and learning inside the park.

Más contenido relacionado

La actualidad más candente

Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.TOM VAN WYK
 
l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]Komthorn Sing
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016Ali Issa
 
Manoogian Task 5 Final Report
Manoogian Task 5 Final ReportManoogian Task 5 Final Report
Manoogian Task 5 Final ReportBader Alghunaim
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVEben van Dyk
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Lasantha Perera
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3fawzey mukhtar
 
Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CVDave Ramos
 
Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control EngineerVICTORIA NGOZI U.
 
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)Pieter Venter
 
Scotts Run Fire Station
Scotts Run Fire StationScotts Run Fire Station
Scotts Run Fire StationFairfax County
 

La actualidad más candente (20)

AMT CV (3)
AMT CV (3)AMT CV (3)
AMT CV (3)
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
NEMER- CV - 16
NEMER- CV - 16NEMER- CV - 16
NEMER- CV - 16
 
l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]l CURRICULUM VITAE. [ komthorn very up date]
l CURRICULUM VITAE. [ komthorn very up date]
 
ALANHERK (1)[1]
ALANHERK (1)[1]ALANHERK (1)[1]
ALANHERK (1)[1]
 
fire & gas specialsit
fire & gas specialsitfire & gas specialsit
fire & gas specialsit
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
CV_Hazwan Updated
CV_Hazwan UpdatedCV_Hazwan Updated
CV_Hazwan Updated
 
Manoogian Task 5 Final Report
Manoogian Task 5 Final ReportManoogian Task 5 Final Report
Manoogian Task 5 Final Report
 
Moh'd Gaweish_CV
Moh'd Gaweish_CVMoh'd Gaweish_CV
Moh'd Gaweish_CV
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 
N137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CVN137557385 Eben Van Dyk-CV
N137557385 Eben Van Dyk-CV
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 
FAWZEY CV LATEST UPDATE-3
FAWZEY CV LATEST  UPDATE-3FAWZEY CV LATEST  UPDATE-3
FAWZEY CV LATEST UPDATE-3
 
Dave B. Ramos CV
Dave B. Ramos CVDave B. Ramos CV
Dave B. Ramos CV
 
Instrument and Control Engineer
Instrument and Control EngineerInstrument and Control Engineer
Instrument and Control Engineer
 
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
PIETER PORTFOLIO - UP TO 2016 (01-05-2016)
 
ckreddycv (1)
ckreddycv (1)ckreddycv (1)
ckreddycv (1)
 
Presentation
PresentationPresentation
Presentation
 
Scotts Run Fire Station
Scotts Run Fire StationScotts Run Fire Station
Scotts Run Fire Station
 

Destacado

Pelan tambahan dan ubahsuai
Pelan tambahan dan ubahsuaiPelan tambahan dan ubahsuai
Pelan tambahan dan ubahsuaiJaclyn Hwang
 
Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...
Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...
Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...Universidad Internacional Valenciana (VIU)
 
Buoni+ Giugno 2015 GameStop Italia
Buoni+ Giugno 2015 GameStop ItaliaBuoni+ Giugno 2015 GameStop Italia
Buoni+ Giugno 2015 GameStop ItaliaGameStop Italia
 
Presentation of various B2B Business models case study
Presentation of various B2B Business models case studyPresentation of various B2B Business models case study
Presentation of various B2B Business models case studyPhilippe Deschenes
 
Tax resources 2014 update
Tax resources  2014 updateTax resources  2014 update
Tax resources 2014 updateKatie Brown
 
Las emociones karla y cristina
Las emociones karla y cristinaLas emociones karla y cristina
Las emociones karla y cristinatallerempleomf
 
Caso de éxito, Bioconservación Dynamics CRM Online
Caso de éxito, Bioconservación Dynamics CRM OnlineCaso de éxito, Bioconservación Dynamics CRM Online
Caso de éxito, Bioconservación Dynamics CRM OnlineAmauta Cloud Consulting
 
CALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIAS
CALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIASCALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIAS
CALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIASMD Asesores Valladolid
 
Bunker mail security
Bunker mail securityBunker mail security
Bunker mail securityTodd Merrill
 
Guia CH3
Guia CH3Guia CH3
Guia CH3chtres
 
Datasheet EnGenius EZ Hotspot Extender
Datasheet EnGenius EZ Hotspot ExtenderDatasheet EnGenius EZ Hotspot Extender
Datasheet EnGenius EZ Hotspot ExtenderEnGenius Europe
 

Destacado (20)

Research comp1
Research comp1Research comp1
Research comp1
 
Pelan tambahan dan ubahsuai
Pelan tambahan dan ubahsuaiPelan tambahan dan ubahsuai
Pelan tambahan dan ubahsuai
 
Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...
Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...
Alumnos destacan de la VIU la gran ventaja que ofrece de conjugar estudios y ...
 
Etapasdelavida
EtapasdelavidaEtapasdelavida
Etapasdelavida
 
CEMflex VB engl.
CEMflex VB engl.CEMflex VB engl.
CEMflex VB engl.
 
Buoni+ Giugno 2015 GameStop Italia
Buoni+ Giugno 2015 GameStop ItaliaBuoni+ Giugno 2015 GameStop Italia
Buoni+ Giugno 2015 GameStop Italia
 
Presentation of various B2B Business models case study
Presentation of various B2B Business models case studyPresentation of various B2B Business models case study
Presentation of various B2B Business models case study
 
Tax resources 2014 update
Tax resources  2014 updateTax resources  2014 update
Tax resources 2014 update
 
Pkv
PkvPkv
Pkv
 
Las emociones karla y cristina
Las emociones karla y cristinaLas emociones karla y cristina
Las emociones karla y cristina
 
Caso de éxito, Bioconservación Dynamics CRM Online
Caso de éxito, Bioconservación Dynamics CRM OnlineCaso de éxito, Bioconservación Dynamics CRM Online
Caso de éxito, Bioconservación Dynamics CRM Online
 
CALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIAS
CALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIASCALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIAS
CALENDARIO LABORAL 2012 MD ASESORES VALLADOLID GESTORES ASESORIAS GESTORIAS
 
Notichanel Jun - Jul
Notichanel Jun - JulNotichanel Jun - Jul
Notichanel Jun - Jul
 
Article Calzado Barato (13)
Article   Calzado Barato (13)Article   Calzado Barato (13)
Article Calzado Barato (13)
 
Bunker mail security
Bunker mail securityBunker mail security
Bunker mail security
 
Guia CH3
Guia CH3Guia CH3
Guia CH3
 
Datasheet EnGenius EZ Hotspot Extender
Datasheet EnGenius EZ Hotspot ExtenderDatasheet EnGenius EZ Hotspot Extender
Datasheet EnGenius EZ Hotspot Extender
 
Aves magacinedicion8
Aves magacinedicion8Aves magacinedicion8
Aves magacinedicion8
 
Life Resoance Cosmetics Insert E
Life Resoance Cosmetics  Insert ELife Resoance Cosmetics  Insert E
Life Resoance Cosmetics Insert E
 
Catalog panasonic 824
Catalog panasonic 824Catalog panasonic 824
Catalog panasonic 824
 

Similar a ICI FINAL REPORT

Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptxTalebAlfihan
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...Jaclyn Hwang
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...Jaclyn Hwang
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vhen Atienza
 
5th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 20125th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 2012ambercourt
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016galih wahyu
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxssuser3797b9
 
Complete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectComplete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectEngr_Emad Khan
 
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptxDURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptxkaustav_ju
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...Pradeep Yadav
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxIESGATEWiz
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6MUHAMMAD SALEEM
 

Similar a ICI FINAL REPORT (20)

Antara Dashboard-002.pptx
Antara Dashboard-002.pptxAntara Dashboard-002.pptx
Antara Dashboard-002.pptx
 
ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)
 
FQUP PPT.pptx
FQUP PPT.pptxFQUP PPT.pptx
FQUP PPT.pptx
 
10. Overall Implementation Programme
10. Overall Implementation Programme10. Overall Implementation Programme
10. Overall Implementation Programme
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...
 
Dealing with construction permits in malaysia doing business - world bank g...
Dealing with construction permits in malaysia   doing business - world bank g...Dealing with construction permits in malaysia   doing business - world bank g...
Dealing with construction permits in malaysia doing business - world bank g...
 
Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016Vivencio Atienza updated resume 2016
Vivencio Atienza updated resume 2016
 
5th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 20125th Amber Court JMB AGM meeting Sept 22 2012
5th Amber Court JMB AGM meeting Sept 22 2012
 
Academic Transcript
Academic TranscriptAcademic Transcript
Academic Transcript
 
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
Wisma atlet asiangameskemayoran-bahandirjen.3feb2016
 
SISCO - Presentation
SISCO - PresentationSISCO - Presentation
SISCO - Presentation
 
ANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptxANPARA D FGD PPT 07.06.2023-M (2).pptx
ANPARA D FGD PPT 07.06.2023-M (2).pptx
 
Complete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric ProjectComplete Report Of Nelum Jehlum Hydro Electric Project
Complete Report Of Nelum Jehlum Hydro Electric Project
 
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptxDURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
DURGAPUR STEEL PLANT Project Review_07.01.23_KC.pptx
 
pp2 Final account-1
pp2 Final account-1pp2 Final account-1
pp2 Final account-1
 
Sadab
SadabSadab
Sadab
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
 
Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6Activities - Presentation (NESPAK) v1.6
Activities - Presentation (NESPAK) v1.6
 
SISCO - Presentation SABIC
SISCO - Presentation SABICSISCO - Presentation SABIC
SISCO - Presentation SABIC
 

Más de Clement Seong

Más de Clement Seong (20)

Final report ADP 2017
Final report ADP 2017Final report ADP 2017
Final report ADP 2017
 
All plates
All platesAll plates
All plates
 
ADP project 1 Slides
ADP project 1 SlidesADP project 1 Slides
ADP project 1 Slides
 
Project Management Project 2
Project Management Project 2Project Management Project 2
Project Management Project 2
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Final Essay
Final EssayFinal Essay
Final Essay
 
Comparative analysis essay
Comparative analysis essayComparative analysis essay
Comparative analysis essay
 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building Science
 
Final B.Tech
Final B.TechFinal B.Tech
Final B.Tech
 
Report final
Report finalReport final
Report final
 
B.services case-study
B.services case-studyB.services case-study
B.services case-study
 
Bstruc project-2-report-edited (1)
Bstruc project-2-report-edited (1)Bstruc project-2-report-edited (1)
Bstruc project-2-report-edited (1)
 
In Adaptation ARC 1133
In Adaptation ARC 1133In Adaptation ARC 1133
In Adaptation ARC 1133
 
FInal VIC Board
FInal VIC BoardFInal VIC Board
FInal VIC Board
 
BCON Project 1:Final
BCON Project 1:FinalBCON Project 1:Final
BCON Project 1:Final
 
Falling water
Falling waterFalling water
Falling water
 
Culture & History 2- Project 2
Culture & History 2- Project 2Culture & History 2- Project 2
Culture & History 2- Project 2
 
Journal 2
Journal 2Journal 2
Journal 2
 
Journal 1
Journal 1Journal 1
Journal 1
 
Assignment 1 individual journal
Assignment 1   individual journalAssignment 1   individual journal
Assignment 1 individual journal
 

Último

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 

Último (20)

Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 

ICI FINAL REPORT

  • 1. FINAL PROJECT PROJECT PROPOSAL ON THE ESTABLISHMENT OF SKYBAR & SKYPARK AT BLOCK E LEVEL 2 CLEMENT CHEN- 0319574 LEE REN JET- 0319058 MS NORMA FNBE 0414 APRIL INTAKE 2014 AUGUST 2014
  • 2. TABLE OF CONTENTS 1. Project Proposal Details 1.1Project Summary 1.2Project description and application 1.3Project quotation 2. Introduction to Site 2.1Location 2.2Site analysis 2.3Concept 3. Design 3.1Site master plan 3.2Details 4. Authority Procedures 5. Bill of Quantities 6. Conclusion
  • 3. Project Proposal Details 1.1 Project summary This project envisages the establishment of a SKYBAR restaurant and SKYPARK recreation area in the Taylor’s University Block E Level 2 area. Since there is no bar and recreation parks in Taylor’s University that can enhance the lives of students, the demand for the service is very attractive The total initial investment requirement is estimated at RM 250,000.00 of which 95% is for building construction.
  • 4. The project will create employment opportunities for 10 persons 1.2 Project description and Application SKYBAR and SKYPARK are facilities where food, drinks, recreation and other services are provided in an efficient, cordial and pleasant manner and style. Operating restaurant and parks both integrated to a learning institution enhances student life, giving them a place to hangout, release stress and strengthen social communication. 1.3 Project Quotation Our proposal shall apply to the areas as indicated in our enclosed summary. We have made several design assumptions which then
  • 5. followed and accepted totally by the consulting engineer will make this alternative pricing for the pre-construction works valid for use. Quotation Our quotation is subject to terms & conditions enclosed herewith on the following assumed design parameters as contained in the technical paper enclosed herewith. Price Our price, subject to terms & conditions stated herewith, for the sub-contract works shall be as follows: [1] Design, supply and install of post-tensioning works including raw materials and necessary accessories and works to do the following: SKYBAR [RM] A. Design fees RM 50,000.00 B. Construction works RM 200,000.00 SKYPARK Recreation Area [RM] A. Design fees RM 3,000.00 B. Construction works RM 10,000.00
  • 6. Introduction to Site 2.1 Location - Location of SKYBAR & SKYPARK
  • 7. Block E level 2 open area
  • 8. 2.2 Site Analysis Our site is located at block E besides the strategic development & international relations office. It has a great view towards the basketball court, lake and the commercial block. Regarding about the weather. The sun will rise from the east and is partly blocked by other blocks. In the afternoon, one of our site will not get hot easily since the sun is located at the south. But during the evening, our site is the ideal choice for recreational since the sun will be blocked from the west! The wind blows from the south east to north west therefore our site is quite windy during the day. Our 30x30 site
  • 9. Direction of sunlight at 3pm Lake view from our site at 3pm
  • 10. Easy access from parking Walking distance from new residence block
  • 11. View towards the East at 3pm
  • 12. Entrance towards the site (South Elevation) View from site towards Block E (North Elevation)
  • 14. Bar Area during the night Planting concept
  • 15. - At night it provides a sense of atmosphere, vibrant and a view for the customers
  • 16. Example (Not to scale) :
  • 17. Site Master Plan ITEM NAME QUANTITY 1 DRINK BAR 4 2 WATER FOUNTAIN 2 3 TABLES & CHAIR SET 10 2 2 3 1
  • 18. DETAILS - Drink Bar (Elevation & Perspective) ITEM DESCRIPTION IMAGE 1 2
  • 19. 1 VARISHIELD SELF-TINTING GLASS http://www.ssg.com.sg/product- catalogue/eco- products/product/30- varishield/2-eco-products 2 TEMPERED SAFETY GLASS http://www.ssg.com.sg/product- catalogue/core- products/product/1-duraglas- t/1-core-products - Water Fountain
  • 20. - Tables & Chair Set
  • 21.
  • 22. DESCRIPTION UNIT/SIZE RATE(RM) RATE AMOUNT TOTAL AMOUNT A HARDSCAPE WORK 1 AIRCONDITIONERS NOS 1288 3 3864 2 CLUBBING STOOLS NOS 220 30 6600 3 BARTENDER TABLE NOS 2000 2 4000 4 METAL RAILLING M² 120 24 2880 5 PARK BENCHES NOS 300 3 900 6 WOODEN PLANK FLOORING FT² 9 165 1485 7 FOUNTAIN NOS 6750 2 13500 8 DINING TABLES NOS 400 50 20000 9 SELF TINTING PANELS NOS 1000 30 30000 HARDSCAPE TOTAL 83229 B SOFTSCAPE WORKS 10 SCRUB M² 55 15 825 11 ARTIFICIAL SMALL TREES NOS 30 2 60 12 SHADE TREES NOS 400 2 800 13 FERTILIZERS KG 10.90 20 218 14 SAND KG 20 30 600 15 HYDRANGEA PLANT NOS (POT) 42 50 2100 16 LAWN TURF M² 11 7.5 82.5 SOFTSCAPE TOTAL 4685.5 267
  • 23. BILL OF QUANTITIES MAINTAINANCE PLAN ITE M DESCRI PTION UNIT/ SIZE USA GE LIS T RATE (RM) QUAN TITY AMOUNT 1 WATER USAGE MONT H (M³) 0- 20 0.57 30 17.1 >20 -35 1.03 21 21.63 >35 2 5000 10000 2 ELECTR IC USAGE MONT H 0- 200 0.218 300 65.4 3 GARDE NER MONT H 1000 2 2000 4 PLUMB ER MON TH 2200 2 4400 22773. 0692 SUBTOTAL 16 50 4.1 3 2800 16504 SUB TOTAL 87914.5 5169 CORRECTION TOTAL RM 87915 517
  • 24. CORRECTION TOTAL Authority Procedures 1. Submit and obtain Development through OSC • Planning plan • Building plan • Engineering plan (earthwork, road & drainage plan, road excavation permit & street lighting plan) • Landscape plan • Water supply plan • Sewerage plan • Infrastructure communication plan • Fire safety plan
  • 25. Estimated Processing Costs 1. Planning plan = MYR 500.00 2. Building plan= MYR 1,300. 3. Engineering plan = MYR 100.00 4. Water supply plan = MYR 1,000.00 1. Submission to Local Authority through OSC 2. Obtain Development Order (DO) from Planning Department 3. Obtain Water Approval 4. Obtain Sewerage Approval 5. Obtain Fire Safety (Arch) Comment 6. Obtain Earthwork Approval 7. Obtain Road and Drainage Approval 8. Obtain Landscape Approval 9. Obtain Street Lighting Approval 10. Obtain MSMA and SPAH Approvals 11. Obtain Building Plan Approval 12. Obtain Fire Safety (M&E) Approval 2. Submit pre-construction notifications to OSC All notifications are submitted via OSC. OSC will then distribute notifications to the relevant agencies such as: • Building Department (B Form - notification to start building work) • Engineering Department (B Form - notification to start earthwork) • Sewerage Certifying Agency (IWK) (PDC 6 Form - notification to start sewerage work)
  • 26. 3. Request final utilities inspections through OSC Under OSC 1Submission, the builder has to request for inspections via OSC. OSC will arrange and coordinate inspections and connections schedule with relevant agencies 1. TELCO connection = MYR495.00 2. Water connection = MYR 30.00 3. Fire safety inspection = MYR 111.00 4. Receive Road and Drainage Final Inspection Once the road and drainage works has been completed, the builder will request the Road and Drainage clearance letter from the Engineering Department of CHKL. The builder has to submit a construction report notification and by signing form G 17, the Engineer certifies that all works were carried out according to regulations. Form G17 will be filed along with Form F (Certificate of Completion and Compliance (CCC) via OSC to the Engineering Department. 5. Obtain Road and Drainage Clearance Letter A date for the inspection will be set-up prior to the issuance of clearance letter for the road and drainage work Agency: Sewerage Certifying Agency (IWK)12 daysno charge6
  • 27. 7. Receive Sewage Final Inspection The Sewerage Certifying Agency (IWK) will carry out an inspection of the sewerage system and issue to the builder a clearance letter for sewerage. 8. Obtain Sewage Clearance Letter Once the inspection has been carried out, a clearance letter is issued to the Builder. This clearance letter will allow the Engineer to issue the Certificate of Completion and compliance (CCC). 9. Receive Fire Safety Final Inspection Fire and Rescue Department will carry out fire safety inspection 10. Obtain Fire Safety Final Letter Fire and Rescue Department will issue to the builder the clearance letter for fire safety 11. Receive Water Inspection Water Authority SYABAS will conduct an onsite inspection of the works and make the connection to the public pipe. 12. Submit Water Test and Commissioning (T&C) Report Water Authority SYABAS will conduct an onsite
  • 28. inspection of the works and make the connection to the public pipe. 13. Obtain Water Clearance Letter The Water Authority SYABAS will issue a clearance letter to the builder and install the water meter at the same time for water connection. 14. Builder’s Principal Submitting Person files the Certificate of Completion and compliance (CCC) The Builder’s Principal Submitting Person (professional, architect) will issue Certificate of Completion and compliance (Form F - CCC) to the Builder/Owner and 2 copies of the CCC will be filed at the OSC for the Building Department (JRBB) and the Board of Architects/Engineers (LAM/LJM). 15. Obtain Water Connection
  • 29. MPSJ.RK.KPT(OSC)-07 PINDAAN: 01 KERAJAAN MALAYSIA JABATAN KERAJAAN TEMPATAN KEMENTERIAN PERUMAHAN DAN KERAJAAN TEMPATAN SENARAI SEMAK DOKUMEN DAN SENARAI SEMAK TERPERINCI AGENSI TEKNIKAL DALAMAN DAN LUARAN TARIKH KUATKUASA : 01 MEI2014
  • 30. (PELAN TAMBAHAN & UBAHSUAIAN) 47610 SUBANG JAYA, SELANGOR DARUL EHSAN. TEL : 03 – 8026 3131 FAX : 03 – 8026 3295 WEB : www.mpsj.gov.my FEBRUARI 2013 HAKCIPTA TERPELIHARA No. Ruj. OSC : MPSJ /____ /_____ No. Ruj. OSC terdahulu (jika ada) :_____________________________ Tarikh Daftar : _____________________________ Masa : _____________________________ Jenis permohonan yang dikemukakan :- PERSIARAN PERPADUAN USJ 5, PUSATSETEMPAT( )OSC MAJLIS PERBANDARAN SUBANG JAYA (MPSJ) Persiaran Perpaduan USJ 5, 47610Subang Jaya, Selangor Darul Ehsan. Tel : 03–8026 3131 Fax : 03–8026 3295 Web : www.mpsj.gov.my
  • 31. 1) Permohonan Tambahan dan Ubahsuaian Bangunan bagi bangunan perusahaan / Perniagaan/Kemudahan Awam 2) Permohonan Tambahan dan Ubahsuaian Bangunan dan Perubahan Material Kegunaan Bangunan 3) Permohonan Tambahan Bilangan Tingkat Bangunan SENARAI SEMAK PENERIMAAN DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN DAN UBAHSUAIAN Tajuk Permohonan : ........................................................................................................................................................... .................................................................................................................................................................. .................................................................................................................................................................. .................................................................................................................................................................. .................................................................................................................................................................. .................................................................................................................................................................. ................................................................................................................................................................... Pemilik / Pemaju : ............................................................................................................................................................ Alamat Pemilik/Pemaju : ............................................................................................................................................................ .................................................................................................................................................................. .................................................................................................................................................................. Tel. & Fax : ............................................................................................................................................................ Perunding : ............................................................................................................................................................ Alamat Perunding : ............................................................................................................................................................ .................................................................................................................................................................. .................................................................................................................................................................. Tel. & Fax : ............................................................................................................................................................ Nama : ............................................................................................................................................................ Perakuan Pemohon/Perunding: Saya bagi pihak Pemohon/Perunding dengan ini membuat perakuan bahawa semua dokumen- dokumen yang disertakan adalah benar serta mematuhi keperluan permohonan pembangunan di Majlis Perbandaran Subang Jaya (MPSJ)
  • 32. .......................……………………………. Nama, Tandatangan & Cop Pemohon / Perunding .......................……………………………. Nama, Tandatangan & Cop Pegawai OSC 1 .......................…………………………… Nama, Tandatangan & Cop Pegawai OSC 2 Tarikh : …………………… Tarikh : ……………………… Tarikh : …………………….. MAKLUMAN Selaras dengan Pekeliling Ketua Setiusaha Kementerian Perumahan dan Kerajaan Tempatan bilangan 5 Tahun 2009 (rujukan KPKT(02)799/6 Klt.8(24) – Template Seragam Senarai Semak Dokumen Dan Senarai Semak Semak Terperinci Agensi Teknikal Luaran Untuk Proses Kelulusan Pemajuan Melalui Pusat Setempat (OSC) bertarikh 6hb Mei 2009, pemakaian template ini dikuatkuasakan penggunaannya mulai 1hb Mei 2011. Sebarang pertanyaan dan penjelasan lanjut berhubung pekeliling ini boleh dikemukakan kepada: KETUA PENGARAH Jabatan Kerajaan Tempatan Kementerian Perumahan & Kerajaan Tempatan Aras 4, Blok K, Pusat Bandara Damansara, 50782 Kuala Lumpur (u.p.: Bahagian Penyelidikan dan Perundangan Teknikal) No. Telefon : 03-20947033 / 2087 4501 No. Fax : 03-2095 5180 / 2095 3717 Sebarang pertanyaan dan penjelasan lanjut berhubung Senarai Semak dan perinciannya, sila hubungi agensi / jabatan teknikal yang berkaitan.
  • 33. SENARAI SEMAK DOKUMEN BAGI PERMOHONAN PELAN TAMBAHAN & UBAHSUAIAN 1) JABATAN BANGUNAN BIL DOKUMEN BILANGAN DOKUMEN ADA(√) ATAU TIADA(X) CATATAN SEMAKAN PEMOHON SEMAKAN KAUNTER 1 Borang A; (Di Peraku oleh Arkitek/Jurutera/Pelukis Pelan Berdaftar)- Dapatkan di Kaunter OSC. ( Jadual Kedua UKBS 1984 ) 1 2 Surat Permohonan yang ditandatangani oleh pemilik atau perunding berdaftar ( Cover letter ) 2 3 Salinan geran atau surat hakmilik tanah asal yang telah disahkan ATAU ‘S & P’ (Sale & Purchase) 1 4 Salinan ‘Tenancy Agreement’ (Jika Dipohon oleh penyewa) 1 5 Salinan resit semasa cukai pintu Januari-Jun Julai-Disember 1 JABATAN/AGENSI TEKNIKALDALAMAN
  • 34. 6 Salinan Sijil Layak Menduduki (CFO)/”Certificate Completion & Compliance” (CCC)- Borang F 1 7 Dokumen sokongan bagi tambahan dan ubahsuai yang melebihi 50% kelulusan asal dan tambahan bilangan tingkat. Salinan surat kelulusan Kebenaran Merancang Perubahan Matan Bangunan daripada Jabatan Perancangan Bandar, MPSJ. 1 8 Dokumen sokongan bagi permohonan Pelan Tambahan/ubahsuaian bangunan kedai pejabat kepada Pusat Pembelajaran/Pusat Tuisyen/ Budget Hotel/Bangunan Keagamaan/ Kareoke/Asrama. Salinan surat kelulusan Kebenaran Merancang Perubahan Matan Bangunan daripada Jabatan Perancangan Bandar, MPSJ 1 9 Salinan surat dari Kementerian Pelancongan untuk ‘Rating Star’ bagi tambahan dan ubahsuai kepada Budget Hotel. (Jika Berkaitan) 1 10 Salinan surat kelulusan arah kiblat dari MAIS untuk tambahan dan ubahsuai yang mempunyai ruang baru tambahan bagi surau. (Jika Berkaitan) 1 11 Pengenalan seperti Nama,Jawatan, (jika berkenaan) alamat terkini,No.Kad Pengenalan dan Nombor pendaftaran Setiap Perunding (Jurutera/Arkitek/Pelukis Pelan) Pemilik dan Pemaju hendaklah ditulis atas setiap helaian pelan.
  • 35. 12 Pelan Tapak ( mengandungi lokasi tapak yang ditandakan, tunjuk arah utara) Penyediaan Pelan dalam skala metric (Termasuk 1 set linen) Pelan perlu ditandatangani oleh Pemilik/ Pemaju & Perunding/ Arkitek/Jurutera/ Pelukis Pelan Berdaftar Pelan Dikemukakan dalam lipatan A4 Memanjang Pelan-pelan perlu diwarnakan 5 13 Template perkiraan Fi yuran proses mengikut Jadual Pertama UKBS 1984 (Yang telah Di Sahkan oleh Jabatan Bangunan) 1 14 Gambar Tapak bersaiz A4 – ‘Hard Copy’ berwarna – jpeg (Pandangan Hadapan/Belakang/Tepi) 1 15 Salinan surat permohonan daripada Perunding Jurutera (C & S)-Cover Letter. (Jika Berkaitan) 1 16 Borang A Di Peraku Oleh Perunding Jurutera C&S- Dapatkan di Kaunter OSC. ( Jadual Kedua UKBS 1984 )- (Jika Berkaitan) 1 17 Pelan Struktur lengkap ditandatangani oleh Pemilik/Pemaju & Perunding Jurutera C & S/ Pelukis Pelan Berdaftar dan di perakui oleh perunding Jurutera C & S- (Jika Berkaitan) 1 (Linen) 18 Pelan Sanitary lengkap ditandatangani oleh Pemilik/Pemaju & Perunding Jurutera C & S/ Pelukis Pelan Berdaftar dan di perakui oleh perunding Jurutera C & S- (Jika Berkaitan) 1(linen)
  • 36. 1) JABATAN BOMBA DAN PENYELAMAT BIL DOKUMEN BILANGAN DOKUMEN ADA(√) ATAU TIADA(X) CATATAN SEMAKAN PEMOHON SEMAKAN KAUNTER 1 Surat Permohonan Rasmi (Cover Letter) 2 2 Pelan Bangunan dalam skala Metric 2 3 Pelan Lantai 2 4 Pelan Keratan Rentas 2 5 Pelan Pandangan Sisi 2 6 Tajuk Cadangan Pemajuan Dengan Tepat 7 Skala Pelan hendaklah 1:100 atau 1:200 ( skala lain dengan kebenaran ) 8 Perakuan Tanggungjawab , Tandatangan Dan Cop Rasmi ‘Orang Yang Berkelayakan’ di setiap helaian pelan. 9 Mencatitkan Kehendak-Kehendak Kelengkapan Menentang Kebakaran Atau Perpasangan Keselamatan Kebakaran Di Muka Hadapan Setiap Perenggan Pelan JABATAN/AGENSI TEKNIKAL LUARAN
  • 37. * NOTA Dokumen Perlu Diasingkan Dan Diikat Mengikut Susunan Setiap Jabatan Yang Di tetapkan. Pengarah, Jabatan Bomba & Penyelamat, Malaysia, No. 3 Persiaran Tebar Layar, Bukit Jelutung, Seksyen U8, 40150 Shah Alam, Selangor Darul Ehsan. Pejabat Zon Petaling, Balai Bomba dan Penyelamat Puchong, Jalan Bandar 2, Pusat Bandar Puchong 47100 Puchong Selangor D.E SENARAI SEMAKAN PERMOHONAN UNTUK JABATAN BOMBA DAN PENYELAMAT MALAYSIA BIL DOKUMEN BILANGAN SET SEMAKAN KAUNTER SENARAI SEMAKAN PERMOHONAN UNTUK KELULUSAN PELAN ARKITEKTURAL 1 Surat Permohonan Rasmi 1 2 Pelan Arkitektural Lengkap 2 3 Pernyataan Tajuk Projek Dengan Jelas / Betul - 4 Pengiraan Beban Mengikut UBBL 1984 1 5 Skala Pelan Hendaklah 1:100 Atau 1:200( Skala Lain Dengan Kebenaran) - 6 Pengiraan Isipadu Bangunan Bagi Penentuan Akses Perkakasan Bomba 1 7 Menunjukkan Dan Mengadakan Akses Perkakas Bomba Mengikut UBBL 1984 (Diwarnakan Kuning) -
  • 38. 8 Mencatatkan Kedudukan Pili Bomba Jarak Tidak Lebih Daripada 91.5m (Antara Satu Pili Bomba Dengan Yang Lain) Dan Diwarnakan Merah. - 9 Mengemukakan Pengiraan Hitungan Had Yang Dibenarkan Bagi Kawasan Tak Terlindung (Jadual Ke 6 UBBL 1984) 1 10 Pelan Arkitektural Perubahan/Tambahan Struktur Di Warnakan Merah - 11 Pelan Arkitektural Struktur Diruntuhkan (Jika Ada) Diwarnakan Biru - 12 Perakuan, Tanggungjawab Dan Cop Rasmi Orang Berkelayakan Di Setiap Helaian Pelan Arkitektural - 13 Mencatitkan “Senarai Syor-Syor Kebombaan” Di Muka Hadapan Setiap Set Pelan Arkitektural. - 14 Keperluan Kehendak-Kehendak Menentang Dan Mencegah Kebakaran Aktif Dan Pasif Mengikut UBBL 1984 Hendaklah Diwarnakan Merah - Tandatangan : Nama Pemohon : …………………………………………………… Nama Syarikat : …………………………………………………… …………………………………………………… …………………………………………………… …………………………………………………… …………………………………………………… …………………………………………………… No Telefon : …………………………………………………… SEMAKAN JBPM – DITERIMA / TOLAK *
  • 39. COP JBPM PEGAWAI PENERIMA : …………………………………………………….. TARIKH : ……………………………………………………… * Potong Yang Tidak Berkaitan CONCLUSION In conclusion, our improved site is now much better and multipurpose. Without the team, I don’t think we could able to make it through! This site here is known for its environment and especially the weather, It would be an ideal place for all people to enjoy/studying. During the process,we learned how to reconstruct a blank site into a multipurpose and useful bar + park for all the students. We also learned how to write a report and our master plan properly. We hope that our sky bar & park will bring lots of benefit to all the students and also our lecturers. We also would hope that they would use it wisely and enjoy their meal without walking all the way
  • 40. to commercial block to have a good meal. We would love to see all the students enjoy and have their new way of studying and learning inside the park.