Coal handling plant
• Coal
• Unloading system
• Conveyor system
• Crushing system
• Feeding system
• Stacking system• Stacking system
• Magnetic separator/ metal detector
• Bin/chute vibratory system
• Coal weighment
• Coal sampling
• Fire fighting system
• Dust suppression system
• Dust extraction system4-Aug-13
CATEGORIZATION OF COAL
Grade UHV
(Kcal / kg) approx.
Equivalent GCV
(Kcal / kg) approx.
A UHV > 6200 Kcal / Kg GCV > 6401
B 6200 > = UHV (Kcal / Kg) > 5600 6401 > GCV >5800
C 5600 > = UHV (Kcal / Kg) > 4940 5801 > GCV >5400
D 4940 > = UHV (Kcal / Kg) > 4200 5401 > GCV >4800
E 4200 > = UHV (Kcal / Kg) > 3360 4801 > GCV >4200
F 3360 > = UHV (Kcal / Kg) > 2400 4201 > GCV >3600F 3360 > = UHV (Kcal / Kg) > 2400 4201 > GCV >3600
G 2400 > = UHV (Kcal / Kg) > 1300 3601 > GCV >3200
•“Useful Heat Value” : UHV = 8900 – 138 (A + M) where
UHV = Useful Heat Value in Kcal / Kg / A = Ash content (%) M = Moisture content (%)
•In the case of coal having moisture less than 2 percent and volatile content less than 19 percent, the useful heat value are
arrived as above reduced by 150 kilo calories per kilogram for each 1 percent reduction in volatile content below 19 percent
fraction prorata.
Both moisture and ash are determined after equilibrating at 60 percent relative humidity and 400C temperature as per relevant
clauses of Indian Standard Specification No. IS 1350 –1959
“Gross Calorific Value” at constant volume is the quantity of heat liberated by combusting the fuel at constant volume in oxygen
saturated with water vapour, the original material and final products of combustion being at a reference temperature at 250C and
the water obtained from the fuel being in the liquid state.
4-Aug-13
COAL CHARACTERITIC
• Moisture 6-7%
• Ash 24-33%
• Volatile matter 24-28%
• Gross Clorific Value 4778-4944 kcal/kg• Gross Clorific Value 4778-4944 kcal/kg
• Hardness index 45-50
• Density 0.8MT/m3
• Size 250mm
4-Aug-13
Coal unloading
4-Aug-13
LAY OUT OF TYPICAL COAL HANDLING
PLANT
WT 1
WT 2
WT 3
BR HOUSE
Con.1A/B
Con.13A/BCon.12A/B
Con.11A/B
C O A L Y A R D
OCHP NCHP
4-Aug-13
CR
HOUSE
CR
HOUSE
TP7
Con2A/B
Con.13A/B
Con 4
Con.10A/B
Con.14A/B
Con.15A/B
Con.3A/B
Con5
Con 9
Con 6
Con 4
C O A L B U N K E R S
Side Arm Charger for hauling rake of wagons,
placement of wagons on tippler table and
evacuation of empty wagons from tippler table.
By attaching rope to rear pulling loop on
car, front of car can be brought somewhat
beyond position of single sheave block.
Wagon placement system
Car puller
evacuation of empty wagons from tippler table.
4-Aug-13
locomotive
Beetle charger
Rabbit charger
Conveyor system
• Idlers – Troughing, Return, Impact, Self aligning
• Pulleys- head, tail, bend, snub pulleys
• Counter weight/ take up
• Gear box, fluid coupling, hold back, scraper• Gear box, fluid coupling, hold back, scraper
• Duct, flap gate, liners, deflector plate, skirt board
• Dust suppression, fire fighting
• Pull cord, zero speed , belt sway , EPB
4-Aug-13
conveyors
• Capacity old/new -600/800T/hr
• Speed old/new- 2.3/2.5m/s, 18A/B-1m/s
11A/B,12A/B-2.9m/s
• Breadth- 1000mm• Breadth- 1000mm
• Material nylon fabric
• Trough 35’
• Cover grade- fire resistant
• Ply/top thick/bottom thick-4/5mm/2mm
4-Aug-13
Conveyor system
4-Aug-13
Conveyor gallery
Pull cord switch
Self aligning roller
Counter weight
Belt sway switch
Zero speed switch
Conveyor system
4-Aug-13
Pull cord switch
Return rollerHold back
Snub pulley
Metal detector, online ms
4-Aug-13
Conveyor system
Inline magnetic separator
Bin/chute vibrator
4-Aug-13
Conveyor head pulley
Bin/chute vibrator
Bin/chute vibrator
electromagnetic bin vibrator well-
suited for use on hoppers,
chutes, tracks, or bins. The coil is
encapsulated to protect against
liquids, dust, and mechanical
damage. The vibrator requires an
electronic controller such as
Automation Devices' Model 6000,
set for DC operation which
produces 3600 VPM. Power
consumption is approximately
225 watts.
Crushing system
• Ring granulator
• Primary crusher/beaker
4-Aug-13
Coal crushing system
Ring granulator
4-Aug-13
Primary crusher/ rotary breakerDeluge system
4-Aug-13
Zerospeedswitch
How Feeders Work and Benefits
Vibrating feeders are classified in two sub-groups, these being Electro-magnetic feeders
and Electro- mechanical feeders. Electromagnetic models incorporate an electric motor
which energies a magnet, enabling it to activate multiple times per minute. Every time the
Feeding system
which energies a magnet, enabling it to activate multiple times per minute. Every time the
magnet is energized it creates a 'stroke' action which resonates through the feeder trough
and vibrates the materials in a uniform, high controlled flow towards the end of the
trough. As there are minimal or no moving components in these feeders, they are
exceptionally reliable units that offer precise feed control where batch weighing and flow
control needs to be precise.
Electro-mechanical feeders are also reliable units with many models offering economical
value compared to electromagnetic models. Material flow is courser and the occasional
preventative maintenance will need implementing. Instead of magnet activation, these
feeders may utilize an eccentric motor, vee-pulley, cam and bearing arrangement to
introduce the vibrating action. These units are capable of operating in the harshest
conditions and are unrelenting in moving massive volumes of coal, rock or aggregates.4-Aug-13
Feeding system
Grizzly feeder
Electromagnetic vibrating feeder
4-Aug-13
Appron feeder
Feeding system
Suspended vib. feeder
The vibratory screen adopts the barrel type of
eccentric shaft vibration exciter and eccentric
block to adjust the swing
4-Aug-13
Vibrating screen
Paddle feeder
Stacker & reclaimer in reclaiming action
V feeder, crusher, hyd coupling, RPG
4-Aug-13
Stacking system
Overhead conveyor stacking
4-Aug-13
Tripper trolley
Overhead conveyor stacking
Stacker reclaimer in stacking
Tripper trolley
Dust extraction system
4-Aug-13
Coal sampling unit, belt weigher
4-Aug-13
A stacker usually operates on a rail-like structure with movable wheels, but the main operation is performed
on a fixed place.
Stackers are used to stack into different patterns, such as cone stacking and chevron stacking. Stacking in a
single cone tends to cause size segregation, with coarser material moving out towards the base. Raw cone
ply stacking is when additional cones are added next to the first cone. Chevron stacking is when the stacker
Stacker-reclaimer
ply stacking is when additional cones are added next to the first cone. Chevron stacking is when the stacker
travels along the length of the stockpile adding layer upon layer of material.
The controlling system used is typically a PLC (programmable logic controller) with an HMI (human-machine
interface) for display connected to a central control system.
Other than stacking, the stacker does three basic movements: luffing, travelling and slewing.
Luffing: This is vertical movement (that is, up & down)by hydraulic cylinders .
Travelling: The stacker moves on a rail track. All the controls are in the controller's cabin which is above the
boom conveyor. The new stackers can be controlled remotely.
Slewing: This is the movement of the stacker around its central axis (that is, rotary movement). This allows
aligning or placing the stockpile in the required area as per requirement. This works mostly by swel penion
which rotates around a swel base. This type of gear assembly is called the sun and planet.
Most stackers are electrically powered by way of a trailing cable. There are basically two types of cable
trailing: PCRD (power cord rotating drum) and CCRD (control cable rotating drum). Pendulum adjustments
are made to ensure the proper alignment of these cables while the stacker is travelling.
4-Aug-13
permissive
• Belt status ready (pull cord, BSS, EPB, Control
supply)
• Discharge gate on running belt open and that
belt is runningbelt is running
interlock
• In case of any belt trip, entire system behind
except crusher will stop
• Any other belt of pair will not start on the
same discharge belt except 1A&1Bsame discharge belt except 1A&1B
• Corresponding feeder will trip if any belt trips
protection
• Belt & following system except crusher will trip in
case of operation of BSS
• In case of excessive belt slipage, low speed due to
over load or otherwise, belt not running although
motor running, belt snapped than belt and followingmotor running, belt snapped than belt and following
system will stop through zeero speed switch
• Overloading of more than 600T/hr
• Motors are protected against over load, short circuit,
single phasing
Operation of CHP
General Instructions
•Before starting the plant, check which of the equipment is available and accordingly plan an appropriate
path for the movement of coal.
•Ensure that the path so planned, is clear for coal movement i.e. Flap Gate position, Interlocking etc.
•Before starting any equipment ensures that the equipment is not subject to a P.T.W.
•Check from each location that the equipment is ready for start and no persons are working on the
equipment.
•Line up the system by starting each equipment from the last conveyor in the up-stream path.
•Good communication between the control room and different equipment locations is essential before
starting the system.
•Ensure that all Metal Detectors and Magnetic Separators are working properly on running conveyors and
foreign material removed, where necessary.foreign material removed, where necessary.
•Ensure that all Electrical systems are healthy and all the protection systems mentioned below are in
service.
a) Hooters
b) Emergency Push Buttons
c) Pull Cord switches
d) Zero-speed switches
e) Belt sway switches
f) Chute block switches
g) Crusher bearing vibration-monitoring equipment
h) Interlocks
i) PA System
j) Magnetic Separators
k) Metal Detectors
l) Electro Magnetic/Thrust Brakes installed in long conveyors
Adequate lighting should be ensured in all the areas.
4-Aug-13
Operation of Paddle Feeders
• The Paddle Feeders feed the coal on the conveyor belt from the Track
hopper at a controlled rate. The paddle blades projected in the hopper
slot scoop the coal from hoppers and discharge it on the conveyor belt
running below.
• The following points need to be checked before taking any paddle feeder
into service.into service.
• a) The paddle arms are free from any obstruction.
• b) There is no leakage at gearboxes and fluid couplings and the oil levels
are correct.
• c) There is no leakage of hydraulic oil, in the case of hydraulically driven
paddle feeders, and the oil levels are correct.
• d) The cable reeling drums for correct winding and unwinding.
• e) The paddle feeder is operating only in interlock mode.
4-Aug-13
Operation of Conveyors
• Various conveyors are provided for transporting the coal from Track
hopper to Bunkers.
• The following precautions are to be taken before taking any conveyor into
service:
• a) There is no oil leakage at gearboxes / fluid couplings and the oil levels
are correct.
• b) The Discharge and Receiving chutes are free from jamming and choking.
• c) The Flap Gates are in correct positions.• c) The Flap Gates are in correct positions.
• d) All inspection doors are in the closed position.
• e) All pull-cords are reset and the EPB is released and ensure that all
protections are healthy.
• f) The Alarm Siren is in working order.
• g) Communication facility is available.
• h) The lighting is adequate.
• i) No Permit To Work (Isolation) is pending against that conveyor.
4-Aug-13
Operation of Stacker Reclaimer
• The Stacker Reclaimer is provided to stack the excess coal
received from the mines and to reclaim the coal, as and when
required.
• The following points need to be checked before returning
Stacker Reclaimer into service:
• a) The track is clear of obstructions.
• b) There is no leakage from gearboxes, fluid couplings &
hydraulic system. The oil levels are correct.
• c) The availability of power supply is checked.
• d) All operations e.g. travel; slewing, luffing etc. are available.
• e) Brakes are clean and functioning correctly.
• f) CRD cable is free from damage and any obstruction and is
tensioned correctly.
4-Aug-13
Operation of Crushers
• Ring Granulator type crushers are provided to crush
the coal generally from (-) 250 mm/100 mm size to (-
) 20 mm size. The following points need to be
checked before returning any crushers to service:
• a) The crusher shall be clear from any jamming.
• b) All inspection doors are in the closed position and
locked.
• c) There is no leakage at gearbox and fluid couplings
and the oil levels are correct.
4-Aug-13
Operation of Trippers
• Trippers are provided on coalbunkers to receive coal from the
conveyors and feed it to the bunkers. The tripper is mounted
on rails and feeds coal to the bunkers for use on all the units.
The following checks are to be carried-out before taking the
tripper into service:
a) The availability of supply.• a) The availability of supply.
• b) That the brakes are clean and functioning correctly.
• c) The tripper discharge chute is free from jamming/blockage.
• d) That the CRD cable is free from any obstruction and is
tensioned correctly.
4-Aug-13
4-Aug-13
TYPICAL CHP
COAL HANDLING PLANT
BY
PRABIR DATTA,B.Sc,F.I.E(I)
LIFE FELLOW,INSTITUTION OF ENGINEERS(INDIA),
LIFE MEMBER,CONSULTING ENGINEERS’ ASSOCIATION OF INDIA(FIDIC AFFILIATED)
MEMBER,ASSOCIATION OF INTERNATIONAL CONSULTANTS(FRANCE)
CONSULTANT CHARTERED MECHANICAL ENGINEER
MARINE&MATERIAL HANDLING
4-Aug-13 THANK YOU

Más contenido relacionado

La actualidad más candente

Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....Vipul Sinha
 
Handling of coal in thermal power plant
Handling of coal in thermal power plantHandling of coal in thermal power plant
Handling of coal in thermal power plantDhruv Amin
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plantRohit Khatri
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsSHIVAJI CHOUDHURY
 
classifications and working of mills in a power plant
classifications and working of mills in a power plantclassifications and working of mills in a power plant
classifications and working of mills in a power plantVVDVARAPRASAD
 
THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING AFAQAHMED JAMADAR
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc Uttam Kumar
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAmay Jain
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedRavi Roy
 
ASH HANDLING PLANT
ASH HANDLING PLANTASH HANDLING PLANT
ASH HANDLING PLANTAditya Anand
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rateManohar Tatwawadi
 
Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoben Anto Chemmannoor
 
COAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARACOAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARARajat Verma
 

La actualidad más candente (20)

Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
CHP
CHP CHP
CHP
 
coal handling plant
coal handling plantcoal handling plant
coal handling plant
 
Chp ppt
Chp pptChp ppt
Chp ppt
 
Coal Handling Plants....
Coal Handling Plants....Coal Handling Plants....
Coal Handling Plants....
 
Handling of coal in thermal power plant
Handling of coal in thermal power plantHandling of coal in thermal power plant
Handling of coal in thermal power plant
 
Presentation on CFBC Boilers
Presentation on CFBC BoilersPresentation on CFBC Boilers
Presentation on CFBC Boilers
 
Coal handling plant
Coal handling plantCoal handling plant
Coal handling plant
 
Coal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plantsCoal mill pulverizer in thermal power plants
Coal mill pulverizer in thermal power plants
 
classifications and working of mills in a power plant
classifications and working of mills in a power plantclassifications and working of mills in a power plant
classifications and working of mills in a power plant
 
THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING THERMAL POWER PLANT AND COAL HANDLING
THERMAL POWER PLANT AND COAL HANDLING
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 
Cement Plant Process and Instruments Used
Cement Plant Process and Instruments UsedCement Plant Process and Instruments Used
Cement Plant Process and Instruments Used
 
ASH HANDLING PLANT
ASH HANDLING PLANTASH HANDLING PLANT
ASH HANDLING PLANT
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
210 mw turbine cycle heat rate
210 mw turbine cycle heat rate210 mw turbine cycle heat rate
210 mw turbine cycle heat rate
 
Boiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plantBoiler auxillaries in a coal fired power plant
Boiler auxillaries in a coal fired power plant
 
COAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARACOAL HANDLING DIVISION/PLANT, ANPARA
COAL HANDLING DIVISION/PLANT, ANPARA
 
NTPC ASH HANDELING
NTPC ASH HANDELING NTPC ASH HANDELING
NTPC ASH HANDELING
 

Destacado

Lineshaft catalog
Lineshaft catalogLineshaft catalog
Lineshaft cataloghendruut
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')Tejasvi Anant
 
Hydraulic Machines Fluid coupling, Fluid torque converter
Hydraulic Machines    Fluid coupling, Fluid torque converterHydraulic Machines    Fluid coupling, Fluid torque converter
Hydraulic Machines Fluid coupling, Fluid torque converterUniversity of Windsor
 
Fluid power introduction
Fluid power introductionFluid power introduction
Fluid power introductionsukusobhaa
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadVishal Dubey
 
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...Vishal Patel
 
Multipoint Fuel Injection System (MPFI)
Multipoint Fuel Injection System (MPFI)Multipoint Fuel Injection System (MPFI)
Multipoint Fuel Injection System (MPFI)Rutwij Patil
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminarCentury Rayon
 
Conveyor handbook
Conveyor handbookConveyor handbook
Conveyor handbookautomotions
 
Hydraulic turbines
Hydraulic turbinesHydraulic turbines
Hydraulic turbinesDr. Ramesh B
 

Destacado (16)

Coal and Ash Handling
Coal and Ash HandlingCoal and Ash Handling
Coal and Ash Handling
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Lineshaft catalog
Lineshaft catalogLineshaft catalog
Lineshaft catalog
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Hydraulic Machines Fluid coupling, Fluid torque converter
Hydraulic Machines    Fluid coupling, Fluid torque converterHydraulic Machines    Fluid coupling, Fluid torque converter
Hydraulic Machines Fluid coupling, Fluid torque converter
 
Fluid power introduction
Fluid power introductionFluid power introduction
Fluid power introduction
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
 
Belt conveyor _2_
Belt conveyor _2_Belt conveyor _2_
Belt conveyor _2_
 
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
Design Of Belt Conveyor to Prevent the failure and many other drawbacks from ...
 
Multipoint Fuel Injection System (MPFI)
Multipoint Fuel Injection System (MPFI)Multipoint Fuel Injection System (MPFI)
Multipoint Fuel Injection System (MPFI)
 
Belt conveyor
Belt conveyorBelt conveyor
Belt conveyor
 
Coal and ash handling systems
Coal and ash handling systemsCoal and ash handling systems
Coal and ash handling systems
 
Kota super thermal power plant seminar
Kota super thermal power plant seminarKota super thermal power plant seminar
Kota super thermal power plant seminar
 
Conveyor handbook
Conveyor handbookConveyor handbook
Conveyor handbook
 
safety officer cv.DOC
safety officer cv.DOCsafety officer cv.DOC
safety officer cv.DOC
 
Hydraulic turbines
Hydraulic turbinesHydraulic turbines
Hydraulic turbines
 

Similar a Planning a coal handling plant

Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanBHANUKISHAN1
 
ritesh final project
ritesh final projectritesh final project
ritesh final project901902
 
Centrifugation techniques
Centrifugation techniquesCentrifugation techniques
Centrifugation techniquesAmany Elsayed
 
Training
TrainingTraining
Trainingkulrao
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal powerShishupal03012015
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-reportAnil Saharan
 
Enerpac shs-series-sync hoist-load-positioning-hydraulic-hoist
Enerpac shs-series-sync hoist-load-positioning-hydraulic-hoistEnerpac shs-series-sync hoist-load-positioning-hydraulic-hoist
Enerpac shs-series-sync hoist-load-positioning-hydraulic-hoistHi Press Hydrualics Ltd
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR Shubham Kulshreshtha
 
AJA ATC-2200-UHV deposition system sputtering system system in San Jose CA
AJA ATC-2200-UHV deposition system sputtering system system in San Jose CAAJA ATC-2200-UHV deposition system sputtering system system in San Jose CA
AJA ATC-2200-UHV deposition system sputtering system system in San Jose CAEmily Tan
 
Traction distribution
Traction distribution Traction distribution
Traction distribution Amit Kumar
 
Fishing systems and harvesting machines
Fishing systems and harvesting machinesFishing systems and harvesting machines
Fishing systems and harvesting machinesSWAGATIKA SAHOO
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxGholamRabbaniGhause
 

Similar a Planning a coal handling plant (20)

Ashwani
AshwaniAshwani
Ashwani
 
Up roughterrain
Up roughterrainUp roughterrain
Up roughterrain
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
Wajahat ppt on ac shop
Wajahat ppt on ac shopWajahat ppt on ac shop
Wajahat ppt on ac shop
 
Ntpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishanNtpc kahalgaon project by bhanu kishan
Ntpc kahalgaon project by bhanu kishan
 
ritesh final project
ritesh final projectritesh final project
ritesh final project
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
Centrifugation techniques
Centrifugation techniquesCentrifugation techniques
Centrifugation techniques
 
Training
TrainingTraining
Training
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
Hirakud pWR overview.ppt
Hirakud pWR overview.pptHirakud pWR overview.ppt
Hirakud pWR overview.ppt
 
C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
 
Enerpac shs-series-sync hoist-load-positioning-hydraulic-hoist
Enerpac shs-series-sync hoist-load-positioning-hydraulic-hoistEnerpac shs-series-sync hoist-load-positioning-hydraulic-hoist
Enerpac shs-series-sync hoist-load-positioning-hydraulic-hoist
 
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
MANUFACTURING PROCESS OF 600 MW TURBO GENERTOR STATOR WINDING BAR
 
Old technologies revisited
Old technologies revisitedOld technologies revisited
Old technologies revisited
 
AJA ATC-2200-UHV deposition system sputtering system system in San Jose CA
AJA ATC-2200-UHV deposition system sputtering system system in San Jose CAAJA ATC-2200-UHV deposition system sputtering system system in San Jose CA
AJA ATC-2200-UHV deposition system sputtering system system in San Jose CA
 
Traction distribution
Traction distribution Traction distribution
Traction distribution
 
Fishing systems and harvesting machines
Fishing systems and harvesting machinesFishing systems and harvesting machines
Fishing systems and harvesting machines
 
Innovative Technology for Steel Melt Shop
Innovative Technology for Steel Melt ShopInnovative Technology for Steel Melt Shop
Innovative Technology for Steel Melt Shop
 
PPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptxPPT 31-05-2023 CHP ET TRAINING.pptx
PPT 31-05-2023 CHP ET TRAINING.pptx
 

Más de PRABIR DATTA

A deep rooted journey -edition- (2)with music clips
A deep rooted journey -edition- (2)with music clips A deep rooted journey -edition- (2)with music clips
A deep rooted journey -edition- (2)with music clips PRABIR DATTA
 
History of geometry
History of geometryHistory of geometry
History of geometryPRABIR DATTA
 
Autocad3dtutorial2016
Autocad3dtutorial2016Autocad3dtutorial2016
Autocad3dtutorial2016PRABIR DATTA
 
Fraud and cheating by quick heal antivirus
Fraud and cheating by quick heal antivirusFraud and cheating by quick heal antivirus
Fraud and cheating by quick heal antivirusPRABIR DATTA
 
Water pressure on lock gate
Water pressure on lock gateWater pressure on lock gate
Water pressure on lock gatePRABIR DATTA
 
Pianc hawser force for lock case study
Pianc hawser force for lock case studyPianc hawser force for lock case study
Pianc hawser force for lock case studyPRABIR DATTA
 
Pianc construction of locks
Pianc  construction of locksPianc  construction of locks
Pianc construction of locksPRABIR DATTA
 
Lock gates and operating equipments
Lock gates and operating equipmentsLock gates and operating equipments
Lock gates and operating equipmentsPRABIR DATTA
 
Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297
Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297
Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297PRABIR DATTA
 
Hydrostatics 160311202946
Hydrostatics 160311202946Hydrostatics 160311202946
Hydrostatics 160311202946PRABIR DATTA
 
Innovative concepts in_navigation_lock_design
Innovative concepts in_navigation_lock_designInnovative concepts in_navigation_lock_design
Innovative concepts in_navigation_lock_designPRABIR DATTA
 
Port of-antwerp-2nd-lock-waaslandhaven
Port of-antwerp-2nd-lock-waaslandhavenPort of-antwerp-2nd-lock-waaslandhaven
Port of-antwerp-2nd-lock-waaslandhavenPRABIR DATTA
 
European handbook-of-maritime-security-exercises-and-drills
European handbook-of-maritime-security-exercises-and-drillsEuropean handbook-of-maritime-security-exercises-and-drills
European handbook-of-maritime-security-exercises-and-drillsPRABIR DATTA
 
Pianc construction of locks
Pianc  construction of locksPianc  construction of locks
Pianc construction of locksPRABIR DATTA
 
Pianc hawser force for lock case study
Pianc hawser force for lock case studyPianc hawser force for lock case study
Pianc hawser force for lock case studyPRABIR DATTA
 
View point june 2018(1)
View point june 2018(1)View point june 2018(1)
View point june 2018(1)PRABIR DATTA
 

Más de PRABIR DATTA (20)

A deep rooted journey -edition- (2)with music clips
A deep rooted journey -edition- (2)with music clips A deep rooted journey -edition- (2)with music clips
A deep rooted journey -edition- (2)with music clips
 
History of geometry
History of geometryHistory of geometry
History of geometry
 
Autocad3dtutorial2016
Autocad3dtutorial2016Autocad3dtutorial2016
Autocad3dtutorial2016
 
Nonrefund
NonrefundNonrefund
Nonrefund
 
Fraud and cheating by quick heal antivirus
Fraud and cheating by quick heal antivirusFraud and cheating by quick heal antivirus
Fraud and cheating by quick heal antivirus
 
Water pressure on lock gate
Water pressure on lock gateWater pressure on lock gate
Water pressure on lock gate
 
Pressure
PressurePressure
Pressure
 
Pianc hawser force for lock case study
Pianc hawser force for lock case studyPianc hawser force for lock case study
Pianc hawser force for lock case study
 
Pianc construction of locks
Pianc  construction of locksPianc  construction of locks
Pianc construction of locks
 
Lock
LockLock
Lock
 
Lock gates and operating equipments
Lock gates and operating equipmentsLock gates and operating equipments
Lock gates and operating equipments
 
Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297
Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297
Hydraulic and-structural-design-of-navigational-locks-2165-784 x-1000297
 
Flanders locks
Flanders locksFlanders locks
Flanders locks
 
Hydrostatics 160311202946
Hydrostatics 160311202946Hydrostatics 160311202946
Hydrostatics 160311202946
 
Innovative concepts in_navigation_lock_design
Innovative concepts in_navigation_lock_designInnovative concepts in_navigation_lock_design
Innovative concepts in_navigation_lock_design
 
Port of-antwerp-2nd-lock-waaslandhaven
Port of-antwerp-2nd-lock-waaslandhavenPort of-antwerp-2nd-lock-waaslandhaven
Port of-antwerp-2nd-lock-waaslandhaven
 
European handbook-of-maritime-security-exercises-and-drills
European handbook-of-maritime-security-exercises-and-drillsEuropean handbook-of-maritime-security-exercises-and-drills
European handbook-of-maritime-security-exercises-and-drills
 
Pianc construction of locks
Pianc  construction of locksPianc  construction of locks
Pianc construction of locks
 
Pianc hawser force for lock case study
Pianc hawser force for lock case studyPianc hawser force for lock case study
Pianc hawser force for lock case study
 
View point june 2018(1)
View point june 2018(1)View point june 2018(1)
View point june 2018(1)
 

Último

The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation decktbatkhuu1
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funneljen_giacalone
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...amitlee9823
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxTusharBahuguna2
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Delhi Call girls
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxmirandajeremy200221
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...home
 

Último (20)

The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Peaches App development presentation deck
Peaches App development presentation deckPeaches App development presentation deck
Peaches App development presentation deck
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Design Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptxDesign Inspiration for College by Slidesgo.pptx
Design Inspiration for College by Slidesgo.pptx
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
Best VIP Call Girls Noida Sector 47 Call Me: 8448380779
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
DragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptxDragonBall PowerPoint Template for demo.pptx
DragonBall PowerPoint Template for demo.pptx
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 

Planning a coal handling plant

  • 1. Coal handling plant • Coal • Unloading system • Conveyor system • Crushing system • Feeding system • Stacking system• Stacking system • Magnetic separator/ metal detector • Bin/chute vibratory system • Coal weighment • Coal sampling • Fire fighting system • Dust suppression system • Dust extraction system4-Aug-13
  • 2. CATEGORIZATION OF COAL Grade UHV (Kcal / kg) approx. Equivalent GCV (Kcal / kg) approx. A UHV > 6200 Kcal / Kg GCV > 6401 B 6200 > = UHV (Kcal / Kg) > 5600 6401 > GCV >5800 C 5600 > = UHV (Kcal / Kg) > 4940 5801 > GCV >5400 D 4940 > = UHV (Kcal / Kg) > 4200 5401 > GCV >4800 E 4200 > = UHV (Kcal / Kg) > 3360 4801 > GCV >4200 F 3360 > = UHV (Kcal / Kg) > 2400 4201 > GCV >3600F 3360 > = UHV (Kcal / Kg) > 2400 4201 > GCV >3600 G 2400 > = UHV (Kcal / Kg) > 1300 3601 > GCV >3200 •“Useful Heat Value” : UHV = 8900 – 138 (A + M) where UHV = Useful Heat Value in Kcal / Kg / A = Ash content (%) M = Moisture content (%) •In the case of coal having moisture less than 2 percent and volatile content less than 19 percent, the useful heat value are arrived as above reduced by 150 kilo calories per kilogram for each 1 percent reduction in volatile content below 19 percent fraction prorata. Both moisture and ash are determined after equilibrating at 60 percent relative humidity and 400C temperature as per relevant clauses of Indian Standard Specification No. IS 1350 –1959 “Gross Calorific Value” at constant volume is the quantity of heat liberated by combusting the fuel at constant volume in oxygen saturated with water vapour, the original material and final products of combustion being at a reference temperature at 250C and the water obtained from the fuel being in the liquid state. 4-Aug-13
  • 3. COAL CHARACTERITIC • Moisture 6-7% • Ash 24-33% • Volatile matter 24-28% • Gross Clorific Value 4778-4944 kcal/kg• Gross Clorific Value 4778-4944 kcal/kg • Hardness index 45-50 • Density 0.8MT/m3 • Size 250mm 4-Aug-13
  • 5. LAY OUT OF TYPICAL COAL HANDLING PLANT WT 1 WT 2 WT 3 BR HOUSE Con.1A/B Con.13A/BCon.12A/B Con.11A/B C O A L Y A R D OCHP NCHP 4-Aug-13 CR HOUSE CR HOUSE TP7 Con2A/B Con.13A/B Con 4 Con.10A/B Con.14A/B Con.15A/B Con.3A/B Con5 Con 9 Con 6 Con 4 C O A L B U N K E R S
  • 6. Side Arm Charger for hauling rake of wagons, placement of wagons on tippler table and evacuation of empty wagons from tippler table. By attaching rope to rear pulling loop on car, front of car can be brought somewhat beyond position of single sheave block. Wagon placement system Car puller evacuation of empty wagons from tippler table. 4-Aug-13 locomotive Beetle charger Rabbit charger
  • 7. Conveyor system • Idlers – Troughing, Return, Impact, Self aligning • Pulleys- head, tail, bend, snub pulleys • Counter weight/ take up • Gear box, fluid coupling, hold back, scraper• Gear box, fluid coupling, hold back, scraper • Duct, flap gate, liners, deflector plate, skirt board • Dust suppression, fire fighting • Pull cord, zero speed , belt sway , EPB 4-Aug-13
  • 8. conveyors • Capacity old/new -600/800T/hr • Speed old/new- 2.3/2.5m/s, 18A/B-1m/s 11A/B,12A/B-2.9m/s • Breadth- 1000mm• Breadth- 1000mm • Material nylon fabric • Trough 35’ • Cover grade- fire resistant • Ply/top thick/bottom thick-4/5mm/2mm 4-Aug-13
  • 9. Conveyor system 4-Aug-13 Conveyor gallery Pull cord switch Self aligning roller Counter weight Belt sway switch Zero speed switch
  • 10. Conveyor system 4-Aug-13 Pull cord switch Return rollerHold back Snub pulley
  • 11. Metal detector, online ms 4-Aug-13
  • 12. Conveyor system Inline magnetic separator Bin/chute vibrator 4-Aug-13 Conveyor head pulley Bin/chute vibrator Bin/chute vibrator electromagnetic bin vibrator well- suited for use on hoppers, chutes, tracks, or bins. The coil is encapsulated to protect against liquids, dust, and mechanical damage. The vibrator requires an electronic controller such as Automation Devices' Model 6000, set for DC operation which produces 3600 VPM. Power consumption is approximately 225 watts.
  • 13. Crushing system • Ring granulator • Primary crusher/beaker 4-Aug-13
  • 14. Coal crushing system Ring granulator 4-Aug-13
  • 15. Primary crusher/ rotary breakerDeluge system 4-Aug-13 Zerospeedswitch
  • 16. How Feeders Work and Benefits Vibrating feeders are classified in two sub-groups, these being Electro-magnetic feeders and Electro- mechanical feeders. Electromagnetic models incorporate an electric motor which energies a magnet, enabling it to activate multiple times per minute. Every time the Feeding system which energies a magnet, enabling it to activate multiple times per minute. Every time the magnet is energized it creates a 'stroke' action which resonates through the feeder trough and vibrates the materials in a uniform, high controlled flow towards the end of the trough. As there are minimal or no moving components in these feeders, they are exceptionally reliable units that offer precise feed control where batch weighing and flow control needs to be precise. Electro-mechanical feeders are also reliable units with many models offering economical value compared to electromagnetic models. Material flow is courser and the occasional preventative maintenance will need implementing. Instead of magnet activation, these feeders may utilize an eccentric motor, vee-pulley, cam and bearing arrangement to introduce the vibrating action. These units are capable of operating in the harshest conditions and are unrelenting in moving massive volumes of coal, rock or aggregates.4-Aug-13
  • 17. Feeding system Grizzly feeder Electromagnetic vibrating feeder 4-Aug-13 Appron feeder
  • 18. Feeding system Suspended vib. feeder The vibratory screen adopts the barrel type of eccentric shaft vibration exciter and eccentric block to adjust the swing 4-Aug-13 Vibrating screen Paddle feeder Stacker & reclaimer in reclaiming action
  • 19. V feeder, crusher, hyd coupling, RPG 4-Aug-13
  • 20. Stacking system Overhead conveyor stacking 4-Aug-13 Tripper trolley Overhead conveyor stacking Stacker reclaimer in stacking Tripper trolley
  • 22. Coal sampling unit, belt weigher 4-Aug-13
  • 23. A stacker usually operates on a rail-like structure with movable wheels, but the main operation is performed on a fixed place. Stackers are used to stack into different patterns, such as cone stacking and chevron stacking. Stacking in a single cone tends to cause size segregation, with coarser material moving out towards the base. Raw cone ply stacking is when additional cones are added next to the first cone. Chevron stacking is when the stacker Stacker-reclaimer ply stacking is when additional cones are added next to the first cone. Chevron stacking is when the stacker travels along the length of the stockpile adding layer upon layer of material. The controlling system used is typically a PLC (programmable logic controller) with an HMI (human-machine interface) for display connected to a central control system. Other than stacking, the stacker does three basic movements: luffing, travelling and slewing. Luffing: This is vertical movement (that is, up & down)by hydraulic cylinders . Travelling: The stacker moves on a rail track. All the controls are in the controller's cabin which is above the boom conveyor. The new stackers can be controlled remotely. Slewing: This is the movement of the stacker around its central axis (that is, rotary movement). This allows aligning or placing the stockpile in the required area as per requirement. This works mostly by swel penion which rotates around a swel base. This type of gear assembly is called the sun and planet. Most stackers are electrically powered by way of a trailing cable. There are basically two types of cable trailing: PCRD (power cord rotating drum) and CCRD (control cable rotating drum). Pendulum adjustments are made to ensure the proper alignment of these cables while the stacker is travelling. 4-Aug-13
  • 24. permissive • Belt status ready (pull cord, BSS, EPB, Control supply) • Discharge gate on running belt open and that belt is runningbelt is running
  • 25. interlock • In case of any belt trip, entire system behind except crusher will stop • Any other belt of pair will not start on the same discharge belt except 1A&1Bsame discharge belt except 1A&1B • Corresponding feeder will trip if any belt trips
  • 26. protection • Belt & following system except crusher will trip in case of operation of BSS • In case of excessive belt slipage, low speed due to over load or otherwise, belt not running although motor running, belt snapped than belt and followingmotor running, belt snapped than belt and following system will stop through zeero speed switch • Overloading of more than 600T/hr • Motors are protected against over load, short circuit, single phasing
  • 27. Operation of CHP General Instructions •Before starting the plant, check which of the equipment is available and accordingly plan an appropriate path for the movement of coal. •Ensure that the path so planned, is clear for coal movement i.e. Flap Gate position, Interlocking etc. •Before starting any equipment ensures that the equipment is not subject to a P.T.W. •Check from each location that the equipment is ready for start and no persons are working on the equipment. •Line up the system by starting each equipment from the last conveyor in the up-stream path. •Good communication between the control room and different equipment locations is essential before starting the system. •Ensure that all Metal Detectors and Magnetic Separators are working properly on running conveyors and foreign material removed, where necessary.foreign material removed, where necessary. •Ensure that all Electrical systems are healthy and all the protection systems mentioned below are in service. a) Hooters b) Emergency Push Buttons c) Pull Cord switches d) Zero-speed switches e) Belt sway switches f) Chute block switches g) Crusher bearing vibration-monitoring equipment h) Interlocks i) PA System j) Magnetic Separators k) Metal Detectors l) Electro Magnetic/Thrust Brakes installed in long conveyors Adequate lighting should be ensured in all the areas. 4-Aug-13
  • 28. Operation of Paddle Feeders • The Paddle Feeders feed the coal on the conveyor belt from the Track hopper at a controlled rate. The paddle blades projected in the hopper slot scoop the coal from hoppers and discharge it on the conveyor belt running below. • The following points need to be checked before taking any paddle feeder into service.into service. • a) The paddle arms are free from any obstruction. • b) There is no leakage at gearboxes and fluid couplings and the oil levels are correct. • c) There is no leakage of hydraulic oil, in the case of hydraulically driven paddle feeders, and the oil levels are correct. • d) The cable reeling drums for correct winding and unwinding. • e) The paddle feeder is operating only in interlock mode. 4-Aug-13
  • 29. Operation of Conveyors • Various conveyors are provided for transporting the coal from Track hopper to Bunkers. • The following precautions are to be taken before taking any conveyor into service: • a) There is no oil leakage at gearboxes / fluid couplings and the oil levels are correct. • b) The Discharge and Receiving chutes are free from jamming and choking. • c) The Flap Gates are in correct positions.• c) The Flap Gates are in correct positions. • d) All inspection doors are in the closed position. • e) All pull-cords are reset and the EPB is released and ensure that all protections are healthy. • f) The Alarm Siren is in working order. • g) Communication facility is available. • h) The lighting is adequate. • i) No Permit To Work (Isolation) is pending against that conveyor. 4-Aug-13
  • 30. Operation of Stacker Reclaimer • The Stacker Reclaimer is provided to stack the excess coal received from the mines and to reclaim the coal, as and when required. • The following points need to be checked before returning Stacker Reclaimer into service: • a) The track is clear of obstructions. • b) There is no leakage from gearboxes, fluid couplings & hydraulic system. The oil levels are correct. • c) The availability of power supply is checked. • d) All operations e.g. travel; slewing, luffing etc. are available. • e) Brakes are clean and functioning correctly. • f) CRD cable is free from damage and any obstruction and is tensioned correctly. 4-Aug-13
  • 31. Operation of Crushers • Ring Granulator type crushers are provided to crush the coal generally from (-) 250 mm/100 mm size to (- ) 20 mm size. The following points need to be checked before returning any crushers to service: • a) The crusher shall be clear from any jamming. • b) All inspection doors are in the closed position and locked. • c) There is no leakage at gearbox and fluid couplings and the oil levels are correct. 4-Aug-13
  • 32. Operation of Trippers • Trippers are provided on coalbunkers to receive coal from the conveyors and feed it to the bunkers. The tripper is mounted on rails and feeds coal to the bunkers for use on all the units. The following checks are to be carried-out before taking the tripper into service: a) The availability of supply.• a) The availability of supply. • b) That the brakes are clean and functioning correctly. • c) The tripper discharge chute is free from jamming/blockage. • d) That the CRD cable is free from any obstruction and is tensioned correctly. 4-Aug-13
  • 34. COAL HANDLING PLANT BY PRABIR DATTA,B.Sc,F.I.E(I) LIFE FELLOW,INSTITUTION OF ENGINEERS(INDIA), LIFE MEMBER,CONSULTING ENGINEERS’ ASSOCIATION OF INDIA(FIDIC AFFILIATED) MEMBER,ASSOCIATION OF INTERNATIONAL CONSULTANTS(FRANCE) CONSULTANT CHARTERED MECHANICAL ENGINEER MARINE&MATERIAL HANDLING 4-Aug-13 THANK YOU