Nissan Part Fabrication
Maximizing Throughput
Executive Summary
Project to increase throughput, profits, and reducing lead time.
Favorable results:
Increased production capacity by 322,080 pcs per year.
Increased annualized profit of current production demand $62,200.
Increased Profits total $195,032
Reduced machining cost by est. $4000.00 per year.
Reduced 16hrs of production per week.
Team Members:
Project Lead: Eric Mosley
Assistant: Michael LoganDate:11/11/13
5
2
3
4
1
Reason for Selection
Improve Inventory
It has become crucial for the shop floor to remain as spacious as possible yet we must keep our inventory
minimum requirement fully stocked at all times. Reducing cycle times reduces WIP inventory that is stored
on the shop floor.
Shrinking the Herbie
There are several processes that a bed rail must pass through to become a finished part. Of all these
processes the VMC’s stand as the “Herbie” with other processes being 3-8 times faster . It was time to see
what could be done to ease the required buffering. Keep machine running non-stop for 8hr shifts.
Increasing Throughput
We are currently quoting our customer for more work (double current orders). Our customer demands a
good price. By studying and improving current process flow we will be in a better position to know our costs
and needs to take on the additional work and offer more competitive pricing
Increasing Profits
With the customer always demanding a competitive price and our needs to be more profitable we must find
ways to increase profits without increasing our prices. Reducing the time and costs to make the customers
part gives us the ability to meet both external and internal demands.
!
I
$
$
Reduce Machine Wear and Costs
Reducing Cycle times Reduces the odds of working the machine over typical hours to complete an order.
A reduced cycle time equates to more parts in less time resulting in less wear per part. Using Programming
techniques such as “smoothing” to reduce cycle times and wear by minimizing impact movements.
$
2
1
Targets
Reduce Machine Cycle Times by 15%
Reduce Machine Setup Times by 25%
Increase profits by 25%
Reduce Machine Wear and Mechanical downtime
$
4
3
6
5 Increase Throughput per shift 10%
Reduce work hours by 15%6
9 3
12
6
9 3
12
6
9 3
12
Machining Concepts
New Tool Path
Old Tool Path
Tool overlaps paths and
machine must start stop
constantly. Redundant path
overlapping is inefficient and
start stopping is bad on
machine components and
negatively effects machining
speeds.
Tool path does not overlap
itself. All paths are forward
progress. No unnecessary
start/stops. Tool path is
“smoothed” allowing higher
machining speeds, much lower
impact movements and less
wear on machine components.
Tool Path: “Linear Ridged” Previous Method
Tool Path: “Curved Smoothing” Improved Method
By designing the tool path to be a continuous “line” for a longer distance the machine has more ability to
reach max velocity. By designing the tool path with less start/stop points you decrease the need to rely on
machine acceleration. This alone reduces machine wear as it is not trying to stomp the brake and mash
the gas as often. This overall reduces the need to rely on VMC ACC/VO Curve and decreases cycle times.
Reduce Setup Times, Increase Quality
Eliminate Sub-programs
Sub-programs, though useful
can also be cumbersome and
difficult to manage. The ability
to edit or problem solve can be
more time consuming.
With Sub-programming it is
more susceptible to have a
corrupt file and machine crash.
Simplistic File Structure
By Eliminating Sub-programs
there is no longer multiple
programs to make up one
complete program. Before there
were 4-5 files to make one full
program. Now there is simply
one file to keep up with.
Use Digital Edge Finder
Digital Edge Finder removes most
of the human error and guess work
out of Work Offset setups. The
operator simply drives the probe to
the material till the LED lights.
Traditional Edge finders require
more knowledge to use, take more
time to set offsets and are more
prone to inaccuracies.
1 2 3
2
Programs:
140 EB000
504 EA800
504 EB000
96 EB000
90 EA800
90 EB000
504 5X80A
92 5X80A
94 5X80A
23 ZJ00A
91 ZJ30A
Programs:
(O1645)140 Main
(O1646)140 Sub1
(O1647)140 Sub2
(O1648)140 Sub3
(O1649)504EA Main
(O1650) 504EA Sub1
(O1651) 504EA Sub2
(O1652) 504EA Sub3
(O1653)96AB Main
(O1654) 96EB Sub1
(O1655) 96EB Sub2
(O1656) 96EB Sub3
(O1657) 96EB Sub4
3
NewOld
1
Reduce Machine Cycle Times by 15%
Reduce Machine Setup Times by 25%
Increase profits by 25%
Reduce Machine Wear and Mechanical
downtime
$
Final Results to Target
Average CT
Reduction
23%
1
2
3
4
Digital Edge
finder takes
43% less time to
setup machine.
Profit was
increased 32%
average.
Resulting in
+ $62,200
annualized.
Machine wear was
reduced successfully.
Machines no longer
shake and vibrate
during operation
Increase Throughput per shift 10%5
Machines are
covered through
operator breaks and
lunches. Result 8hr up
time, Increased
Throughput 13%
23%
43%
32%
($62,200)
Estimated
$4k
savings
13%
6
9 3
12
6
9 3
12
Reduce work hours by 15%6
Due to all time
savings, required hrs
to produce order fail
16hrs from 7 down to
5 shifts.
29%6
9 3
12
Reduced Machine Cycle Times by 23% = AVG
+1155pcs per shift
Reduced Machine Setup Times by 43% = 30min
per day, = 72pcs per shift
Increased Throughput per shift 13% = AVG
+115pcs per shift
$
Total Results
Additional Throughput
1342pcs per Shift
6710pcs per Week
322,080pcs per Year
Additional Profits
$62,200 realized
$128,832 potential
profit.
$4000.00 Savings
Total year = $195,032
Increased profits by 32% = $62,200 annual
(based off machine time delta only, from the Qtool)
Increased Capacity Potential = $4 x 10% = 0.40
x 1342 x 5days x 48weeks = $128,832 Additional
Profit
Reduced Machine Wear and Mechanical
downtime estimated $4000.00 in annual savings.

Más contenido relacionado

Destacado

Value perception luxury apparel brands
Value perception   luxury apparel brandsValue perception   luxury apparel brands
Value perception luxury apparel brandsAnil Kumar
 
Kontroler 3D
Kontroler 3DKontroler 3D
Kontroler 3Dagamiarz
 
запрошення на семінар
запрошення на семінарзапрошення на семінар
запрошення на семінарdirk_shultzz
 
Studentpresentatie jbc
Studentpresentatie jbcStudentpresentatie jbc
Studentpresentatie jbcSanneReinhard
 
Introduction to 3D Mapping with X3D
Introduction to 3D Mapping with X3DIntroduction to 3D Mapping with X3D
Introduction to 3D Mapping with X3DIan Panganiban
 
Dossier finca parcelas santa maría de la alameda
Dossier finca   parcelas santa maría de la alamedaDossier finca   parcelas santa maría de la alameda
Dossier finca parcelas santa maría de la alamedaCASASDEMADERANATURAL
 
Design process improvement
Design process improvementDesign process improvement
Design process improvementAnil Kumar
 
Luxury today executive summary
Luxury today executive summaryLuxury today executive summary
Luxury today executive summaryAnil Kumar
 
Integrating Geospatial Data to your Applications
Integrating Geospatial Data to your ApplicationsIntegrating Geospatial Data to your Applications
Integrating Geospatial Data to your ApplicationsIan Panganiban
 
Social media: opening up new routes to volunteering
Social media: opening up new routes to volunteeringSocial media: opening up new routes to volunteering
Social media: opening up new routes to volunteeringbenconnor
 
Business development strategy
Business development strategyBusiness development strategy
Business development strategyAnil Kumar
 

Destacado (13)

Pres
PresPres
Pres
 
Value perception luxury apparel brands
Value perception   luxury apparel brandsValue perception   luxury apparel brands
Value perception luxury apparel brands
 
Kontroler 3D
Kontroler 3DKontroler 3D
Kontroler 3D
 
запрошення на семінар
запрошення на семінарзапрошення на семінар
запрошення на семінар
 
Studentpresentatie jbc
Studentpresentatie jbcStudentpresentatie jbc
Studentpresentatie jbc
 
Modal verbs
Modal verbsModal verbs
Modal verbs
 
Introduction to 3D Mapping with X3D
Introduction to 3D Mapping with X3DIntroduction to 3D Mapping with X3D
Introduction to 3D Mapping with X3D
 
Dossier finca parcelas santa maría de la alameda
Dossier finca   parcelas santa maría de la alamedaDossier finca   parcelas santa maría de la alameda
Dossier finca parcelas santa maría de la alameda
 
Design process improvement
Design process improvementDesign process improvement
Design process improvement
 
Luxury today executive summary
Luxury today executive summaryLuxury today executive summary
Luxury today executive summary
 
Integrating Geospatial Data to your Applications
Integrating Geospatial Data to your ApplicationsIntegrating Geospatial Data to your Applications
Integrating Geospatial Data to your Applications
 
Social media: opening up new routes to volunteering
Social media: opening up new routes to volunteeringSocial media: opening up new routes to volunteering
Social media: opening up new routes to volunteering
 
Business development strategy
Business development strategyBusiness development strategy
Business development strategy
 

Similar a Bed Rail Report

JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
ACERCON COLOR REGISTER CONTROL
ACERCON COLOR REGISTER CONTROL ACERCON COLOR REGISTER CONTROL
ACERCON COLOR REGISTER CONTROL ASAIES AUTOMATION
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineLaukik Raut
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTFASI93
 
H0432045055
H0432045055H0432045055
H0432045055theijes
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
GregorySusa-Portfolio
GregorySusa-PortfolioGregorySusa-Portfolio
GregorySusa-PortfolioGregory Susa
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going leanbwu.nl
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhusashi prabhu
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanMohamed Helmy
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)Prasanna3804
 
Vsm and wip with arena simulation
Vsm and wip with  arena simulationVsm and wip with  arena simulation
Vsm and wip with arena simulationuniceder1111
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industryGanesh TN
 
Optimizing Your z/OS Mainframe Through zIIP Offload and SQL Analysis
Optimizing Your z/OS Mainframe Through zIIP Offload and SQL AnalysisOptimizing Your z/OS Mainframe Through zIIP Offload and SQL Analysis
Optimizing Your z/OS Mainframe Through zIIP Offload and SQL AnalysisPrecisely
 

Similar a Bed Rail Report (20)

JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
Enterprise
EnterpriseEnterprise
Enterprise
 
ACERCON COLOR REGISTER CONTROL
ACERCON COLOR REGISTER CONTROL ACERCON COLOR REGISTER CONTROL
ACERCON COLOR REGISTER CONTROL
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
H0432045055
H0432045055H0432045055
H0432045055
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
om
omom
om
 
GregorySusa-Portfolio
GregorySusa-PortfolioGregorySusa-Portfolio
GregorySusa-Portfolio
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu37020766 jit-and-lean-manufacturing-by-sashi-prabhu
37020766 jit-and-lean-manufacturing-by-sashi-prabhu
 
Shigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of LeanShigeo Shingo - The Master Of Lean
Shigeo Shingo - The Master Of Lean
 
Just In Time - JIT
Just In Time - JITJust In Time - JIT
Just In Time - JIT
 
TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)TOYOTA PRODUCTION SYSTEM (TPS)
TOYOTA PRODUCTION SYSTEM (TPS)
 
Vsm and wip with arena simulation
Vsm and wip with  arena simulationVsm and wip with  arena simulation
Vsm and wip with arena simulation
 
OEE
OEEOEE
OEE
 
Case study furniture industry
Case study   furniture industryCase study   furniture industry
Case study furniture industry
 
Optimizing Your z/OS Mainframe Through zIIP Offload and SQL Analysis
Optimizing Your z/OS Mainframe Through zIIP Offload and SQL AnalysisOptimizing Your z/OS Mainframe Through zIIP Offload and SQL Analysis
Optimizing Your z/OS Mainframe Through zIIP Offload and SQL Analysis
 

Bed Rail Report

  • 1. Nissan Part Fabrication Maximizing Throughput Executive Summary Project to increase throughput, profits, and reducing lead time. Favorable results: Increased production capacity by 322,080 pcs per year. Increased annualized profit of current production demand $62,200. Increased Profits total $195,032 Reduced machining cost by est. $4000.00 per year. Reduced 16hrs of production per week. Team Members: Project Lead: Eric Mosley Assistant: Michael LoganDate:11/11/13
  • 2. 5 2 3 4 1 Reason for Selection Improve Inventory It has become crucial for the shop floor to remain as spacious as possible yet we must keep our inventory minimum requirement fully stocked at all times. Reducing cycle times reduces WIP inventory that is stored on the shop floor. Shrinking the Herbie There are several processes that a bed rail must pass through to become a finished part. Of all these processes the VMC’s stand as the “Herbie” with other processes being 3-8 times faster . It was time to see what could be done to ease the required buffering. Keep machine running non-stop for 8hr shifts. Increasing Throughput We are currently quoting our customer for more work (double current orders). Our customer demands a good price. By studying and improving current process flow we will be in a better position to know our costs and needs to take on the additional work and offer more competitive pricing Increasing Profits With the customer always demanding a competitive price and our needs to be more profitable we must find ways to increase profits without increasing our prices. Reducing the time and costs to make the customers part gives us the ability to meet both external and internal demands. ! I $ $ Reduce Machine Wear and Costs Reducing Cycle times Reduces the odds of working the machine over typical hours to complete an order. A reduced cycle time equates to more parts in less time resulting in less wear per part. Using Programming techniques such as “smoothing” to reduce cycle times and wear by minimizing impact movements. $
  • 3. 2 1 Targets Reduce Machine Cycle Times by 15% Reduce Machine Setup Times by 25% Increase profits by 25% Reduce Machine Wear and Mechanical downtime $ 4 3 6 5 Increase Throughput per shift 10% Reduce work hours by 15%6 9 3 12 6 9 3 12 6 9 3 12
  • 4. Machining Concepts New Tool Path Old Tool Path Tool overlaps paths and machine must start stop constantly. Redundant path overlapping is inefficient and start stopping is bad on machine components and negatively effects machining speeds. Tool path does not overlap itself. All paths are forward progress. No unnecessary start/stops. Tool path is “smoothed” allowing higher machining speeds, much lower impact movements and less wear on machine components. Tool Path: “Linear Ridged” Previous Method Tool Path: “Curved Smoothing” Improved Method By designing the tool path to be a continuous “line” for a longer distance the machine has more ability to reach max velocity. By designing the tool path with less start/stop points you decrease the need to rely on machine acceleration. This alone reduces machine wear as it is not trying to stomp the brake and mash the gas as often. This overall reduces the need to rely on VMC ACC/VO Curve and decreases cycle times.
  • 5. Reduce Setup Times, Increase Quality Eliminate Sub-programs Sub-programs, though useful can also be cumbersome and difficult to manage. The ability to edit or problem solve can be more time consuming. With Sub-programming it is more susceptible to have a corrupt file and machine crash. Simplistic File Structure By Eliminating Sub-programs there is no longer multiple programs to make up one complete program. Before there were 4-5 files to make one full program. Now there is simply one file to keep up with. Use Digital Edge Finder Digital Edge Finder removes most of the human error and guess work out of Work Offset setups. The operator simply drives the probe to the material till the LED lights. Traditional Edge finders require more knowledge to use, take more time to set offsets and are more prone to inaccuracies. 1 2 3 2 Programs: 140 EB000 504 EA800 504 EB000 96 EB000 90 EA800 90 EB000 504 5X80A 92 5X80A 94 5X80A 23 ZJ00A 91 ZJ30A Programs: (O1645)140 Main (O1646)140 Sub1 (O1647)140 Sub2 (O1648)140 Sub3 (O1649)504EA Main (O1650) 504EA Sub1 (O1651) 504EA Sub2 (O1652) 504EA Sub3 (O1653)96AB Main (O1654) 96EB Sub1 (O1655) 96EB Sub2 (O1656) 96EB Sub3 (O1657) 96EB Sub4 3 NewOld 1
  • 6. Reduce Machine Cycle Times by 15% Reduce Machine Setup Times by 25% Increase profits by 25% Reduce Machine Wear and Mechanical downtime $ Final Results to Target Average CT Reduction 23% 1 2 3 4 Digital Edge finder takes 43% less time to setup machine. Profit was increased 32% average. Resulting in + $62,200 annualized. Machine wear was reduced successfully. Machines no longer shake and vibrate during operation Increase Throughput per shift 10%5 Machines are covered through operator breaks and lunches. Result 8hr up time, Increased Throughput 13% 23% 43% 32% ($62,200) Estimated $4k savings 13% 6 9 3 12 6 9 3 12 Reduce work hours by 15%6 Due to all time savings, required hrs to produce order fail 16hrs from 7 down to 5 shifts. 29%6 9 3 12
  • 7. Reduced Machine Cycle Times by 23% = AVG +1155pcs per shift Reduced Machine Setup Times by 43% = 30min per day, = 72pcs per shift Increased Throughput per shift 13% = AVG +115pcs per shift $ Total Results Additional Throughput 1342pcs per Shift 6710pcs per Week 322,080pcs per Year Additional Profits $62,200 realized $128,832 potential profit. $4000.00 Savings Total year = $195,032 Increased profits by 32% = $62,200 annual (based off machine time delta only, from the Qtool) Increased Capacity Potential = $4 x 10% = 0.40 x 1342 x 5days x 48weeks = $128,832 Additional Profit Reduced Machine Wear and Mechanical downtime estimated $4000.00 in annual savings.