SlideShare una empresa de Scribd logo
1 de 2
Descargar para leer sin conexión
glz
               ~




   Deutsche Gesellschaft                                                                                                       Directorate General New and
   fUr Intematlonale                                                                                                           Renewable Energy andEnergy
   Zusammenarbelt (GIZ) GmbH                                                                                                   Conservation



                    Mini Hydro Power Project for Capacity Development (MHPP2)

          You r reference, your correspo nden ce dated       Ou r reference	          Telep hone                 Fax                   Dale
                                                                                      +62- 21-527802 5           +62-2 1-5277762       24 .05.20 12


   The GIZ Mini Hydro Power Project for Capacity Building (MHPp2) open for internship

                                                     Location : Jakarta, Indonesia

                                   Period: For a period of 2-6 months (starting as soon as possible)

                                               Background and work of GIZ MHPp 2 :


       MHPP 2 aims to sustainably provide electricity to 90.000 people, 160 institutions, and 290 productive use
       applications through the use of renewable energy technologies. While current technology focus is on micro­
       hydro power (MHP), the project is also considering other technologies such as solar and biomass.
       Experience has shown that sustainability has been an issue while implementing MHP for rural development.
       There have been many cases where installed MHPs failed within a few months or years, far shorter of its
       actual life expectancy. Challenges regarding MHP sustainability vary, from managerial to technical issues
       and occur during both the development and operational process, Monitoring and evaluation are critical to
       ensure performance of the schemes while achieving the project goals, anticipate upcoming problems that
       might arise and promote improvements through lessons learned. Project performance relates directly to
       goals achieved, as well as quality which underpins sustainability of the MHP schemes.
       Ensuring sustainability is performed by a cyclical process that includes regular monitoring , periodic
       evaluation, and adjustments on the implementation process as required. Extensive operations and
       administration training is also conducted on village-level upon the completion of the MHP installation.
       Besides that, our approach to ensure MHP sustainability is also using the installed MHP to increase
       productivity of the community. Until now, we have been working on implementation of appliances that can be
       used as tools to generate income in the communi ty together with local NGOs.

      Students with strong analytical thinking are welcomed to be part of our team for a short period (as mentioned

      above). You will work together with us to empower communities to operate and maintain renewable energy

      installations (specifically MHPs), develop productive use of energy options and develop sustainability

      approaches through performance monitoring.

      Requirements for the intern:

      Fluent in English. Broad basic knowledge in engineering (electrical/physics would be preferable),

      management and administration , economics and/or socio-economic and environmental impact assessments

      is required.

      Important:

      The graduation date of any prospective intern should not be longer ago than six months from when the

      internship is due to start.

      App.lication procedure:

      Candidates for an internship shall apply for an internship with MHPP2 by SUbmitting the following:

  1.	 Updated curriculum vitae (CV) with photograph of candidate
  2.	 Letter of Motivation for the internship (highlighting the candidates reasons for the internship and area of
      interests)
      Applications shall be submitted electronically to:

                                                         Ms Atiek Puspa Fadhilah

                                   Advisor - Mini Hydro Power Project for Capacity Development (MHPp 2 )

                                                        Email: atiekJadhilah@giz .de



MHPP' omce:	                   ASEAN Centre for Energy (AC E) Building. 6'" Floor ,                      T +62-21-5278025 F. +62-21-5277762
                               JI H R. Rasuna Said Block X-2 Kav. 7-8
                               Jakarta 12950, Indonesia
Current internships available:

         Monitoring and Evaluation
         Internship time frame: June - July 2012
         Topic: Monitoring MHP
         Background: The GIZ has supported installation of 136 MHP in several areas in Sumatera and Sulawesi.
         Their operational performance should be monitored and evaluated to ensure theirsustainability. Monitoring
         requires data collection regarding MHP performance includes amount of energy that has been produced and
         consumed by the community, and managerial aspects of the MHP management. Therefore improvements
         can be initiated to raise MHP sustainability.
         Intern main tasks: Support the initiative to build a simple monitoring system for MHP including kWh meter
         installation , and design data capturing mechanism and evaluation which will include various stakeholders.
         Skills required: broad basic knowledge in electrical engineering, spread sheet skills for data capturing ,
         analysis and presentation; report/fact sheet compilation and editing in English; possible rural site visits under
         basic conditions




         Productive Use of Energy
         Internship time frame : July - October 2012
         Topic: Assessment of productive use of energy (PUE) at selected sites
                                     2
         Background: The MHPP has initiated a PUE pilot programme in 11 villages (6 in Sumatera and 5 in
         Sulawesi) with operational MHP schemes. The pilot project aims to identify PUE options and assess their
         financial performance . The field testing of the pilot will be an initial 3-month period (from June - August
         2012). Underlying motive is to introduce appliances that are suitable for rural entrepreneurs to expand their
         production and/or start new enterprises. The key performance indicator will be the value of income
         generated by the PUE appliance. It is anticipated that a total of about 50 appliances will be deployed.
         Successful case studies will subsequently be identified, compiled and presented to key stakeholders (e.g.
         Ministry for Cooperatives, SME support organisations, rural development organisations , etc)
         Intern main tasks : Support the coordination of the PUE pilot programme (monthly monitoring results, data
         analysis, recommendations , consultative meetings with field facilitators) ; prepare and coordinate a
         community survey on opinions and preferences ; identify and compile case studies (according to a pre­
         determined criteria) into fact sheets
         Skills required: spread sheet skills for data capturing , analysis and presentation ; report/fact sheet
         compilation and editing in English; possible rural site visits under basic conditions
         Reference materials (attached):
         - PUE Database Explanatory Manual



        With best regards,




        Dr. Rudolf Rauch
        Principal Advisor
        Mini Hydro Power Project
                                      2
        for Capacity Development (MHPp )




MHPp ' Office	           ASEAN Ce ntre for Energy (AC E) BUilding , 6" Floor.     T. +62-21-52 78025   F. +62-21-52 77762
                         JI. H. R. Rasuna Said Block X-2 Kav. 7-8
                         Jakarta 12950, In donesia

Más contenido relacionado

Destacado

Revista som hi 09-10 bona
Revista som hi 09-10 bonaRevista som hi 09-10 bona
Revista som hi 09-10 bona
albertcamara
 
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag BerlinLeseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Ingolf Ludmann-Schneider
 
Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013
Nicolas Berg
 
El abuso sexual infantil
El abuso sexual infantilEl abuso sexual infantil
El abuso sexual infantil
Areli Balboa
 

Destacado (20)

Capitla humano TIC Argentina 08
Capitla humano TIC Argentina 08Capitla humano TIC Argentina 08
Capitla humano TIC Argentina 08
 
Normas
NormasNormas
Normas
 
Acampan por Muse
Acampan por MuseAcampan por Muse
Acampan por Muse
 
Revista som hi 09-10 bona
Revista som hi 09-10 bonaRevista som hi 09-10 bona
Revista som hi 09-10 bona
 
KASEBA MULANDO CV
KASEBA MULANDO CVKASEBA MULANDO CV
KASEBA MULANDO CV
 
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
The Solar Future DE - Bruce Sohn "By 2013, will it have been possible to achi...
 
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag BerlinLeseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
Leseprobe Buch: „Vendetta“ bei Pax et Bonum Verlag Berlin
 
Mil millones de bocas
Mil millones de bocasMil millones de bocas
Mil millones de bocas
 
Benchmarking Digital: A Digital Experience Index Is Born
Benchmarking Digital: A Digital Experience Index Is BornBenchmarking Digital: A Digital Experience Index Is Born
Benchmarking Digital: A Digital Experience Index Is Born
 
Edificio vicson margarita danies
Edificio vicson   margarita daniesEdificio vicson   margarita danies
Edificio vicson margarita danies
 
Resume revamp
Resume revampResume revamp
Resume revamp
 
Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013Finanzierung startup startimpuls bern jan 2013
Finanzierung startup startimpuls bern jan 2013
 
El abuso sexual infantil
El abuso sexual infantilEl abuso sexual infantil
El abuso sexual infantil
 
Trucos publicitarios colores
Trucos publicitarios coloresTrucos publicitarios colores
Trucos publicitarios colores
 
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
El Big Data y Business Intelligence en mi empresa: ¿de qué me sirve?
 
Cmc origen sistema solar
Cmc origen sistema solarCmc origen sistema solar
Cmc origen sistema solar
 
Unidad3 valoraciones perito
Unidad3 valoraciones peritoUnidad3 valoraciones perito
Unidad3 valoraciones perito
 
Motor and gear engineering specialized in design, engineering and manufactu...
Motor and gear engineering   specialized in design, engineering and manufactu...Motor and gear engineering   specialized in design, engineering and manufactu...
Motor and gear engineering specialized in design, engineering and manufactu...
 
Chapter 3 (brand positioning)
Chapter 3 (brand positioning)Chapter 3 (brand positioning)
Chapter 3 (brand positioning)
 
Demostración de guiones periodísticos televisivos.
Demostración de guiones periodísticos televisivos.Demostración de guiones periodísticos televisivos.
Demostración de guiones periodísticos televisivos.
 

Similar a 120525 af internship invitation

ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
#win(ashwin) Work
 
Global Atlas Training on Planning the Renewable Energy Transition Solar and W...
Global Atlas Training on Planning the Renewable Energy Transition Solar and W...Global Atlas Training on Planning the Renewable Energy Transition Solar and W...
Global Atlas Training on Planning the Renewable Energy Transition Solar and W...
Whitney Chen
 
CV_SAURABH BANCHHOR_B.E_2013 - NEW
CV_SAURABH BANCHHOR_B.E_2013 - NEWCV_SAURABH BANCHHOR_B.E_2013 - NEW
CV_SAURABH BANCHHOR_B.E_2013 - NEW
saurabh banchhor
 
Summer training report on SJVNL
Summer training report on SJVNLSummer training report on SJVNL
Summer training report on SJVNL
Sudhir Negi
 
Mohit Kathel Resume - Welspun
Mohit Kathel Resume - WelspunMohit Kathel Resume - Welspun
Mohit Kathel Resume - Welspun
Mohit Kathel
 
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.pptADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ssuser32c60a1
 
EDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaEDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj Shukla
Pankaj Shukla
 
Final Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_ENFinal Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_EN
William Sabandar
 

Similar a 120525 af internship invitation (20)

CV of Jahangir
CV of JahangirCV of Jahangir
CV of Jahangir
 
ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_ASHWIN A_Senior planning Engineer_
ASHWIN A_Senior planning Engineer_
 
Provisional agenda and presentation for the global atlas training workshop in...
Provisional agenda and presentation for the global atlas training workshop in...Provisional agenda and presentation for the global atlas training workshop in...
Provisional agenda and presentation for the global atlas training workshop in...
 
Global Atlas Training on Planning the Renewable Energy Transition Solar and W...
Global Atlas Training on Planning the Renewable Energy Transition Solar and W...Global Atlas Training on Planning the Renewable Energy Transition Solar and W...
Global Atlas Training on Planning the Renewable Energy Transition Solar and W...
 
A Summer Internship Project Report On Renewable Energy
A Summer Internship Project Report On Renewable EnergyA Summer Internship Project Report On Renewable Energy
A Summer Internship Project Report On Renewable Energy
 
AFD Energy Portfolio in Indonesia.pdf
AFD Energy Portfolio in Indonesia.pdfAFD Energy Portfolio in Indonesia.pdf
AFD Energy Portfolio in Indonesia.pdf
 
CV_SAURABH BANCHHOR_B.E_2013 - NEW
CV_SAURABH BANCHHOR_B.E_2013 - NEWCV_SAURABH BANCHHOR_B.E_2013 - NEW
CV_SAURABH BANCHHOR_B.E_2013 - NEW
 
PREM SINGH
PREM SINGHPREM SINGH
PREM SINGH
 
Summer training report on SJVNL
Summer training report on SJVNLSummer training report on SJVNL
Summer training report on SJVNL
 
Internship topics
Internship topicsInternship topics
Internship topics
 
Climate finance sato (jica)coop geothermal energy dvpt indonesia-ccxg gf marc...
Climate finance sato (jica)coop geothermal energy dvpt indonesia-ccxg gf marc...Climate finance sato (jica)coop geothermal energy dvpt indonesia-ccxg gf marc...
Climate finance sato (jica)coop geothermal energy dvpt indonesia-ccxg gf marc...
 
Mohit Kathel Resume - Welspun
Mohit Kathel Resume - WelspunMohit Kathel Resume - Welspun
Mohit Kathel Resume - Welspun
 
John John_ Resume
John John_ ResumeJohn John_ Resume
John John_ Resume
 
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.pptADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
ADB_MYA_RE_Presentation_31_May2013_FINAL.ppt
 
Experiences and Challenges Faced in Improving Government Building and Street ...
Experiences and Challenges Faced in Improving Government Building and Street ...Experiences and Challenges Faced in Improving Government Building and Street ...
Experiences and Challenges Faced in Improving Government Building and Street ...
 
EDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj ShuklaEDPM Report # 2_ Pankaj Shukla
EDPM Report # 2_ Pankaj Shukla
 
Use of renewable energy for developing country
Use of renewable energy for developing countryUse of renewable energy for developing country
Use of renewable energy for developing country
 
REVISED ENERGY INITIATIVES.pdf
REVISED ENERGY INITIATIVES.pdfREVISED ENERGY INITIATIVES.pdf
REVISED ENERGY INITIATIVES.pdf
 
Final Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_ENFinal Report - P2EBT Task Force_EN
Final Report - P2EBT Task Force_EN
 
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensaHandbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
Handbook - Malaysia Solar FiT feed-in-tariff - renewable energy - EcoSensa
 

Más de Denish Anugra

Dahsyatnya khasiat wudhu
Dahsyatnya khasiat wudhuDahsyatnya khasiat wudhu
Dahsyatnya khasiat wudhu
Denish Anugra
 
Jika allah swt telah mencintai kita
Jika allah swt telah mencintai kitaJika allah swt telah mencintai kita
Jika allah swt telah mencintai kita
Denish Anugra
 
Membuat web-sederhana-dengan-joomla-ilkom
Membuat web-sederhana-dengan-joomla-ilkomMembuat web-sederhana-dengan-joomla-ilkom
Membuat web-sederhana-dengan-joomla-ilkom
Denish Anugra
 
Data Center Kementerian Keuangan
Data Center Kementerian KeuanganData Center Kementerian Keuangan
Data Center Kementerian Keuangan
Denish Anugra
 

Más de Denish Anugra (7)

Fisika dasar-modul
Fisika dasar-modulFisika dasar-modul
Fisika dasar-modul
 
Dahsyatnya khasiat wudhu
Dahsyatnya khasiat wudhuDahsyatnya khasiat wudhu
Dahsyatnya khasiat wudhu
 
Jika allah swt telah mencintai kita
Jika allah swt telah mencintai kitaJika allah swt telah mencintai kita
Jika allah swt telah mencintai kita
 
Tutorial ci
Tutorial ciTutorial ci
Tutorial ci
 
Membuat web-sederhana-dengan-joomla-ilkom
Membuat web-sederhana-dengan-joomla-ilkomMembuat web-sederhana-dengan-joomla-ilkom
Membuat web-sederhana-dengan-joomla-ilkom
 
Data Center Kementerian Keuangan
Data Center Kementerian KeuanganData Center Kementerian Keuangan
Data Center Kementerian Keuangan
 
Tugas
TugasTugas
Tugas
 

Último

CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
giselly40
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Último (20)

08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 

120525 af internship invitation

  • 1. glz ~ Deutsche Gesellschaft Directorate General New and fUr Intematlonale Renewable Energy andEnergy Zusammenarbelt (GIZ) GmbH Conservation Mini Hydro Power Project for Capacity Development (MHPP2) You r reference, your correspo nden ce dated Ou r reference Telep hone Fax Dale +62- 21-527802 5 +62-2 1-5277762 24 .05.20 12 The GIZ Mini Hydro Power Project for Capacity Building (MHPp2) open for internship Location : Jakarta, Indonesia Period: For a period of 2-6 months (starting as soon as possible) Background and work of GIZ MHPp 2 : MHPP 2 aims to sustainably provide electricity to 90.000 people, 160 institutions, and 290 productive use applications through the use of renewable energy technologies. While current technology focus is on micro­ hydro power (MHP), the project is also considering other technologies such as solar and biomass. Experience has shown that sustainability has been an issue while implementing MHP for rural development. There have been many cases where installed MHPs failed within a few months or years, far shorter of its actual life expectancy. Challenges regarding MHP sustainability vary, from managerial to technical issues and occur during both the development and operational process, Monitoring and evaluation are critical to ensure performance of the schemes while achieving the project goals, anticipate upcoming problems that might arise and promote improvements through lessons learned. Project performance relates directly to goals achieved, as well as quality which underpins sustainability of the MHP schemes. Ensuring sustainability is performed by a cyclical process that includes regular monitoring , periodic evaluation, and adjustments on the implementation process as required. Extensive operations and administration training is also conducted on village-level upon the completion of the MHP installation. Besides that, our approach to ensure MHP sustainability is also using the installed MHP to increase productivity of the community. Until now, we have been working on implementation of appliances that can be used as tools to generate income in the communi ty together with local NGOs. Students with strong analytical thinking are welcomed to be part of our team for a short period (as mentioned above). You will work together with us to empower communities to operate and maintain renewable energy installations (specifically MHPs), develop productive use of energy options and develop sustainability approaches through performance monitoring. Requirements for the intern: Fluent in English. Broad basic knowledge in engineering (electrical/physics would be preferable), management and administration , economics and/or socio-economic and environmental impact assessments is required. Important: The graduation date of any prospective intern should not be longer ago than six months from when the internship is due to start. App.lication procedure: Candidates for an internship shall apply for an internship with MHPP2 by SUbmitting the following: 1. Updated curriculum vitae (CV) with photograph of candidate 2. Letter of Motivation for the internship (highlighting the candidates reasons for the internship and area of interests) Applications shall be submitted electronically to: Ms Atiek Puspa Fadhilah Advisor - Mini Hydro Power Project for Capacity Development (MHPp 2 ) Email: atiekJadhilah@giz .de MHPP' omce: ASEAN Centre for Energy (AC E) Building. 6'" Floor , T +62-21-5278025 F. +62-21-5277762 JI H R. Rasuna Said Block X-2 Kav. 7-8 Jakarta 12950, Indonesia
  • 2. Current internships available: Monitoring and Evaluation Internship time frame: June - July 2012 Topic: Monitoring MHP Background: The GIZ has supported installation of 136 MHP in several areas in Sumatera and Sulawesi. Their operational performance should be monitored and evaluated to ensure theirsustainability. Monitoring requires data collection regarding MHP performance includes amount of energy that has been produced and consumed by the community, and managerial aspects of the MHP management. Therefore improvements can be initiated to raise MHP sustainability. Intern main tasks: Support the initiative to build a simple monitoring system for MHP including kWh meter installation , and design data capturing mechanism and evaluation which will include various stakeholders. Skills required: broad basic knowledge in electrical engineering, spread sheet skills for data capturing , analysis and presentation; report/fact sheet compilation and editing in English; possible rural site visits under basic conditions Productive Use of Energy Internship time frame : July - October 2012 Topic: Assessment of productive use of energy (PUE) at selected sites 2 Background: The MHPP has initiated a PUE pilot programme in 11 villages (6 in Sumatera and 5 in Sulawesi) with operational MHP schemes. The pilot project aims to identify PUE options and assess their financial performance . The field testing of the pilot will be an initial 3-month period (from June - August 2012). Underlying motive is to introduce appliances that are suitable for rural entrepreneurs to expand their production and/or start new enterprises. The key performance indicator will be the value of income generated by the PUE appliance. It is anticipated that a total of about 50 appliances will be deployed. Successful case studies will subsequently be identified, compiled and presented to key stakeholders (e.g. Ministry for Cooperatives, SME support organisations, rural development organisations , etc) Intern main tasks : Support the coordination of the PUE pilot programme (monthly monitoring results, data analysis, recommendations , consultative meetings with field facilitators) ; prepare and coordinate a community survey on opinions and preferences ; identify and compile case studies (according to a pre­ determined criteria) into fact sheets Skills required: spread sheet skills for data capturing , analysis and presentation ; report/fact sheet compilation and editing in English; possible rural site visits under basic conditions Reference materials (attached): - PUE Database Explanatory Manual With best regards, Dr. Rudolf Rauch Principal Advisor Mini Hydro Power Project 2 for Capacity Development (MHPp ) MHPp ' Office ASEAN Ce ntre for Energy (AC E) BUilding , 6" Floor. T. +62-21-52 78025 F. +62-21-52 77762 JI. H. R. Rasuna Said Block X-2 Kav. 7-8 Jakarta 12950, In donesia