Closing MG Steam &
 Condensate System on a Paper
          Machine

                                   Abstract:
This paper presents how the ineffective condensate removal problem can be
eliminated from the MG by closing MG steam & condensate system just by
changing condensate piping of suitable size. In addition to a trouble free
operation, boiler fuel saving, lower dependency of equipments, electricity saving
can be achieved by directing condensate from MG directly to boiler house. In
addition, a higher condensate return can be obtained by recovering flash steam
fully or partially.




                                   By:
                                D K Singhal
                      deveshksinghal@rediffmail.com
                        Chandpur Enterprises Ltd.,
                     Noorpur Road, Chandpur –246725
                        Dist. BIJNOR (U.P.), INDIA




                                                                                    1
Introduction:

Energy conservation has been a topic of interest for almost all involved in any
type of operation due to ever increasing costs of energy and fuel. As a tool of
energy conservation, system closure plays a vital role. As the paper making
involves drying of paper by utilization of latent heat content available in steam,
the condensate is generated. The purpose to recover the condensate generally is
to reuse heat content available in it, but, as a solution to a different problem, it
has been found that the condensate can be transferred more efficiently to boiler
house without much effort.

Case History:

In a particular case, it was observed that in a waste paper based mill, steam
consumption in hydrapulping or pulp mill-stock preparation section was virtually
nil. All the steam was being used only for paper machine. Once again, in absence
of any flow meter, a time totalizer was connected with the only boiler feed pump
and a daily reading was taken used to get the total run hours of boiler feed pump,
which multiplied with the pump flow rate gives steam consumption. Analyzing
the pump running hours on a daily basis, it was found that the boiler feed pump
run hours could be considered to be good indicative of steam consumption.

Since the beginning, the mill faced a problem of frequent vibrations in MG and
MG framings due to improper water removal from MG. After frequent problems,
it was thought that only one steam trap of 2” size was inadequate and another trap
of same size was installed in parallel to the previous one. The problem reduced
significantly, but still appeared almost every fortnight. Then alongwith inverted
bucket type, thermodynamic traps were also installed thinking that the bucket
might be stuck to the body of trap. The problem remained the same. Finally, a
bypass line was provided without any steam trap to condensate tank (Open to
atmosphere), so that in case any problem appears, the machine personnel may
empty out MG with that line. But, by this time the machine personnel were so
frightened of the problem that they made it a habit to use the bypass line always
open to condensate tank. This resulted in heavy steam losses and the steam
consumption increased by around 15-25% in a month as significant quantity of
steam was now being released to atmosphere along with condensate.




                                                                                       2
Action Taken:

To analyze the problem, data was collected on MG pressure during different
conditions. It was observed that the pressure remained at around 2.8 Kg/cm2g
during normal operation. During short breaks at wire, or MG-pope reel, the
pressure remained nearly the same as the duration of the break was of the order
of 1-4 minutes. For relatively longer breaks or small shuts of 15-45 minutes, such
as quality change, system washing, wire & felt cleaning, the pressure was kept at
around 1-1.5 bar. For longer shuts such as clothing change, monthly maintenance
shut etc. the pressure was reduced down to zero, but such instances were only just
a couple or so per month.

On the basis of above data it was thought if we could supply condensate directly
to the boiler house by means of pressure inside MG, saving on following points
could be achieved-

1.    No breakdown due to MG hammering due to improper removal of
      condensate.
2.    No need of Condensate pump (3 HP) – a saving of around RS. 180/- per
      day.
3.    No wastage of flash steam near machine house resulting in boiler feed
      water temperature increase by around 20 C, approximating a saving of
      around RS. 250/- per day.
4.    No moving parts in the system, (pumps, steam traps etc.) hence no
      maintenance.


Now, the steam flow rate was computed by multiplying boiler feed pump running
hours with pump flow capacity. With this value, the condensate flow velocity
was calculated. It was observed that the nominal speed was of the order of 0.2
m/s only in a 2” pipeline. In order to increase the flow velocity so that the
pressure drop in the line increases, and hence steam flashing is reduced, the
pipeline diameter was reduced to 20 mm ID only for a length of around 2 Mts.
The purpose of smaller pipe section was to ensure that pressure drop across
complete pipeline is lower, while, only a narrow path is available for the
condensate and steam thus ensuring lower steam losses. This line was then
directed to boiler feed water tank. The steam losses were found to be reduced
drastically after this scheme was implemented. At first time, when the machine
was started after a long shut of a few days due to some other reason, improper
condensate removal was observed initially due to low MG pressure. Hence a

                                                                                   3
bypass line was fitted in order to drain the condensate during startups. This line
was used for nearly one hour during startup, and as soon as the MG pressure
reached to normal value, condensate was directed to boiler directly. The total
investment incurred for the modification of pipelines, giving extra valves, labour
for fitting work etc. was calculated to be of the order of RS. 4000/- only.
Furthermore, as fitted earlier, three steam traps were freed from the system,
which could be used elsewhere, if required.

Steam Wastage from Proposed System:

One may question the utility of proposed system that in absence of any steam
trap, a lot of steam will be wasted. It was tried to evaluate the quantity of
maximum possible steam wastage by the proposed method. The following
assumptions are being taken:

Diameter of pipeline:                  20 mm
Steam pressure inside MG               2.8 Kg/cm2
Steam velocity in the pipeline         20 m/s

Volumetric flow rate of steam          3.14 * 0.02 * 0.02 * 20 / 4 m3/sec.
                                       = 0.00628 m3/sec
                                       = 22 m3/hr

At 2.8 Kg/cm2g, specific volume        0.49 m3/Kg
Steam Flow Possible in the line        22/0.49 Kg/Hr.
                                       = 44 Kg/Hr.

If the normal steam consumption is of the order of 2200 Kg/hr, the maximum
possible steam loss accounts for a maximum of 2%. Furthermore, as proposed
hereunder, instrumentation can be used to reduce these losses to zero.

Instrumentation:

Many mills may like to add instrumentation to such systems. A logic has been
developed for incorporation of the instrumentation for automatic control of
condensate flow to the boiler house.

1.    A pressurized condensate tank is used to receive all condensate from MG.
      This tank is connected without any inlet valve.


                                                                                     4
2.    At the bottom of tank a pipeline is connected which transfers the
      condensate to boiler house. The pipeline is so designed that the condensate
      flow rate in the line is of the order of 2-3 m/s. This is done to ensure that
      only condensate with no or very less steam is sent to boiler house.
3.    The above pipeline has a control valve which controls the level in the tank
      using lever transmitter and a controller. If the level is high, the control
      valve is opened, and if the level is low, the control valve opening reduces.
4.    Another ON/OFF type drain valve (solenoid valve) is fitted in the bottom
      of tank that opens up if either the level is higher than alarm value or the
      pressure is below a critical value at which condensate ceases to flow to
      boiler house.
5.    A manual drain valve is provided in the tank for draining this tank during
      emergency. Safety valve of course is not very much needed, as in this tank;
      pressure cannot be more than MG pressure. Still, if desired so, a safety
      valve may be given.

Earlier, it was decided to observe the performance of above system for a few
months, before investing for the instrumentation as discussed above. Later on
when it was found that no MG hammering was observed after modification in
condensate piping, even in two years. Again steam consumption did not increase
using above system, the installation of instrumentation was ruled out and decided
to let system work as it is. It was also noted that using the above system, the
boiler feed water temperature that remained to the tune of 60 deg. Centigrade,
could be increased to 95 deg. Centigrade. In this way, no steam was required to
further heat up the condensate.

Installation of Heat Exchanger:

To further increase the condensate return, it was planned to install a heat
exchanger in the condensate line. This heat exchanger acts as heat exchanger as
well as a condenser. The fresh water is passed through the heat exchanger and hot
water coming out of heat exchanger is used for different purposes, within the
plant. The amount of flash vapors can be calculated as under-

Steam Pressure in MG:                  2.8 Kg/cm2
Condensate Pressure:                   2.8 Kg/cm2
Condensate Enthalpy:                   141.8 Kcal/Kg
After flashing, condensate enthalpy    99.2 Kcal/Kg
Flash Vapor enthalpy:                  638.8 Kcal/Kg
Flash Vapors generated                 (141.8-99.2)/(638.8-99.2)

                                                                                      5
= 0.0789 Kg/Kg steam
                                       = 8%

By installing the heat exchanger, condensate return was increased by 8%,
obviously, as more condensate was being available, the blow down could be
reduced significantly without any problem. Even if the gains due to application of
hot water in different applications are ignored, the reduced blow downs make the
investment very much viable with a payback period of a few months. The above
systems have been discussed in figures 1,2, and 3 given at the end of this paper.

Overall Benefits:

By the proposed work, the following benefits were observed-

1.    The MG hammering problems were completely eliminated. Hence down
      time due to above problem was reduced by 100%.
2.    Steam consumption was reduced by nearly 5%.
3.    Condensate return was increased to 92-95%.
4.    Blow downs were drastically reduced.
5.    Hot water became available for pulp mill and paper machine showering
      purpose, using the waste heat with flash steam.
6.    Application of boiler descaling chemicals was completely eliminated.
7.    If there is some air present inside MG, heat transfer is reduced drastically.
      This air also restricts to flow of condensate through steam trap. With the
      system discussed above, such possibilities are completely eliminated, and
      even the production can be increased to certain extent.

Conclusion:

After modification in condensate piping, and installation of heat exchanger,
condensate return about 95% could be achieved. After successful operation for a
long time, it is now clear that the best way for condensate removal to let it flow
without any restriction.




                                                                                      6
Hot Water To
                                                Process

                   Vapours


Cooling Water                 Condenser



Hot
Condensate
               Evaporator                   Heat Exchanger




                                                       Boiler Feed Tank



             Fig. 1: System for Improving Condensate Return




                                                                   7
Pressure
                                        Gauge


                                                                LIC


  Feed Pressurised Condensate                                    To Boiler House




                                          Low
                                          Pressure
                                          Switch

                   Manual Drain Valve
                                        Automatic Drain Valve
                                        (to open if pressure is low, or level is high)




Fig. 2: Instrumentation Schematic for Direct Condensate Transfer




                                                                                         8
Hot Cooling Water


Pressurised Condensate
From Dryer 1
         Dryer 2
         Dryer 3
         Dryer 4
         Dryer 5


                                     Cooling Water                  To Boiler House
                                                     Intermediate
                                                     Condensate
                                                     Collecting
                                                     Tank




Fig. 3: Heat Exchanger for Condensate Heat Recovery for
Multiple Dryers




                                                                                      9

Más contenido relacionado

La actualidad más candente

Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13Payden Sewell
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performanceHashim Hasnain Hadi
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesVaibhav Paydelwar
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...Ajay Singhal
 
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Raghab Gorain
 
A Study of Boiler Efficiency
A Study of Boiler EfficiencyA Study of Boiler Efficiency
A Study of Boiler EfficiencyEthan Grabill
 
Deaerator -thermal power plants
Deaerator  -thermal power plantsDeaerator  -thermal power plants
Deaerator -thermal power plantsAshish Kumar Jain
 
Revamps for Ageing Methanol Plants
Revamps for Ageing Methanol PlantsRevamps for Ageing Methanol Plants
Revamps for Ageing Methanol PlantsGerard B. Hawkins
 
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@SSEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@SSamriddha Shil
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantHareesh VS
 
Boiler accessories
Boiler accessoriesBoiler accessories
Boiler accessoriesrudrik joshi
 

La actualidad más candente (20)

High Pressure Boilers
High Pressure BoilersHigh Pressure Boilers
High Pressure Boilers
 
Forbes Marshall Boilers
Forbes Marshall BoilersForbes Marshall Boilers
Forbes Marshall Boilers
 
Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13Boiler and steam system seminar short version 05 29-13
Boiler and steam system seminar short version 05 29-13
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performance
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Boiler Superheater Design Modification
Boiler Superheater Design ModificationBoiler Superheater Design Modification
Boiler Superheater Design Modification
 
Turbine
TurbineTurbine
Turbine
 
Super critical boiler
Super critical boilerSuper critical boiler
Super critical boiler
 
Boiler blowdown
Boiler blowdownBoiler blowdown
Boiler blowdown
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
Indian scenario of super critical power plants issues and challenges by ntpc...
Indian scenario of super critical power plants  issues and challenges by ntpc...Indian scenario of super critical power plants  issues and challenges by ntpc...
Indian scenario of super critical power plants issues and challenges by ntpc...
 
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
Super Critical Technology-Fundamental Concepts about Super Critical Technolog...
 
A Study of Boiler Efficiency
A Study of Boiler EfficiencyA Study of Boiler Efficiency
A Study of Boiler Efficiency
 
Deaerator -thermal power plants
Deaerator  -thermal power plantsDeaerator  -thermal power plants
Deaerator -thermal power plants
 
Developments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power BoilersDevelopments in Industrial Boilers, WHR and Power Boilers
Developments in Industrial Boilers, WHR and Power Boilers
 
Revamps for Ageing Methanol Plants
Revamps for Ageing Methanol PlantsRevamps for Ageing Methanol Plants
Revamps for Ageing Methanol Plants
 
Aprds system
Aprds systemAprds system
Aprds system
 
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@SSEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
SEMINAR ON SUPER CRITICAL BOILER....SAMRIDDHA SHIL.....S@S
 
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power PlantWater steam Circuit in Supercritical Boiler for 660MW Power Plant
Water steam Circuit in Supercritical Boiler for 660MW Power Plant
 
Boiler accessories
Boiler accessoriesBoiler accessories
Boiler accessories
 

Similar a Closing MG Steam & Condensate System Saves Energy

NTPC ,sipat voccational training
NTPC ,sipat voccational trainingNTPC ,sipat voccational training
NTPC ,sipat voccational trainingbhumit1
 
Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...
Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...
Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...IJERA Editor
 
Entering Into the Spirit of Energy Saving
Entering Into the Spirit of Energy SavingEntering Into the Spirit of Energy Saving
Entering Into the Spirit of Energy SavingEMEX
 
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersEnergy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersThermodyne Engineering systems
 
Performance optimization of thermal systems in textile industries
Performance optimization of thermal systems in textile industriesPerformance optimization of thermal systems in textile industries
Performance optimization of thermal systems in textile industriesIOSR Journals
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Report on Industrial Training
Report on Industrial TrainingReport on Industrial Training
Report on Industrial TrainingNashiyat Fyza
 
Heat pump water heaters
Heat pump water heatersHeat pump water heaters
Heat pump water heatersVikas Markanda
 
Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...RAJESHKUMAR4616
 
Boiler doc 08 control application
Boiler doc 08   control applicationBoiler doc 08   control application
Boiler doc 08 control applicationMars Tsani
 
PakistanPetroleumLtd_InternshipReport
PakistanPetroleumLtd_InternshipReportPakistanPetroleumLtd_InternshipReport
PakistanPetroleumLtd_InternshipReportQassam Sarmad
 
H&MProject_TylerLenzen_Spring2014
H&MProject_TylerLenzen_Spring2014H&MProject_TylerLenzen_Spring2014
H&MProject_TylerLenzen_Spring2014Tyler Lenzen
 
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIATENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIAAvinash Kumar
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training ReportNiravDesai66
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccppDurgSingh
 
Boiler doc 01 intro
Boiler doc 01   introBoiler doc 01   intro
Boiler doc 01 introMars Tsani
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperiencePooja Agarwal
 

Similar a Closing MG Steam & Condensate System Saves Energy (20)

Article - 2012 PTQ Q1
Article - 2012 PTQ Q1Article - 2012 PTQ Q1
Article - 2012 PTQ Q1
 
NTPC ,sipat voccational training
NTPC ,sipat voccational trainingNTPC ,sipat voccational training
NTPC ,sipat voccational training
 
Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...
Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...
Experimental Study on Heat Recovery from Continuous Blow down Water And Reduc...
 
Entering Into the Spirit of Energy Saving
Entering Into the Spirit of Energy SavingEntering Into the Spirit of Energy Saving
Entering Into the Spirit of Energy Saving
 
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne BoilersEnergy Saving Tips For Steam Boiler - Thermodyne Boilers
Energy Saving Tips For Steam Boiler - Thermodyne Boilers
 
Performance optimization of thermal systems in textile industries
Performance optimization of thermal systems in textile industriesPerformance optimization of thermal systems in textile industries
Performance optimization of thermal systems in textile industries
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Report on Industrial Training
Report on Industrial TrainingReport on Industrial Training
Report on Industrial Training
 
Heat pump water heaters
Heat pump water heatersHeat pump water heaters
Heat pump water heaters
 
Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...
 
Boiler doc 08 control application
Boiler doc 08   control applicationBoiler doc 08   control application
Boiler doc 08 control application
 
PakistanPetroleumLtd_InternshipReport
PakistanPetroleumLtd_InternshipReportPakistanPetroleumLtd_InternshipReport
PakistanPetroleumLtd_InternshipReport
 
Model 8.1-pressure control
Model 8.1-pressure controlModel 8.1-pressure control
Model 8.1-pressure control
 
H&MProject_TylerLenzen_Spring2014
H&MProject_TylerLenzen_Spring2014H&MProject_TylerLenzen_Spring2014
H&MProject_TylerLenzen_Spring2014
 
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIATENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
TENUGHAT THERMAL POWER STATION, T.T.P.S. LALPANIA
 
Sabardairy Training Report
Sabardairy Training ReportSabardairy Training Report
Sabardairy Training Report
 
Ppt of internship at dccpp
Ppt of internship at dccppPpt of internship at dccpp
Ppt of internship at dccpp
 
Boiler doc 01 intro
Boiler doc 01   introBoiler doc 01   intro
Boiler doc 01 intro
 
Soot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field ExperienceSoot Blowing Optimization- Field Experience
Soot Blowing Optimization- Field Experience
 
Adm apn051-en
Adm apn051-enAdm apn051-en
Adm apn051-en
 

Más de deveshksinghal

Steam Flow Measurement By Dk Singhal
Steam Flow Measurement By Dk SinghalSteam Flow Measurement By Dk Singhal
Steam Flow Measurement By Dk Singhaldeveshksinghal
 
Mild Steel Mg Cylinder
Mild Steel Mg CylinderMild Steel Mg Cylinder
Mild Steel Mg Cylinderdeveshksinghal
 
Paper Mill Effluents By D K Singhal
Paper Mill Effluents By D K SinghalPaper Mill Effluents By D K Singhal
Paper Mill Effluents By D K Singhaldeveshksinghal
 
Optimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K SinghalOptimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K Singhaldeveshksinghal
 
Manpower Trainingby D K Singhal
Manpower Trainingby D K SinghalManpower Trainingby D K Singhal
Manpower Trainingby D K Singhaldeveshksinghal
 
Condensate Collection By Dk Singhal
Condensate Collection By Dk SinghalCondensate Collection By Dk Singhal
Condensate Collection By Dk Singhaldeveshksinghal
 
Benchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K SinghalBenchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K Singhaldeveshksinghal
 
Basis Weight Control By D K Singhal
Basis Weight Control By D K SinghalBasis Weight Control By D K Singhal
Basis Weight Control By D K Singhaldeveshksinghal
 
Optimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K SinghalOptimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K Singhaldeveshksinghal
 
Benchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K SinghalBenchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K Singhaldeveshksinghal
 

Más de deveshksinghal (10)

Steam Flow Measurement By Dk Singhal
Steam Flow Measurement By Dk SinghalSteam Flow Measurement By Dk Singhal
Steam Flow Measurement By Dk Singhal
 
Mild Steel Mg Cylinder
Mild Steel Mg CylinderMild Steel Mg Cylinder
Mild Steel Mg Cylinder
 
Paper Mill Effluents By D K Singhal
Paper Mill Effluents By D K SinghalPaper Mill Effluents By D K Singhal
Paper Mill Effluents By D K Singhal
 
Optimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K SinghalOptimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K Singhal
 
Manpower Trainingby D K Singhal
Manpower Trainingby D K SinghalManpower Trainingby D K Singhal
Manpower Trainingby D K Singhal
 
Condensate Collection By Dk Singhal
Condensate Collection By Dk SinghalCondensate Collection By Dk Singhal
Condensate Collection By Dk Singhal
 
Benchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K SinghalBenchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K Singhal
 
Basis Weight Control By D K Singhal
Basis Weight Control By D K SinghalBasis Weight Control By D K Singhal
Basis Weight Control By D K Singhal
 
Optimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K SinghalOptimization Of Grade Change By D K Singhal
Optimization Of Grade Change By D K Singhal
 
Benchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K SinghalBenchmarking In Papermaking Processes By D K Singhal
Benchmarking In Papermaking Processes By D K Singhal
 

Último

Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 

Último (20)

Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 

Closing MG Steam & Condensate System Saves Energy

  • 1. Closing MG Steam & Condensate System on a Paper Machine Abstract: This paper presents how the ineffective condensate removal problem can be eliminated from the MG by closing MG steam & condensate system just by changing condensate piping of suitable size. In addition to a trouble free operation, boiler fuel saving, lower dependency of equipments, electricity saving can be achieved by directing condensate from MG directly to boiler house. In addition, a higher condensate return can be obtained by recovering flash steam fully or partially. By: D K Singhal deveshksinghal@rediffmail.com Chandpur Enterprises Ltd., Noorpur Road, Chandpur –246725 Dist. BIJNOR (U.P.), INDIA 1
  • 2. Introduction: Energy conservation has been a topic of interest for almost all involved in any type of operation due to ever increasing costs of energy and fuel. As a tool of energy conservation, system closure plays a vital role. As the paper making involves drying of paper by utilization of latent heat content available in steam, the condensate is generated. The purpose to recover the condensate generally is to reuse heat content available in it, but, as a solution to a different problem, it has been found that the condensate can be transferred more efficiently to boiler house without much effort. Case History: In a particular case, it was observed that in a waste paper based mill, steam consumption in hydrapulping or pulp mill-stock preparation section was virtually nil. All the steam was being used only for paper machine. Once again, in absence of any flow meter, a time totalizer was connected with the only boiler feed pump and a daily reading was taken used to get the total run hours of boiler feed pump, which multiplied with the pump flow rate gives steam consumption. Analyzing the pump running hours on a daily basis, it was found that the boiler feed pump run hours could be considered to be good indicative of steam consumption. Since the beginning, the mill faced a problem of frequent vibrations in MG and MG framings due to improper water removal from MG. After frequent problems, it was thought that only one steam trap of 2” size was inadequate and another trap of same size was installed in parallel to the previous one. The problem reduced significantly, but still appeared almost every fortnight. Then alongwith inverted bucket type, thermodynamic traps were also installed thinking that the bucket might be stuck to the body of trap. The problem remained the same. Finally, a bypass line was provided without any steam trap to condensate tank (Open to atmosphere), so that in case any problem appears, the machine personnel may empty out MG with that line. But, by this time the machine personnel were so frightened of the problem that they made it a habit to use the bypass line always open to condensate tank. This resulted in heavy steam losses and the steam consumption increased by around 15-25% in a month as significant quantity of steam was now being released to atmosphere along with condensate. 2
  • 3. Action Taken: To analyze the problem, data was collected on MG pressure during different conditions. It was observed that the pressure remained at around 2.8 Kg/cm2g during normal operation. During short breaks at wire, or MG-pope reel, the pressure remained nearly the same as the duration of the break was of the order of 1-4 minutes. For relatively longer breaks or small shuts of 15-45 minutes, such as quality change, system washing, wire & felt cleaning, the pressure was kept at around 1-1.5 bar. For longer shuts such as clothing change, monthly maintenance shut etc. the pressure was reduced down to zero, but such instances were only just a couple or so per month. On the basis of above data it was thought if we could supply condensate directly to the boiler house by means of pressure inside MG, saving on following points could be achieved- 1. No breakdown due to MG hammering due to improper removal of condensate. 2. No need of Condensate pump (3 HP) – a saving of around RS. 180/- per day. 3. No wastage of flash steam near machine house resulting in boiler feed water temperature increase by around 20 C, approximating a saving of around RS. 250/- per day. 4. No moving parts in the system, (pumps, steam traps etc.) hence no maintenance. Now, the steam flow rate was computed by multiplying boiler feed pump running hours with pump flow capacity. With this value, the condensate flow velocity was calculated. It was observed that the nominal speed was of the order of 0.2 m/s only in a 2” pipeline. In order to increase the flow velocity so that the pressure drop in the line increases, and hence steam flashing is reduced, the pipeline diameter was reduced to 20 mm ID only for a length of around 2 Mts. The purpose of smaller pipe section was to ensure that pressure drop across complete pipeline is lower, while, only a narrow path is available for the condensate and steam thus ensuring lower steam losses. This line was then directed to boiler feed water tank. The steam losses were found to be reduced drastically after this scheme was implemented. At first time, when the machine was started after a long shut of a few days due to some other reason, improper condensate removal was observed initially due to low MG pressure. Hence a 3
  • 4. bypass line was fitted in order to drain the condensate during startups. This line was used for nearly one hour during startup, and as soon as the MG pressure reached to normal value, condensate was directed to boiler directly. The total investment incurred for the modification of pipelines, giving extra valves, labour for fitting work etc. was calculated to be of the order of RS. 4000/- only. Furthermore, as fitted earlier, three steam traps were freed from the system, which could be used elsewhere, if required. Steam Wastage from Proposed System: One may question the utility of proposed system that in absence of any steam trap, a lot of steam will be wasted. It was tried to evaluate the quantity of maximum possible steam wastage by the proposed method. The following assumptions are being taken: Diameter of pipeline: 20 mm Steam pressure inside MG 2.8 Kg/cm2 Steam velocity in the pipeline 20 m/s Volumetric flow rate of steam 3.14 * 0.02 * 0.02 * 20 / 4 m3/sec. = 0.00628 m3/sec = 22 m3/hr At 2.8 Kg/cm2g, specific volume 0.49 m3/Kg Steam Flow Possible in the line 22/0.49 Kg/Hr. = 44 Kg/Hr. If the normal steam consumption is of the order of 2200 Kg/hr, the maximum possible steam loss accounts for a maximum of 2%. Furthermore, as proposed hereunder, instrumentation can be used to reduce these losses to zero. Instrumentation: Many mills may like to add instrumentation to such systems. A logic has been developed for incorporation of the instrumentation for automatic control of condensate flow to the boiler house. 1. A pressurized condensate tank is used to receive all condensate from MG. This tank is connected without any inlet valve. 4
  • 5. 2. At the bottom of tank a pipeline is connected which transfers the condensate to boiler house. The pipeline is so designed that the condensate flow rate in the line is of the order of 2-3 m/s. This is done to ensure that only condensate with no or very less steam is sent to boiler house. 3. The above pipeline has a control valve which controls the level in the tank using lever transmitter and a controller. If the level is high, the control valve is opened, and if the level is low, the control valve opening reduces. 4. Another ON/OFF type drain valve (solenoid valve) is fitted in the bottom of tank that opens up if either the level is higher than alarm value or the pressure is below a critical value at which condensate ceases to flow to boiler house. 5. A manual drain valve is provided in the tank for draining this tank during emergency. Safety valve of course is not very much needed, as in this tank; pressure cannot be more than MG pressure. Still, if desired so, a safety valve may be given. Earlier, it was decided to observe the performance of above system for a few months, before investing for the instrumentation as discussed above. Later on when it was found that no MG hammering was observed after modification in condensate piping, even in two years. Again steam consumption did not increase using above system, the installation of instrumentation was ruled out and decided to let system work as it is. It was also noted that using the above system, the boiler feed water temperature that remained to the tune of 60 deg. Centigrade, could be increased to 95 deg. Centigrade. In this way, no steam was required to further heat up the condensate. Installation of Heat Exchanger: To further increase the condensate return, it was planned to install a heat exchanger in the condensate line. This heat exchanger acts as heat exchanger as well as a condenser. The fresh water is passed through the heat exchanger and hot water coming out of heat exchanger is used for different purposes, within the plant. The amount of flash vapors can be calculated as under- Steam Pressure in MG: 2.8 Kg/cm2 Condensate Pressure: 2.8 Kg/cm2 Condensate Enthalpy: 141.8 Kcal/Kg After flashing, condensate enthalpy 99.2 Kcal/Kg Flash Vapor enthalpy: 638.8 Kcal/Kg Flash Vapors generated (141.8-99.2)/(638.8-99.2) 5
  • 6. = 0.0789 Kg/Kg steam = 8% By installing the heat exchanger, condensate return was increased by 8%, obviously, as more condensate was being available, the blow down could be reduced significantly without any problem. Even if the gains due to application of hot water in different applications are ignored, the reduced blow downs make the investment very much viable with a payback period of a few months. The above systems have been discussed in figures 1,2, and 3 given at the end of this paper. Overall Benefits: By the proposed work, the following benefits were observed- 1. The MG hammering problems were completely eliminated. Hence down time due to above problem was reduced by 100%. 2. Steam consumption was reduced by nearly 5%. 3. Condensate return was increased to 92-95%. 4. Blow downs were drastically reduced. 5. Hot water became available for pulp mill and paper machine showering purpose, using the waste heat with flash steam. 6. Application of boiler descaling chemicals was completely eliminated. 7. If there is some air present inside MG, heat transfer is reduced drastically. This air also restricts to flow of condensate through steam trap. With the system discussed above, such possibilities are completely eliminated, and even the production can be increased to certain extent. Conclusion: After modification in condensate piping, and installation of heat exchanger, condensate return about 95% could be achieved. After successful operation for a long time, it is now clear that the best way for condensate removal to let it flow without any restriction. 6
  • 7. Hot Water To Process Vapours Cooling Water Condenser Hot Condensate Evaporator Heat Exchanger Boiler Feed Tank Fig. 1: System for Improving Condensate Return 7
  • 8. Pressure Gauge LIC Feed Pressurised Condensate To Boiler House Low Pressure Switch Manual Drain Valve Automatic Drain Valve (to open if pressure is low, or level is high) Fig. 2: Instrumentation Schematic for Direct Condensate Transfer 8
  • 9. Hot Cooling Water Pressurised Condensate From Dryer 1 Dryer 2 Dryer 3 Dryer 4 Dryer 5 Cooling Water To Boiler House Intermediate Condensate Collecting Tank Fig. 3: Heat Exchanger for Condensate Heat Recovery for Multiple Dryers 9