LONDON CITY HALL |A
Holistic Design Approach
Architect: Foster + Partners
Location: London, England
Completed: 2002
Size: 130,000 sq ft
Structural Engineer: Arup
Owner: More London Development Ltd.
Current Tenants: Greater London Authority
THE ENVIRONMENTAL CRISIS
Since the turn of the millennium, a heightened
awareness of the world’s environmental issues has
surfaced. Studies done around the world have
concluded that buildings are responsible for consuming
half of the total amount of energy consumed in the
developed world. In addition, few people are aware that
buildings are responsible for producing half of the
world’s carbon dioxide emissions.
With this rising knowledge, it is apparent that
architecture and the incorporation of innovative design
strategies have the potential to dramatically influence the
earth’s well being. As technology continues to develop,
the ability to explore
1.
Emerging Technologies 2011 Andrea Gonzalez
innovative methods of utilizing alternative and
renewable resources comes with greater ease. In
addition, the development of advanced digital design
tools allows architects to explore environmentally
responsible strategies, while simultaneously
analyzing their success.
Overall, greater access to these innovative design
technologies has, and will continue to allow architects
to take on a more holistic approach to design, just as
Foster and Partners did with London City Hall (Fig
1)(4).
BACKGROUN
D
In the 1980s, London’s local government had been
dissolved and the old government building was
transformed into a hotel and aquarium. With Prime
Minister, Tony Blair’s commitment to bringing back a
London-wide government in 1997, the election of a new
Mayor and Greater London Authority called for a new
government building (7).
The City Hall project was an opportunity to express the
values of the newly formed governing body and act as a
symbol of change for London (11). The project brief
called for a building to house the Greater London
Authority (GLA), which consists of the Mayor, London
Assembly and their support staff (8).
DESIGN
LAUNCH
The design for London City Hall was part of a developer-
led competition, which asked for submissions according
to a design brief that required the promotion of
transparency and democracy (9). In addition to these
requirements, Foster and Partners incorporated their
own environmental goals for the project. In order to
produce an energy-conscious design, architects began
to collaborate with engineers, Arup, early on in the
design process. Together, Foster and Partners and Arup
worked to design the initial London City Hall submission,
which took the form of a conventional office block with a
debate chamber positioned at the end (Fig 2)(4).
2.
Emerging Technologies 2011 Andrea Gonzalez
After selecting Foster and Partners to take on the
project, the jury, consisting of political and professional
representatives, described the desire for a more iconic
building form. With this direction in mind, the design team
took the sketch that appealed to the jurors and began to
reassess the presence of the brief requirements (Fig 3).
At this point, volumetric studies were done by
manipulating and altering the weight of the brief (9).As
the design sequence progressed, the building began to
take the form of a more dynamic shape that was
conceptually
driven by the
detailed brief
requirements.
Advanced
computer-
modeling
techniques
helped to create
iterative
studies of 3D
models
throughout the
design process
(Fig 4)(8).
DESIGN
CONCEPT
London City Hall’s building form is justified according to
two main design criteria that consist of democratic and
environmental ideals (1).
Democratic criteria
City Hall begins to respond to the necessity for
democracy by drawing the public in with its iconic
building form. The ground level consists of a sunken
outdoor amphitheater that draws the public into an
underground café and exhibition space located
directly beneath
the assembly
chamber (Fig 7)(4). A
central winding
ramp allows patrons
to symbolically
ascend through all
ten stories of the
building and above
the debate chamber
of their elected
representatives (Fig
5)(1). The ramp
eventually leads
past the mayor’s
3.
Emerging Technologies 2011 Andrea Gonzalez
4. 5.
office to what is known as “London’s Living Room”. This
space provides an excellent exhibition space with its
naturally lit spaces, as well as an outdoor terrace that
can accommodate up to 200 guests (4).
The transparent glass exterior allows the citizens of
London to feel like they are a greater part of their
governing body. The transparent façade allows
Londoners to see directly into the operating chamber,
symbolizing an open system of government. This idea is
enhanced by the building’s views over the Thames River,
Tower Bridge and cityscape abroad that serve as a
reminder of London’s role as a historically rooted and
ever- developing world-class city. The chamber also
contains 250 seats for public and press viewing of the
GLA’s meetings and debates (8).
Along with the democratic concept, the working
atmosphere created inside of the building is admittedly
not the spacious office type found in a luxurious office
building.
Instead, the inside is more
of a local-government- style
office, where the
workspace is pushed to
the center and open-
plan areas line the
perimeter (Fig 6).
6.
Emerging Technologies 2011 Andrea Gonzalez
7.
Environmental Criteria
Designed to set the standard for environmentally
conscious buildings in London, London City Hall
incorporates several passive and active design
features to achieve its sustainable merit.
Position
Located on the edge of the Thames, London City Hall
takes full advantage of its seclusion from traffic noise and
fumes (Fig 8). In addition, the building is positioned to
receive the fresh air of the Thames and optimize energy
performance according to its position on site and
orientation to the sun (4).
Form
The exterior formal moves are derived from the desire
to reduce the total glass surface area of the
building. In general, a spherical building consumes 25%
less energy than cubic building of the same volume.
Therefore, the solar heat gain and heat loss through
London City Hall’s building envelope is minimized (9).
Envelope
Experimental building simulations showed that the
energy consumption of an office building could be
drastically reduced with the incorporation of
thermally efficient cladding. Consequently, the
amount of cooling and heating loads would
immediately be limited.
8.
Emerging Technologies 2011 Andrea Gonzalez
The building envelope also responds to thermal
mapping results, which were derived using three-
dimensional lighting analyses and a daylight
simulation technique. This
technique calculated the
incident solar radiation by
calculated the
illuminance for each
panel and converting it
into a heat gain value.
In locations along the
façade where the greatest
solar impacts occur, the
ratio of glazing
to cladding is reduced
and an operable louver system is used (Fig 9)(4).
The angles of the stepping floor plate overhang on the
southern façade are calculated to take advantage of
sunlight during winter and provide natural shading
during summer (Fig 10)(1). In contrast, along the
Northern façade, where direct sun exposure is minimal,
the assembly chamber is completely glazed and
unshaded (Fig 11).
The spherical geometry of the structure required the
exact measurements of 654 unique panels that were set
at different angles.
For the creation of these
panels, vector points were
individually fixed according to
computer coordinates.
For each panel of glazing,
four vector points were
chosen and the planning
contractor then created
offsets, which allowed a
machine to measure and cut
the exact size and shape of
each panel (9). Each panel is
composed of high-
performance solar- control
glazing, insulated opaque
panels and operable vents.
Ventilation
London City Hall’s
environmental strategies
also begin to incorporate
passive control systems that
allow the building to operate
more efficiently.
Amongst these systems are
displacement floor grills
placed below windows that
supply fresh air to the office
spaces. Operable vents
10.
9.
Emerging Technologies 2011 Andrea Gonzalez
11.
along the edge of the building also allow for natural
ventilation (Fig 12). Displacement ventilation systems are
used to cool the committee rooms and debate chamber.
During winter, a hygroscopic thermal wheel extracts heat
and moisture from the air and is used to preheat the air
supply. During the summer, the same system is used to
cool the incoming air supply.
Heating and Cooling
Chilled beams along with low-level air supply serve as
the main forms of cooling.
Borehole cooling allows cool groundwater to be pumped
up from the ground to chiller beams in the ceilings (Fig
13). After cooling the building, the borehole water is
recycled and used for flushing toilets.
During the winter, mass amounts of heat are lost
through the exposed external wall of the chamber. In
order to heat the chamber, the diagrid façade structure
is used as a large radiator and convector heater.
The combination of these energy-saving cooling
strategies eliminates the need for mechanical
chillers and
reduces the
annual energy
consumption of
the building’s
mechanical
systems by
approximately
25% that of a
typical office
building (4).
12.
Emerging Technologies 2011 Andrea Gonzalez
13.
PERFORMANCE
CHECK
After a year of operation, London City Hall was
consuming a reported 50% more energy than it had been
predicted to consume (Fig 14). Prior to construction, the
building was predicted to use 236kWh/sq m, while the
recorded consumption in 2003 was 376kWh/sq m.
Because the many were persuaded of the building’s
form due to its environmental merits, this news was
startling to officials. A Greater London Authority
spokesman commented that the building program was
used differently than initially intended, while it also acted
as a conference center and tourist attraction (2).
David Kong explained that in addition to this, many
factors out of the architect’s hands had an influence.
This included the tenant housing more
employees in the building than predicted, which
created more heat that the cooling loads could compete
with. In addition, lights were generally kept on all day,
producing extra heat loads. David Kong’s final response
emphasized that despite what reports may say, London
City Hall was a groundbreaking office building that
implemented sustainable technologies, which had never
been entirely incorporated into one London building
before. He added that all included technologies, such as
borehole cooling, a high performance façade and
photovoltaics, will undoubtedly produce less carbon
emissions in the end (9).
RETROFITTI
NG
By August 2007, a solar photovoltaic system was
installed on the roof of London City Hall (Fig 15)(2).
Because photovoltaics did not adhere with the initial
construction program, special measures were taken to
ensure that the roof structure had the ability to be
retrofitted with photovoltaics when government funding
was available (9). Benefits of solar photovoltaics include
providing clean, inexhaustible energy from the sun
while producing zero carbon emissions (8).
14.
Emerging Technologies 2011 Andrea Gonzalez
CONCLUSION
Standing monumentally as a part of the “More
London” development, London City Hall,
successfully uses innovative practices to declare
itself visibly and functionally as a technologically
groundbreaking building.
With Foster and Partners’ holistic design approach, the
architects were able to deliver not only a transparent and
democratic building, but a building that incorporated the
most groundbreaking and sustainable technologies of its
time.
Today, the building stands proudly, with success
radiating visibly from its transparent façade and literally
from its functioning chiller beams. Marked by its success,
London City Hall will continue to act as a role model and
precedent for many iconic, environmentally responsible
buildings to come.
15. 16.
Emerging Technologies 2011 Andrea Gonzalez
Emerging Technologies 2011 Andrea Gonzalez
ACKNOWLEDGEMEN
TS
I would like to specially thank David Kong of Foster and
Partners for generously donating his time and
knowledge to my research efforts.
REFERENC
ES
(1) Barker, Don. "Foster's New City Hall." Architecture
Week. 26 Feb. 2003. Web. 4 June 2011.
<http://www.architectureweek.com/2003/0226/
design_1-3.html>.
(2) Bennett, Ellen. "Ken's Gas Guzzler." Building
Design 29 July 2005: 1. Print.
(3) Catalogue: Foster and Partners. Munich: Prestel,
2005. 10-11+. Print.
(4) Foster, Norman Bürogebäude in ökologischer
Verantwortung / Office Buildings and Environmental
Responsibility, in "Detail - Zeitschrift für Architektur +
Baudetail", September 2002, n. 9 v. 42 .
(5) Gabriel, Andreas Die Arbeitsweise von Foster und
Partner –ein Interviewein Interview mit Ken
Shuttleworth und Max Neal / Foster and Partners'
Working Methods - An Interview with Ken
Shuttleworth and Max Neal, in "Detail - Zeitschrift für
Architektur + Baudetail", September 2002, n. 9 v. 42 .
(6) Glynn, Simon. "City Hall London by Foster and
Partners." Galinsky. 2004. Web. 5 June 2011.
<http://www.galinsky.com/buildings/cityhall/inde
x.htm>.
(7) "Greater London Authority." Wikipedia. Web. 20
June 2011.
<http://en.wikipedia.org/wiki/Greater_London_A
uthority>.
(8) Inside City Hall: Home of London's Government.
Greater London Authority, 2008. Print.
(9) Kong, David. "Foster and Partners and London
City Hall." Personal interview. 6 June 2011.
(10)"London City Hall: The Queen's Walk, London,
England, SE1." Architecture of London and the
Rest of Britain: London Architecture .co.uk. Web. 5
June 2011.
<http://www.londonarchitecture.co.uk/Building/
660/London-City-Hall.php>.
(11) Shuttleworth, Ken Ein Symbol für die Zukunft / A
Symbol for the Future, in "Detail - Zeitschrift für
Architektur + Baudetail", September 2002, n. 9 v. 42
.
(12) Thonger, James Ein schrittweiser Prozess -
Zusammenarbeit zwischen Architekt und Ingenieru /
Collaboration Between Architects and Engineers -
An Iterative Process, in "Detail - Zeitschrift für
Architektur + Baudetail", September 2002, n. 9 v. 42 .
(13)Vom städtebaulichen Konzept zum Detail / From the
Urban Planning Concept to the Details, in "Detail -
Zeitschrift für Architektur + Baudetail", September
2002, n. 9 v. 42 .
Emerging Technologies 2011 Andrea Gonzalez
Image Credits
1, © 2009 Philipp Klinger; 2, 3, 6, 9-13, 17, Detail
Magazine; 4, 16, © Foster + Partners; 5,
http://www.photoradar.com/photos/80998/amckel vie/city-
hall-london-0; 7,
http://www.london.gov.uk/learning/docs/inside_city
_hall.pdf; 8, James O Jenkins; 14, Building Design; 15,
© Nigel Young, Foster + Partners
17.

Más contenido relacionado

Similar a london-city-hall-.pptx

Richard rogers-lloyds-london
Richard rogers-lloyds-londonRichard rogers-lloyds-london
Richard rogers-lloyds-londonVishvendu pandey
 
Amstel III the Reuse City- Dominik Lukkes
Amstel III the Reuse City- Dominik LukkesAmstel III the Reuse City- Dominik Lukkes
Amstel III the Reuse City- Dominik LukkesNRP
 
528103_180f92e738574807abc09974bcb412fb
528103_180f92e738574807abc09974bcb412fb528103_180f92e738574807abc09974bcb412fb
528103_180f92e738574807abc09974bcb412fbSadiq Ali
 
geothermal energy linked hybrid
geothermal energy linked hybridgeothermal energy linked hybrid
geothermal energy linked hybridSOAKASHMIR
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyScottishWindowTintingCOSprings
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyFortWorthWindowFilm1
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyScottishWindowTinting1
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studywindowfilmkansascity
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyScottishWindowTintingFtCollins
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studydallaswindowfilm
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyDenverCommercialWindowTinting
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyCommWindowTintingSaltLake
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studywindowfilmhouston
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyGreenLightWindowFilmsFortWorth
 
Ae4 Final Report
Ae4 Final ReportAe4 Final Report
Ae4 Final ReportRyan Brown
 
MNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressedMNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressedMaria Nikolousi
 
Chapter 10 discussion and conclusion
Chapter 10   discussion and conclusionChapter 10   discussion and conclusion
Chapter 10 discussion and conclusionLokman Hakim Ismail
 

Similar a london-city-hall-.pptx (20)

Richard rogers-lloyds-london
Richard rogers-lloyds-londonRichard rogers-lloyds-london
Richard rogers-lloyds-london
 
Amstel III the Reuse City- Dominik Lukkes
Amstel III the Reuse City- Dominik LukkesAmstel III the Reuse City- Dominik Lukkes
Amstel III the Reuse City- Dominik Lukkes
 
528103_180f92e738574807abc09974bcb412fb
528103_180f92e738574807abc09974bcb412fb528103_180f92e738574807abc09974bcb412fb
528103_180f92e738574807abc09974bcb412fb
 
Ventilation
Ventilation Ventilation
Ventilation
 
geothermal energy linked hybrid
geothermal energy linked hybridgeothermal energy linked hybrid
geothermal energy linked hybrid
 
Facade Research Document
Facade Research DocumentFacade Research Document
Facade Research Document
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Impact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption studyImpact of window films on the overall energy consumption study
Impact of window films on the overall energy consumption study
 
Ae4 Final Report
Ae4 Final ReportAe4 Final Report
Ae4 Final Report
 
MNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressedMNikolousi Portfolio-ilovepdf-compressed
MNikolousi Portfolio-ilovepdf-compressed
 
Chapter 10 discussion and conclusion
Chapter 10   discussion and conclusionChapter 10   discussion and conclusion
Chapter 10 discussion and conclusion
 
High rise
High riseHigh rise
High rise
 

Más de gero33

paimiosanatorio-alvaraalto-090418195900-phpapp01.pptx
paimiosanatorio-alvaraalto-090418195900-phpapp01.pptxpaimiosanatorio-alvaraalto-090418195900-phpapp01.pptx
paimiosanatorio-alvaraalto-090418195900-phpapp01.pptxgero33
 
MERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtg
MERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtgMERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtg
MERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtggero33
 
Álgebra De Boole Parte 1.ugiuytdfguiudffffff
Álgebra De Boole Parte 1.ugiuytdfguiudffffffÁlgebra De Boole Parte 1.ugiuytdfguiudffffff
Álgebra De Boole Parte 1.ugiuytdfguiudffffffgero33
 
Logica_Digital_Unidad_VI-parte1.pdvdfvdfvptx
Logica_Digital_Unidad_VI-parte1.pdvdfvdfvptxLogica_Digital_Unidad_VI-parte1.pdvdfvdfvptx
Logica_Digital_Unidad_VI-parte1.pdvdfvdfvptxgero33
 
Módulo bibliográfico TSC 4 2022.pdf
Módulo bibliográfico TSC 4 2022.pdfMódulo bibliográfico TSC 4 2022.pdf
Módulo bibliográfico TSC 4 2022.pdfgero33
 
Logica Digital Unidad VI -parte2a.pptx
Logica Digital Unidad VI -parte2a.pptxLogica Digital Unidad VI -parte2a.pptx
Logica Digital Unidad VI -parte2a.pptxgero33
 
Temas de Composiciòn_Pause-Clarke.pdf
Temas de Composiciòn_Pause-Clarke.pdfTemas de Composiciòn_Pause-Clarke.pdf
Temas de Composiciòn_Pause-Clarke.pdfgero33
 
MANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdf
MANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdfMANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdf
MANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdfgero33
 
3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdf
3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdf3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdf
3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdfgero33
 
10 Recomendaciones para disenar.pdf
10 Recomendaciones para disenar.pdf10 Recomendaciones para disenar.pdf
10 Recomendaciones para disenar.pdfgero33
 

Más de gero33 (10)

paimiosanatorio-alvaraalto-090418195900-phpapp01.pptx
paimiosanatorio-alvaraalto-090418195900-phpapp01.pptxpaimiosanatorio-alvaraalto-090418195900-phpapp01.pptx
paimiosanatorio-alvaraalto-090418195900-phpapp01.pptx
 
MERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtg
MERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtgMERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtg
MERCADO SANTA CATERINAA.ccrcrcrffrfrbbbbbbbbtg
 
Álgebra De Boole Parte 1.ugiuytdfguiudffffff
Álgebra De Boole Parte 1.ugiuytdfguiudffffffÁlgebra De Boole Parte 1.ugiuytdfguiudffffff
Álgebra De Boole Parte 1.ugiuytdfguiudffffff
 
Logica_Digital_Unidad_VI-parte1.pdvdfvdfvptx
Logica_Digital_Unidad_VI-parte1.pdvdfvdfvptxLogica_Digital_Unidad_VI-parte1.pdvdfvdfvptx
Logica_Digital_Unidad_VI-parte1.pdvdfvdfvptx
 
Módulo bibliográfico TSC 4 2022.pdf
Módulo bibliográfico TSC 4 2022.pdfMódulo bibliográfico TSC 4 2022.pdf
Módulo bibliográfico TSC 4 2022.pdf
 
Logica Digital Unidad VI -parte2a.pptx
Logica Digital Unidad VI -parte2a.pptxLogica Digital Unidad VI -parte2a.pptx
Logica Digital Unidad VI -parte2a.pptx
 
Temas de Composiciòn_Pause-Clarke.pdf
Temas de Composiciòn_Pause-Clarke.pdfTemas de Composiciòn_Pause-Clarke.pdf
Temas de Composiciòn_Pause-Clarke.pdf
 
MANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdf
MANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdfMANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdf
MANUAL DE CONCEPTOS DE FORMAS ARQUITECTONICAS.pdf
 
3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdf
3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdf3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdf
3.b.2.Instalaciones_comunes_en_edificios_de_vivienda_colectiva._Fichas.pdf
 
10 Recomendaciones para disenar.pdf
10 Recomendaciones para disenar.pdf10 Recomendaciones para disenar.pdf
10 Recomendaciones para disenar.pdf
 

Último

Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure servicePooja Nehwal
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...ssifa0344
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfGale Pooley
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...ssifa0344
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Delhi Call girls
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...ssifa0344
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja Nehwal
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfGale Pooley
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceanilsa9823
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfGale Pooley
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Pooja Nehwal
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfGale Pooley
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfGale Pooley
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptxFinTech Belgium
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfSaviRakhecha1
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfMichael Silva
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptxFinTech Belgium
 
The Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfThe Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfGale Pooley
 

Último (20)

Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
 
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANIKA) Budhwar Peth Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
The Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdfThe Economic History of the U.S. Lecture 18.pdf
The Economic History of the U.S. Lecture 18.pdf
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
Best VIP Call Girls Noida Sector 18 Call Me: 8448380779
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home DeliveryPooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
Pooja 9892124323 : Call Girl in Juhu Escorts Service Free Home Delivery
 
The Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdfThe Economic History of the U.S. Lecture 26.pdf
The Economic History of the U.S. Lecture 26.pdf
 
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Gomti Nagar Lucknow best sexual service
 
The Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdfThe Economic History of the U.S. Lecture 21.pdf
The Economic History of the U.S. Lecture 21.pdf
 
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
Dharavi Russian callg Girls, { 09892124323 } || Call Girl In Mumbai ...
 
The Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdfThe Economic History of the U.S. Lecture 17.pdf
The Economic History of the U.S. Lecture 17.pdf
 
The Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdfThe Economic History of the U.S. Lecture 23.pdf
The Economic History of the U.S. Lecture 23.pdf
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
 
Indore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdfIndore Real Estate Market Trends Report.pdf
Indore Real Estate Market Trends Report.pdf
 
Stock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdfStock Market Brief Deck (Under Pressure).pdf
Stock Market Brief Deck (Under Pressure).pdf
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
The Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfThe Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdf
 

london-city-hall-.pptx

  • 1. LONDON CITY HALL |A Holistic Design Approach Architect: Foster + Partners Location: London, England Completed: 2002 Size: 130,000 sq ft Structural Engineer: Arup Owner: More London Development Ltd. Current Tenants: Greater London Authority THE ENVIRONMENTAL CRISIS Since the turn of the millennium, a heightened awareness of the world’s environmental issues has surfaced. Studies done around the world have concluded that buildings are responsible for consuming half of the total amount of energy consumed in the developed world. In addition, few people are aware that buildings are responsible for producing half of the world’s carbon dioxide emissions. With this rising knowledge, it is apparent that architecture and the incorporation of innovative design strategies have the potential to dramatically influence the earth’s well being. As technology continues to develop, the ability to explore 1. Emerging Technologies 2011 Andrea Gonzalez
  • 2. innovative methods of utilizing alternative and renewable resources comes with greater ease. In addition, the development of advanced digital design tools allows architects to explore environmentally responsible strategies, while simultaneously analyzing their success. Overall, greater access to these innovative design technologies has, and will continue to allow architects to take on a more holistic approach to design, just as Foster and Partners did with London City Hall (Fig 1)(4). BACKGROUN D In the 1980s, London’s local government had been dissolved and the old government building was transformed into a hotel and aquarium. With Prime Minister, Tony Blair’s commitment to bringing back a London-wide government in 1997, the election of a new Mayor and Greater London Authority called for a new government building (7). The City Hall project was an opportunity to express the values of the newly formed governing body and act as a symbol of change for London (11). The project brief called for a building to house the Greater London Authority (GLA), which consists of the Mayor, London Assembly and their support staff (8). DESIGN LAUNCH The design for London City Hall was part of a developer- led competition, which asked for submissions according to a design brief that required the promotion of transparency and democracy (9). In addition to these requirements, Foster and Partners incorporated their own environmental goals for the project. In order to produce an energy-conscious design, architects began to collaborate with engineers, Arup, early on in the design process. Together, Foster and Partners and Arup worked to design the initial London City Hall submission, which took the form of a conventional office block with a debate chamber positioned at the end (Fig 2)(4). 2. Emerging Technologies 2011 Andrea Gonzalez
  • 3. After selecting Foster and Partners to take on the project, the jury, consisting of political and professional representatives, described the desire for a more iconic building form. With this direction in mind, the design team took the sketch that appealed to the jurors and began to reassess the presence of the brief requirements (Fig 3). At this point, volumetric studies were done by manipulating and altering the weight of the brief (9).As the design sequence progressed, the building began to take the form of a more dynamic shape that was conceptually driven by the detailed brief requirements. Advanced computer- modeling techniques helped to create iterative studies of 3D models throughout the design process (Fig 4)(8). DESIGN CONCEPT London City Hall’s building form is justified according to two main design criteria that consist of democratic and environmental ideals (1). Democratic criteria City Hall begins to respond to the necessity for democracy by drawing the public in with its iconic building form. The ground level consists of a sunken outdoor amphitheater that draws the public into an underground café and exhibition space located directly beneath the assembly chamber (Fig 7)(4). A central winding ramp allows patrons to symbolically ascend through all ten stories of the building and above the debate chamber of their elected representatives (Fig 5)(1). The ramp eventually leads past the mayor’s 3. Emerging Technologies 2011 Andrea Gonzalez 4. 5.
  • 4. office to what is known as “London’s Living Room”. This space provides an excellent exhibition space with its naturally lit spaces, as well as an outdoor terrace that can accommodate up to 200 guests (4). The transparent glass exterior allows the citizens of London to feel like they are a greater part of their governing body. The transparent façade allows Londoners to see directly into the operating chamber, symbolizing an open system of government. This idea is enhanced by the building’s views over the Thames River, Tower Bridge and cityscape abroad that serve as a reminder of London’s role as a historically rooted and ever- developing world-class city. The chamber also contains 250 seats for public and press viewing of the GLA’s meetings and debates (8). Along with the democratic concept, the working atmosphere created inside of the building is admittedly not the spacious office type found in a luxurious office building. Instead, the inside is more of a local-government- style office, where the workspace is pushed to the center and open- plan areas line the perimeter (Fig 6). 6. Emerging Technologies 2011 Andrea Gonzalez 7.
  • 5. Environmental Criteria Designed to set the standard for environmentally conscious buildings in London, London City Hall incorporates several passive and active design features to achieve its sustainable merit. Position Located on the edge of the Thames, London City Hall takes full advantage of its seclusion from traffic noise and fumes (Fig 8). In addition, the building is positioned to receive the fresh air of the Thames and optimize energy performance according to its position on site and orientation to the sun (4). Form The exterior formal moves are derived from the desire to reduce the total glass surface area of the building. In general, a spherical building consumes 25% less energy than cubic building of the same volume. Therefore, the solar heat gain and heat loss through London City Hall’s building envelope is minimized (9). Envelope Experimental building simulations showed that the energy consumption of an office building could be drastically reduced with the incorporation of thermally efficient cladding. Consequently, the amount of cooling and heating loads would immediately be limited. 8. Emerging Technologies 2011 Andrea Gonzalez
  • 6. The building envelope also responds to thermal mapping results, which were derived using three- dimensional lighting analyses and a daylight simulation technique. This technique calculated the incident solar radiation by calculated the illuminance for each panel and converting it into a heat gain value. In locations along the façade where the greatest solar impacts occur, the ratio of glazing to cladding is reduced and an operable louver system is used (Fig 9)(4). The angles of the stepping floor plate overhang on the southern façade are calculated to take advantage of sunlight during winter and provide natural shading during summer (Fig 10)(1). In contrast, along the Northern façade, where direct sun exposure is minimal, the assembly chamber is completely glazed and unshaded (Fig 11). The spherical geometry of the structure required the exact measurements of 654 unique panels that were set at different angles. For the creation of these panels, vector points were individually fixed according to computer coordinates. For each panel of glazing, four vector points were chosen and the planning contractor then created offsets, which allowed a machine to measure and cut the exact size and shape of each panel (9). Each panel is composed of high- performance solar- control glazing, insulated opaque panels and operable vents. Ventilation London City Hall’s environmental strategies also begin to incorporate passive control systems that allow the building to operate more efficiently. Amongst these systems are displacement floor grills placed below windows that supply fresh air to the office spaces. Operable vents 10. 9. Emerging Technologies 2011 Andrea Gonzalez 11.
  • 7. along the edge of the building also allow for natural ventilation (Fig 12). Displacement ventilation systems are used to cool the committee rooms and debate chamber. During winter, a hygroscopic thermal wheel extracts heat and moisture from the air and is used to preheat the air supply. During the summer, the same system is used to cool the incoming air supply. Heating and Cooling Chilled beams along with low-level air supply serve as the main forms of cooling. Borehole cooling allows cool groundwater to be pumped up from the ground to chiller beams in the ceilings (Fig 13). After cooling the building, the borehole water is recycled and used for flushing toilets. During the winter, mass amounts of heat are lost through the exposed external wall of the chamber. In order to heat the chamber, the diagrid façade structure is used as a large radiator and convector heater. The combination of these energy-saving cooling strategies eliminates the need for mechanical chillers and reduces the annual energy consumption of the building’s mechanical systems by approximately 25% that of a typical office building (4). 12. Emerging Technologies 2011 Andrea Gonzalez 13.
  • 8. PERFORMANCE CHECK After a year of operation, London City Hall was consuming a reported 50% more energy than it had been predicted to consume (Fig 14). Prior to construction, the building was predicted to use 236kWh/sq m, while the recorded consumption in 2003 was 376kWh/sq m. Because the many were persuaded of the building’s form due to its environmental merits, this news was startling to officials. A Greater London Authority spokesman commented that the building program was used differently than initially intended, while it also acted as a conference center and tourist attraction (2). David Kong explained that in addition to this, many factors out of the architect’s hands had an influence. This included the tenant housing more employees in the building than predicted, which created more heat that the cooling loads could compete with. In addition, lights were generally kept on all day, producing extra heat loads. David Kong’s final response emphasized that despite what reports may say, London City Hall was a groundbreaking office building that implemented sustainable technologies, which had never been entirely incorporated into one London building before. He added that all included technologies, such as borehole cooling, a high performance façade and photovoltaics, will undoubtedly produce less carbon emissions in the end (9). RETROFITTI NG By August 2007, a solar photovoltaic system was installed on the roof of London City Hall (Fig 15)(2). Because photovoltaics did not adhere with the initial construction program, special measures were taken to ensure that the roof structure had the ability to be retrofitted with photovoltaics when government funding was available (9). Benefits of solar photovoltaics include providing clean, inexhaustible energy from the sun while producing zero carbon emissions (8). 14. Emerging Technologies 2011 Andrea Gonzalez
  • 9. CONCLUSION Standing monumentally as a part of the “More London” development, London City Hall, successfully uses innovative practices to declare itself visibly and functionally as a technologically groundbreaking building. With Foster and Partners’ holistic design approach, the architects were able to deliver not only a transparent and democratic building, but a building that incorporated the most groundbreaking and sustainable technologies of its time. Today, the building stands proudly, with success radiating visibly from its transparent façade and literally from its functioning chiller beams. Marked by its success, London City Hall will continue to act as a role model and precedent for many iconic, environmentally responsible buildings to come. 15. 16. Emerging Technologies 2011 Andrea Gonzalez
  • 10. Emerging Technologies 2011 Andrea Gonzalez ACKNOWLEDGEMEN TS I would like to specially thank David Kong of Foster and Partners for generously donating his time and knowledge to my research efforts. REFERENC ES (1) Barker, Don. "Foster's New City Hall." Architecture Week. 26 Feb. 2003. Web. 4 June 2011. <http://www.architectureweek.com/2003/0226/ design_1-3.html>. (2) Bennett, Ellen. "Ken's Gas Guzzler." Building Design 29 July 2005: 1. Print. (3) Catalogue: Foster and Partners. Munich: Prestel, 2005. 10-11+. Print. (4) Foster, Norman Bürogebäude in ökologischer Verantwortung / Office Buildings and Environmental Responsibility, in "Detail - Zeitschrift für Architektur + Baudetail", September 2002, n. 9 v. 42 . (5) Gabriel, Andreas Die Arbeitsweise von Foster und Partner –ein Interviewein Interview mit Ken Shuttleworth und Max Neal / Foster and Partners' Working Methods - An Interview with Ken Shuttleworth and Max Neal, in "Detail - Zeitschrift für Architektur + Baudetail", September 2002, n. 9 v. 42 . (6) Glynn, Simon. "City Hall London by Foster and Partners." Galinsky. 2004. Web. 5 June 2011. <http://www.galinsky.com/buildings/cityhall/inde x.htm>. (7) "Greater London Authority." Wikipedia. Web. 20 June 2011. <http://en.wikipedia.org/wiki/Greater_London_A uthority>. (8) Inside City Hall: Home of London's Government. Greater London Authority, 2008. Print. (9) Kong, David. "Foster and Partners and London City Hall." Personal interview. 6 June 2011. (10)"London City Hall: The Queen's Walk, London, England, SE1." Architecture of London and the Rest of Britain: London Architecture .co.uk. Web. 5 June 2011. <http://www.londonarchitecture.co.uk/Building/ 660/London-City-Hall.php>. (11) Shuttleworth, Ken Ein Symbol für die Zukunft / A Symbol for the Future, in "Detail - Zeitschrift für Architektur + Baudetail", September 2002, n. 9 v. 42 . (12) Thonger, James Ein schrittweiser Prozess - Zusammenarbeit zwischen Architekt und Ingenieru / Collaboration Between Architects and Engineers - An Iterative Process, in "Detail - Zeitschrift für Architektur + Baudetail", September 2002, n. 9 v. 42 . (13)Vom städtebaulichen Konzept zum Detail / From the Urban Planning Concept to the Details, in "Detail - Zeitschrift für Architektur + Baudetail", September 2002, n. 9 v. 42 .
  • 11. Emerging Technologies 2011 Andrea Gonzalez Image Credits 1, © 2009 Philipp Klinger; 2, 3, 6, 9-13, 17, Detail Magazine; 4, 16, © Foster + Partners; 5, http://www.photoradar.com/photos/80998/amckel vie/city- hall-london-0; 7, http://www.london.gov.uk/learning/docs/inside_city _hall.pdf; 8, James O Jenkins; 14, Building Design; 15, © Nigel Young, Foster + Partners 17.