Contractor
Safety
Management
System
Training Objective
1. Identify the OHS legal
requirements for all key parties
involved
2. Describe what health and safety
information should be evaluated
prior to selection of contractors
3. Understand the systems for
contractor management and
compliance
4. Effective management of
contractor OHS risks
5. Identify indicators for evaluating
a contractor's OHS performance
Course Agenda
1st Day 2nd Day
I. Understanding of CSMS II. Maintaining Contractor
01. Screening & Selection Contractor 01. Support Contractor HSE Management
02. Contractor Orientation 02. Review Contractor HSE Personnel
03. Contractor Compliance 03. Permission to Commence the work
04. Contractor Rating System 04. Monitor and Manage HSE Performance
05. Requirement for Evaluation, Acceptance
and re-evaluation by risk
05. Verify Completion (Closing)
06. HSE Information 06. Review HSE Performance
07. Contractor Personnel 07. HSE Roles & Responsible
08. HSE Training 08. Leadership Element
Wrapped Out 1-st Day Post-Assesment
1st Day
Definisi
Client : A legal entity or individual companies that appoint
legal entity or individual companies to provide employees,
equipment, material or services
Contractor : A legal entity designated companies and
individuals to provide employees, equipment, material or
services to clients / her costumer
Sub-contractor : A company or private legal entity
designated by the contractor to provide employees,
equipment, materials or services to the contractor with
the consent of the client / customer.
What is CSMS?
A System to manage Contractor/Sub-
Contractor from HSE perspective start from
contractor selection until contract end to
achieve health and safe working environment
What is objective of CSMS?
Improve the performance of HSE in the
workplace by the company / client and
contractor HSE management system
effective management
Contractor assist in program management
- HSE program that is consistent with the
Client Expectation
Facilitating the gap between the HSE MS
Contractor, Sub Contractor and
Contractor others who work in the area of
company / client
Typical of Company Project Management
CSMS
Standard
HSE Selection
&
Evaluation
Information
As a level HSE
standards to be
achieved by the
contractor
As a tool for the
selection and
evaluation of the
basic criteria HSE
As a means of
HSE information
to contractors
Function of CSMS
CSMS
HSE
Proc EMP
Provide technical support and
advice on matters of HSE
regarding the selection and
management of contractors.
Maintain a list of all
the approved
contractors
Assist management in monitoring all
contractors in the work area and ensure
that requirements are met. This situation
should be reported to your supervisor
or local managers as soon as possible
Responsibility
1. Screening
and selection
criteria
2. Contractor
Orientation
3. Contractor
Compliance
4. Contractor
Rating
System
5. Requirement
for Evaluation,
Acceptance and
Re-Evaluation by
Risk Category
6. HSE
Information
7. Contractor
Personnel
8. Training Procedure
8 Steps Procedures
• HSE criteria is only part of the selection process. Other
considerations include financial issues, quality, reliability, and
availability of contractors proposed. It may be necessary to weigh
the importance of HSE requirements on other factors, but checks
should be done on the ground level so that contractors who do not
succeed are not given further consideration.
• Each contract HSE requirements imposed by the client will be
required on a sub-contractor, should be considered in the selection
process.
1. Screening and Selection criteria
• Assessing the risk of the job to be given. All work
contracts can be categorized as low, medium or high, this
category will then determine the level of involvement of
the company's employer
• Exposure hazards in the workplace, the nature of the job,
and the job's location determines the risk level jobs.
Example: working in high areas with potential falls,
exposure to noise, heat stress, the danger of tripping, lifting
operations, and whether the work is done off-shore /
onshore.
1.1.Risk Identification
Tipe Pekerjaan Level
Risk
Crane Operation High
Forklift Operation High
Hot Work High
Warehouse Service Medium
Cathering Service Medium
Office Service Low
Training Service Low
Tipe pekerjaan dengan tingkat resiko
• Methods of screening and pre-qualification based on the nature and
hazards of each job. ACL provides a method for screening,
identification, and pre-qualification of contractors who have a
record of safe work before bidding. ACL is required for all high-risk
occupations. Evaluation of the contractor in relation to the history of
safe work.
1.2 Approved Contractor List (ACL)
a. Check ACL exist for companies that are able to provide the
necessary services.
b. If the prospective contractor does not exist in the ACL, then get
approval from management to transmit information from the
contractor HSE
c. Question - the question of the HSE management system, will be
sent to prospective contractors and equipped and then sent back,
all the requested information should be provided. No work will
begin until the contractor has completed the approval process.
1.2 Approved Contractor List (ACL)
HSE Quostionaire
d. After receiving the return of the contractor, HSE will review the
answers of contractors and decide whether the contractor should be
added to the ACL or not, and if necessary will be done on direct
observation.
e. If the contractor is not approved, the HSE will inform the person
requesting the addition of a contractor, so that the problem of the
HSE can already be identified
f. If the contractor is approved, HSE will sign the necessary
documents and save them
1.2 Approved Contractor List (ACL)
g. Make sure that the contractor has valid insurance coverage and negotiate
agreements hold harmless (A provision in the agreement in which one or
both parties agree not to hold the other party responsible for any loss,
damage, or liability)
h. Department authorities will store files of approved contractors. Each
contractor on the ACL must be able to maintain the standard of the pre-
qualification or if it is not possible to be removed from the list. To
achieve this goal, all contractors must annually update the information
required and allow for periodic review of their HSE management system
1.2 Approved Contractor List (ACL)
2. Contractor Orientation
In doing Contractor orientation needs to be known and in the
identification of typical jobs based on the results of the risk
analysis
Risk Analysis
High Risk Medium Risk Low Risk
• When a project requires a high-risk
activities, meetings will be held to
review the scope of work and
potential hazards. In this meeting
the contractor HSE strategy will be
developed to determine how the
contractor will manage HSE.
2.1. Contractor Orientation – Resiko Tinggi
• Kontraktor menyediakan orang dan alat
untuk pelaksanaan pekerjaan di bawah
pengawasan klien, instruksi dan sistem
manajemen HSE Klien. Kontraktor
memiliki sistem manajemen untuk
memberikan jaminan bahwa personil
mereka bertanggung jawab untuk
memenuhi syarat untuk pekerjaan
tersebut
Metodologi Pekerjaan
• Kontraktor menjalankan semua aspek
pekerjaan di bawah sistem manajemen
HSE sendiri, memberikan instruksi dan
pengawasan yang diperlukan, dan
memverifikasi berfungsinya sistem
manajemen HSE nya.
• Untuk proyek Resiko Sedang,
kontraktor akan diminta untuk mengisi
pertanyaan kualifikasi dan
mengembangkan rencana spesifik
berdasarkan lingkup pekerjaan dan
terkait bahaya.
2.2. Contractor Orientation – Resiko Sedang
Untuk proyek berisiko rendah, kontraktor
akan meninjau informasi HSE yang
berlaku untuk bahaya lingkup kerja
mereka.
2.3. Contractor Orientation – Resiko Rendah
• Review tahunan dan memperbarui file
kontraktor, audit lapangan secara berkala,
laporan proyek dan data kinerja lapangan , dan
statistik bulanan yang disediakan oleh kontraktor
akan digunakan untuk proses verifikasi. Audit
sederhana mungkin termasuk pengecekan
langsung pelatihan / orientasi atau sertifikat oleh
pengawas
Implementasi
Catatan
Internal
Audit
Client
Audit
3. Contractor Compliance
• Kontraktor akan dinilai berdasarkan pada efektivitas program HSE
mereka dan dokumen HSE mereka baik sebagai Level 1, Level 2,
Level 3
Level 3
Level 2
Level 1
Catatan HSE yang baik
Diijinkan bekerja di
wilayah client/customer
Minimum Supervision
Catatan HSE dapat
diterima namun tidak
memliki HSE program
ataupun dalam
development
Catatan HSE tidak ada
dan tidak memliki HSE
program ataupun dalam
development
4. Contractor Rating System
REARR
High Risk / Critical Parts and Service
1. Financially Acceptable by
procurement
2. Agreement commercial terms
3. Conducted Audit QMS,
Capability, Capacity,Specific
required scope
4. Re-Evaluation – Site visit 2 year
Medium Risk / Preferred Parts and Service
1. Financially Acceptable by procurement
2. Agreement commercial terms
3. Facility Audit to the specific required
scope
4. Re-Evaluation – Site visit as needed
Low Risk / General Parts and
Service
1. Financially Acceptable by
procurement
2. Agreement commercial
terms
3. Normally no Site visit
5.Requirement for Evaluation, Acceptance and Re-
Evaluation by Risk Category - REARR
Informasi umum tentang ekspektasi HSE dapat dilakukan dalam
bentuk meeting atau distribusi prosedur ataupun keduanya. Namun
umunya kesemuanya digabungkan dalam bentuk Project HSE Plan
6. HSE Information
Project HSE Plan
Project HSE Plan adalah sebuah dokumen yang disepakati oleh
kedua belah pihak ( Client dan Sub Contractor) yang didasarkan
oleh “In Line” antara HSE prosedur Client dan Sub Contractor
Persyaratan persyaratan yang terdapat didalam Project HSE Plan
adalah sebagai berikut, namun tidak terbatas:
Project HSE Plan Content
Detail will be explained at ‘how to create
Project HSE plan? Ask your administrator
Kick of Meeting dilakukan guna menyampaikan informasi –
informasi yang berhubungan dengan HSE yang terkait dengan
proyek yang akan dilaksanakan.
Kick of Meeting harus dihadiri oleh Pimpinan kontraktor dan dapat
didampingi oleh Project Manager, HSE Manager dan pihak lainnya.
Project HSE Kick of Meeting
Project HSE Kick Off Meeting check list
Pengarahan karyawan dari kontraktor harus melingkupi sebagai
berikut:
• Kontraktor harus memahami persyaratan HSE Policy dan
standar HSE yang berlaku pada saat melakukan pekerjaan
dilokasi.
• Setiap karyawan dari kontraktor harus menyetujui bahwa
mereka telah diinformasikan dan mengerti semua hal yang
berkaitan tentang HSE sebeum bekerja dilokasi.
• Informasi tentag evakuasi untuk merespon situasi emergensi.
• Informasi tentang pertolongan pertama pada kecelakaan dan
pelaporan dari kecelakaan dan penyakit akibat kerja.
• Pengaturan supervisi dan hal yang berkaitan tentang tugas dan
tanggung jawab.
• Semua persyaratan yang ditetapkan perusahaan dan peraturan
perundangan
7. Contractor Personnel
1. Karyawan ditempat kerja harus menerima pelatihan tentang
aktifitas kontraktor secara berkala
2. Pihak Klien berkewajiban memberikan pelatihan – pelatihan
ataupun program refreshing yang berkaitan dengan HSE
kepada karyawan kontraktor
3. Pihak kontraktor berkewajiban untuk memberikan pelatihan –
pelatihan tentang HSE kepada karyawannya baik secara
internal ataupun eksternal
HSE Induction
8. Training
2nd Day
Sebelum memulai pekerjaan, HSE Representative Client membantu
kontraktor untuk pemenuhan HSE requirements
Hal ini termasuk, namun tidak terbatas pada:
 Meninjau dan menyetujui persyaratan HSE yang final, termasuk
keamanan dan / atau rencana pengelolaan lingkungan, laporan
metode kerja dan desain produk atau spesifikasi;
 Memberikan saran HSE dan informasi, termasuk menghubungi
pakar yang relevan dan penasehat HSE; dan / atau
 Mengatur pelatihan pelatihan yang diperlukan Perusahaan atau HSE
Induction
1. Support contractor HSE management
The Company HSE Representative checks that the HSE
requirements have been met, including comparing the implemented
controls against the requirements listed .
The Contractor representative reviews and signs to confirm that
the agreed controls have been implemented.
The Company HSE Representative signs to confirm that the
controls are adequate and that Company HSE requirements have
been met.
Where relevant , the Company HSE Representative consults with
the work site Area Scheduler / Production Manager to confirm that
the risks have been accurately identified and the controls are
satisfactory before permits are issued and permission is granted to
commence work.
2. Review contractor HSE controls
Any remaining job tickets or required work permits are
issued and permission to commence work is granted.
3. Permission to commence work
The Company HSE Representative and the contractor representative
monitor and manage HSE performance throughout the duration of the
contracted / supplied works.
Monitoring may include visits to supplier sites, auditing of contractor
activities or other formal checks as well as more informal assessments.
The Company HSE Representative’s responsibilities include
 Monitoring contractor HSE performance and providing relevant and
timely feedback;
 Providing access to HSE information and advice;
 Ensuring adequate communication and consultation of HSE issues
and requirements; and
 Coordinating the site emergency response.
4. Monitor and manage HSE performance
The contractor representative’s responsibilities include:
 Continual monitoring of effectiveness of contractor’s HSE controls;
 Ensuring adequate supervision of contractor / supplier work;
 Complying with Company HSE policies and procedures; and
 Reporting any HSE incidents, hazards or near-misses.
4. Monitor and manage HSE performance
At the conclusion of contracted works, or the delivery of supplied
goods / services, the Company HSE Representative verifies that the
works / goods have been provided as specified in the contract and that
all agreed HSE requirements were met. This may include:
 Verifying completion of works and/or receipt of goods as ordered;
 Decommmissioning of HSE controls and restoration of the site;
 Provision of Safety in Design and/or Hazard Studies documentation
for design work;
5. Verify completion
As part of the major work close-out process, the Company HSE
Representative formally assesses the HSE performance of the
contractor following the Procurement process. This information is then
used to update the ‘Contractor and Supplier’database.
Contractors are also given an opportunity to provide feedback on
Company HSE management. This feedback is reviewed by the
Company Representative, who provides a copy to the Safety and
Sustainability Team, Corporate Services.
6. Review HSE performance
7. 1 Company HSE representative(s) – Page 14
The responsibilities of the Company HSE Representative(s) include:
1.Developing the scope of contracted works/supply and the associated
specifications (including HSE requirements) in consultation with
subject matter experts;
2.Identifying the technical requirements and competencies needed to
perform the contracted work/supply, in consultation with the
contractors, including arranging for pre-award site inspections where
necessary;
7. Role and Responsible (HSE)
7. 1 Company HSE representative(s) – Page 24
The responsibilities of the Company HSE Representative(s) include:
3.Identifying the HSE hazards and risk management requirements for
the job, in consultation with the contractor and other relevant parties
(e.g. site manager, HSE advisors);
4.Notifying the contractor of the scope of work, the associated HSE
risks and controls required and the level of safety management
documentation required by Company, using form to record them in the
contract documents;
5.Providing relevant procedures and HSE documents, including risk
assessments of known work site hazards, and assisting in accessing and
addressing any queries in relation to Company HSE requirements and
procedures;
7. Role and Responsible (HSE)
7. 1 Company HSE representative(s) – Page 34
6.Validating contractor safety records, checking contractor training and
competency records (licences, etc.), reviewing and approving HSE risk
management plans and controls and arranging any required Company
training and inductions,
7.Arranging delivery of the site-specific induction (this may be done by
a suitably qualified person nominated by the manager responsible for
the work site);
8.Approving work to commence, including ensuring any required
permits are issued, that the Authorised Issuing Officer has approved
appointment of Persons In Charge (PIC), and ensuring that all work
permit conditions are met;
7. Role and Responsible (HSE)
7. 1 Company HSE representative(s) – Page 44
9.Coordinating all site works, identifying the worksite boundaries,
communicating site hazards and environmental aspects and resolving
conflicting simultaneous operations;
10.Ensuring adequate site consultation and communication takes place,
like the daily pre-start toolbox meeting. These meetings may well be led
by the contractors Site Manager / supervisor after initial handover and
commencement of works;
11.Ensuring that the site emergency response is adequate, organised and
has been communicated to all parties
7. Role and Responsible (HSE)
7.2 Contractor representative(s) – Page 1
These responsibilities include:
1.Consulting with Company to identify the HSE hazards and risks arising from the
contractor’s part of the job and to understand Company HSE management
requirements;
2.Ensuring Company HSE management actions, training and competency
requirements are met;
3.Providing relevant HSE management documentation required by Company (as
listed in the contract), including contractor training and competency records (licences,
etc.);
4.Preparing HSE risk management plans and controls in consultation with relevant
contractor personnel and Company, including developing and applying appropriate
safe work methods and performing job hazard analyses (JHAs) that comply with
Company HSE system;
5.Ensuring that all relevant contractor personnel hold the required qualifications,
certificates and inductions and are equipped with the correct personal protective
equipment (PPE) and other safety equipment (e.g. personal isolation locks), as
required under law and by Company, prior to the commencement of work;
7. Role and Responsible (HSE)
7.2 Contractor representative(s) – Page 2
These responsibilities include:
6.Supervising works directly, with a supervisor present on site and
contactable at all times whilst the contractor has personnel on site,
continuously monitoring for HSE hazards and conflicting simultaneous
operations and informing Company of any conflicts;
7.Coordinating and communicating with Company to ensure the
accuracy and completeness of on-site HSE risk management activities,
including monitoring the implementation and effectiveness of the
agreed risk controls; and
8.Reporting any injuries, safety and environmental hazards, near misses
and incidents to the Company HSE Representative(s) and, in the
event of a reportable incident occurring, preserving the incident scene
for investigation and assisting with the investigation of incidents.
7. Role and Responsible (HSE)
HSE Leader mush have followings element as
minimum skills and competences;
• Demonstrated management commitment
• Policies and principles
• Goals, objectives and plans
• Procedures and performance standards
8. Leadership Elements
• Line management accountability
and responsibility
• Safety personnel
• Integrated organization
structure
• Motivation and awareness
• Effective communication
• Training and development
• Incident investigation
• Audits and observations
8. Leadership Elements
Contractor safety management system
Contractor safety management system

Más contenido relacionado

La actualidad más candente

training near miss program
training near miss programtraining near miss program
training near miss programoscar anell
 
Basic safety
Basic safetyBasic safety
Basic safetyLalit M
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012ChinaHarbour
 
Ehs management issues& challenges safety
Ehs management issues& challenges safetyEhs management issues& challenges safety
Ehs management issues& challenges safetyArvind Kumar
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...AMIT SAHU
 
BBS Presentation by Uma Mahesh
BBS Presentation by Uma MaheshBBS Presentation by Uma Mahesh
BBS Presentation by Uma MaheshUma Mahesh Guraza
 
OHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessmentOHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessmentTechnoSysCon
 
Industrial Safety Training by Author Stream
Industrial Safety Training by Author StreamIndustrial Safety Training by Author Stream
Industrial Safety Training by Author StreamAtlantic Training, LLC.
 
Supervisor Safety Training
Supervisor Safety TrainingSupervisor Safety Training
Supervisor Safety TrainingSteve Wise
 
ISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness TrainingISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness TrainingDr Madhu Aman Sharma
 
EMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfEMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfBimal Chandra Das
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Chris Morris
 
Permit to work system
Permit to work systemPermit to work system
Permit to work systemAsif Khan
 
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Indohaan Technology
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 

La actualidad más candente (20)

training near miss program
training near miss programtraining near miss program
training near miss program
 
safety training
safety training   safety training
safety training
 
Basic safety
Basic safetyBasic safety
Basic safety
 
Near miss
Near missNear miss
Near miss
 
Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012Monthly Safety Report Feb 2012
Monthly Safety Report Feb 2012
 
Ehs management issues& challenges safety
Ehs management issues& challenges safetyEhs management issues& challenges safety
Ehs management issues& challenges safety
 
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...Ppt for IMPROVEMENT OF SAFETY   THROUGH    SAFETY MANAGAMENT PLAN –  office p...
Ppt for IMPROVEMENT OF SAFETY THROUGH SAFETY MANAGAMENT PLAN – office p...
 
HSE Management System
HSE Management SystemHSE Management System
HSE Management System
 
BBS Presentation by Uma Mahesh
BBS Presentation by Uma MaheshBBS Presentation by Uma Mahesh
BBS Presentation by Uma Mahesh
 
OHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessmentOHSAS Hazard identification & Risk assessment
OHSAS Hazard identification & Risk assessment
 
Industrial Safety Training by Author Stream
Industrial Safety Training by Author StreamIndustrial Safety Training by Author Stream
Industrial Safety Training by Author Stream
 
Unsafe Act and Unsafe condition
Unsafe Act and Unsafe conditionUnsafe Act and Unsafe condition
Unsafe Act and Unsafe condition
 
Supervisor Safety Training
Supervisor Safety TrainingSupervisor Safety Training
Supervisor Safety Training
 
ISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness TrainingISO 45001 Employee Awareness Training
ISO 45001 Employee Awareness Training
 
EMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdfEMPLOYEE PARTICIPATION IN SAFETY.pdf
EMPLOYEE PARTICIPATION IN SAFETY.pdf
 
Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016Visitors SHE Induction Presentation 2016
Visitors SHE Induction Presentation 2016
 
Permit to work system
Permit to work systemPermit to work system
Permit to work system
 
HIRA training
HIRA   trainingHIRA   training
HIRA training
 
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...Behaviour-based safety (BBS) is the “application of science of behaviour chan...
Behaviour-based safety (BBS) is the “application of science of behaviour chan...
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 

Destacado

Contractor Hse Handbook
Contractor Hse HandbookContractor Hse Handbook
Contractor Hse Handbooksmpr_iqbal
 
Proses K3 di Pertamina
Proses K3 di PertaminaProses K3 di Pertamina
Proses K3 di PertaminaErru Azhar
 
Buku k3 a5
Buku k3 a5Buku k3 a5
Buku k3 a5Abdul YD
 
Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanFlevy.com Best Practices
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management PlanPhilip Hà
 
Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...
Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...
Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...Dony Bagus Kharisma Putra
 
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014Aestikani Mahani
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Easwaran Kanason
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fitri Ifony
 
Modul keselamatan-dan-kesehatan-kerja
Modul keselamatan-dan-kesehatan-kerjaModul keselamatan-dan-kesehatan-kerja
Modul keselamatan-dan-kesehatan-kerjaSyaifi Al-Mahfudzi
 
Alat Pelindung Diri - K3
Alat Pelindung Diri - K3Alat Pelindung Diri - K3
Alat Pelindung Diri - K3Al Marson
 

Destacado (20)

Contractor safety management system (csms)
Contractor safety management system (csms)Contractor safety management system (csms)
Contractor safety management system (csms)
 
Contractor safety management system
Contractor safety  management systemContractor safety  management system
Contractor safety management system
 
Contractor Hse Handbook
Contractor Hse HandbookContractor Hse Handbook
Contractor Hse Handbook
 
Proses K3 di Pertamina
Proses K3 di PertaminaProses K3 di Pertamina
Proses K3 di Pertamina
 
Buku k3 a5
Buku k3 a5Buku k3 a5
Buku k3 a5
 
Hse Action Plan
Hse Action PlanHse Action Plan
Hse Action Plan
 
Ebook - 7 Pola Struktur K3LH Safety Toon
Ebook - 7 Pola Struktur K3LH Safety ToonEbook - 7 Pola Struktur K3LH Safety Toon
Ebook - 7 Pola Struktur K3LH Safety Toon
 
Health, Safety and Environmental Management Plan
Health, Safety and Environmental Management PlanHealth, Safety and Environmental Management Plan
Health, Safety and Environmental Management Plan
 
Introduction to HSE
Introduction to HSEIntroduction to HSE
Introduction to HSE
 
HSE Management Plan
HSE Management PlanHSE Management Plan
HSE Management Plan
 
Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...
Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...
Materi Seminar Nasional K3 2014 (Pak Arief Zulkarnain ) - Concep and How to I...
 
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
 
Katalog Safety Poster - Agustus 2015
Katalog Safety Poster - Agustus 2015Katalog Safety Poster - Agustus 2015
Katalog Safety Poster - Agustus 2015
 
Katalog Safety Poster - Eksklusif
Katalog Safety Poster - EksklusifKatalog Safety Poster - Eksklusif
Katalog Safety Poster - Eksklusif
 
Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)Petronas health, safety and environment guidelines (HSE)
Petronas health, safety and environment guidelines (HSE)
 
Hse plan
Hse planHse plan
Hse plan
 
Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000Fmc close out repot hse dept. rev.000
Fmc close out repot hse dept. rev.000
 
Modul keselamatan-dan-kesehatan-kerja
Modul keselamatan-dan-kesehatan-kerjaModul keselamatan-dan-kesehatan-kerja
Modul keselamatan-dan-kesehatan-kerja
 
Alat Pelindung Diri - K3
Alat Pelindung Diri - K3Alat Pelindung Diri - K3
Alat Pelindung Diri - K3
 
Materi Training Safety
Materi Training SafetyMateri Training Safety
Materi Training Safety
 

Similar a Contractor safety management system

Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safetymanik980318
 
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDITSCOTT SITTNER
 
Best Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemBest Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemPECB
 
Safety competency training - star rating system1.ppt
Safety competency training - star rating system1.pptSafety competency training - star rating system1.ppt
Safety competency training - star rating system1.pptShamsherSingh753496
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slidesDoreen Yeo
 
Pb02 c accreditation process for cb
Pb02 c   accreditation process for cbPb02 c   accreditation process for cb
Pb02 c accreditation process for cbyoussefpec
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdfAddisu15
 
Mata electric QC PLAN
Mata electric QC PLANMata electric QC PLAN
Mata electric QC PLANTina Sharpe
 
Management review procedure for legal practices
Management review procedure for legal practicesManagement review procedure for legal practices
Management review procedure for legal practicesVal Antoff
 
Auditing in pharmacutical industries
Auditing in pharmacutical industriesAuditing in pharmacutical industries
Auditing in pharmacutical industriesPriyanka Kandhare
 
Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...SIBENDU SURAJEET JENA
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxShankar Maind Patil
 
QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1Thomas Wilson
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationDeekshitha HS
 
Civil Eng Assessment for Maintenance Management.pptx
Civil Eng Assessment for Maintenance Management.pptxCivil Eng Assessment for Maintenance Management.pptx
Civil Eng Assessment for Maintenance Management.pptxRajivDass1
 
RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10Satyanarayana Raju
 
Internal quality audit procedure example
Internal quality audit procedure exampleInternal quality audit procedure example
Internal quality audit procedure exampleTuan Anh Nguyen
 

Similar a Contractor safety management system (20)

PROJECT REPORT
PROJECT REPORTPROJECT REPORT
PROJECT REPORT
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
 
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
1.8.0 SITTNER CONOCO TRAIN HOW TO SURVIVE AN AUDIT
 
Best Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management SystemBest Practices of Auditing an Energy Management System
Best Practices of Auditing an Energy Management System
 
Safety competency training - star rating system1.ppt
Safety competency training - star rating system1.pptSafety competency training - star rating system1.ppt
Safety competency training - star rating system1.ppt
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
Pb02 c accreditation process for cb
Pb02 c   accreditation process for cbPb02 c   accreditation process for cb
Pb02 c accreditation process for cb
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
Mata electric QC PLAN
Mata electric QC PLANMata electric QC PLAN
Mata electric QC PLAN
 
Management review procedure for legal practices
Management review procedure for legal practicesManagement review procedure for legal practices
Management review procedure for legal practices
 
Auditing in pharmacutical industries
Auditing in pharmacutical industriesAuditing in pharmacutical industries
Auditing in pharmacutical industries
 
Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...Implementation of quality management concepts in managing Engineering Project...
Implementation of quality management concepts in managing Engineering Project...
 
SM Unit2.pptx
SM Unit2.pptxSM Unit2.pptx
SM Unit2.pptx
 
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptxAUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
AUDITING OF QUALITY ASSURANCE AND ENGINEERING DEPARTMENT.pptx
 
AVAITION SANG QASP
AVAITION SANG QASPAVAITION SANG QASP
AVAITION SANG QASP
 
QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1QA QC Overview CPOU_Final Rev 1
QA QC Overview CPOU_Final Rev 1
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
Civil Eng Assessment for Maintenance Management.pptx
Civil Eng Assessment for Maintenance Management.pptxCivil Eng Assessment for Maintenance Management.pptx
Civil Eng Assessment for Maintenance Management.pptx
 
RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10RAJU-CV(UPDATED) on 2016 Aug 10
RAJU-CV(UPDATED) on 2016 Aug 10
 
Internal quality audit procedure example
Internal quality audit procedure exampleInternal quality audit procedure example
Internal quality audit procedure example
 

Último

social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 

Último (20)

social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 

Contractor safety management system

  • 2. Training Objective 1. Identify the OHS legal requirements for all key parties involved 2. Describe what health and safety information should be evaluated prior to selection of contractors 3. Understand the systems for contractor management and compliance 4. Effective management of contractor OHS risks 5. Identify indicators for evaluating a contractor's OHS performance
  • 3. Course Agenda 1st Day 2nd Day I. Understanding of CSMS II. Maintaining Contractor 01. Screening & Selection Contractor 01. Support Contractor HSE Management 02. Contractor Orientation 02. Review Contractor HSE Personnel 03. Contractor Compliance 03. Permission to Commence the work 04. Contractor Rating System 04. Monitor and Manage HSE Performance 05. Requirement for Evaluation, Acceptance and re-evaluation by risk 05. Verify Completion (Closing) 06. HSE Information 06. Review HSE Performance 07. Contractor Personnel 07. HSE Roles & Responsible 08. HSE Training 08. Leadership Element Wrapped Out 1-st Day Post-Assesment
  • 5. Definisi Client : A legal entity or individual companies that appoint legal entity or individual companies to provide employees, equipment, material or services Contractor : A legal entity designated companies and individuals to provide employees, equipment, material or services to clients / her costumer Sub-contractor : A company or private legal entity designated by the contractor to provide employees, equipment, materials or services to the contractor with the consent of the client / customer.
  • 6. What is CSMS? A System to manage Contractor/Sub- Contractor from HSE perspective start from contractor selection until contract end to achieve health and safe working environment
  • 7. What is objective of CSMS? Improve the performance of HSE in the workplace by the company / client and contractor HSE management system effective management Contractor assist in program management - HSE program that is consistent with the Client Expectation Facilitating the gap between the HSE MS Contractor, Sub Contractor and Contractor others who work in the area of company / client
  • 8. Typical of Company Project Management
  • 9. CSMS Standard HSE Selection & Evaluation Information As a level HSE standards to be achieved by the contractor As a tool for the selection and evaluation of the basic criteria HSE As a means of HSE information to contractors Function of CSMS
  • 10. CSMS HSE Proc EMP Provide technical support and advice on matters of HSE regarding the selection and management of contractors. Maintain a list of all the approved contractors Assist management in monitoring all contractors in the work area and ensure that requirements are met. This situation should be reported to your supervisor or local managers as soon as possible Responsibility
  • 11. 1. Screening and selection criteria 2. Contractor Orientation 3. Contractor Compliance 4. Contractor Rating System 5. Requirement for Evaluation, Acceptance and Re-Evaluation by Risk Category 6. HSE Information 7. Contractor Personnel 8. Training Procedure 8 Steps Procedures
  • 12. • HSE criteria is only part of the selection process. Other considerations include financial issues, quality, reliability, and availability of contractors proposed. It may be necessary to weigh the importance of HSE requirements on other factors, but checks should be done on the ground level so that contractors who do not succeed are not given further consideration. • Each contract HSE requirements imposed by the client will be required on a sub-contractor, should be considered in the selection process. 1. Screening and Selection criteria
  • 13. • Assessing the risk of the job to be given. All work contracts can be categorized as low, medium or high, this category will then determine the level of involvement of the company's employer • Exposure hazards in the workplace, the nature of the job, and the job's location determines the risk level jobs. Example: working in high areas with potential falls, exposure to noise, heat stress, the danger of tripping, lifting operations, and whether the work is done off-shore / onshore. 1.1.Risk Identification
  • 14. Tipe Pekerjaan Level Risk Crane Operation High Forklift Operation High Hot Work High Warehouse Service Medium Cathering Service Medium Office Service Low Training Service Low Tipe pekerjaan dengan tingkat resiko
  • 15. • Methods of screening and pre-qualification based on the nature and hazards of each job. ACL provides a method for screening, identification, and pre-qualification of contractors who have a record of safe work before bidding. ACL is required for all high-risk occupations. Evaluation of the contractor in relation to the history of safe work. 1.2 Approved Contractor List (ACL)
  • 16. a. Check ACL exist for companies that are able to provide the necessary services. b. If the prospective contractor does not exist in the ACL, then get approval from management to transmit information from the contractor HSE c. Question - the question of the HSE management system, will be sent to prospective contractors and equipped and then sent back, all the requested information should be provided. No work will begin until the contractor has completed the approval process. 1.2 Approved Contractor List (ACL) HSE Quostionaire
  • 17. d. After receiving the return of the contractor, HSE will review the answers of contractors and decide whether the contractor should be added to the ACL or not, and if necessary will be done on direct observation. e. If the contractor is not approved, the HSE will inform the person requesting the addition of a contractor, so that the problem of the HSE can already be identified f. If the contractor is approved, HSE will sign the necessary documents and save them 1.2 Approved Contractor List (ACL)
  • 18. g. Make sure that the contractor has valid insurance coverage and negotiate agreements hold harmless (A provision in the agreement in which one or both parties agree not to hold the other party responsible for any loss, damage, or liability) h. Department authorities will store files of approved contractors. Each contractor on the ACL must be able to maintain the standard of the pre- qualification or if it is not possible to be removed from the list. To achieve this goal, all contractors must annually update the information required and allow for periodic review of their HSE management system 1.2 Approved Contractor List (ACL)
  • 19. 2. Contractor Orientation In doing Contractor orientation needs to be known and in the identification of typical jobs based on the results of the risk analysis Risk Analysis High Risk Medium Risk Low Risk
  • 20. • When a project requires a high-risk activities, meetings will be held to review the scope of work and potential hazards. In this meeting the contractor HSE strategy will be developed to determine how the contractor will manage HSE. 2.1. Contractor Orientation – Resiko Tinggi
  • 21. • Kontraktor menyediakan orang dan alat untuk pelaksanaan pekerjaan di bawah pengawasan klien, instruksi dan sistem manajemen HSE Klien. Kontraktor memiliki sistem manajemen untuk memberikan jaminan bahwa personil mereka bertanggung jawab untuk memenuhi syarat untuk pekerjaan tersebut Metodologi Pekerjaan • Kontraktor menjalankan semua aspek pekerjaan di bawah sistem manajemen HSE sendiri, memberikan instruksi dan pengawasan yang diperlukan, dan memverifikasi berfungsinya sistem manajemen HSE nya.
  • 22. • Untuk proyek Resiko Sedang, kontraktor akan diminta untuk mengisi pertanyaan kualifikasi dan mengembangkan rencana spesifik berdasarkan lingkup pekerjaan dan terkait bahaya. 2.2. Contractor Orientation – Resiko Sedang
  • 23. Untuk proyek berisiko rendah, kontraktor akan meninjau informasi HSE yang berlaku untuk bahaya lingkup kerja mereka. 2.3. Contractor Orientation – Resiko Rendah
  • 24. • Review tahunan dan memperbarui file kontraktor, audit lapangan secara berkala, laporan proyek dan data kinerja lapangan , dan statistik bulanan yang disediakan oleh kontraktor akan digunakan untuk proses verifikasi. Audit sederhana mungkin termasuk pengecekan langsung pelatihan / orientasi atau sertifikat oleh pengawas Implementasi Catatan Internal Audit Client Audit 3. Contractor Compliance
  • 25. • Kontraktor akan dinilai berdasarkan pada efektivitas program HSE mereka dan dokumen HSE mereka baik sebagai Level 1, Level 2, Level 3 Level 3 Level 2 Level 1 Catatan HSE yang baik Diijinkan bekerja di wilayah client/customer Minimum Supervision Catatan HSE dapat diterima namun tidak memliki HSE program ataupun dalam development Catatan HSE tidak ada dan tidak memliki HSE program ataupun dalam development 4. Contractor Rating System
  • 26. REARR High Risk / Critical Parts and Service 1. Financially Acceptable by procurement 2. Agreement commercial terms 3. Conducted Audit QMS, Capability, Capacity,Specific required scope 4. Re-Evaluation – Site visit 2 year Medium Risk / Preferred Parts and Service 1. Financially Acceptable by procurement 2. Agreement commercial terms 3. Facility Audit to the specific required scope 4. Re-Evaluation – Site visit as needed Low Risk / General Parts and Service 1. Financially Acceptable by procurement 2. Agreement commercial terms 3. Normally no Site visit 5.Requirement for Evaluation, Acceptance and Re- Evaluation by Risk Category - REARR
  • 27. Informasi umum tentang ekspektasi HSE dapat dilakukan dalam bentuk meeting atau distribusi prosedur ataupun keduanya. Namun umunya kesemuanya digabungkan dalam bentuk Project HSE Plan 6. HSE Information Project HSE Plan Project HSE Plan adalah sebuah dokumen yang disepakati oleh kedua belah pihak ( Client dan Sub Contractor) yang didasarkan oleh “In Line” antara HSE prosedur Client dan Sub Contractor Persyaratan persyaratan yang terdapat didalam Project HSE Plan adalah sebagai berikut, namun tidak terbatas:
  • 28. Project HSE Plan Content Detail will be explained at ‘how to create Project HSE plan? Ask your administrator
  • 29. Kick of Meeting dilakukan guna menyampaikan informasi – informasi yang berhubungan dengan HSE yang terkait dengan proyek yang akan dilaksanakan. Kick of Meeting harus dihadiri oleh Pimpinan kontraktor dan dapat didampingi oleh Project Manager, HSE Manager dan pihak lainnya. Project HSE Kick of Meeting Project HSE Kick Off Meeting check list
  • 30. Pengarahan karyawan dari kontraktor harus melingkupi sebagai berikut: • Kontraktor harus memahami persyaratan HSE Policy dan standar HSE yang berlaku pada saat melakukan pekerjaan dilokasi. • Setiap karyawan dari kontraktor harus menyetujui bahwa mereka telah diinformasikan dan mengerti semua hal yang berkaitan tentang HSE sebeum bekerja dilokasi. • Informasi tentag evakuasi untuk merespon situasi emergensi. • Informasi tentang pertolongan pertama pada kecelakaan dan pelaporan dari kecelakaan dan penyakit akibat kerja. • Pengaturan supervisi dan hal yang berkaitan tentang tugas dan tanggung jawab. • Semua persyaratan yang ditetapkan perusahaan dan peraturan perundangan 7. Contractor Personnel
  • 31. 1. Karyawan ditempat kerja harus menerima pelatihan tentang aktifitas kontraktor secara berkala 2. Pihak Klien berkewajiban memberikan pelatihan – pelatihan ataupun program refreshing yang berkaitan dengan HSE kepada karyawan kontraktor 3. Pihak kontraktor berkewajiban untuk memberikan pelatihan – pelatihan tentang HSE kepada karyawannya baik secara internal ataupun eksternal HSE Induction 8. Training
  • 33. Sebelum memulai pekerjaan, HSE Representative Client membantu kontraktor untuk pemenuhan HSE requirements Hal ini termasuk, namun tidak terbatas pada:  Meninjau dan menyetujui persyaratan HSE yang final, termasuk keamanan dan / atau rencana pengelolaan lingkungan, laporan metode kerja dan desain produk atau spesifikasi;  Memberikan saran HSE dan informasi, termasuk menghubungi pakar yang relevan dan penasehat HSE; dan / atau  Mengatur pelatihan pelatihan yang diperlukan Perusahaan atau HSE Induction 1. Support contractor HSE management
  • 34. The Company HSE Representative checks that the HSE requirements have been met, including comparing the implemented controls against the requirements listed . The Contractor representative reviews and signs to confirm that the agreed controls have been implemented. The Company HSE Representative signs to confirm that the controls are adequate and that Company HSE requirements have been met. Where relevant , the Company HSE Representative consults with the work site Area Scheduler / Production Manager to confirm that the risks have been accurately identified and the controls are satisfactory before permits are issued and permission is granted to commence work. 2. Review contractor HSE controls
  • 35. Any remaining job tickets or required work permits are issued and permission to commence work is granted. 3. Permission to commence work
  • 36. The Company HSE Representative and the contractor representative monitor and manage HSE performance throughout the duration of the contracted / supplied works. Monitoring may include visits to supplier sites, auditing of contractor activities or other formal checks as well as more informal assessments. The Company HSE Representative’s responsibilities include  Monitoring contractor HSE performance and providing relevant and timely feedback;  Providing access to HSE information and advice;  Ensuring adequate communication and consultation of HSE issues and requirements; and  Coordinating the site emergency response. 4. Monitor and manage HSE performance
  • 37. The contractor representative’s responsibilities include:  Continual monitoring of effectiveness of contractor’s HSE controls;  Ensuring adequate supervision of contractor / supplier work;  Complying with Company HSE policies and procedures; and  Reporting any HSE incidents, hazards or near-misses. 4. Monitor and manage HSE performance
  • 38. At the conclusion of contracted works, or the delivery of supplied goods / services, the Company HSE Representative verifies that the works / goods have been provided as specified in the contract and that all agreed HSE requirements were met. This may include:  Verifying completion of works and/or receipt of goods as ordered;  Decommmissioning of HSE controls and restoration of the site;  Provision of Safety in Design and/or Hazard Studies documentation for design work; 5. Verify completion
  • 39. As part of the major work close-out process, the Company HSE Representative formally assesses the HSE performance of the contractor following the Procurement process. This information is then used to update the ‘Contractor and Supplier’database. Contractors are also given an opportunity to provide feedback on Company HSE management. This feedback is reviewed by the Company Representative, who provides a copy to the Safety and Sustainability Team, Corporate Services. 6. Review HSE performance
  • 40. 7. 1 Company HSE representative(s) – Page 14 The responsibilities of the Company HSE Representative(s) include: 1.Developing the scope of contracted works/supply and the associated specifications (including HSE requirements) in consultation with subject matter experts; 2.Identifying the technical requirements and competencies needed to perform the contracted work/supply, in consultation with the contractors, including arranging for pre-award site inspections where necessary; 7. Role and Responsible (HSE)
  • 41. 7. 1 Company HSE representative(s) – Page 24 The responsibilities of the Company HSE Representative(s) include: 3.Identifying the HSE hazards and risk management requirements for the job, in consultation with the contractor and other relevant parties (e.g. site manager, HSE advisors); 4.Notifying the contractor of the scope of work, the associated HSE risks and controls required and the level of safety management documentation required by Company, using form to record them in the contract documents; 5.Providing relevant procedures and HSE documents, including risk assessments of known work site hazards, and assisting in accessing and addressing any queries in relation to Company HSE requirements and procedures; 7. Role and Responsible (HSE)
  • 42. 7. 1 Company HSE representative(s) – Page 34 6.Validating contractor safety records, checking contractor training and competency records (licences, etc.), reviewing and approving HSE risk management plans and controls and arranging any required Company training and inductions, 7.Arranging delivery of the site-specific induction (this may be done by a suitably qualified person nominated by the manager responsible for the work site); 8.Approving work to commence, including ensuring any required permits are issued, that the Authorised Issuing Officer has approved appointment of Persons In Charge (PIC), and ensuring that all work permit conditions are met; 7. Role and Responsible (HSE)
  • 43. 7. 1 Company HSE representative(s) – Page 44 9.Coordinating all site works, identifying the worksite boundaries, communicating site hazards and environmental aspects and resolving conflicting simultaneous operations; 10.Ensuring adequate site consultation and communication takes place, like the daily pre-start toolbox meeting. These meetings may well be led by the contractors Site Manager / supervisor after initial handover and commencement of works; 11.Ensuring that the site emergency response is adequate, organised and has been communicated to all parties 7. Role and Responsible (HSE)
  • 44. 7.2 Contractor representative(s) – Page 1 These responsibilities include: 1.Consulting with Company to identify the HSE hazards and risks arising from the contractor’s part of the job and to understand Company HSE management requirements; 2.Ensuring Company HSE management actions, training and competency requirements are met; 3.Providing relevant HSE management documentation required by Company (as listed in the contract), including contractor training and competency records (licences, etc.); 4.Preparing HSE risk management plans and controls in consultation with relevant contractor personnel and Company, including developing and applying appropriate safe work methods and performing job hazard analyses (JHAs) that comply with Company HSE system; 5.Ensuring that all relevant contractor personnel hold the required qualifications, certificates and inductions and are equipped with the correct personal protective equipment (PPE) and other safety equipment (e.g. personal isolation locks), as required under law and by Company, prior to the commencement of work; 7. Role and Responsible (HSE)
  • 45. 7.2 Contractor representative(s) – Page 2 These responsibilities include: 6.Supervising works directly, with a supervisor present on site and contactable at all times whilst the contractor has personnel on site, continuously monitoring for HSE hazards and conflicting simultaneous operations and informing Company of any conflicts; 7.Coordinating and communicating with Company to ensure the accuracy and completeness of on-site HSE risk management activities, including monitoring the implementation and effectiveness of the agreed risk controls; and 8.Reporting any injuries, safety and environmental hazards, near misses and incidents to the Company HSE Representative(s) and, in the event of a reportable incident occurring, preserving the incident scene for investigation and assisting with the investigation of incidents. 7. Role and Responsible (HSE)
  • 46. HSE Leader mush have followings element as minimum skills and competences; • Demonstrated management commitment • Policies and principles • Goals, objectives and plans • Procedures and performance standards 8. Leadership Elements
  • 47. • Line management accountability and responsibility • Safety personnel • Integrated organization structure • Motivation and awareness • Effective communication • Training and development • Incident investigation • Audits and observations 8. Leadership Elements