1. Centro de Pesquisas de Energia Elétrica - CEPEL Electric Energy Research Center - CEPEL Título do trabalho IHA World Congress Advancing Sustainable Hydropower Session 5 – Assessing Sustainability Performance Iguassu, Brazil, 14-17 Jun 2011 Autor/apresentador Área Albert C. G. Melo Director-General
19. Affected area recovered during constructionLesser deforestation and works impact Forest is recovered Source: Eletrobras
20. Manual for Hydropower Inventory ofRiver Basins, 2007 Social and Environmental Aspects considered since the first planning process Integrated Environmental (and Social) Assessment – IEA
21.
22. SINV – Decision Support System for Hydropoer River Basin Inventory Studies Dominant alternatives SINV - Screen for Preliminary Multi-objective Analysis
23. Manual for Hydropower Inventory ofRiver Basins, 2007 By bringing out an English translation of the 2007 edition of the Manual for Hydropower Inventory Studies of River Basins, the Ministry of Mines and Energy intends to offer the international community a basic reference to be considered in the portfolio of possible energy solutions in developing countries, which should be of particular interest to multilateral financing and development organizations.