CONTENTS 
I. PROJECT USING PLC 
1. Project Objective 
2. Hardware and Software Used 
3. Flowchart of the Project 
4. Working of the Project 
5. Result and Future Scope 
II. PROJECT USING SCADA 
1. Project Objective and Software Used 
2. Working of the Project 
3. SCADA Programming 
4. Window Script Used 
5. Result and Future Scope
ASET 
I. PROJECT 
USING 
PLC 
3
PROJECT OBJECTIVE ASET 
To design a system using PLC with the specifications given: There are 
four LEDs red, green, yellow and blue. Two push-button switches are 
there for START, STOP and for LED selection there is SELECT switch. 
The START button is pressed after that: 
• Condition 1: If SELECT switch is pressed once then red LED glows. 
• Condition 2: If SELECT switch is pressed twice then green LED 
glows. 
• Condition 3: If SELECT switch is pressed thrice then yellow LED 
glows. 
• Condition 4: If SELECT switch is pressed four times then blue LED 
glows. 
4
ASET 
HARDWARE & SOFTWARE 
USED 
• PLC: Allen Bradley Micro Logix 1000 with 10 Input 
/ Output. 
• Programming Software: Rockwell software RS 
Logix 500 English. 
• Communication Software: RS Linx. 
• Programming Language: Ladder Logic. 
• Communication Protocol: RS 232 
• Other Hardware: Push Buttons, Light Emitting 
Diode. 
5
ASET 
BLOCK DIAGRAM OF 
PROJECT 
POWER 
SUPPLY 
PROCESSOR 
I M 
N O 
P D 
U U 
T L 
E 
O M 
U O 
T D 
P U 
U L 
T E 
PROGRAMMING 
DEVICE 
From 
INPUT 
(Pushbuttons) 
To 
OUTPUT 
(LEDs) 
6 
RS- 232
ASET FLOWCHART 
7
ASET 
8 
WORKING OF PROJECT 
FIG 1: SELECT SWITCH CONNECTED TO THE COUNTERS IS PRESSED
WORKING OF PROJECT ASET 
9 
FIGURE 2: GLOWING OF RED LED
WORKING OF PROJECT ASET 
10 
FIGURE 3: GLOWING OF GREEN LED
WORKING OF PROJECT ASET 
FIGURE 4: GLOWING OF YELLOW LED 11
WORKING OF PROJECT ASET 
FIGURE 5: GLOWING OF BLUE LED 12
RESULT AND FUTURE SCOPE ASET 
RESULT 
The conditions mentioned in the objective are satisfied. 
FUTURE SCOPE 
• The project based on glowing different LEDs can be extended 
in industry environment for doing different automated tasks by 
usage of same set of hardware, just by changing the program 
or logic stored in the PLC. 
• If the PLC is connected with SCADA using ”Device 
Connectivity” feature, various other features like Recipe 
Management, Alarms etc. can be used to make the system 
more reliable for the industrial environment. 
13
ASET 
14 
II. PROJECT 
USING 
SCADA
ASET 
OBJECTIVE AND SOFTWARE 
REQUIRED 
PROJECT OBJECTIVE 
To design ”Sewage Water Treatment System” in Wonderware Intouch 
SCADA. 
SOFTWARE REQUIRED 
Wonderware Intouch version 9.0 
WORKING OF PROJECT 
When the START switch is turned on, water from the storage tank flows to 
the sedimentation tank after passing through the screening filter. As soon 
as the sedimentation tank is filled the rotator inside the tank is turned on so 
as to deposit the sediments at the bottom of the tank. 
Clean water from the sedimentation tank is transferred to the chlorine tank 
where the water is chlorinated to kill the germs and make it fit for 
drinking. Next, the water is oxygenated by passing oxygen gas into it in 
the chlorine tank. The water from the chlorine tank is filtered and stored in 
another tank for usage. 
15
WORKING OF THE PROJECT ASET 
16
SCADA PROGRAMMING ASET 
FIGURE 1: FINISHED WINDOW IN MINDOW MAKER 17
OBJECT PROPERTIES ASET 
18 
• These properties are 
common to all symbol 
factory graphical 
objects 
• These properties are 
visible only when 
“break cell” operation 
is performed on symbol 
factory objects
ASET 
19 
SCADA PROGRAMMING 
FIGURE 2: FILLING OF SEDIMENTATION TANK
ASET 
20 
SCADA PROGRAMMING 
FIGURE 3: OXYGENATION OF CHLORINATION TANK AFTER SEDIMENTATION
ASET 
21 
SCADA PROGRAMMING 
FIGURE 4: CLEAR WATER BEING FILLED TANK FOR USAGE
WINDOW SCRIPT USED ASET 
22 
There are two parts in the script: 
(1) On Show: how the things 
should appear as soon as the 
window viewer is started. 
(2) While showing: how things 
will appear once the task starts to 
run on window viewer. 
• Value of A is incremented when 
A<105, the START switch is 
kept on and the STOP is off. 
The increment is done in 1 sec 
period. 
• As soon as A=105, the value of 
A is reset to 0 and the process 
repeats itself in an infinite loop 
until the STOP switch is 
pressed on.
RESULT AND FUTURE SCOPE ASET 
RESULTS 
The design of ”Sewage Water Treatment System” is 
successfully implemented in Intouch SCADA 
FUTURE SCOPE 
This project can be implemented practically when SCADA is 
connected with PLC. More enhanced features can be added up 
to it. For e.g. R. O. purification system can be added. 
2. The project based on sewage can be extended to water 
purification systems, oil refinery systems in industries. 
3. The project can also be extended to packaged drinking 
water industries where water is first purified, then filled into 
bottles, capped, labelled and then sold in bottles. 
23

Más contenido relacionado

La actualidad más candente

What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)
yogesh8418
 
Plc example presentation
Plc example presentationPlc example presentation
Plc example presentation
Roshit Kadiru
 
Plc 8 raja presentation plc
Plc 8  raja presentation  plcPlc 8  raja presentation  plc
Plc 8 raja presentation plc
Rameez Raja
 
PLC Ladder Programming [Mechatronics]
PLC Ladder Programming [Mechatronics]PLC Ladder Programming [Mechatronics]
PLC Ladder Programming [Mechatronics]
Dr. S.N. Teli
 

La actualidad más candente (20)

What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)What Is a Programmable Logic Controller (PLC)
What Is a Programmable Logic Controller (PLC)
 
Plc scada details and comparison
Plc scada details and comparisonPlc scada details and comparison
Plc scada details and comparison
 
plc training report
plc training reportplc training report
plc training report
 
PLC SCADA report Paras Singhal
PLC SCADA report Paras SinghalPLC SCADA report Paras Singhal
PLC SCADA report Paras Singhal
 
Plc ppt
Plc pptPlc ppt
Plc ppt
 
Scada System
Scada  SystemScada  System
Scada System
 
PLC and SCADA in Industrial Automation
PLC and SCADA in Industrial AutomationPLC and SCADA in Industrial Automation
PLC and SCADA in Industrial Automation
 
Summer training plc & scada
Summer training  plc & scada Summer training  plc & scada
Summer training plc & scada
 
summer internship report on PLC & SCADA
summer internship report on PLC & SCADAsummer internship report on PLC & SCADA
summer internship report on PLC & SCADA
 
classic control and PLC training report
classic control and PLC training reportclassic control and PLC training report
classic control and PLC training report
 
What is hmi
What is hmi What is hmi
What is hmi
 
INDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLCINDUSTRIAL AUTOMATION USING PLC
INDUSTRIAL AUTOMATION USING PLC
 
Plc example presentation
Plc example presentationPlc example presentation
Plc example presentation
 
Plc & scada Training Report
Plc & scada Training ReportPlc & scada Training Report
Plc & scada Training Report
 
Industrial Automation
Industrial AutomationIndustrial Automation
Industrial Automation
 
Programmable logic Controller
Programmable logic ControllerProgrammable logic Controller
Programmable logic Controller
 
Basic plc
Basic plcBasic plc
Basic plc
 
PPT of PLC and SCADA
PPT of PLC and SCADAPPT of PLC and SCADA
PPT of PLC and SCADA
 
Plc 8 raja presentation plc
Plc 8  raja presentation  plcPlc 8  raja presentation  plc
Plc 8 raja presentation plc
 
PLC Ladder Programming [Mechatronics]
PLC Ladder Programming [Mechatronics]PLC Ladder Programming [Mechatronics]
PLC Ladder Programming [Mechatronics]
 

Similar a plc and scada presentation

De-Inking Plant Final Tower Control using SIEMENS PLC(report
De-Inking Plant Final Tower Control using SIEMENS PLC(reportDe-Inking Plant Final Tower Control using SIEMENS PLC(report
De-Inking Plant Final Tower Control using SIEMENS PLC(report
abdullah s
 
Minor_Project_Report
Minor_Project_ReportMinor_Project_Report
Minor_Project_Report
Vansh Kumar
 

Similar a plc and scada presentation (20)

IRJET- Automatic Bottle Filling and Capping System using PLC
IRJET- Automatic Bottle Filling and Capping System using PLCIRJET- Automatic Bottle Filling and Capping System using PLC
IRJET- Automatic Bottle Filling and Capping System using PLC
 
IRJET- Smart Irrigation System using Soil Moisture Sensor and PLC
IRJET- Smart Irrigation System using Soil Moisture Sensor and PLCIRJET- Smart Irrigation System using Soil Moisture Sensor and PLC
IRJET- Smart Irrigation System using Soil Moisture Sensor and PLC
 
De-Inking Plant Final Tower Control using SIEMENS PLC(report
De-Inking Plant Final Tower Control using SIEMENS PLC(reportDe-Inking Plant Final Tower Control using SIEMENS PLC(report
De-Inking Plant Final Tower Control using SIEMENS PLC(report
 
Automatic Irrigation System Project Report
Automatic Irrigation System Project ReportAutomatic Irrigation System Project Report
Automatic Irrigation System Project Report
 
Bottle Filling Application using Arduino
Bottle Filling Application using ArduinoBottle Filling Application using Arduino
Bottle Filling Application using Arduino
 
Industrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEWIndustrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEW
 
Industrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEWIndustrial Process Management Using LabVIEW
Industrial Process Management Using LabVIEW
 
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
 
Electronic DIY project book
Electronic DIY project book Electronic DIY project book
Electronic DIY project book
 
Design, simulation and implementation of an Arduino microcontroller based aut...
Design, simulation and implementation of an Arduino microcontroller based aut...Design, simulation and implementation of an Arduino microcontroller based aut...
Design, simulation and implementation of an Arduino microcontroller based aut...
 
IRJET-E-Blood Bank Application using Cloud Computing
IRJET-E-Blood Bank Application using Cloud ComputingIRJET-E-Blood Bank Application using Cloud Computing
IRJET-E-Blood Bank Application using Cloud Computing
 
Smart irrigation system
Smart irrigation systemSmart irrigation system
Smart irrigation system
 
Basic plc
Basic plcBasic plc
Basic plc
 
Microcontroller project111
Microcontroller project111Microcontroller project111
Microcontroller project111
 
Microcontroller project
Microcontroller projectMicrocontroller project
Microcontroller project
 
PIC Axe049(print34)
PIC Axe049(print34)PIC Axe049(print34)
PIC Axe049(print34)
 
Functional Design Specification of Hyperglass Cleaning
Functional Design Specification of Hyperglass CleaningFunctional Design Specification of Hyperglass Cleaning
Functional Design Specification of Hyperglass Cleaning
 
IRJET- Real Time Fault Detection System for Steam Condenser by using PLC SCADA
IRJET- Real Time Fault Detection System for Steam Condenser by using PLC SCADAIRJET- Real Time Fault Detection System for Steam Condenser by using PLC SCADA
IRJET- Real Time Fault Detection System for Steam Condenser by using PLC SCADA
 
Minor_Project_Report
Minor_Project_ReportMinor_Project_Report
Minor_Project_Report
 
smart home automation system
smart home automation systemsmart home automation system
smart home automation system
 

Más de Indira Kundu (6)

Basics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADABasics of Automation, PLC and SCADA
Basics of Automation, PLC and SCADA
 
Plc and scada report
Plc and scada reportPlc and scada report
Plc and scada report
 
Uttrakhand disaster
Uttrakhand disasterUttrakhand disaster
Uttrakhand disaster
 
Report on automatic door
Report on automatic doorReport on automatic door
Report on automatic door
 
Training ppt
Training pptTraining ppt
Training ppt
 
faradays law and its applications ppt
faradays law and its applications pptfaradays law and its applications ppt
faradays law and its applications ppt
 

Último

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Último (20)

Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 

plc and scada presentation

  • 1. ASET 1 SUMMER TRAINING PRESENTATION ON PLC AND SCADA SUBMITTED BY INDIRA KUNDU B.TECH (ECE) 7TH SEMESTER SUBMITTED TO Ms. PUSHPA GOTHWAL
  • 2. ASET 2 CONTENTS I. PROJECT USING PLC 1. Project Objective 2. Hardware and Software Used 3. Flowchart of the Project 4. Working of the Project 5. Result and Future Scope II. PROJECT USING SCADA 1. Project Objective and Software Used 2. Working of the Project 3. SCADA Programming 4. Window Script Used 5. Result and Future Scope
  • 3. ASET I. PROJECT USING PLC 3
  • 4. PROJECT OBJECTIVE ASET To design a system using PLC with the specifications given: There are four LEDs red, green, yellow and blue. Two push-button switches are there for START, STOP and for LED selection there is SELECT switch. The START button is pressed after that: • Condition 1: If SELECT switch is pressed once then red LED glows. • Condition 2: If SELECT switch is pressed twice then green LED glows. • Condition 3: If SELECT switch is pressed thrice then yellow LED glows. • Condition 4: If SELECT switch is pressed four times then blue LED glows. 4
  • 5. ASET HARDWARE & SOFTWARE USED • PLC: Allen Bradley Micro Logix 1000 with 10 Input / Output. • Programming Software: Rockwell software RS Logix 500 English. • Communication Software: RS Linx. • Programming Language: Ladder Logic. • Communication Protocol: RS 232 • Other Hardware: Push Buttons, Light Emitting Diode. 5
  • 6. ASET BLOCK DIAGRAM OF PROJECT POWER SUPPLY PROCESSOR I M N O P D U U T L E O M U O T D P U U L T E PROGRAMMING DEVICE From INPUT (Pushbuttons) To OUTPUT (LEDs) 6 RS- 232
  • 8. ASET 8 WORKING OF PROJECT FIG 1: SELECT SWITCH CONNECTED TO THE COUNTERS IS PRESSED
  • 9. WORKING OF PROJECT ASET 9 FIGURE 2: GLOWING OF RED LED
  • 10. WORKING OF PROJECT ASET 10 FIGURE 3: GLOWING OF GREEN LED
  • 11. WORKING OF PROJECT ASET FIGURE 4: GLOWING OF YELLOW LED 11
  • 12. WORKING OF PROJECT ASET FIGURE 5: GLOWING OF BLUE LED 12
  • 13. RESULT AND FUTURE SCOPE ASET RESULT The conditions mentioned in the objective are satisfied. FUTURE SCOPE • The project based on glowing different LEDs can be extended in industry environment for doing different automated tasks by usage of same set of hardware, just by changing the program or logic stored in the PLC. • If the PLC is connected with SCADA using ”Device Connectivity” feature, various other features like Recipe Management, Alarms etc. can be used to make the system more reliable for the industrial environment. 13
  • 14. ASET 14 II. PROJECT USING SCADA
  • 15. ASET OBJECTIVE AND SOFTWARE REQUIRED PROJECT OBJECTIVE To design ”Sewage Water Treatment System” in Wonderware Intouch SCADA. SOFTWARE REQUIRED Wonderware Intouch version 9.0 WORKING OF PROJECT When the START switch is turned on, water from the storage tank flows to the sedimentation tank after passing through the screening filter. As soon as the sedimentation tank is filled the rotator inside the tank is turned on so as to deposit the sediments at the bottom of the tank. Clean water from the sedimentation tank is transferred to the chlorine tank where the water is chlorinated to kill the germs and make it fit for drinking. Next, the water is oxygenated by passing oxygen gas into it in the chlorine tank. The water from the chlorine tank is filtered and stored in another tank for usage. 15
  • 16. WORKING OF THE PROJECT ASET 16
  • 17. SCADA PROGRAMMING ASET FIGURE 1: FINISHED WINDOW IN MINDOW MAKER 17
  • 18. OBJECT PROPERTIES ASET 18 • These properties are common to all symbol factory graphical objects • These properties are visible only when “break cell” operation is performed on symbol factory objects
  • 19. ASET 19 SCADA PROGRAMMING FIGURE 2: FILLING OF SEDIMENTATION TANK
  • 20. ASET 20 SCADA PROGRAMMING FIGURE 3: OXYGENATION OF CHLORINATION TANK AFTER SEDIMENTATION
  • 21. ASET 21 SCADA PROGRAMMING FIGURE 4: CLEAR WATER BEING FILLED TANK FOR USAGE
  • 22. WINDOW SCRIPT USED ASET 22 There are two parts in the script: (1) On Show: how the things should appear as soon as the window viewer is started. (2) While showing: how things will appear once the task starts to run on window viewer. • Value of A is incremented when A<105, the START switch is kept on and the STOP is off. The increment is done in 1 sec period. • As soon as A=105, the value of A is reset to 0 and the process repeats itself in an infinite loop until the STOP switch is pressed on.
  • 23. RESULT AND FUTURE SCOPE ASET RESULTS The design of ”Sewage Water Treatment System” is successfully implemented in Intouch SCADA FUTURE SCOPE This project can be implemented practically when SCADA is connected with PLC. More enhanced features can be added up to it. For e.g. R. O. purification system can be added. 2. The project based on sewage can be extended to water purification systems, oil refinery systems in industries. 3. The project can also be extended to packaged drinking water industries where water is first purified, then filled into bottles, capped, labelled and then sold in bottles. 23