International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1411
IMPLIMENTATION OF POKA YOKE IN PACKING LINE
Anurag Upadhyay
B.E Mechanical, M.Tech Advanced Production System, SAM College of Engineering & Technology, Bhopal
Prof. Vipin Titariya , Mechanical Engineering. of SAM College of Engineering & Technology ,Bhopal, M.P, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract -On shop floor we address many problemscaused
by human mistakes and due to human error this are random
in nature because they take place due to the negligence,
ignorance, knowledge etc of the responsible persons Some of
them become the reason of costumer complains. For prevent
this type of human error we implement poka yoke into the
system. In this case we discuss about the problem of
underweight jar cartoon. This is the most normal problems
facing by the industry's during this time because of the
pressure of the production and the high demand of the goods
this problem takes place. Same problem we address sin a
FMCG industry during the packing of the 1 kg jar. Some time
the number of jar into the carton is short and its leads to the
costumer complain. For solving this problem a poka yoka is
implement for proofing the problem. In this a weighingscaleis
placed data the end of the packing station at this stage a
helper weigh the carton and write the weight of the carton on
it. So that he can find out the underweight carton and packing
leader also trace out the carton and find out the odd one.
1.INTRODUCTION
Poka-yoke [poka joke] is a Japanese term that means
"mistake-proofing" or “inadvertent error prevention”. A
poka-yoke is any mechanism in a lean
manufacturing process that helps an equipment operator
avoid (yokeru) mistakes (poka). Its purpose is to eliminate
product defects by preventing, correcting, constrain or
drawing attention to human errors as they occur. The
concept was formalized, and the term adopted, by Shigeo
Shingo as part of the Toyota Production System it is the best
production it gives many other tools for productivity
improvement. It was originally described as baka-yoke, but
asthis means "fool-proofing" (or "idiot-proofing") the name
was changed to the milder poka-yoke. It is so simple and
inexpensive tool prevents the defects from being made or
highlights a problem or a defect if any defect occurs it is not
passed to the next operation as show in fig 3. It will stop or
prevent by the way of proofing.
2. Research Methodology
In this we have to implement the poka yoke by PDCA (Plan,
Do, Check, Act ) method. In this method we find out the plan
what we have to do for mistake proofing and then we
implement the method into the system and the check the
results. If the results are in acceptable limitsthe idea is fixed
on it another wise the next plan is implemented on the
system till we don't get the permanent solution for the
problem.
In this case we are working on the problem of the
underweight jar carton. In this case we addressed a problem
of the underweight jar cartoon in this the carton packed at
the end of the packing unit is under weight some time at it
cause the costumer complaint. So that for preventing this
human ,mistake we find out the poka yoke for solving this
problem. In this a weighing scaleof30 KG is placed at theend
of the packing unit and a helper weigh each carton and write
the weight of the carton on it. So that he can easily trace out
the weight of the carton and the packing leader and the
quality executive and the loadingleaderalsochecktheweight
of each carton during the internal movement of the carton
and the loading of the carton.
Implementation Procedure -
Date - 30/1/2017
Problem - Under Weight Carton
Unit - Jar Packing Unit
Responsibility - XYZ
PDCA Cycle -
Plan - In this a weighing scale of 30 KG is placed at the endof
the packing unit and a helper weigh each carton after
packing and write the weight of the carton on it by
permanent marker.
Do - The weighing scale is installed and the helper is also
placed at the end of the packing line
Check - After analyzing the data of the packing unit we find
out that the process is working well and we get the proper
and use full out comes from this.
Act - After analyzing all the results and the outcomes we
finally place this poka yoke into the system successfully.
3. RESUTS & OUTCOMES
AREA - PACKING LINE
MACHINE - WEIGHTING MACHINE
PROBLEM - IMPROPER FILLING OF JAR INTO THE
CARTON
Description of Problem - Jar waspacked into a carton with
definite quantity of 20 jar per cartoon but due to mistake
some time quality team find less number of jar into the
cartoon.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1412
FIG 1 - Weighing scale & Helper
ROOT COUSE - Absence of Control Measures
CORRECTIVE ACTION - Provide Weighing machine as a
Control Measure
WORKING - When a carton is strapped after filling of the
jar it will go to the weighing machine for weight and a
worker write its weight on the cartoon.
Table 1 -Before Implementation of Poka Yoke
DATE UNDER WEIGHT CARTONS
1-Feb-17 3
2-Feb-17 2
3-Feb-17 0
4-Feb-17 0
5-Feb-17 0
6-Feb-17 1
7-Feb-17 0
8-Feb-17 4
Graph 1 - Before Implementation of Poka Yoke
Table 2 - After Implementation of Poka Yoke
Date Under Weight Cartons
9-Feb-17 0
10-Feb-17 0
11-Feb-17 0
12-Feb-17 0
13-Feb-17 0
14-Feb-17 0
15-Feb-17 0
Graph 2 - After Implementation of Poka Yoke
All the calculation are done on the outcomes to find out the
actual results of the system. By this we get the proper values
of the underweight jar cartons. This is the most important
face of the research paper because on the basis of this result
we finalize the process.
Calculations-
Average underweight cartoon before the poka yoke - 1.25
After the installation of the poka yoke - 0
The underweight carton defect reduce by - 125 %
REFERENCES
[1] International Journal Of Engineering Science &
Research Technology Review On“Poka-Yoke:Technique
To Prevent Defect ” Aishwarya J. Kurhade ISSN: 2277-
9655 (I2OR), Publication Impact Factor: 3.785
[Kurhade,4.(11): November, 2015]
[2] "Poka-Yoke and Quality Control on Traub Machine for
Kick Starter Driven Shaft" Atif Jamal, Ujjwal Kumar,
Aftab A. Ansari, Balwant Singh Journal of Material
Science and Mechanical Engineering (JMSME) Print
ISSN: 2393-9095; Online ISSN: 2393-9109; Volume 2,
Number 7; April-June, 2015 pp. 10-15
[3] The International Journal of Advanced Manufacturing
Technology October 2015, Volume 81, Issue 1–4, pp
315–327, Six Sigma through Poka-Yoke: a navigation
through literature arena M. Vinod, S. R. Devadasan,
D. T. Sunil, V. M. M. Thilak
[4] "AN EFFECTIVE USE OF POKA YOKE FOR A NEW
PROCESS IN ASSEMBLY LINE" Ishani kar,Dr. Shobha R,
Anuj Rajan. International Research Journal of
Engineering and Technology (IRJET)e-ISSN:2395-0056
Volume: 02 Issue: 03| June-2015

Más contenido relacionado

Similar a IRJET- Implimentation of Poka Yoke in Packing Line

Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Singh Kakkar
 

Similar a IRJET- Implimentation of Poka Yoke in Packing Line (20)

A012430106
A012430106A012430106
A012430106
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLCIRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
IRJET- Smart System for Sorting Defective Parts and Distribution Line using PLC
 
Development of Bottle Unscramble Machine
Development of Bottle Unscramble MachineDevelopment of Bottle Unscramble Machine
Development of Bottle Unscramble Machine
 
Analysis of Safety Stock
Analysis of Safety StockAnalysis of Safety Stock
Analysis of Safety Stock
 
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLCIRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
IRJET- Robotic System for Automatic Pouring of Molten Metal using PLC
 
IRJET- Design and Development of a Bandsaw Machine Roller Bracket for Wei...
IRJET-  	  Design and Development of a Bandsaw Machine Roller Bracket for Wei...IRJET-  	  Design and Development of a Bandsaw Machine Roller Bracket for Wei...
IRJET- Design and Development of a Bandsaw Machine Roller Bracket for Wei...
 
IRJET- Design and Fabrication of Job Weight Operated Material Handling Equipment
IRJET- Design and Fabrication of Job Weight Operated Material Handling EquipmentIRJET- Design and Fabrication of Job Weight Operated Material Handling Equipment
IRJET- Design and Fabrication of Job Weight Operated Material Handling Equipment
 
IRJET- Design and Fabrication of Papad Making Machine for Grihaudyog
IRJET- Design and Fabrication of Papad Making Machine for GrihaudyogIRJET- Design and Fabrication of Papad Making Machine for Grihaudyog
IRJET- Design and Fabrication of Papad Making Machine for Grihaudyog
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
 
Smart bore well child rescue system
Smart bore well child rescue systemSmart bore well child rescue system
Smart bore well child rescue system
 
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...IRJET-  	  Productivity Improvement of Assembly Workstation in a Small Scale ...
IRJET- Productivity Improvement of Assembly Workstation in a Small Scale ...
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
 
Line balancing example
Line balancing exampleLine balancing example
Line balancing example
 
KIOCL
KIOCLKIOCL
KIOCL
 
Automatic Painting Gun for Solar Storage Tank with Arduino UNO Microcontroller
Automatic Painting Gun for Solar Storage Tank with Arduino UNO MicrocontrollerAutomatic Painting Gun for Solar Storage Tank with Arduino UNO Microcontroller
Automatic Painting Gun for Solar Storage Tank with Arduino UNO Microcontroller
 
Gurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 FinalGurnoor Technical Trainee Review 2011-2012 Final
Gurnoor Technical Trainee Review 2011-2012 Final
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 

Más de IRJET Journal

Más de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Último

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Último (20)

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 

IRJET- Implimentation of Poka Yoke in Packing Line

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1411 IMPLIMENTATION OF POKA YOKE IN PACKING LINE Anurag Upadhyay B.E Mechanical, M.Tech Advanced Production System, SAM College of Engineering & Technology, Bhopal Prof. Vipin Titariya , Mechanical Engineering. of SAM College of Engineering & Technology ,Bhopal, M.P, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract -On shop floor we address many problemscaused by human mistakes and due to human error this are random in nature because they take place due to the negligence, ignorance, knowledge etc of the responsible persons Some of them become the reason of costumer complains. For prevent this type of human error we implement poka yoke into the system. In this case we discuss about the problem of underweight jar cartoon. This is the most normal problems facing by the industry's during this time because of the pressure of the production and the high demand of the goods this problem takes place. Same problem we address sin a FMCG industry during the packing of the 1 kg jar. Some time the number of jar into the carton is short and its leads to the costumer complain. For solving this problem a poka yoka is implement for proofing the problem. In this a weighingscaleis placed data the end of the packing station at this stage a helper weigh the carton and write the weight of the carton on it. So that he can find out the underweight carton and packing leader also trace out the carton and find out the odd one. 1.INTRODUCTION Poka-yoke [poka joke] is a Japanese term that means "mistake-proofing" or “inadvertent error prevention”. A poka-yoke is any mechanism in a lean manufacturing process that helps an equipment operator avoid (yokeru) mistakes (poka). Its purpose is to eliminate product defects by preventing, correcting, constrain or drawing attention to human errors as they occur. The concept was formalized, and the term adopted, by Shigeo Shingo as part of the Toyota Production System it is the best production it gives many other tools for productivity improvement. It was originally described as baka-yoke, but asthis means "fool-proofing" (or "idiot-proofing") the name was changed to the milder poka-yoke. It is so simple and inexpensive tool prevents the defects from being made or highlights a problem or a defect if any defect occurs it is not passed to the next operation as show in fig 3. It will stop or prevent by the way of proofing. 2. Research Methodology In this we have to implement the poka yoke by PDCA (Plan, Do, Check, Act ) method. In this method we find out the plan what we have to do for mistake proofing and then we implement the method into the system and the check the results. If the results are in acceptable limitsthe idea is fixed on it another wise the next plan is implemented on the system till we don't get the permanent solution for the problem. In this case we are working on the problem of the underweight jar carton. In this case we addressed a problem of the underweight jar cartoon in this the carton packed at the end of the packing unit is under weight some time at it cause the costumer complaint. So that for preventing this human ,mistake we find out the poka yoke for solving this problem. In this a weighing scaleof30 KG is placed at theend of the packing unit and a helper weigh each carton and write the weight of the carton on it. So that he can easily trace out the weight of the carton and the packing leader and the quality executive and the loadingleaderalsochecktheweight of each carton during the internal movement of the carton and the loading of the carton. Implementation Procedure - Date - 30/1/2017 Problem - Under Weight Carton Unit - Jar Packing Unit Responsibility - XYZ PDCA Cycle - Plan - In this a weighing scale of 30 KG is placed at the endof the packing unit and a helper weigh each carton after packing and write the weight of the carton on it by permanent marker. Do - The weighing scale is installed and the helper is also placed at the end of the packing line Check - After analyzing the data of the packing unit we find out that the process is working well and we get the proper and use full out comes from this. Act - After analyzing all the results and the outcomes we finally place this poka yoke into the system successfully. 3. RESUTS & OUTCOMES AREA - PACKING LINE MACHINE - WEIGHTING MACHINE PROBLEM - IMPROPER FILLING OF JAR INTO THE CARTON Description of Problem - Jar waspacked into a carton with definite quantity of 20 jar per cartoon but due to mistake some time quality team find less number of jar into the cartoon.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 6.171 | ISO 9001:2008 Certified Journal | Page 1412 FIG 1 - Weighing scale & Helper ROOT COUSE - Absence of Control Measures CORRECTIVE ACTION - Provide Weighing machine as a Control Measure WORKING - When a carton is strapped after filling of the jar it will go to the weighing machine for weight and a worker write its weight on the cartoon. Table 1 -Before Implementation of Poka Yoke DATE UNDER WEIGHT CARTONS 1-Feb-17 3 2-Feb-17 2 3-Feb-17 0 4-Feb-17 0 5-Feb-17 0 6-Feb-17 1 7-Feb-17 0 8-Feb-17 4 Graph 1 - Before Implementation of Poka Yoke Table 2 - After Implementation of Poka Yoke Date Under Weight Cartons 9-Feb-17 0 10-Feb-17 0 11-Feb-17 0 12-Feb-17 0 13-Feb-17 0 14-Feb-17 0 15-Feb-17 0 Graph 2 - After Implementation of Poka Yoke All the calculation are done on the outcomes to find out the actual results of the system. By this we get the proper values of the underweight jar cartons. This is the most important face of the research paper because on the basis of this result we finalize the process. Calculations- Average underweight cartoon before the poka yoke - 1.25 After the installation of the poka yoke - 0 The underweight carton defect reduce by - 125 % REFERENCES [1] International Journal Of Engineering Science & Research Technology Review On“Poka-Yoke:Technique To Prevent Defect ” Aishwarya J. Kurhade ISSN: 2277- 9655 (I2OR), Publication Impact Factor: 3.785 [Kurhade,4.(11): November, 2015] [2] "Poka-Yoke and Quality Control on Traub Machine for Kick Starter Driven Shaft" Atif Jamal, Ujjwal Kumar, Aftab A. Ansari, Balwant Singh Journal of Material Science and Mechanical Engineering (JMSME) Print ISSN: 2393-9095; Online ISSN: 2393-9109; Volume 2, Number 7; April-June, 2015 pp. 10-15 [3] The International Journal of Advanced Manufacturing Technology October 2015, Volume 81, Issue 1–4, pp 315–327, Six Sigma through Poka-Yoke: a navigation through literature arena M. Vinod, S. R. Devadasan, D. T. Sunil, V. M. M. Thilak [4] "AN EFFECTIVE USE OF POKA YOKE FOR A NEW PROCESS IN ASSEMBLY LINE" Ishani kar,Dr. Shobha R, Anuj Rajan. International Research Journal of Engineering and Technology (IRJET)e-ISSN:2395-0056 Volume: 02 Issue: 03| June-2015