RISK MANAGEMENT TECHNIQUE OF READY MIX CONCRETE PLANTS
Vijaykumar Baheti1, Dr. A.B.More2, Prof. D.B.Bhosale3, Pooja Shinde4
1 P.G.Student, Department of Civil Engineering TSSM’s Padmabhushan Vasantdada Patil Institute of Technology
Bavdhan Pune, India
2 Asst. professor, Department of Civil Engineering TSSM’s Padmabhushan Vasantdada Patil Institute of
Technology Bavdhan Pune, India
3 Head of department, Department of Civil Engineering TSSM’s Padmabhushan Vasantdada Patil Institute of
Technology Bavdhan Pune, India
4 P.G.Student, Department of Civil Engineering, Reva institute of technology & management, Bangalore, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract – Ready mix concrete (RMC) is an essential
material in contemporary construction and engineering
projects. The systematic identification and assessment of risk
and effectively dealing with the results is significanttosuccess
of RMC industry and variousprojects. Readymixindustriescan
be extremely complex and fraught with uncertainty. Like the
nature of the construction companies like RMC, and the
growing need of having innovation and complex projects, the
risk management process has become more complex. Still
there is no efficient method for the effective assessment of
various risks in these sectors. In this study, an attempt is made
to find out the most critical risk in RMC plants by developing a
risk management model using Failure mode and effective
Analysis (FMEA) technique. This was resulted in six risks with
risk priority number of equal values and hence a risk
prioritization was done using Analytical Network Process
(ANP) with the help of super decision Software. Finally some
remedial measures have been found out for the most critical
risks in that plant.
Key Words: Ready mix concrete(RMC) plants, FMEA
(Failure mode and effective Analysis), Risk priority
number(RPN), Super decision software, Analytical network
process(ANP).
1. INTRODUCTION
Ready Mix Concrete (RMC) is a concrete delivered at site or
into purchasers vehicle in plastic condition and requiring no
further treatment before being placed in a position it is to be
set and hardened (IS 4926-2001). Ready mix Concrete is
preferred over site mix concrete because it isenvironmental
friendly. Its manufacturing is not messy and it is time
consuming. It offers solution to specific problemofcustomer
and ensures customer satisfaction and provides concrete of
desired quality. It also eliminates the storing of materials at
site for manufacturing concreterequiredatprojectsites. The
quality of concrete has a direct effect on the strength and
durability of the structure as whole. There are things which
found fewer advantages to produce concrete on a worksite
than RMC. Quality of concrete is under the threat which
resulting in deficient product due to some reasons. RMC is
produced under the factory conditions and permits a close
control of all operations of manufacture and transportation
of fresh concrete. Due to its durability,lowcostanditsability
to be customized for different applications, RMC is now one
of the most popular building materials.
In India, use and demand of RMCisgrowing rapidlyincivil
and construction business. Some of construction companies
are foraying in RMC business due to its huge potential. RMC
industry is exposed to various risks so risk management is
implemented on various plants to minimize risk in
production and delivery at sites. The critical failure mode in
production process should be found out and various
measures to be implemented on RMC plants. The systematic
identification and assessment of risk and effectively dealing
with the results is significant to success of any industry and
projects. Hence, the need for a proper and most efficient
technique for the risk assessment in RMC industry is very
important.
In this work, control charts helps to understand the cube
samples failure in the concrete production processdueto its
improper mix design or due to calibration and weighing on
scale wrongly. To find out most critical failure mode in
production process the Failure Mode and Effective Analysis
(FMEA) technique is used and to take appropriatecorrective
actions for the improvement is done.Fortheprioritizationof
the identified risks, ANP technique is used. Analytical
Network Process (ANP) is a multi-criteria decision making
technique which is commonly used for the prioritization of
risks. The ANP technique is implemented in this work with
the help of super decision software. Three RMC plants
selected from pune region for this study and the results
developed are analyzed to know the efficiency and
effectiveness of the developed technique. And remedial
measures for the identified critical failure mode are
suggested.
2. LITERATURE REVIEW
Goutam Dutta et.al [1] were conducteda studyondesignand
applications of Risk Adjusted Cumulative Sum (RACUSUM)
for online strength monitoring of Ready Mixed Concrete. In
this paper, an attempt is made to design and apply a new
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2702
CUSUM procedure for RMC industry which takes care of the
risks involved and associated with the production of RMC.
This procedure is termed as Risk Adjusted CUSUM
(RACUSUM). Mohamed A 2 et.al [2] were conducted a study
on the use of basic quality tools for improvement of the
construction industry. Quality control of Ready Mixed
Concrete can be divided into three convenient areas like
forward control, immediate control and retrospective
control. Statistical Quality Control (SQC) application proves
to be an important tool which can be used effectively for
quality and productivity improvement for infrastructure
projects. Statistical Quality Control canbeeffectivelyapplied
to RMC industry for online (during production) and also
offline (before and after production) quality monitoringand
control.
Gupta D. Y et.al [3] was conducted study on a revolution in
production of concrete. A production of ready mix concrete
includes mix design of RMC, IS codes, mixing process,
carrying of concrete,handling process,qualityassurance and
site preparation. Ready mix concreteisanindustrial product
which is delivered to consumer in fresh condition after the
production process of RMC plant. The process of Ready
mixed concrete (RMC) flows from (design, production,
transportation, pouring, placement and maintenance).
Agnieszka Dziadosz et.al [4] conducted a study on risk
analysis in construction projects. This article presents three
different methods of the risk analysis as well as highlighting
their advantages, disadvantage and primary areas of
applications.
Mehrzad et.al [5] were studied about assessment and risk
management of potential hazards by Failure Modes and
Effect Analysis (FMEA) methos in Yazd Steel Complex. In his
work, the risks in different parts of the complex were
evaluated by using FMEA method. Jyoti Trivedi et.al [6]were
studied about the FMEA risk management technique for
quality control of RMC production. The risk prioritynumber
results indicated processfailureintermsofirregulargrading
process, material testing prior use in mixing process which
were the important factor to be monitored for quality
control. Gunjun joshi et.al [7] were studied about FMEA and
Alternatives v/s Enhanced Risk Assessment Mechanism. In
this work, the advantage of using six sigma in Risk
Assessment are also pointed out and proposed a novel
technique which would overcome therestrictionsofexisting
Risk Management tools.
3. RISK MANAGEMENT
Risk management is the identification, assessment and
prioritization of risks (defined in ISO 31000 as the effect of
uncertainty on objective) followed by coordinated and
economical applications of resources to minimize monitor
and control the probability and/or impact of unfortunate
events or to maximize the realization of opportunities. The
management of any risks or uncertainty generally involves
the following;
 Risk identification
 Risk assessment
 Risk prioritization
Risk Identification
Risk identification is one of the most importantstagesin risk
management process. In this stage,all thepotential risksthat
could affect the project objective are identified.Itisstudying
a situation to realize what could go wrong at any given point
of time during the projects. For risk identification, some of
the methods used are checklists, Brainstorming, Tree
diagram, Cause– effectDiagram,interviewing,Questionnaire
surveys, etc.
Risk Assessment
Risk assessment is merely a method of analyzing the
seriousness of the risk. There are two approaches to
analyzing identified risks, and they are the qualitative and
quantitative methods.
The different method of risk assessment is done with
following:
 Fault tree Analysis (FTA)
 Cost of exposure quality risk analysis
 Failure Mode and Effect Analysis (FMEA)
 Cause-consequence Analysis
 Event tree analysis(ETA)
Failure Mode and Effective Analysis (FMEA):
FMEA is the technique which is used to identify the
potential failure modes for the product or a process before
the problem occurs to consider the risk. It might also rank
each failure according to the criticality of a failure effect and
its likelihood of taking place. FMEAisananalytical technique
which explores the effect of failure ofindividual components
in a system. In order tp calculate risk in FMEA, risk has three
components which are multiplied to produce RPN (risk
priority number). By doing this calculation one will be able
to decide the priority to select the most severe factor. There
is no threshold value for RPNs. The most common rating for
severity, occurrence and detection in order to calculate risk
priority number can be seen. It can be seen from results that
risk priority number of the process factor with highest
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2703
number, thus it needs to be corrected immediately for
improvement.
Rating scale for occurrence, severity and detection
Table 3.1: Rating scale of FMEA
After obtaining the rating for severity, occurrence and
detection, the risk priority number (RPN) is calculated for
each failure mode as per equation
RPN= Severity*Occurrence*Detection
= S*O*D
The factor with maximum value of RPN is considered as the
most critical risk and factor with minimum RPN is the least
critical risk. Here the major consideration is given to the
most critical risk, since it governs the overall performance of
the plants.
Risk Prioritization
In the risk prioritization step,theoverall setofidentified risk
events, their impact assessments, and their probabilities of
occurrence are processed to derive a most to least critical
rank order of identified risks. The objective of risk
prioritization is to prioritize the identified risks for
mitigation. The most commonly used risk prioritization
method is the Analytical Network process (ANP).
Analytical Network Process (ANP):
The Analytical Network Process (ANP) is a structured
network technique for organizing and analyzing complex
decisions. Based on mathematics and psychology, it was
developed by Thomas L. Saaty in the 1980s and has been
extensively studied and refined since then. ANP provides a
general framework to deal with decisions without making
assumptions about the independence of higher – level
elements and about theindependenceofthe elementswithin
a level. In fact ANP uses a network without the need to
specify levels as in a hierarchy. Generally the ANP technique
implements a decision scale made by saaty, for the
prioritization of the judgments.
Table 3.2: Rating scale of ANP
4. METHODOLOGY OF WORK
Literature Review
Data collection from three different RMC plants
Questionnarie prepared and collceted
Risk priority number on the basis of analysis of
questionnaire
Failure mode in production identified from FMEA
technique and analyzing to obtain specific failure using
ANP
Remedial measures suggestion for the most specific failure
mode of production
Conclusion of work
Flow chart 4.1: Methodology of work
1 2 3 4 5
Occurrence Remote Low Moderate High
Very
high
Severity None Low Moderate High Extreme
Detection
Very
high
High Moderate Low
Very
low
Intensity Of
Importance
Definition Explanations
1
Equal
Importance
Two Elements Contribute
Equally To The Objective
3
Moderate
Importance
Experience & Judgement
Slightly Favour One
Elements Over Another
5
Strong
Importance
Experience & Judgement
Slightly Favour One
Elements Over Another
7
Very Strong
Importance
An Activity Is Favoured
Very Strongly Over Another
9
Absolute
Importance
The Evidence Favouring
One Activity Over Another
Is Of The Highest Possible
Order Of Affirmation
2,4,6,8
Used To Express
Intermediate
Values
Nil
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2704
5. DATA COLLECTION AND ANALYSIS
The data collection for this study involves identification of
important risks that are occurring in the RMC plants. These
are identified by carrying out preliminary questionnaire
survey. Here 3 RMC plants are selected and survey is carried
out. The risk factors considered for the survey are
categorized under 7 major risks.
From the collected data, the RMC plants having risks with
moderate and major effects on the working of plant are
selected for the risk management technique. Therewasonly
one plant (plant – 2) under this, so this technique is
implemented on that plant only.
FMEA Application
For the plant selected for the applications of FMEA, the
major risks with moderate andhighrating,consideredareas
follows;
 Operational risks
 Safety risk
 Quality risk
After obtaining the rating for severity, occurrence and
detection, the risk priority number (RPN) is calculated for
each risks as per the equation;
RPN= severity*occurrence*detection
= S*O*D
Table 5.1: FMEA worksheet
Major risk Failure mode S O D RPN
Operational
risks
Lack of expert in plant 4 4 3 48
Delay due to traffic
conditions
3 3 3 27
Break down of
machinery
4 4 3 48
New technology
adoption
3 2 3 18
Wrongly designed
plant layout
3 2 2 12
Quality
risks
Not keeping proper
checklists
4 4 3 48
No advanced testing
facilities
3 4 2 24
Poor maintenance of
material
2 3 2 12
Inefficient mixers 4 4 3 36
Varying moisture
conditions
3 3 2 18
Safety risks Site injure 4 4 3 48
Mishandlingofmaterial 2 2 2 6
Improper working
practices
4 4 3 48
Improper maintains of
machinery
4 4 3 48
The task of determining the most critical risks was
carried out using FMEA technique and it resulted with
six risks with equal risk priority number(RPN=48)
 lack of expert in plant
 Breakdown of machinery
 Not keeping proper checklists
 Site injure
 Improper working practices
 Improper maintenance of machinery
From the above six risks, it is difficult to find out most
critical risks of that plant, risk prioritization was done
using ANP technique with the help of super decision
software.
ANP Application
The steps by steps procedure involved ANP analysis is
performed with Super Decision software are;
Decision Network structure
This is the first stage in the super decision software. In
this case, a network structure isdevelopedbybreaking
down the decision problem into a network of inter
related decision elements. The network structure
consists of clusters as goal, criteria and alternatives.
Figure below shows the decision network structure
obtained from the software.
Pair wise comparison generally is any process of
comparing entities in pairs to judge which of each
entity is preferred, or has a greater amount of some
quantitative property, or whether or not the two
entities are identical. In the ANP pair wisecomparison,
the significance/importance of risk over another is
measured qualitatively.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2705
Inconsistency Analysis
The final stage in the prioritization using the software
is to calculate a ConsistencyRatio(CR)tomeasurehow
consistent the judgment have been relative to large
samples of purely random judgment. First of all, a
comparison matrix of order (n x n) is formed. In this
matrix, the diagonal members are always equal to one.
The other members are filled based on the judgment
values entered in the pair wise comparison. The
comparison matrices (weighted Priority Matrices) for
the criteria Severity, Occurrence and detection and
consistency ratio (CR) obtained from the software is
shown below.
Table 5.2: ANP consistency ratio
Criteria Consistency Ratio (CR)
Severity 0.0822
Occurrence 0.08095
Detection 0.09005
Final priority ranking of risks
The final ranking of the alternatives wasobtainedafter
performing the inconsistency analysis. The priority
ranking obtained is as shown below;
Table 5.3: Final priority ranking of alternatives
Alternatives Normal weight
Ideal
weight
Ranking
Break down of
machinery
0.147040 0.358840 III
Improper
maintenance of
machinery
0.106742 0.260495 IV
Improper
working practices
0.099392 0.242559 VI
Lack of expert in
plant
0.183700 0.448307 II
Not keeping
proper checklists
0.053361 0.130225 V
Site injure 0.409764 1.0000 I
From the priority ranking, it can be concluded that the most
critical risk among the six alternatives is the site injure with
rank I.
6. CONCLUSIONS
 FMEA technique resulted in six critical failure mode
with equal RPN of 48.
 Hence, to find out most critical failure mode out of these
six risks, a prioritization was made with the help of
super decision software was used.
 Prioritization usingpairwise comparisonsamongthesix
risks resulted in identified site injuries with the top
ranking.
 Remedial measures can be suggested are;
 Provision of well awareness toeachworkerson
drivers training, First aid training, Fire fighting
training,, concrete pumping, material handling,
etc.
 Provisions of proper proactive equipment of
very good quality.
 Provision of engineering controls over plant.
REFERENCES
[1] Goutam Dutta and Debasis sarkar, “Design and
Applications of Risk Adjusted Cumulative Sum
(RACUSUM) for online strength monitoring of Ready
Mixed Concrete”, Indian instituteoftechnology research
and publications, W.P. No. 2008-08-01 August 2008.
[2] Mohamed A 2, “Use of basic quality tools for
improvement of the construction industry”,
International journal of civil and environmental
engineering, 28-35.
[3] Gupta D. Y, “A revolution in production of concrete”,
NBMC, May 2008.
[4] Agnieszka Dziadosz, Mariusz Rejment, “Risk analysis in
construction projects- chosen methods”, Procedia
engineering 122,258-265, July 2015.
[5] Mehrzad Ebrahemzadih, G.H.Halvani, Behzad
Shahmoradi, Omid Giahil, “Assessment and Risk
Management of potential hazards by failure mode and
effect Analysis (FMEA) method in Yazd Steel Complex”
open Journal of safety science and Technology,
2014,4,127-135,September 2014.
[6] Jyoti Trivedi and Dr. Chakradhar Iyunni, “FMEA risk
management Technique for quality control of RMC
production”, International journal of advance
engineering and research Development (IJAERD), e-
ISSN: 2348-4470, print-ISSN:2348-6406, May 2015.
[7] Gunjun joshi, Himanshu Joshi, “FMEA and Alternatives
v/s Enhanced Risk Assessment Mechanism”,
International Journal of computer Applications, 0975-
8887, volume 93, No 14, May 2014.
[8] Hanumant P. Naiknavare, Swati D. Deshpande,RajeshD.
Padhye, (May 2016), “Model Chart of Quality Control
Process for Ready Mixed Concrete Plants”, IOSR Journal
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056
Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072
© 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2706
of Mechanical and Civil Engineering (IOSR-JMCE) ISSN:
2278-1684, PP: 50-54.
[9] Vipin V. Munot, Ashish P. Waghmare, (Dec 2014),
“Compressive strength of Ready Mixed Concrete Using
Soft Computing Techniques”, International Journal of
Engineering Research and Applications (IJERA), ISSN :
2248-9622, Vol. 4, Issue 12( Part 3), December 2014,
pp.12-14.
[10] M. B. Chougule, N. P. Sonaje, (July 2014), “Anova
Method and T test method as statistical tools for
monitoring performance of pilot plant water used in
textile wet processing”, International Journal of
Application orInnovationinEngineering&Management
(IJAIEM), ISSN : 2319-4847, Volume 3,Issue7, July2014
[11] E.Poovaragavan, K.Chandra Sekar (April 2016),
“Continuous Process Improvement in Ready mix
Concrete Plants”, International Journal of Scientific &
Engineering Research,ISSN:2229-5518,Volume7,Issue
4, April-2016.
[12] P.L.Jain, “Quality Control and Total Quality
Management”, Tata Mcgraw Hill publications.

Más contenido relacionado

La actualidad más candente

RME-085_TQM Unit-4 Part 5
RME-085_TQM Unit-4  Part 5RME-085_TQM Unit-4  Part 5
RME-085_TQM Unit-4 Part 5ssuserf6c4bd
 
Using multivariable linear regression technique
Using multivariable linear regression techniqueUsing multivariable linear regression technique
Using multivariable linear regression techniquePemmasani Srinivas
 
Earned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of ProjectsEarned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of ProjectsRicardo Viana Vargas
 
A defect prediction model based on the relationships between developers and c...
A defect prediction model based on the relationships between developers and c...A defect prediction model based on the relationships between developers and c...
A defect prediction model based on the relationships between developers and c...Vrije Universiteit Brussel
 
RME-085 TQM Unit-5 part 5
RME-085 TQM Unit-5  part 5RME-085 TQM Unit-5  part 5
RME-085 TQM Unit-5 part 5ssuserf6c4bd
 
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...ijseajournal
 
SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...
SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...
SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...ijseajournal
 
RME-085 TQM unit-4 part 1
RME-085 TQM unit-4  part 1RME-085 TQM unit-4  part 1
RME-085 TQM unit-4 part 1ssuserf6c4bd
 
RME-085 TQM Unit-5 part 4
RME-085 TQM Unit-5  part 4RME-085 TQM Unit-5  part 4
RME-085 TQM Unit-5 part 4ssuserf6c4bd
 
Configuration Engineering for Invitro-Diagnostic Product Development
Configuration Engineering for Invitro-Diagnostic Product DevelopmentConfiguration Engineering for Invitro-Diagnostic Product Development
Configuration Engineering for Invitro-Diagnostic Product DevelopmentArnold Rudorfer
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...IRJET Journal
 

La actualidad más candente (19)

RME-085_TQM Unit-4 Part 5
RME-085_TQM Unit-4  Part 5RME-085_TQM Unit-4  Part 5
RME-085_TQM Unit-4 Part 5
 
Establishing A Defect Prediction Model Using A Combination of Product Metrics...
Establishing A Defect Prediction Model Using A Combination of Product Metrics...Establishing A Defect Prediction Model Using A Combination of Product Metrics...
Establishing A Defect Prediction Model Using A Combination of Product Metrics...
 
A Regression Analysis Approach for Building a Prediction Model for System Tes...
A Regression Analysis Approach for Building a Prediction Model for System Tes...A Regression Analysis Approach for Building a Prediction Model for System Tes...
A Regression Analysis Approach for Building a Prediction Model for System Tes...
 
Using multivariable linear regression technique
Using multivariable linear regression techniqueUsing multivariable linear regression technique
Using multivariable linear regression technique
 
Earned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of ProjectsEarned Value Analysis in the Control of Projects
Earned Value Analysis in the Control of Projects
 
A010510109
A010510109A010510109
A010510109
 
A012210104
A012210104A012210104
A012210104
 
A defect prediction model based on the relationships between developers and c...
A defect prediction model based on the relationships between developers and c...A defect prediction model based on the relationships between developers and c...
A defect prediction model based on the relationships between developers and c...
 
RME-085 TQM Unit-5 part 5
RME-085 TQM Unit-5  part 5RME-085 TQM Unit-5  part 5
RME-085 TQM Unit-5 part 5
 
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
 
SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...
SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...
SOFTWARE REQUIREMENT CHANGE EFFORT ESTIMATION MODEL PROTOTYPE TOOL FOR SOFTWA...
 
RME-085 TQM unit-4 part 1
RME-085 TQM unit-4  part 1RME-085 TQM unit-4  part 1
RME-085 TQM unit-4 part 1
 
RME-085 TQM Unit-5 part 4
RME-085 TQM Unit-5  part 4RME-085 TQM Unit-5  part 4
RME-085 TQM Unit-5 part 4
 
4213ijsea01 (1)
4213ijsea01 (1)4213ijsea01 (1)
4213ijsea01 (1)
 
Ijciet 10 01_029
Ijciet 10 01_029Ijciet 10 01_029
Ijciet 10 01_029
 
Configuration Engineering for Invitro-Diagnostic Product Development
Configuration Engineering for Invitro-Diagnostic Product DevelopmentConfiguration Engineering for Invitro-Diagnostic Product Development
Configuration Engineering for Invitro-Diagnostic Product Development
 
1
11
1
 
C41041120
C41041120C41041120
C41041120
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
 

Similar a Risk Management Technique of Ready Mix Concrete Plants

IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET Journal
 
Quality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewQuality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewIRJET Journal
 
Effectiveness of Risk Management and Chosen Methods in Construction Sector
Effectiveness of Risk Management and Chosen Methods in Construction SectorEffectiveness of Risk Management and Chosen Methods in Construction Sector
Effectiveness of Risk Management and Chosen Methods in Construction SectorIRJET Journal
 
IRJET-Qualitative Risk Analysis for Construction Projects
IRJET-Qualitative Risk Analysis for Construction ProjectsIRJET-Qualitative Risk Analysis for Construction Projects
IRJET-Qualitative Risk Analysis for Construction ProjectsIRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 
Risk Management In High Rise Construction Projects
Risk Management In High Rise Construction ProjectsRisk Management In High Rise Construction Projects
Risk Management In High Rise Construction ProjectsIRJET Journal
 
IRJET- Achieving Total Quality Management in Construction Project using Six S...
IRJET- Achieving Total Quality Management in Construction Project using Six S...IRJET- Achieving Total Quality Management in Construction Project using Six S...
IRJET- Achieving Total Quality Management in Construction Project using Six S...IRJET Journal
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET Journal
 
Study and Need of Risk Management for Construction Projects
Study and Need of Risk Management for Construction ProjectsStudy and Need of Risk Management for Construction Projects
Study and Need of Risk Management for Construction ProjectsIRJET Journal
 
IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...
IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...
IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...IRJET Journal
 
Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...
Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...
Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...IRJET Journal
 
IRJET- Analysis of Risk Management in Construction Sector using Fault Tree...
IRJET- 	  Analysis of Risk Management in Construction Sector using Fault Tree...IRJET- 	  Analysis of Risk Management in Construction Sector using Fault Tree...
IRJET- Analysis of Risk Management in Construction Sector using Fault Tree...IRJET Journal
 
IRJET- Risk Management using Primavera Software for Residential Sector
IRJET-  	  Risk Management using Primavera Software for Residential SectorIRJET-  	  Risk Management using Primavera Software for Residential Sector
IRJET- Risk Management using Primavera Software for Residential SectorIRJET Journal
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET Journal
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...IRJET Journal
 
Criticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould SystemCriticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould SystemIRJET Journal
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on SiteIRJET Journal
 
An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...prjpublications
 
Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...
Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...
Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...nitinrane33
 
Risk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial BuildingsRisk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial BuildingsIRJET Journal
 

Similar a Risk Management Technique of Ready Mix Concrete Plants (20)

IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction ProjectsIRJET-Survey on Effects of Productivity of Equipment in Construction Projects
IRJET-Survey on Effects of Productivity of Equipment in Construction Projects
 
Quality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short ReviewQuality Improvement using FMEA : A Short Review
Quality Improvement using FMEA : A Short Review
 
Effectiveness of Risk Management and Chosen Methods in Construction Sector
Effectiveness of Risk Management and Chosen Methods in Construction SectorEffectiveness of Risk Management and Chosen Methods in Construction Sector
Effectiveness of Risk Management and Chosen Methods in Construction Sector
 
IRJET-Qualitative Risk Analysis for Construction Projects
IRJET-Qualitative Risk Analysis for Construction ProjectsIRJET-Qualitative Risk Analysis for Construction Projects
IRJET-Qualitative Risk Analysis for Construction Projects
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 
Risk Management In High Rise Construction Projects
Risk Management In High Rise Construction ProjectsRisk Management In High Rise Construction Projects
Risk Management In High Rise Construction Projects
 
IRJET- Achieving Total Quality Management in Construction Project using Six S...
IRJET- Achieving Total Quality Management in Construction Project using Six S...IRJET- Achieving Total Quality Management in Construction Project using Six S...
IRJET- Achieving Total Quality Management in Construction Project using Six S...
 
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
IRJET-Identification of Factors Influencing Equipment Productivity in Constru...
 
Study and Need of Risk Management for Construction Projects
Study and Need of Risk Management for Construction ProjectsStudy and Need of Risk Management for Construction Projects
Study and Need of Risk Management for Construction Projects
 
IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...
IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...
IRJET- Risk Modelling in Highway Construction Project using Regression and Fa...
 
Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...
Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...
Assessment of Risk in Construction Projects by Modified Fuzzy Analytic Hierar...
 
IRJET- Analysis of Risk Management in Construction Sector using Fault Tree...
IRJET- 	  Analysis of Risk Management in Construction Sector using Fault Tree...IRJET- 	  Analysis of Risk Management in Construction Sector using Fault Tree...
IRJET- Analysis of Risk Management in Construction Sector using Fault Tree...
 
IRJET- Risk Management using Primavera Software for Residential Sector
IRJET-  	  Risk Management using Primavera Software for Residential SectorIRJET-  	  Risk Management using Primavera Software for Residential Sector
IRJET- Risk Management using Primavera Software for Residential Sector
 
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk AnalysisIRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
IRJET- Risk Management of Construction Projects by using Primavera Risk Analysis
 
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...IRJET-  	  Study and Analysis of Risk Management Strategies in Construction P...
IRJET- Study and Analysis of Risk Management Strategies in Construction P...
 
Criticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould SystemCriticality Analysis and Quality Appraisal of Innoson Injection Mould System
Criticality Analysis and Quality Appraisal of Innoson Injection Mould System
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...An integrated approach for enhancing ready mixed concrete utility using analy...
An integrated approach for enhancing ready mixed concrete utility using analy...
 
Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...
Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...
Evaluating the Selection Criteria of Formwork System (FS) for RCC Building Co...
 
Risk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial BuildingsRisk Management in Medium Sized Commercial Buildings
Risk Management in Medium Sized Commercial Buildings
 

Más de IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

Más de IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Último

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 

Último (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 

Risk Management Technique of Ready Mix Concrete Plants

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2701 RISK MANAGEMENT TECHNIQUE OF READY MIX CONCRETE PLANTS Vijaykumar Baheti1, Dr. A.B.More2, Prof. D.B.Bhosale3, Pooja Shinde4 1 P.G.Student, Department of Civil Engineering TSSM’s Padmabhushan Vasantdada Patil Institute of Technology Bavdhan Pune, India 2 Asst. professor, Department of Civil Engineering TSSM’s Padmabhushan Vasantdada Patil Institute of Technology Bavdhan Pune, India 3 Head of department, Department of Civil Engineering TSSM’s Padmabhushan Vasantdada Patil Institute of Technology Bavdhan Pune, India 4 P.G.Student, Department of Civil Engineering, Reva institute of technology & management, Bangalore, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract – Ready mix concrete (RMC) is an essential material in contemporary construction and engineering projects. The systematic identification and assessment of risk and effectively dealing with the results is significanttosuccess of RMC industry and variousprojects. Readymixindustriescan be extremely complex and fraught with uncertainty. Like the nature of the construction companies like RMC, and the growing need of having innovation and complex projects, the risk management process has become more complex. Still there is no efficient method for the effective assessment of various risks in these sectors. In this study, an attempt is made to find out the most critical risk in RMC plants by developing a risk management model using Failure mode and effective Analysis (FMEA) technique. This was resulted in six risks with risk priority number of equal values and hence a risk prioritization was done using Analytical Network Process (ANP) with the help of super decision Software. Finally some remedial measures have been found out for the most critical risks in that plant. Key Words: Ready mix concrete(RMC) plants, FMEA (Failure mode and effective Analysis), Risk priority number(RPN), Super decision software, Analytical network process(ANP). 1. INTRODUCTION Ready Mix Concrete (RMC) is a concrete delivered at site or into purchasers vehicle in plastic condition and requiring no further treatment before being placed in a position it is to be set and hardened (IS 4926-2001). Ready mix Concrete is preferred over site mix concrete because it isenvironmental friendly. Its manufacturing is not messy and it is time consuming. It offers solution to specific problemofcustomer and ensures customer satisfaction and provides concrete of desired quality. It also eliminates the storing of materials at site for manufacturing concreterequiredatprojectsites. The quality of concrete has a direct effect on the strength and durability of the structure as whole. There are things which found fewer advantages to produce concrete on a worksite than RMC. Quality of concrete is under the threat which resulting in deficient product due to some reasons. RMC is produced under the factory conditions and permits a close control of all operations of manufacture and transportation of fresh concrete. Due to its durability,lowcostanditsability to be customized for different applications, RMC is now one of the most popular building materials. In India, use and demand of RMCisgrowing rapidlyincivil and construction business. Some of construction companies are foraying in RMC business due to its huge potential. RMC industry is exposed to various risks so risk management is implemented on various plants to minimize risk in production and delivery at sites. The critical failure mode in production process should be found out and various measures to be implemented on RMC plants. The systematic identification and assessment of risk and effectively dealing with the results is significant to success of any industry and projects. Hence, the need for a proper and most efficient technique for the risk assessment in RMC industry is very important. In this work, control charts helps to understand the cube samples failure in the concrete production processdueto its improper mix design or due to calibration and weighing on scale wrongly. To find out most critical failure mode in production process the Failure Mode and Effective Analysis (FMEA) technique is used and to take appropriatecorrective actions for the improvement is done.Fortheprioritizationof the identified risks, ANP technique is used. Analytical Network Process (ANP) is a multi-criteria decision making technique which is commonly used for the prioritization of risks. The ANP technique is implemented in this work with the help of super decision software. Three RMC plants selected from pune region for this study and the results developed are analyzed to know the efficiency and effectiveness of the developed technique. And remedial measures for the identified critical failure mode are suggested. 2. LITERATURE REVIEW Goutam Dutta et.al [1] were conducteda studyondesignand applications of Risk Adjusted Cumulative Sum (RACUSUM) for online strength monitoring of Ready Mixed Concrete. In this paper, an attempt is made to design and apply a new
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2702 CUSUM procedure for RMC industry which takes care of the risks involved and associated with the production of RMC. This procedure is termed as Risk Adjusted CUSUM (RACUSUM). Mohamed A 2 et.al [2] were conducted a study on the use of basic quality tools for improvement of the construction industry. Quality control of Ready Mixed Concrete can be divided into three convenient areas like forward control, immediate control and retrospective control. Statistical Quality Control (SQC) application proves to be an important tool which can be used effectively for quality and productivity improvement for infrastructure projects. Statistical Quality Control canbeeffectivelyapplied to RMC industry for online (during production) and also offline (before and after production) quality monitoringand control. Gupta D. Y et.al [3] was conducted study on a revolution in production of concrete. A production of ready mix concrete includes mix design of RMC, IS codes, mixing process, carrying of concrete,handling process,qualityassurance and site preparation. Ready mix concreteisanindustrial product which is delivered to consumer in fresh condition after the production process of RMC plant. The process of Ready mixed concrete (RMC) flows from (design, production, transportation, pouring, placement and maintenance). Agnieszka Dziadosz et.al [4] conducted a study on risk analysis in construction projects. This article presents three different methods of the risk analysis as well as highlighting their advantages, disadvantage and primary areas of applications. Mehrzad et.al [5] were studied about assessment and risk management of potential hazards by Failure Modes and Effect Analysis (FMEA) methos in Yazd Steel Complex. In his work, the risks in different parts of the complex were evaluated by using FMEA method. Jyoti Trivedi et.al [6]were studied about the FMEA risk management technique for quality control of RMC production. The risk prioritynumber results indicated processfailureintermsofirregulargrading process, material testing prior use in mixing process which were the important factor to be monitored for quality control. Gunjun joshi et.al [7] were studied about FMEA and Alternatives v/s Enhanced Risk Assessment Mechanism. In this work, the advantage of using six sigma in Risk Assessment are also pointed out and proposed a novel technique which would overcome therestrictionsofexisting Risk Management tools. 3. RISK MANAGEMENT Risk management is the identification, assessment and prioritization of risks (defined in ISO 31000 as the effect of uncertainty on objective) followed by coordinated and economical applications of resources to minimize monitor and control the probability and/or impact of unfortunate events or to maximize the realization of opportunities. The management of any risks or uncertainty generally involves the following;  Risk identification  Risk assessment  Risk prioritization Risk Identification Risk identification is one of the most importantstagesin risk management process. In this stage,all thepotential risksthat could affect the project objective are identified.Itisstudying a situation to realize what could go wrong at any given point of time during the projects. For risk identification, some of the methods used are checklists, Brainstorming, Tree diagram, Cause– effectDiagram,interviewing,Questionnaire surveys, etc. Risk Assessment Risk assessment is merely a method of analyzing the seriousness of the risk. There are two approaches to analyzing identified risks, and they are the qualitative and quantitative methods. The different method of risk assessment is done with following:  Fault tree Analysis (FTA)  Cost of exposure quality risk analysis  Failure Mode and Effect Analysis (FMEA)  Cause-consequence Analysis  Event tree analysis(ETA) Failure Mode and Effective Analysis (FMEA): FMEA is the technique which is used to identify the potential failure modes for the product or a process before the problem occurs to consider the risk. It might also rank each failure according to the criticality of a failure effect and its likelihood of taking place. FMEAisananalytical technique which explores the effect of failure ofindividual components in a system. In order tp calculate risk in FMEA, risk has three components which are multiplied to produce RPN (risk priority number). By doing this calculation one will be able to decide the priority to select the most severe factor. There is no threshold value for RPNs. The most common rating for severity, occurrence and detection in order to calculate risk priority number can be seen. It can be seen from results that risk priority number of the process factor with highest
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2703 number, thus it needs to be corrected immediately for improvement. Rating scale for occurrence, severity and detection Table 3.1: Rating scale of FMEA After obtaining the rating for severity, occurrence and detection, the risk priority number (RPN) is calculated for each failure mode as per equation RPN= Severity*Occurrence*Detection = S*O*D The factor with maximum value of RPN is considered as the most critical risk and factor with minimum RPN is the least critical risk. Here the major consideration is given to the most critical risk, since it governs the overall performance of the plants. Risk Prioritization In the risk prioritization step,theoverall setofidentified risk events, their impact assessments, and their probabilities of occurrence are processed to derive a most to least critical rank order of identified risks. The objective of risk prioritization is to prioritize the identified risks for mitigation. The most commonly used risk prioritization method is the Analytical Network process (ANP). Analytical Network Process (ANP): The Analytical Network Process (ANP) is a structured network technique for organizing and analyzing complex decisions. Based on mathematics and psychology, it was developed by Thomas L. Saaty in the 1980s and has been extensively studied and refined since then. ANP provides a general framework to deal with decisions without making assumptions about the independence of higher – level elements and about theindependenceofthe elementswithin a level. In fact ANP uses a network without the need to specify levels as in a hierarchy. Generally the ANP technique implements a decision scale made by saaty, for the prioritization of the judgments. Table 3.2: Rating scale of ANP 4. METHODOLOGY OF WORK Literature Review Data collection from three different RMC plants Questionnarie prepared and collceted Risk priority number on the basis of analysis of questionnaire Failure mode in production identified from FMEA technique and analyzing to obtain specific failure using ANP Remedial measures suggestion for the most specific failure mode of production Conclusion of work Flow chart 4.1: Methodology of work 1 2 3 4 5 Occurrence Remote Low Moderate High Very high Severity None Low Moderate High Extreme Detection Very high High Moderate Low Very low Intensity Of Importance Definition Explanations 1 Equal Importance Two Elements Contribute Equally To The Objective 3 Moderate Importance Experience & Judgement Slightly Favour One Elements Over Another 5 Strong Importance Experience & Judgement Slightly Favour One Elements Over Another 7 Very Strong Importance An Activity Is Favoured Very Strongly Over Another 9 Absolute Importance The Evidence Favouring One Activity Over Another Is Of The Highest Possible Order Of Affirmation 2,4,6,8 Used To Express Intermediate Values Nil
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2704 5. DATA COLLECTION AND ANALYSIS The data collection for this study involves identification of important risks that are occurring in the RMC plants. These are identified by carrying out preliminary questionnaire survey. Here 3 RMC plants are selected and survey is carried out. The risk factors considered for the survey are categorized under 7 major risks. From the collected data, the RMC plants having risks with moderate and major effects on the working of plant are selected for the risk management technique. Therewasonly one plant (plant – 2) under this, so this technique is implemented on that plant only. FMEA Application For the plant selected for the applications of FMEA, the major risks with moderate andhighrating,consideredareas follows;  Operational risks  Safety risk  Quality risk After obtaining the rating for severity, occurrence and detection, the risk priority number (RPN) is calculated for each risks as per the equation; RPN= severity*occurrence*detection = S*O*D Table 5.1: FMEA worksheet Major risk Failure mode S O D RPN Operational risks Lack of expert in plant 4 4 3 48 Delay due to traffic conditions 3 3 3 27 Break down of machinery 4 4 3 48 New technology adoption 3 2 3 18 Wrongly designed plant layout 3 2 2 12 Quality risks Not keeping proper checklists 4 4 3 48 No advanced testing facilities 3 4 2 24 Poor maintenance of material 2 3 2 12 Inefficient mixers 4 4 3 36 Varying moisture conditions 3 3 2 18 Safety risks Site injure 4 4 3 48 Mishandlingofmaterial 2 2 2 6 Improper working practices 4 4 3 48 Improper maintains of machinery 4 4 3 48 The task of determining the most critical risks was carried out using FMEA technique and it resulted with six risks with equal risk priority number(RPN=48)  lack of expert in plant  Breakdown of machinery  Not keeping proper checklists  Site injure  Improper working practices  Improper maintenance of machinery From the above six risks, it is difficult to find out most critical risks of that plant, risk prioritization was done using ANP technique with the help of super decision software. ANP Application The steps by steps procedure involved ANP analysis is performed with Super Decision software are; Decision Network structure This is the first stage in the super decision software. In this case, a network structure isdevelopedbybreaking down the decision problem into a network of inter related decision elements. The network structure consists of clusters as goal, criteria and alternatives. Figure below shows the decision network structure obtained from the software. Pair wise comparison generally is any process of comparing entities in pairs to judge which of each entity is preferred, or has a greater amount of some quantitative property, or whether or not the two entities are identical. In the ANP pair wisecomparison, the significance/importance of risk over another is measured qualitatively.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2705 Inconsistency Analysis The final stage in the prioritization using the software is to calculate a ConsistencyRatio(CR)tomeasurehow consistent the judgment have been relative to large samples of purely random judgment. First of all, a comparison matrix of order (n x n) is formed. In this matrix, the diagonal members are always equal to one. The other members are filled based on the judgment values entered in the pair wise comparison. The comparison matrices (weighted Priority Matrices) for the criteria Severity, Occurrence and detection and consistency ratio (CR) obtained from the software is shown below. Table 5.2: ANP consistency ratio Criteria Consistency Ratio (CR) Severity 0.0822 Occurrence 0.08095 Detection 0.09005 Final priority ranking of risks The final ranking of the alternatives wasobtainedafter performing the inconsistency analysis. The priority ranking obtained is as shown below; Table 5.3: Final priority ranking of alternatives Alternatives Normal weight Ideal weight Ranking Break down of machinery 0.147040 0.358840 III Improper maintenance of machinery 0.106742 0.260495 IV Improper working practices 0.099392 0.242559 VI Lack of expert in plant 0.183700 0.448307 II Not keeping proper checklists 0.053361 0.130225 V Site injure 0.409764 1.0000 I From the priority ranking, it can be concluded that the most critical risk among the six alternatives is the site injure with rank I. 6. CONCLUSIONS  FMEA technique resulted in six critical failure mode with equal RPN of 48.  Hence, to find out most critical failure mode out of these six risks, a prioritization was made with the help of super decision software was used.  Prioritization usingpairwise comparisonsamongthesix risks resulted in identified site injuries with the top ranking.  Remedial measures can be suggested are;  Provision of well awareness toeachworkerson drivers training, First aid training, Fire fighting training,, concrete pumping, material handling, etc.  Provisions of proper proactive equipment of very good quality.  Provision of engineering controls over plant. REFERENCES [1] Goutam Dutta and Debasis sarkar, “Design and Applications of Risk Adjusted Cumulative Sum (RACUSUM) for online strength monitoring of Ready Mixed Concrete”, Indian instituteoftechnology research and publications, W.P. No. 2008-08-01 August 2008. [2] Mohamed A 2, “Use of basic quality tools for improvement of the construction industry”, International journal of civil and environmental engineering, 28-35. [3] Gupta D. Y, “A revolution in production of concrete”, NBMC, May 2008. [4] Agnieszka Dziadosz, Mariusz Rejment, “Risk analysis in construction projects- chosen methods”, Procedia engineering 122,258-265, July 2015. [5] Mehrzad Ebrahemzadih, G.H.Halvani, Behzad Shahmoradi, Omid Giahil, “Assessment and Risk Management of potential hazards by failure mode and effect Analysis (FMEA) method in Yazd Steel Complex” open Journal of safety science and Technology, 2014,4,127-135,September 2014. [6] Jyoti Trivedi and Dr. Chakradhar Iyunni, “FMEA risk management Technique for quality control of RMC production”, International journal of advance engineering and research Development (IJAERD), e- ISSN: 2348-4470, print-ISSN:2348-6406, May 2015. [7] Gunjun joshi, Himanshu Joshi, “FMEA and Alternatives v/s Enhanced Risk Assessment Mechanism”, International Journal of computer Applications, 0975- 8887, volume 93, No 14, May 2014. [8] Hanumant P. Naiknavare, Swati D. Deshpande,RajeshD. Padhye, (May 2016), “Model Chart of Quality Control Process for Ready Mixed Concrete Plants”, IOSR Journal
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395 -0056 Volume: 04 Issue: 06 | June -2017 www.irjet.net p-ISSN: 2395-0072 © 2017, IRJET | Impact Factor value: 5.181 | ISO 9001:2008 Certified Journal | Page 2706 of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 50-54. [9] Vipin V. Munot, Ashish P. Waghmare, (Dec 2014), “Compressive strength of Ready Mixed Concrete Using Soft Computing Techniques”, International Journal of Engineering Research and Applications (IJERA), ISSN : 2248-9622, Vol. 4, Issue 12( Part 3), December 2014, pp.12-14. [10] M. B. Chougule, N. P. Sonaje, (July 2014), “Anova Method and T test method as statistical tools for monitoring performance of pilot plant water used in textile wet processing”, International Journal of Application orInnovationinEngineering&Management (IJAIEM), ISSN : 2319-4847, Volume 3,Issue7, July2014 [11] E.Poovaragavan, K.Chandra Sekar (April 2016), “Continuous Process Improvement in Ready mix Concrete Plants”, International Journal of Scientific & Engineering Research,ISSN:2229-5518,Volume7,Issue 4, April-2016. [12] P.L.Jain, “Quality Control and Total Quality Management”, Tata Mcgraw Hill publications.