SlideShare una empresa de Scribd logo
1 de 4
Descargar para leer sin conexión
LEED 2009 for New Construction and Major Renovations
                       Project Checklist                                                                  Eco-Plaza

   20   0    6         Sustainable Sites                                                        Possible Points:      26
    Y    ?   N   d/C

   Y              C    Prereq 1     Construction Activity Pollution Prevention
   1              d    Credit 1     Site Selection                                                                    1
             5    d    Credit 2     Development Density and Community Connectivity                                    5
             1    d    Credit 3     Brownfield Redevelopment                                                          1
   6              d    Credit 4.1   Alternative Transportation—Public Transportation Access                           6
   1              d    Credit 4.2   Alternative Transportation—Bicycle Storage and Changing Rooms                     1
   3              d    Credit 4.3   Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles               3
   2              d    Credit 4.4   Alternative Transportation—Parking Capacity                                       2
   1              C    Credit 5.1   Site Development—Protect or Restore Habitat                                       1
   1              d    Credit 5.2   Site Development—Maximize Open Space                                              1
   1              d    Credit 6.1   Stormwater Design—Quantity Control                                                1
   1              d    Credit 6.2   Stormwater Design—Quality Control                                                 1
   1              C    Credit 7.1   Heat Island Effect—Non-roof                                                       1
   1              d    Credit 7.2   Heat Island Effect—Roof                                                           1
   1              d    Credit 8     Light Pollution Reduction                                                         1


   6    0    2         Water Efficiency                                                         Possible Points:      10
    Y    ?   N

   Y              d    Prereq 1     Water Use Reduction—20% Reduction
   2              d    Credit 1     Water Efficient Landscaping                                                       2 to 4
                                     X   Reduce by 50%                                                                2
                                         No Potable Water Use or Irrigation                                           4
             2    d    Credit 2     Innovative Wastewater Technologies                                                2
   4              d    Credit 3     Water Use Reduction                                                               2 to 4
                                         Reduce by 30%                                                                2
                                         Reduce by 35%                                                                3
                                     X   Reduce by 40%                                                                4




LEED 2009 for New Construction and Major Renovations Project Checklist                                                         1 of 4
28   0    0        Energy and Atmosphere                                                   Possible Points:      35
    Y    ?   N

   Y              C   Prereq 1   Fundamental Commissioning of Building Energy Systems
   Y              d   Prereq 2   Minimum Energy Performance
   Y              d   Prereq 3   Fundamental Refrigerant Management
   12             d   Credit 1   Optimize Energy Performance                                                        1 to 19
                                      Improve by 12% for New Buildings or 8% for Existing Building Renovations      1
                                      Improve by 14% for New Buildings or 10% for Existing Building Renovations     2
                                      Improve by 16% for New Buildings or 12% for Existing Building Renovations     3
                                      Improve by 18% for New Buildings or 14% for Existing Building Renovations     4
                                      Improve by 20% for New Buildings or 16% for Existing Building Renovations     5
                                      Improve by 22% for New Buildings or 18% for Existing Building Renovations     6
                                      Improve by 24% for New Buildings or 20% for Existing Building Renovations     7
                                      Improve by 26% for New Buildings or 22% for Existing Building Renovations     8
                                      Improve by 28% for New Buildings or 24% for Existing Building Renovations     9
                                      Improve by 30% for New Buildings or 26% for Existing Building Renovations     10
                                      Improve by 32% for New Buildings or 28% for Existing Building Renovations     11
                                  x   Improve by 34% for New Buildings or 30% for Existing Building Renovations     12
                                      Improve by 36% for New Buildings or 32% for Existing Building Renovations     13
                                      Improve by 38% for New Buildings or 34% for Existing Building Renovations     14
                                      Improve by 40% for New Buildings or 36% for Existing Building Renovations     15
                                      Improve by 42% for New Buildings or 38% for Existing Building Renovations     16
                                      Improve by 44% for New Buildings or 40% for Existing Building Renovations     17
                                      Improve by 46% for New Buildings or 42% for Existing Building Renovations     18
                                      Improve by 48%+ for New Buildings or 44%+ for Existing Building Renovations   19
   7              d   Credit 2   On-Site Renewable Energy                                                           1 to 7
                                      1% Renewable Energy                                                           1
                                      3% Renewable Energy                                                           2
                                      5% Renewable Energy                                                           3
                                      7% Renewable Energy                                                           4
                                      9% Renewable Energy                                                           5
                                      11% Renewable Energy                                                          6
                                  x   13% Renewable Energy                                                          7
   2              C   Credit 3   Enhanced Commissioning                                                             2
   2              d   Credit 4   Enhanced Refrigerant Management                                                    2
   3              C   Credit 5   Measurement and Verification                                                       3
   2              C   Credit 6   Green Power                                                                        2




LEED 2009 for New Construction and Major Renovations Project Checklist                                                        2 of 4
7    0    3        Materials and Resources                                                  Possible Points:   14
    Y    ?   N

   Y              d   Prereq 1     Storage and Collection of Recyclables
             1    C   Credit 1.1   Building Reuse—Maintain Existing Walls, Floors, and Roof                       1 to 3
                                        Reuse 55%                                                                 1
                                        Reuse 75%                                                                 2
                                        Reuse 95%                                                                 3
             1    C   Credit 1.2   Building Reuse—Maintain 50% of Interior Non-Structural Elements                1
   1              C   Credit 2     Construction Waste Management                                                  1 to 2
                                    x   50% Recycled or Salvaged                                                  1
                                        75% Recycled or Salvaged                                                  2
   1              C   Credit 3     Materials Reuse                                                                1 to 2
                                    x   Reuse 5%                                                                  1
                                        Reuse 10%                                                                 2
   2              C   Credit 4     Recycled Content                                                               1 to 2
                                        10% of Content                                                            1
                                    x   20% of Content                                                            2
   2              C   Credit 5     Regional Materials                                                             1 to 2
                                        10% of Materials                                                          1
                                    x   20% of Materials                                                          2
   1              C   Credit 6     Rapidly Renewable Materials                                                    1
             1    C   Credit 7     Certified Wood                                                                 1




LEED 2009 for New Construction and Major Renovations Project Checklist                                                     3 of 4
15   0    0         Indoor Environmental Quality                                                              Possible Points:   15
    Y    ?   N

   Y              d   Prereq 1     Minimum Indoor Air Quality Performance
   Y              d   Prereq 2     Environmental Tobacco Smoke (ETS) Control
   1              d   Credit 1     Outdoor Air Delivery Monitoring                                                                  1
   1              d   Credit 2     Increased Ventilation                                                                            1
   1              C   Credit 3.1   Construction IAQ Management Plan—During Construction                                             1
   1              C   Credit 3.2   Construction IAQ Management Plan—Before Occupancy                                                1
   1              C   Credit 4.1   Low-Emitting Materials—Adhesives and Sealants                                                    1
   1              C   Credit 4.2   Low-Emitting Materials—Paints and Coatings                                                       1
   1              C   Credit 4.3   Low-Emitting Materials—Flooring Systems                                                          1
   1              C   Credit 4.4   Low-Emitting Materials—Composite Wood and Agrifiber Products                                     1
   1              d   Credit 5     Indoor Chemical and Pollutant Source Control                                                     1
   1              d   Credit 6.1   Controllability of Systems—Lighting                                                              1
   1              d   Credit 6.2   Controllability of Systems—Thermal Comfort                                                       1
   1              d   Credit 7.1   Thermal Comfort—Design                                                                           1
   1              d   Credit 7.2   Thermal Comfort—Verification                                                                     1
   1              d   Credit 8.1   Daylight and Views—Daylight                                                                      1
   1              d   Credit 8.2   Daylight and Views—Views                                                                         1


   5    0    1         Innovation and Design Process                                                             Possible Points:   6
    Y    ?   N

   1              d/C Credit 1.1   Innovation in Design: Specific Title                                                             1
   1              d/C Credit 1.2   Innovation in Design: Specific Title                                                             1
   1              d/C Credit 1.3   Innovation in Design: Specific Title                                                             1
   1              d/C Credit 1.4   Innovation in Design: Specific Title                                                             1
   1              d/C Credit 1.5   Innovation in Design: Specific Title                                                             1
             1    d/C Credit 2     LEED Accredited Professional                                                                     1


   3    0    0         Regional Priority Credits                                                                  Possible Points: 4
    Y    ?   N

   1              d/C Credit 1.1   Regional Priority: Specific Credit                                                               1
   1              d/C Credit 1.2   Regional Priority: Specific Credit                                                               1
   1              d/C Credit 1.3   Regional Priority: Specific Credit                                                               1
                  d/C Credit 1.4   Regional Priority: Specific Credit                                                               1


   84   0    12        Total                                                                                      Possible Points: 110
                                 Certified 40 to 49 points   Silver 50 to 59 points   Gold 60 to 79 points   Platinum 80 to 110




LEED 2009 for New Construction and Major Renovations Project Checklist                                                                   4 of 4

Más contenido relacionado

La actualidad más candente

Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1djk447
 
Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1djk447
 
State of green business report 2012
State of green business report 2012State of green business report 2012
State of green business report 2012Philippe Porta
 
Presentation dental room 121011
Presentation dental room 121011Presentation dental room 121011
Presentation dental room 121011crf123
 
Designing for Sustainability - Intelligent Glass Solutions
Designing for Sustainability - Intelligent Glass SolutionsDesigning for Sustainability - Intelligent Glass Solutions
Designing for Sustainability - Intelligent Glass SolutionsSaulo Rozendo
 
Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...
Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...
Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...EIBTM
 
Greensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas CommunityGreensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas CommunityBNIM
 
Final presentation protos_biokraftstoffe
Final presentation protos_biokraftstoffeFinal presentation protos_biokraftstoffe
Final presentation protos_biokraftstoffeIskandar Muda
 
Meeting Today's Sustainability Challenges: Carbon Footprinting and More...
Meeting Today's Sustainability Challenges: Carbon Footprinting and More... Meeting Today's Sustainability Challenges: Carbon Footprinting and More...
Meeting Today's Sustainability Challenges: Carbon Footprinting and More... Ryan Henkensiefken
 
Community engagement plan july 2011
Community engagement plan july 2011Community engagement plan july 2011
Community engagement plan july 2011Milton Santos
 

La actualidad más candente (20)

Yale red ox presentation draft 1
Yale red ox presentation draft 1Yale red ox presentation draft 1
Yale red ox presentation draft 1
 
Final presentation draft 1
Final presentation draft 1Final presentation draft 1
Final presentation draft 1
 
State of green business report 2012
State of green business report 2012State of green business report 2012
State of green business report 2012
 
The Business Value of Going Green
The Business Value of Going GreenThe Business Value of Going Green
The Business Value of Going Green
 
Presentation dental room 121011
Presentation dental room 121011Presentation dental room 121011
Presentation dental room 121011
 
GREEN BUILDINGS
GREEN BUILDINGSGREEN BUILDINGS
GREEN BUILDINGS
 
James Brew Portfolio Small
James Brew Portfolio SmallJames Brew Portfolio Small
James Brew Portfolio Small
 
Designing for Sustainability - Intelligent Glass Solutions
Designing for Sustainability - Intelligent Glass SolutionsDesigning for Sustainability - Intelligent Glass Solutions
Designing for Sustainability - Intelligent Glass Solutions
 
The Cost of Building Green
The Cost of Building GreenThe Cost of Building Green
The Cost of Building Green
 
Setawwa 2010, 1-29 choules
Setawwa   2010, 1-29 choulesSetawwa   2010, 1-29 choules
Setawwa 2010, 1-29 choules
 
Analyzing water treatment start-ups
Analyzing water treatment start-upsAnalyzing water treatment start-ups
Analyzing water treatment start-ups
 
Greening the Gray - NYWEA 2012
Greening the Gray - NYWEA 2012Greening the Gray - NYWEA 2012
Greening the Gray - NYWEA 2012
 
Savannah Harbor Expansion Project Update - March 14, 2013
Savannah Harbor Expansion Project Update - March 14, 2013Savannah Harbor Expansion Project Update - March 14, 2013
Savannah Harbor Expansion Project Update - March 14, 2013
 
Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...
Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...
Commission for a Sustainable London 2012: Assuring Sustainability for the Lon...
 
Skanska presentation
Skanska presentationSkanska presentation
Skanska presentation
 
Skanska Profile
Skanska ProfileSkanska Profile
Skanska Profile
 
Greensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas CommunityGreensburg | The Green Rebirth of a Kansas Community
Greensburg | The Green Rebirth of a Kansas Community
 
Final presentation protos_biokraftstoffe
Final presentation protos_biokraftstoffeFinal presentation protos_biokraftstoffe
Final presentation protos_biokraftstoffe
 
Meeting Today's Sustainability Challenges: Carbon Footprinting and More...
Meeting Today's Sustainability Challenges: Carbon Footprinting and More... Meeting Today's Sustainability Challenges: Carbon Footprinting and More...
Meeting Today's Sustainability Challenges: Carbon Footprinting and More...
 
Community engagement plan july 2011
Community engagement plan july 2011Community engagement plan july 2011
Community engagement plan july 2011
 

Similar a Leed 2009 checklist

58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Congress for the New Urbanism
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated ManualTom_Pritscher
 
45502553 construction-project-checklist
45502553 construction-project-checklist45502553 construction-project-checklist
45502553 construction-project-checklistimaduddin91
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Innovative Water Recycling
Innovative Water RecyclingInnovative Water Recycling
Innovative Water RecyclingPERCWater
 
Data-Driven Green Design Case Studies - Dominique Davison
Data-Driven Green Design Case Studies - Dominique DavisonData-Driven Green Design Case Studies - Dominique Davison
Data-Driven Green Design Case Studies - Dominique DavisonUS-Ignite
 
Elaine Muir (Plan Vivo)-Carbon Offsetting Case Study
Elaine Muir (Plan Vivo)-Carbon Offsetting Case StudyElaine Muir (Plan Vivo)-Carbon Offsetting Case Study
Elaine Muir (Plan Vivo)-Carbon Offsetting Case StudyScotland Malawi Partnership
 
Beyond Zero Carbon Housing - Robin Nicholson
Beyond Zero Carbon Housing - Robin NicholsonBeyond Zero Carbon Housing - Robin Nicholson
Beyond Zero Carbon Housing - Robin NicholsonCreative Energy Homes
 
Richard presentation march
Richard presentation marchRichard presentation march
Richard presentation marchbbptoronto
 
Specifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksSpecifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksVikki Jacobs
 
Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...
Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...
Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...CWS_2010
 
Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…
Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…
Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…rhenkensiefken
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green buildingMamdooh Amin
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webberONEIA
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webberONEIA
 

Similar a Leed 2009 checklist (20)

58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
Highlands Garden Village-Case Study-lmplementation of New Urbanism-Jonathan R...
 
Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated Manual
 
45502553 construction-project-checklist
45502553 construction-project-checklist45502553 construction-project-checklist
45502553 construction-project-checklist
 
Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Innovative Water Recycling
Innovative Water RecyclingInnovative Water Recycling
Innovative Water Recycling
 
Data-Driven Green Design Case Studies - Dominique Davison
Data-Driven Green Design Case Studies - Dominique DavisonData-Driven Green Design Case Studies - Dominique Davison
Data-Driven Green Design Case Studies - Dominique Davison
 
BUDMA 2011
BUDMA 2011BUDMA 2011
BUDMA 2011
 
Elaine Muir (Plan Vivo)-Carbon Offsetting Case Study
Elaine Muir (Plan Vivo)-Carbon Offsetting Case StudyElaine Muir (Plan Vivo)-Carbon Offsetting Case Study
Elaine Muir (Plan Vivo)-Carbon Offsetting Case Study
 
Beyond Zero Carbon Housing - Robin Nicholson
Beyond Zero Carbon Housing - Robin NicholsonBeyond Zero Carbon Housing - Robin Nicholson
Beyond Zero Carbon Housing - Robin Nicholson
 
Richard presentation march
Richard presentation marchRichard presentation march
Richard presentation march
 
Stratford's Core Area_Plan
Stratford's Core Area_PlanStratford's Core Area_Plan
Stratford's Core Area_Plan
 
Specifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risksSpecifying low carbon buildings: recognising and reducing risks
Specifying low carbon buildings: recognising and reducing risks
 
Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...
Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...
Nicholas Parker, Cleantech Group LLC - Water and the Future of the Canadian E...
 
Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…
Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…
Meeting Today’s Sustainability Challenges: Carbon Footprinting and More…
 
Structure engineers and green building
Structure engineers and green buildingStructure engineers and green building
Structure engineers and green building
 
City Council May 15, 2012 Hickory Update
City Council May 15, 2012 Hickory UpdateCity Council May 15, 2012 Hickory Update
City Council May 15, 2012 Hickory Update
 
Green Home Mortgage
Green Home MortgageGreen Home Mortgage
Green Home Mortgage
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webber
 
Post globe 2010 doug webber
Post globe 2010 doug webberPost globe 2010 doug webber
Post globe 2010 doug webber
 

Más de J C

Structural calculations (conections and slab)
Structural calculations (conections and slab)Structural calculations (conections and slab)
Structural calculations (conections and slab)J C
 
Summary of costs
Summary of costsSummary of costs
Summary of costsJ C
 
Summary of loan and payments
Summary of loan and paymentsSummary of loan and payments
Summary of loan and paymentsJ C
 
Gutter sizing data
Gutter sizing dataGutter sizing data
Gutter sizing dataJ C
 
Irrigation savings
Irrigation savingsIrrigation savings
Irrigation savingsJ C
 
Water storage data
Water storage dataWater storage data
Water storage dataJ C
 
Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant reviewJ C
 
Loan analysis
Loan analysisLoan analysis
Loan analysisJ C
 
Costs
CostsCosts
CostsJ C
 
Schedule
ScheduleSchedule
ScheduleJ C
 
Final pv system
Final pv systemFinal pv system
Final pv systemJ C
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysisJ C
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizingJ C
 
Structural costs
Structural costsStructural costs
Structural costsJ C
 
Foundation Analysis
Foundation AnalysisFoundation Analysis
Foundation AnalysisJ C
 
Foundation data
Foundation dataFoundation data
Foundation dataJ C
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation PlanJ C
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demandJ C
 
Storage capacity
Storage capacityStorage capacity
Storage capacityJ C
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On RoofJ C
 

Más de J C (20)

Structural calculations (conections and slab)
Structural calculations (conections and slab)Structural calculations (conections and slab)
Structural calculations (conections and slab)
 
Summary of costs
Summary of costsSummary of costs
Summary of costs
 
Summary of loan and payments
Summary of loan and paymentsSummary of loan and payments
Summary of loan and payments
 
Gutter sizing data
Gutter sizing dataGutter sizing data
Gutter sizing data
 
Irrigation savings
Irrigation savingsIrrigation savings
Irrigation savings
 
Water storage data
Water storage dataWater storage data
Water storage data
 
Leed consultant review
Leed consultant reviewLeed consultant review
Leed consultant review
 
Loan analysis
Loan analysisLoan analysis
Loan analysis
 
Costs
CostsCosts
Costs
 
Schedule
ScheduleSchedule
Schedule
 
Final pv system
Final pv systemFinal pv system
Final pv system
 
Pv system analysis
Pv system analysisPv system analysis
Pv system analysis
 
Pv system sizing
Pv system sizingPv system sizing
Pv system sizing
 
Structural costs
Structural costsStructural costs
Structural costs
 
Foundation Analysis
Foundation AnalysisFoundation Analysis
Foundation Analysis
 
Foundation data
Foundation dataFoundation data
Foundation data
 
Irrigation Plan
Irrigation PlanIrrigation Plan
Irrigation Plan
 
Irrigation demand
Irrigation demandIrrigation demand
Irrigation demand
 
Storage capacity
Storage capacityStorage capacity
Storage capacity
 
Water Collected On Roof
Water Collected On RoofWater Collected On Roof
Water Collected On Roof
 

Último

What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 

Último (20)

What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 

Leed 2009 checklist

  • 1. LEED 2009 for New Construction and Major Renovations Project Checklist Eco-Plaza 20 0 6 Sustainable Sites Possible Points: 26 Y ? N d/C Y C Prereq 1 Construction Activity Pollution Prevention 1 d Credit 1 Site Selection 1 5 d Credit 2 Development Density and Community Connectivity 5 1 d Credit 3 Brownfield Redevelopment 1 6 d Credit 4.1 Alternative Transportation—Public Transportation Access 6 1 d Credit 4.2 Alternative Transportation—Bicycle Storage and Changing Rooms 1 3 d Credit 4.3 Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles 3 2 d Credit 4.4 Alternative Transportation—Parking Capacity 2 1 C Credit 5.1 Site Development—Protect or Restore Habitat 1 1 d Credit 5.2 Site Development—Maximize Open Space 1 1 d Credit 6.1 Stormwater Design—Quantity Control 1 1 d Credit 6.2 Stormwater Design—Quality Control 1 1 C Credit 7.1 Heat Island Effect—Non-roof 1 1 d Credit 7.2 Heat Island Effect—Roof 1 1 d Credit 8 Light Pollution Reduction 1 6 0 2 Water Efficiency Possible Points: 10 Y ? N Y d Prereq 1 Water Use Reduction—20% Reduction 2 d Credit 1 Water Efficient Landscaping 2 to 4 X Reduce by 50% 2 No Potable Water Use or Irrigation 4 2 d Credit 2 Innovative Wastewater Technologies 2 4 d Credit 3 Water Use Reduction 2 to 4 Reduce by 30% 2 Reduce by 35% 3 X Reduce by 40% 4 LEED 2009 for New Construction and Major Renovations Project Checklist 1 of 4
  • 2. 28 0 0 Energy and Atmosphere Possible Points: 35 Y ? N Y C Prereq 1 Fundamental Commissioning of Building Energy Systems Y d Prereq 2 Minimum Energy Performance Y d Prereq 3 Fundamental Refrigerant Management 12 d Credit 1 Optimize Energy Performance 1 to 19 Improve by 12% for New Buildings or 8% for Existing Building Renovations 1 Improve by 14% for New Buildings or 10% for Existing Building Renovations 2 Improve by 16% for New Buildings or 12% for Existing Building Renovations 3 Improve by 18% for New Buildings or 14% for Existing Building Renovations 4 Improve by 20% for New Buildings or 16% for Existing Building Renovations 5 Improve by 22% for New Buildings or 18% for Existing Building Renovations 6 Improve by 24% for New Buildings or 20% for Existing Building Renovations 7 Improve by 26% for New Buildings or 22% for Existing Building Renovations 8 Improve by 28% for New Buildings or 24% for Existing Building Renovations 9 Improve by 30% for New Buildings or 26% for Existing Building Renovations 10 Improve by 32% for New Buildings or 28% for Existing Building Renovations 11 x Improve by 34% for New Buildings or 30% for Existing Building Renovations 12 Improve by 36% for New Buildings or 32% for Existing Building Renovations 13 Improve by 38% for New Buildings or 34% for Existing Building Renovations 14 Improve by 40% for New Buildings or 36% for Existing Building Renovations 15 Improve by 42% for New Buildings or 38% for Existing Building Renovations 16 Improve by 44% for New Buildings or 40% for Existing Building Renovations 17 Improve by 46% for New Buildings or 42% for Existing Building Renovations 18 Improve by 48%+ for New Buildings or 44%+ for Existing Building Renovations 19 7 d Credit 2 On-Site Renewable Energy 1 to 7 1% Renewable Energy 1 3% Renewable Energy 2 5% Renewable Energy 3 7% Renewable Energy 4 9% Renewable Energy 5 11% Renewable Energy 6 x 13% Renewable Energy 7 2 C Credit 3 Enhanced Commissioning 2 2 d Credit 4 Enhanced Refrigerant Management 2 3 C Credit 5 Measurement and Verification 3 2 C Credit 6 Green Power 2 LEED 2009 for New Construction and Major Renovations Project Checklist 2 of 4
  • 3. 7 0 3 Materials and Resources Possible Points: 14 Y ? N Y d Prereq 1 Storage and Collection of Recyclables 1 C Credit 1.1 Building Reuse—Maintain Existing Walls, Floors, and Roof 1 to 3 Reuse 55% 1 Reuse 75% 2 Reuse 95% 3 1 C Credit 1.2 Building Reuse—Maintain 50% of Interior Non-Structural Elements 1 1 C Credit 2 Construction Waste Management 1 to 2 x 50% Recycled or Salvaged 1 75% Recycled or Salvaged 2 1 C Credit 3 Materials Reuse 1 to 2 x Reuse 5% 1 Reuse 10% 2 2 C Credit 4 Recycled Content 1 to 2 10% of Content 1 x 20% of Content 2 2 C Credit 5 Regional Materials 1 to 2 10% of Materials 1 x 20% of Materials 2 1 C Credit 6 Rapidly Renewable Materials 1 1 C Credit 7 Certified Wood 1 LEED 2009 for New Construction and Major Renovations Project Checklist 3 of 4
  • 4. 15 0 0 Indoor Environmental Quality Possible Points: 15 Y ? N Y d Prereq 1 Minimum Indoor Air Quality Performance Y d Prereq 2 Environmental Tobacco Smoke (ETS) Control 1 d Credit 1 Outdoor Air Delivery Monitoring 1 1 d Credit 2 Increased Ventilation 1 1 C Credit 3.1 Construction IAQ Management Plan—During Construction 1 1 C Credit 3.2 Construction IAQ Management Plan—Before Occupancy 1 1 C Credit 4.1 Low-Emitting Materials—Adhesives and Sealants 1 1 C Credit 4.2 Low-Emitting Materials—Paints and Coatings 1 1 C Credit 4.3 Low-Emitting Materials—Flooring Systems 1 1 C Credit 4.4 Low-Emitting Materials—Composite Wood and Agrifiber Products 1 1 d Credit 5 Indoor Chemical and Pollutant Source Control 1 1 d Credit 6.1 Controllability of Systems—Lighting 1 1 d Credit 6.2 Controllability of Systems—Thermal Comfort 1 1 d Credit 7.1 Thermal Comfort—Design 1 1 d Credit 7.2 Thermal Comfort—Verification 1 1 d Credit 8.1 Daylight and Views—Daylight 1 1 d Credit 8.2 Daylight and Views—Views 1 5 0 1 Innovation and Design Process Possible Points: 6 Y ? N 1 d/C Credit 1.1 Innovation in Design: Specific Title 1 1 d/C Credit 1.2 Innovation in Design: Specific Title 1 1 d/C Credit 1.3 Innovation in Design: Specific Title 1 1 d/C Credit 1.4 Innovation in Design: Specific Title 1 1 d/C Credit 1.5 Innovation in Design: Specific Title 1 1 d/C Credit 2 LEED Accredited Professional 1 3 0 0 Regional Priority Credits Possible Points: 4 Y ? N 1 d/C Credit 1.1 Regional Priority: Specific Credit 1 1 d/C Credit 1.2 Regional Priority: Specific Credit 1 1 d/C Credit 1.3 Regional Priority: Specific Credit 1 d/C Credit 1.4 Regional Priority: Specific Credit 1 84 0 12 Total Possible Points: 110 Certified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Platinum 80 to 110 LEED 2009 for New Construction and Major Renovations Project Checklist 4 of 4