SlideShare una empresa de Scribd logo
1 de 24
Descargar para leer sin conexión
BUILDING CONSTRUCTION 2 (BLD 60703/ARC 2513)
PROJECT 1: SKELETAL CONSTRUCTION - TEMPORARY BUS SHELTER
GROUP MEMBERS:
CHOO ZI ZHAO 0320498
MUHAMMAD ASHROFF 0325736
RAJAN KULANDAYA 0317164
WONG WAN JIUAN 0327173
MUHAMMAD ZAIM 0325930
TUTOR
MS SUJATAVANI GUNASAGARAN
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 DESIGN ANALYSIS
3.0 PRECEDENT STUDIES
4.0 DESIGN DEVELOPMENT
5.0 DESIGN CONSIDERATION
6.0 JOINTS AND CONNECTIONS
7.0 LOAD AND FORCE
8.0 CONSTRUCTION PROCESS
9.0 CONCLUSION
REFERENCE
APPENDIX
1.0 Introduction
In this project, five of us chose Tetrahedron and Triangular Prism as our
skeletal form to construct our temporary bus shelter in a scale of 1:5.
Although Triangular form is the most stable construction form due to its
inherent structural characteristic, the consideration of using Bamboo in
our design becomes our most challenging decision. Compared to other
construction methods by using nuts and bolts for connections, we are
going to use traditional joints used in bamboo construction to connect
each of the primary and secondary supports, from the foundation to the
roof and some minor materials to enhance its strength, such as concrete
to hold the bamboo’s primary support.
Our decision is to prove Bamboo can be widely used in light construction
such as a bus shelter by replacing materials like wood and metal. By
utilising traditional bamboo joints, its structure also can be easily
dismantled.
2.0 Design Analysis
There are two aspects our group looked into before constructing our temporary bus shelter:
1. Form of the bus shelter
2. Material (Focus on Bamboo)
2.1 Form
The reason of choosing Tetrahedron and Triangular Prism to design our bus shelter is based
on the triangle inherent structural characteristic in the form. Compare to square, the end points of
triangle can transfer high amount of forces due to its rigidness without deformation. So, triangles
often used as trusses in bridges or as others support structures in the building.
2.2 Material
Our group chooses Bamboo as our main material for our project to show that the shape and material can perform well together.
Due to Bamboo’s growth cycle, it can grow more than one metre in a single day, and it can reach its maximum height within the first six months. For
Bamboo to be used in construction, it needs 3 years to develop its strengths and five to six years to fully mature. Compare to normal trees’ growth,
Bamboo can be harvested faster and solve the shortage of some materials. Bamboo has its own advantages and disadvantages as follow:
Tetrahedron Triangular Prism
Advantages
 Bamboo is an extremely strong fibre
 Highly flexible
 Low-cost and environmentally friendly
 Light weight compared to steel
 Shock absorbing and thus earthquake resistant
 Bamboo can prevent pollution by absorbing large
amounts of nitrogen from waste water
 It also reduces the amount of CO2 in the air
Disadvantages
 Joining Techniques are limited however the development of more effective
methods Is still being researched
 Flammability Bamboo structures are not fire resistant and the cost of
treatment is high
 Bamboo has a round profile therefore connections are pretty complicated.
 Bamboo is hollow there is no material to tighten the middle to the cane
 Bamboo is not suitable for loads in cross direction because there are no
cross fibres
 Bamboo is a natural material that varies in diameter length and quality
according to the climate.
 The density of fibres in cross section of a bamboo shell varies with thickness
as well as in height so it is not constant
 Bamboo is more prone to insect attacks than other trees and grasses
Correct bamboo to use due
to brownish hue
3.0 Precedent Studies
We got some inspiration from a series of precedents
Bamboo Structure
1. Restaurant at Greenville, Jarkata, Indonesia- DSA+s
We admired the aesthetics of bamboo used and how the bamboo was standing on the
concrete foundation that came out from ground to prevent from water.
The usage of a wide and also high roof for allowing to wind flow freely through the
restaurant. The roof cover also made from bamboo, which is assembled with coupling
system. The system is used for preventing water dripping, and for protecting cracking
which usually happened when bamboo is being exposed directly to the sun.
2. Bamboo Bus Stop, Bombay, India – Indian Institute of Technology
The bus stand was built in a nearby village
We were inspired by the simple, functional and sturdy form, and how a zinc roof was implemented on the bamboo
rafter.
In our case we thought of replacing the zinc roof with a corrugated board to disperse sunlight and increase
brightness in the bus shelter.
3. Bamboo Selection
 Bamboo used for construction should be a light brown hue. This ensures that the plant is at least
3 years old
 Avoid bamboo that’s cut in spring or early summer these batches are generally weaker due to
increased fibre moisture content
Foundation
Concrete Formula Applied & Concrete mix proportions
 Concrete ratio should be as low as workability will allow.
 Excess water causes swelling of the bamboo.
 High early strength cement is preferred to minimize cracks caused by swelling of bamboo
when seasoned bamboo cannot be waterproofed.
Waterproofing & Strengthening Bamboo
The bamboo trusses are first coated with 2 – 3 layers of rubber tree oil. The oil helps to protect the bamboo from moisture.
Bamboo has to be treated against insect attack these are to be soaked in a solution of borax and boric acid. Fifty grams of each chemical for every litre
of water. Soaking time typically takes 3 days.
another method can be used where the bamboo is soaked in an alum solution for 30 minutes to preserve them for 15 years.
Roof
In our model, we use PVC corrugated cardboard sheet to represent polycarbonate corrugated roofing.
The reasons for choosing this material is due to its many advantages:-
• Uv resistance
• High plasticity
• Light and heat resistance (Metallic Sunstop)
• Good thermal insulation
• Lightweight
• Fire resistance
• High degree of transparency
• Impact resistance and unbreakable
• Easy transportation
• Virtually Unbreakable
Code Structural(mm) Colour Thickness (+/-5%) Length
A Angular Corrugated
(5Grooves)
Brown, Clear,
Metallic
0.8mm, 0.10mm, 0.12, 18mm,
MS-1.0mm
18', 20'
MC Mid-Circular Corrugated
(9Grooves)
Brown, Clear 0.9mm
6', 7', 8', 10',
12', 20'
http://www.deskylight.com.my/product-polycarbonate
PVC Corrugated Board to
represent actual material
4.0 Design Development
Initially we had planned to use a cylinder & a rectangular prism as our base forms
We collectively drew some sketches as well as made a few mock up models.
However, we found that it was going to be a tough process to apply bamboo into a cylindrical form structure as bamboo needs to be bent and curved at
times with special machinery
So instead we used more rigid forms such and a tetrahedron and a rectangular prism as they seem easier to work with
Another reason why we chose to work with bamboo is that we wanted to create a structure that is not only made out of sustainable materials but also a
structure that doesn’t depend on a lot of additional materials meaning a structure that depends solely on locking and interlocking joints.
Mock-up
model refined
Initial
scheme
Stage 1 Initial Form of Bus shelter identified some difficulties due to securing the 3 structures together
from shear weight plus too many unnecessary members
Stage 2 Reduced the number of structures down to 2. We found it easier to
work with however in terms of stability it was still pretty bad as well as for the
prevention of rainwater at the back of the structure. This structure was lacking proper space
for the seating as well.
Stage 3
Stability was reinforced after adding horizontal, slanted, benches on either ends of the structure
connected to a third main structure in the middle (which visually shows a division of each structure)
This is a unique feature we considered and reinforced stability greatly. Our final 1:5 scale structure is based on this design
4.1 Technical Drawing and Terminology
Rafter
Sitting Area/ Bench
Batten
Timber Decking
PLAN
FRONT ELEVATION
White PVC Corrugated Board Roofing
Column
Concrete Foundation
Sitting Area/ Bench
White PVC Corrugated Board Roofing
Sitting Area/ Bench
Timber Decking
REAR ELEVATION
Batten
Column
Rafter
SIDE ELEVATION
5.0 Design Consideration
There are a few requirements in the brief to build the temporary bus shelter:
1. Bus shelter should able to occupy 5 people
2. Weather Resistant
5.1 Occupancy of the Bus Shelter
5.2 Weather Resistant
We choose PVC Coruggated Board to represent Polycarbonate roofing. It is because this roofing
system can reduce sunlight and heat, and incresing the brightness inside the bus shelter. Besides, it
is easily to maintain and lightweight.
For the raining, we create 15 degree slope for our roofing slope and decrease the height of the roof to
2.2M. It can use as a stand to avoid the rain.
SUN
6.0 Joints and Connections
Main Structure
Wedge Dowel Chord Bamboo
Roof & Foundation
L Plates Screw Plank
6.1 Bamboo Cut and Joinery Techniques
Bamboo Cuts
Bamboo Joinery Techniques Use of Dowels and Wedges
Splicing Bamboo Pole
In this model, we were using sawing and drilling to make bamboo’s joineries.
Three different cut which are One Ear, Beveled and Flute Mouth were applied in the model.
Joining Two Ear with vertical elements,
which at the part of column and rafter.
Joining bamboo with dowel is to fix the position of the strcuture and also lashing around
it. Inserting wedge between the bamboos is to advoid movement while lashing.
To adding the length of the bamboo,
telescpoe splicing can be applied.
6.2 Bamboo Lashing Techniques
We used the lashing techniques as follow:-
Drilled lashing Joint, Pegged lashing joint, Modern square lashing, Diagonal lashing and West country shear lashing
7.0 Load and Force
Bamboos natural ability is having a tensile strength, to create a stable structure, in this category we look into its structure, we formed primary structure
and its secondary structure. For the primary structure, we put two bamboos together acting as a ‘Column’; secondary structure is identified basically
are rafter and batten, which are to support the roof; and also the bench, acts as the connection among the columns’ to transfer the loads.
7.1 Primary and Secondary Structures
PLAN REAR ELEVATION
FRONT ELEVATION SIDE ELEVATION
LEGEND
PRIMARY
SECONDARY
7.2 Load Transfer
Legend
PLAN
SIDE ELEVATION FRONT ELEVATION
8.0 Construction Process
1. Cutting bamboo to create joints
2. Inserting wedges / dowels and lashing
3. Form and connect primary and secondary structures
4. Formed rafter and batten, with PVC corrugated board as roofing sheet
5. Concrete mixing to create foundation pad
6. Constructing timber decking
7. Coat painting 8. Load testing
Then, we are DONE!!!
9.0 Conclusion
Through all the time we spend to construct a Bamboo bus shelter, we realize mock up models and concept drawings are not really to be 100% followed
and assumed. So, to make our group’s bus shelter design’s structure workable, we have research on the connection techniques of the bamboo. From
the structure itself, we found that our bamboo bus shelter is very unique; we are not only using the traditional method to reduce the use of metal bolt
and nuts but also successfully attached seating area as a part of the support structure. However, during the model making, we also realize the quality
of bamboo has to be controlled, or else uneven diameter of the bamboo is affecting the level of the structure. The best part of this project for us in this
group was we finally built a model almost same as our concept design. And we prove, the forms and the material those we choose are able to sustain.
References
1. Appropriate Building Materials: a Catalogue of Potential Solutions, Third Revised Edition (1988). Retrieved on Sept, 2016, from
http://www.nzdl.org/gsdlmod?e=d-00000-00---off-0hdl--00-0----0-10-0---0---0direct-10---4-------0-1l--11-en-50---20-about---00-0-1-00-0--4----0-0-
11-10-0utfZz-8-00&a=d&c=hdl&cl=CL1.1&d=HASH70c81f6386a2600bdfdd3f.3.13
2. http://inhabitat.com/indian-students-make-bamboo-bus-stop/
3. Green, L. (2013, February 23). SCOUT PIONEERING. Retrieved October 02, 2016,
from https://scoutpioneering.com/tag/what-kind-of-rope-for-lashing/
3. Stéphane Schröder. 2009. Bamboo Joints and Joinery Techniques. Retrieved September 30, 2016,
from http://www.guaduabamboo.com/working-with-bamboo/joining-bamboo.
4. Schröder, S. (2016, May 04). Bamboo Lashing Techniques. Retrieved September 30, 2016,
from https://www.bambooimport.com/en/blog/bamboo-lashing-techniques
Appendix
All designs and development sketches
f

Más contenido relacionado

La actualidad más candente

Matrimandir - The soul of Auroville
Matrimandir - The soul of AurovilleMatrimandir - The soul of Auroville
Matrimandir - The soul of AurovilleSamya Nayak
 
Servicing large buildings
Servicing large buildingsServicing large buildings
Servicing large buildingsJulian Swindell
 
Sri sai spiritual centre banglore
Sri sai spiritual centre bangloreSri sai spiritual centre banglore
Sri sai spiritual centre bangloreUma M
 
ALUMINIUM AS A BUILDING MATERIAL dissertation
ALUMINIUM AS A BUILDING MATERIAL dissertationALUMINIUM AS A BUILDING MATERIAL dissertation
ALUMINIUM AS A BUILDING MATERIAL dissertationArchDuty
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case studySona Rawat
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 PresentationKellyann Hiew
 
Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit마 이환
 
Building Construction Project 1
Building Construction Project 1Building Construction Project 1
Building Construction Project 1lawchang
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsCarmen Chan
 
ECO RESORT A.d. case study machan lonavla
ECO RESORT A.d. case study machan lonavla ECO RESORT A.d. case study machan lonavla
ECO RESORT A.d. case study machan lonavla Dikshant Kubal
 
PJCC AUDITORIUM COM.pptx
PJCC AUDITORIUM COM.pptxPJCC AUDITORIUM COM.pptx
PJCC AUDITORIUM COM.pptxSNEHALGUPTA13
 
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, MohaliCASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, MohaliAr. Prerna Chouhan
 
Apartmnet LABURNUM, GURGAON
Apartmnet LABURNUM, GURGAONApartmnet LABURNUM, GURGAON
Apartmnet LABURNUM, GURGAONAr. Sahid Akhtar
 

La actualidad más candente (20)

Space frame
Space frameSpace frame
Space frame
 
Matrimandir - The soul of Auroville
Matrimandir - The soul of AurovilleMatrimandir - The soul of Auroville
Matrimandir - The soul of Auroville
 
Urban studies case study townships
Urban studies case study townshipsUrban studies case study townships
Urban studies case study townships
 
Dry & Wet Riser Systems
Dry & Wet Riser SystemsDry & Wet Riser Systems
Dry & Wet Riser Systems
 
Servicing large buildings
Servicing large buildingsServicing large buildings
Servicing large buildings
 
Sri sai spiritual centre banglore
Sri sai spiritual centre bangloreSri sai spiritual centre banglore
Sri sai spiritual centre banglore
 
Vertical Circulation and Services of Highrise
Vertical Circulation and Services of HighriseVertical Circulation and Services of Highrise
Vertical Circulation and Services of Highrise
 
ALUMINIUM AS A BUILDING MATERIAL dissertation
ALUMINIUM AS A BUILDING MATERIAL dissertationALUMINIUM AS A BUILDING MATERIAL dissertation
ALUMINIUM AS A BUILDING MATERIAL dissertation
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case study
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 Presentation
 
Case Study Report: The Summit
Case Study Report: The SummitCase Study Report: The Summit
Case Study Report: The Summit
 
Presentation1.pptx
Presentation1.pptxPresentation1.pptx
Presentation1.pptx
 
Transportation Systems In Buildings
Transportation Systems In BuildingsTransportation Systems In Buildings
Transportation Systems In Buildings
 
Building Construction Project 1
Building Construction Project 1Building Construction Project 1
Building Construction Project 1
 
Museum Case Studies
Museum Case StudiesMuseum Case Studies
Museum Case Studies
 
B.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building SystemsB.tech Project 1 - Industrialised Building Systems
B.tech Project 1 - Industrialised Building Systems
 
ECO RESORT A.d. case study machan lonavla
ECO RESORT A.d. case study machan lonavla ECO RESORT A.d. case study machan lonavla
ECO RESORT A.d. case study machan lonavla
 
PJCC AUDITORIUM COM.pptx
PJCC AUDITORIUM COM.pptxPJCC AUDITORIUM COM.pptx
PJCC AUDITORIUM COM.pptx
 
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, MohaliCASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
CASE STUDY - District Administrative & Judicial Court Complex, Sector 76, Mohali
 
Apartmnet LABURNUM, GURGAON
Apartmnet LABURNUM, GURGAONApartmnet LABURNUM, GURGAON
Apartmnet LABURNUM, GURGAON
 

Destacado

Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setarshacjhow
 
Emergency shelter System Design by Shirish Avrani
Emergency shelter System Design by Shirish AvraniEmergency shelter System Design by Shirish Avrani
Emergency shelter System Design by Shirish AvraniShirish Avrani
 
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...marc dowling
 
Mr. c.n. pandey
Mr. c.n. pandeyMr. c.n. pandey
Mr. c.n. pandeySchakma
 
SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...
SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...
SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...University of Nottingham
 
Construction Technology Course outline
Construction Technology Course outlineConstruction Technology Course outline
Construction Technology Course outlineEst chua
 
Vehicle Body Terminology, Visibility & Space
Vehicle Body  Terminology, Visibility & SpaceVehicle Body  Terminology, Visibility & Space
Vehicle Body Terminology, Visibility & SpaceRajat Seth
 
Corrugated bamboo roofing sheets
Corrugated bamboo roofing sheetsCorrugated bamboo roofing sheets
Corrugated bamboo roofing sheetsUtkarsh Dwivedi
 
Bamboo Construction
Bamboo Construction Bamboo Construction
Bamboo Construction BINITA RAMI
 
Taylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectusTaylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectusEst
 

Destacado (14)

Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 
Emergency shelter System Design by Shirish Avrani
Emergency shelter System Design by Shirish AvraniEmergency shelter System Design by Shirish Avrani
Emergency shelter System Design by Shirish Avrani
 
ResearchPresentation
ResearchPresentationResearchPresentation
ResearchPresentation
 
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter -  Preliminary P...
OTZI: (Grenade Hut) Instantly Deployable Life Safety Shelter - Preliminary P...
 
Emergency Shelter
Emergency ShelterEmergency Shelter
Emergency Shelter
 
Mr. c.n. pandey
Mr. c.n. pandeyMr. c.n. pandey
Mr. c.n. pandey
 
SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...
SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...
SEMESTER 1: Introduction to Construction Industry Project 2 Brief - Building ...
 
Construction Technology Course outline
Construction Technology Course outlineConstruction Technology Course outline
Construction Technology Course outline
 
Building construction with Guadua angustifolia Kunth in Colombia
Building construction with Guadua angustifolia Kunth in ColombiaBuilding construction with Guadua angustifolia Kunth in Colombia
Building construction with Guadua angustifolia Kunth in Colombia
 
Vehicle Body Terminology, Visibility & Space
Vehicle Body  Terminology, Visibility & SpaceVehicle Body  Terminology, Visibility & Space
Vehicle Body Terminology, Visibility & Space
 
Roofs bamboo
Roofs bambooRoofs bamboo
Roofs bamboo
 
Corrugated bamboo roofing sheets
Corrugated bamboo roofing sheetsCorrugated bamboo roofing sheets
Corrugated bamboo roofing sheets
 
Bamboo Construction
Bamboo Construction Bamboo Construction
Bamboo Construction
 
Taylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectusTaylors school-of-architecture-building-and-design-prospectus
Taylors school-of-architecture-building-and-design-prospectus
 

Similar a Building Construction 2 - Project 1 - Temporary Bus Shelter

Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportTan Jaden
 
Design of Long Span Bamboo Roof
Design of Long Span Bamboo RoofDesign of Long Span Bamboo Roof
Design of Long Span Bamboo RoofIRJET Journal
 
Civil Prototyping for the Bamboo Product
Civil Prototyping for the Bamboo ProductCivil Prototyping for the Bamboo Product
Civil Prototyping for the Bamboo ProductBhaskarWabhitkar1
 
BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1Yen Min Khor
 
IRJET- A Study on Transparent Concrete
IRJET-  	  A Study on Transparent ConcreteIRJET-  	  A Study on Transparent Concrete
IRJET- A Study on Transparent ConcreteIRJET Journal
 
Replacement of Steel by Bamboo Reinforcement
Replacement of Steel by Bamboo ReinforcementReplacement of Steel by Bamboo Reinforcement
Replacement of Steel by Bamboo ReinforcementIOSR Journals
 
IRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building ConstructionIRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building ConstructionIRJET Journal
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1Carlson Ko
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop reportAmelisa Collins
 
Report on Bamboo House/Hotel Civil Prototyping
Report on Bamboo House/Hotel Civil PrototypingReport on Bamboo House/Hotel Civil Prototyping
Report on Bamboo House/Hotel Civil PrototypingBhaskarWabhitkar1
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS.pptx
ADVANCED TECHNIQUES IN CONSTRUCTIONS.pptxADVANCED TECHNIQUES IN CONSTRUCTIONS.pptx
ADVANCED TECHNIQUES IN CONSTRUCTIONS.pptxPranotiHunungare
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsLin Hui
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systemsFarah Sham
 
Building construction report
Building construction reportBuilding construction report
Building construction reportChong Yi Hui
 
Cable and tensile structures
Cable and tensile structures Cable and tensile structures
Cable and tensile structures rohan joshi
 
Bamboo Blocks An Emerging Construction Material.pptx
Bamboo Blocks An Emerging Construction Material.pptxBamboo Blocks An Emerging Construction Material.pptx
Bamboo Blocks An Emerging Construction Material.pptxOMPRAKASHMAURYA28
 
Bamboo-as-Construction-Material.pptx
Bamboo-as-Construction-Material.pptxBamboo-as-Construction-Material.pptx
Bamboo-as-Construction-Material.pptxpramodKumarsahani1
 
Advance Techniques in Construction.pptx
Advance Techniques in Construction.pptxAdvance Techniques in Construction.pptx
Advance Techniques in Construction.pptxsandeep chougule
 

Similar a Building Construction 2 - Project 1 - Temporary Bus Shelter (20)

Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 ReportProject 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
Project 1 Skeletal Construction (Temporary Bus Shelter) A3 Report
 
Design of Long Span Bamboo Roof
Design of Long Span Bamboo RoofDesign of Long Span Bamboo Roof
Design of Long Span Bamboo Roof
 
Bcon Report 1
Bcon Report 1Bcon Report 1
Bcon Report 1
 
Civil Prototyping for the Bamboo Product
Civil Prototyping for the Bamboo ProductCivil Prototyping for the Bamboo Product
Civil Prototyping for the Bamboo Product
 
BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1BUILDING CONSTRUCTION 2 - PROJ 1
BUILDING CONSTRUCTION 2 - PROJ 1
 
IRJET- A Study on Transparent Concrete
IRJET-  	  A Study on Transparent ConcreteIRJET-  	  A Study on Transparent Concrete
IRJET- A Study on Transparent Concrete
 
Replacement of Steel by Bamboo Reinforcement
Replacement of Steel by Bamboo ReinforcementReplacement of Steel by Bamboo Reinforcement
Replacement of Steel by Bamboo Reinforcement
 
IRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building ConstructionIRJET- Importance of Bamboo in Building Construction
IRJET- Importance of Bamboo in Building Construction
 
Building Construction 2 Project 1
Building Construction 2 Project 1Building Construction 2 Project 1
Building Construction 2 Project 1
 
Print th isbusstop report
Print th isbusstop reportPrint th isbusstop report
Print th isbusstop report
 
Report on Bamboo House/Hotel Civil Prototyping
Report on Bamboo House/Hotel Civil PrototypingReport on Bamboo House/Hotel Civil Prototyping
Report on Bamboo House/Hotel Civil Prototyping
 
unit 5.pptx
unit 5.pptxunit 5.pptx
unit 5.pptx
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS.pptx
ADVANCED TECHNIQUES IN CONSTRUCTIONS.pptxADVANCED TECHNIQUES IN CONSTRUCTIONS.pptx
ADVANCED TECHNIQUES IN CONSTRUCTIONS.pptx
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Prefabricated timber framing systems
Prefabricated timber framing  systemsPrefabricated timber framing  systems
Prefabricated timber framing systems
 
Building construction report
Building construction reportBuilding construction report
Building construction report
 
Cable and tensile structures
Cable and tensile structures Cable and tensile structures
Cable and tensile structures
 
Bamboo Blocks An Emerging Construction Material.pptx
Bamboo Blocks An Emerging Construction Material.pptxBamboo Blocks An Emerging Construction Material.pptx
Bamboo Blocks An Emerging Construction Material.pptx
 
Bamboo-as-Construction-Material.pptx
Bamboo-as-Construction-Material.pptxBamboo-as-Construction-Material.pptx
Bamboo-as-Construction-Material.pptx
 
Advance Techniques in Construction.pptx
Advance Techniques in Construction.pptxAdvance Techniques in Construction.pptx
Advance Techniques in Construction.pptx
 

Último

2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptxsuhanimunjal27
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funneljen_giacalone
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...Call Girls in Nagpur High Profile
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...amitlee9823
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Call Girls in Nagpur High Profile
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceanilsa9823
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneLukeKholes
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...amitlee9823
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx2-tool presenthdbdbdbdbddhdhddation.pptx
2-tool presenthdbdbdbdbddhdhddation.pptx
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Tapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the FunnelTapestry Clothing Brands: Collapsing the Funnel
Tapestry Clothing Brands: Collapsing the Funnel
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...Booking open Available Pune Call Girls Nanded City  6297143586 Call Hot India...
Booking open Available Pune Call Girls Nanded City 6297143586 Call Hot India...
 
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
Jigani Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bangal...
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...Top Rated  Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
Top Rated Pune Call Girls Koregaon Park ⟟ 6297143586 ⟟ Call Me For Genuine S...
 
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun serviceCALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
CALL ON ➥8923113531 🔝Call Girls Aminabad Lucknow best Night Fun service
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
RT Nagar Call Girls Service: 🍓 7737669865 🍓 High Profile Model Escorts | Bang...
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 

Building Construction 2 - Project 1 - Temporary Bus Shelter

  • 1. BUILDING CONSTRUCTION 2 (BLD 60703/ARC 2513) PROJECT 1: SKELETAL CONSTRUCTION - TEMPORARY BUS SHELTER GROUP MEMBERS: CHOO ZI ZHAO 0320498 MUHAMMAD ASHROFF 0325736 RAJAN KULANDAYA 0317164 WONG WAN JIUAN 0327173 MUHAMMAD ZAIM 0325930 TUTOR MS SUJATAVANI GUNASAGARAN
  • 2. TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 DESIGN ANALYSIS 3.0 PRECEDENT STUDIES 4.0 DESIGN DEVELOPMENT 5.0 DESIGN CONSIDERATION 6.0 JOINTS AND CONNECTIONS 7.0 LOAD AND FORCE 8.0 CONSTRUCTION PROCESS 9.0 CONCLUSION REFERENCE APPENDIX
  • 3. 1.0 Introduction In this project, five of us chose Tetrahedron and Triangular Prism as our skeletal form to construct our temporary bus shelter in a scale of 1:5. Although Triangular form is the most stable construction form due to its inherent structural characteristic, the consideration of using Bamboo in our design becomes our most challenging decision. Compared to other construction methods by using nuts and bolts for connections, we are going to use traditional joints used in bamboo construction to connect each of the primary and secondary supports, from the foundation to the roof and some minor materials to enhance its strength, such as concrete to hold the bamboo’s primary support. Our decision is to prove Bamboo can be widely used in light construction such as a bus shelter by replacing materials like wood and metal. By utilising traditional bamboo joints, its structure also can be easily dismantled.
  • 4. 2.0 Design Analysis There are two aspects our group looked into before constructing our temporary bus shelter: 1. Form of the bus shelter 2. Material (Focus on Bamboo) 2.1 Form The reason of choosing Tetrahedron and Triangular Prism to design our bus shelter is based on the triangle inherent structural characteristic in the form. Compare to square, the end points of triangle can transfer high amount of forces due to its rigidness without deformation. So, triangles often used as trusses in bridges or as others support structures in the building. 2.2 Material Our group chooses Bamboo as our main material for our project to show that the shape and material can perform well together. Due to Bamboo’s growth cycle, it can grow more than one metre in a single day, and it can reach its maximum height within the first six months. For Bamboo to be used in construction, it needs 3 years to develop its strengths and five to six years to fully mature. Compare to normal trees’ growth, Bamboo can be harvested faster and solve the shortage of some materials. Bamboo has its own advantages and disadvantages as follow: Tetrahedron Triangular Prism Advantages  Bamboo is an extremely strong fibre  Highly flexible  Low-cost and environmentally friendly  Light weight compared to steel  Shock absorbing and thus earthquake resistant  Bamboo can prevent pollution by absorbing large amounts of nitrogen from waste water  It also reduces the amount of CO2 in the air Disadvantages  Joining Techniques are limited however the development of more effective methods Is still being researched  Flammability Bamboo structures are not fire resistant and the cost of treatment is high  Bamboo has a round profile therefore connections are pretty complicated.  Bamboo is hollow there is no material to tighten the middle to the cane  Bamboo is not suitable for loads in cross direction because there are no cross fibres  Bamboo is a natural material that varies in diameter length and quality according to the climate.  The density of fibres in cross section of a bamboo shell varies with thickness as well as in height so it is not constant  Bamboo is more prone to insect attacks than other trees and grasses
  • 5. Correct bamboo to use due to brownish hue 3.0 Precedent Studies We got some inspiration from a series of precedents Bamboo Structure 1. Restaurant at Greenville, Jarkata, Indonesia- DSA+s We admired the aesthetics of bamboo used and how the bamboo was standing on the concrete foundation that came out from ground to prevent from water. The usage of a wide and also high roof for allowing to wind flow freely through the restaurant. The roof cover also made from bamboo, which is assembled with coupling system. The system is used for preventing water dripping, and for protecting cracking which usually happened when bamboo is being exposed directly to the sun. 2. Bamboo Bus Stop, Bombay, India – Indian Institute of Technology The bus stand was built in a nearby village We were inspired by the simple, functional and sturdy form, and how a zinc roof was implemented on the bamboo rafter. In our case we thought of replacing the zinc roof with a corrugated board to disperse sunlight and increase brightness in the bus shelter.
  • 6. 3. Bamboo Selection  Bamboo used for construction should be a light brown hue. This ensures that the plant is at least 3 years old  Avoid bamboo that’s cut in spring or early summer these batches are generally weaker due to increased fibre moisture content Foundation Concrete Formula Applied & Concrete mix proportions  Concrete ratio should be as low as workability will allow.  Excess water causes swelling of the bamboo.  High early strength cement is preferred to minimize cracks caused by swelling of bamboo when seasoned bamboo cannot be waterproofed. Waterproofing & Strengthening Bamboo The bamboo trusses are first coated with 2 – 3 layers of rubber tree oil. The oil helps to protect the bamboo from moisture. Bamboo has to be treated against insect attack these are to be soaked in a solution of borax and boric acid. Fifty grams of each chemical for every litre of water. Soaking time typically takes 3 days. another method can be used where the bamboo is soaked in an alum solution for 30 minutes to preserve them for 15 years.
  • 7. Roof In our model, we use PVC corrugated cardboard sheet to represent polycarbonate corrugated roofing. The reasons for choosing this material is due to its many advantages:- • Uv resistance • High plasticity • Light and heat resistance (Metallic Sunstop) • Good thermal insulation • Lightweight • Fire resistance • High degree of transparency • Impact resistance and unbreakable • Easy transportation • Virtually Unbreakable Code Structural(mm) Colour Thickness (+/-5%) Length A Angular Corrugated (5Grooves) Brown, Clear, Metallic 0.8mm, 0.10mm, 0.12, 18mm, MS-1.0mm 18', 20' MC Mid-Circular Corrugated (9Grooves) Brown, Clear 0.9mm 6', 7', 8', 10', 12', 20' http://www.deskylight.com.my/product-polycarbonate PVC Corrugated Board to represent actual material
  • 8. 4.0 Design Development Initially we had planned to use a cylinder & a rectangular prism as our base forms We collectively drew some sketches as well as made a few mock up models. However, we found that it was going to be a tough process to apply bamboo into a cylindrical form structure as bamboo needs to be bent and curved at times with special machinery So instead we used more rigid forms such and a tetrahedron and a rectangular prism as they seem easier to work with Another reason why we chose to work with bamboo is that we wanted to create a structure that is not only made out of sustainable materials but also a structure that doesn’t depend on a lot of additional materials meaning a structure that depends solely on locking and interlocking joints.
  • 9. Mock-up model refined Initial scheme Stage 1 Initial Form of Bus shelter identified some difficulties due to securing the 3 structures together from shear weight plus too many unnecessary members Stage 2 Reduced the number of structures down to 2. We found it easier to work with however in terms of stability it was still pretty bad as well as for the prevention of rainwater at the back of the structure. This structure was lacking proper space for the seating as well. Stage 3 Stability was reinforced after adding horizontal, slanted, benches on either ends of the structure connected to a third main structure in the middle (which visually shows a division of each structure) This is a unique feature we considered and reinforced stability greatly. Our final 1:5 scale structure is based on this design
  • 10. 4.1 Technical Drawing and Terminology Rafter Sitting Area/ Bench Batten Timber Decking PLAN FRONT ELEVATION White PVC Corrugated Board Roofing Column Concrete Foundation Sitting Area/ Bench
  • 11. White PVC Corrugated Board Roofing Sitting Area/ Bench Timber Decking REAR ELEVATION Batten Column Rafter SIDE ELEVATION
  • 12. 5.0 Design Consideration There are a few requirements in the brief to build the temporary bus shelter: 1. Bus shelter should able to occupy 5 people 2. Weather Resistant 5.1 Occupancy of the Bus Shelter 5.2 Weather Resistant We choose PVC Coruggated Board to represent Polycarbonate roofing. It is because this roofing system can reduce sunlight and heat, and incresing the brightness inside the bus shelter. Besides, it is easily to maintain and lightweight. For the raining, we create 15 degree slope for our roofing slope and decrease the height of the roof to 2.2M. It can use as a stand to avoid the rain. SUN
  • 13. 6.0 Joints and Connections Main Structure Wedge Dowel Chord Bamboo Roof & Foundation L Plates Screw Plank
  • 14. 6.1 Bamboo Cut and Joinery Techniques Bamboo Cuts Bamboo Joinery Techniques Use of Dowels and Wedges Splicing Bamboo Pole In this model, we were using sawing and drilling to make bamboo’s joineries. Three different cut which are One Ear, Beveled and Flute Mouth were applied in the model. Joining Two Ear with vertical elements, which at the part of column and rafter. Joining bamboo with dowel is to fix the position of the strcuture and also lashing around it. Inserting wedge between the bamboos is to advoid movement while lashing. To adding the length of the bamboo, telescpoe splicing can be applied.
  • 15. 6.2 Bamboo Lashing Techniques We used the lashing techniques as follow:- Drilled lashing Joint, Pegged lashing joint, Modern square lashing, Diagonal lashing and West country shear lashing
  • 16. 7.0 Load and Force Bamboos natural ability is having a tensile strength, to create a stable structure, in this category we look into its structure, we formed primary structure and its secondary structure. For the primary structure, we put two bamboos together acting as a ‘Column’; secondary structure is identified basically are rafter and batten, which are to support the roof; and also the bench, acts as the connection among the columns’ to transfer the loads. 7.1 Primary and Secondary Structures PLAN REAR ELEVATION FRONT ELEVATION SIDE ELEVATION LEGEND PRIMARY SECONDARY
  • 17. 7.2 Load Transfer Legend PLAN SIDE ELEVATION FRONT ELEVATION
  • 18. 8.0 Construction Process 1. Cutting bamboo to create joints 2. Inserting wedges / dowels and lashing 3. Form and connect primary and secondary structures
  • 19. 4. Formed rafter and batten, with PVC corrugated board as roofing sheet 5. Concrete mixing to create foundation pad 6. Constructing timber decking
  • 20. 7. Coat painting 8. Load testing Then, we are DONE!!!
  • 21. 9.0 Conclusion Through all the time we spend to construct a Bamboo bus shelter, we realize mock up models and concept drawings are not really to be 100% followed and assumed. So, to make our group’s bus shelter design’s structure workable, we have research on the connection techniques of the bamboo. From the structure itself, we found that our bamboo bus shelter is very unique; we are not only using the traditional method to reduce the use of metal bolt and nuts but also successfully attached seating area as a part of the support structure. However, during the model making, we also realize the quality of bamboo has to be controlled, or else uneven diameter of the bamboo is affecting the level of the structure. The best part of this project for us in this group was we finally built a model almost same as our concept design. And we prove, the forms and the material those we choose are able to sustain.
  • 22. References 1. Appropriate Building Materials: a Catalogue of Potential Solutions, Third Revised Edition (1988). Retrieved on Sept, 2016, from http://www.nzdl.org/gsdlmod?e=d-00000-00---off-0hdl--00-0----0-10-0---0---0direct-10---4-------0-1l--11-en-50---20-about---00-0-1-00-0--4----0-0- 11-10-0utfZz-8-00&a=d&c=hdl&cl=CL1.1&d=HASH70c81f6386a2600bdfdd3f.3.13 2. http://inhabitat.com/indian-students-make-bamboo-bus-stop/ 3. Green, L. (2013, February 23). SCOUT PIONEERING. Retrieved October 02, 2016, from https://scoutpioneering.com/tag/what-kind-of-rope-for-lashing/ 3. Stéphane Schröder. 2009. Bamboo Joints and Joinery Techniques. Retrieved September 30, 2016, from http://www.guaduabamboo.com/working-with-bamboo/joining-bamboo. 4. Schröder, S. (2016, May 04). Bamboo Lashing Techniques. Retrieved September 30, 2016, from https://www.bambooimport.com/en/blog/bamboo-lashing-techniques
  • 23. Appendix All designs and development sketches
  • 24. f