3. • Mixed use development on a 1.2 km site
• Incorporates elements of Arabic design, culture and lifestyle
• Site contains a total of 138,000 m2 of gross floor area with
an additional 3,000m2 of ancillary building space
Responsible for:
• Code evaluation and compliance assurance
• Troubleshooting and value engineering in construction
• Re-design of restaurants and retail areas
• Apartment re-design and coordination
• Hotel facade redesign and spa coordination
4. Energy Center Luxury Hotel Marina Chandlery
50 Apartments 224 keys 92 Apartments 77 Apartments
Gym and pool Thai Restaurant Gym and pool Gym and pool
All Day Dining 14 Retail spaces
3 Club Lounges Seafood Restaurant
Rooftop Bar
7. 160 Unit mixed-use building
6 stories over 2 levels of
parking
Concrete and Steel construction
Responsible for:
•Design Development
•Re-work from 4 story wood to 6
story steel
•Extensive value engineering
•Construction Documents from
beginning to end
•Full coordination of all
disciplines including over 500
columns per floor
•Construction administration and
quality control
•Specification and product
selection
11. • Phase One of two phases, 580
total units
• $189M total construction cost
• 264 units – 825 sf average
• 4 story wood structure
surrounding 6 story garage
Responsible for:
• Construction Document
Management/Coordination
• Full coordination of all
disciplines
• Construction administration
and quality control
• Specification and product
selection
• Value Engineering
18. 833 Unit, Multi product Master Plan
(2) 4-story Wrap Apartment Buildings - 583
units
3-story Cluster Townhomes – 152 for sale
units
3-story Row Townhomes – 73 for sale units
Alley loaded single family – 25 units
Responsible for:
Full Product Development
Design Development
Entitlement negotiations with City of Santa
Clara and neighborhood outreach.
Feasibility studies
Model review and supervision
Green Building Elements
Color and Specification Selection
20. • Phase One of two phases - 527 total unit mixed use,
LEED Silver project with 100kw solar and 45k sf retail
• $141M total construction cost
• 338 units – 895 sf average
• 325,000 rentable sf – 933 parking stalls
• 3 and 4 story wood structures over 2 level concrete
parking garage/podium
Responsible for:
• Extensive value engineering
• Construction Document Management/Coordination
• Full coordination of all disciplines
• Construction administration and quality control
• Specification and product selection
• LEED Retrofit Supervision and Coordination